NEM Gas Baseload Stats

CCGT and steam-cycle gas thermal plant across the NEM — baseload and mid-merit units, not open-cycle peakers. Stats for the selected period. Data through 08 Nov 2026, 03:40 AEST.

Browse by type
Energy revenue (× MLF)
$18.89M
FCAS revenue (× MLF)
$5.7k
FCAS volume
6,599.8 MWh
Dispatched
147,509.2 MWh
Capacity factor
7.2%
Generators
11

Energy revenue = cleared MW × (5/60 h) × regional RRP × MLF. FCAS revenue = sum of cleared FCAS MW × (5/60 h) × regional FCAS price × MLF (raise/lower 6s, 60s, 5min, reg). FCAS volume = total FCAS enablement MWh across all services. Capacity factor = dispatched MWh ÷ (nameplate MW × period hours). SRMC from financial assumptions. Not AEMO settlement data.

Site DUID Region Tech Energy rev. (× MLF) FCAS rev. (× MLF) FCAS MWh MWh dispatch MWh available Capacity factor Est. SRMC
Tallawarra TALWA1 NSW1 Turbine - CCGT $9.63M $0 — 38,046.0 58,315.2 13.2% $84.30 View
Pelican Point PPCCGT SA1 Turbine - CCGT $5.99M $0 — 67,204.9 87,559.7 17.6% $84.30 View
Torrens Island B TORRB3 SA1 Turbine - Steam Sub Critical $2.72M $5.7k 6,599.8 36,403.1 112,807.3 25.3% $2.00 View
Newport NPS VIC1 Turbine - Steam Sub Critical $238.6k $0 — 1,819.2 2,540.0 0.5% $2.00 View
Yarwun 1 YARWUN_1 QLD1 Turbine - CCGT $193.8k $0 — 2,092.7 19,675.5 1.6% $84.30 View
Osborne OSB-AG SA1 Turbine - CCGT $70.1k $0 — 695.0 797.0 0.5% $84.30 View
Torrens Island B TORRB4 SA1 Turbine - Steam Sub Critical $52.4k $0 — 1,248.3 6,105.0 0.9% $2.00 View
Torrens Island B TORRB2 SA1 Turbine - Steam Sub Critical $0 $0 — — — 0.0% $5.47 View
Tamar Valley Combined Cycle TVCC201 TAS1 Turbine - CCGT $0 $0 — — — 0.0% $84.30 View
Townsville Power Station YABULU2 QLD1 Turbine - CCGT $0 $0 — — — 0.0% $84.30 View
Townsville Power Station YABULU QLD1 Turbine - CCGT $0 $0 — — — 0.0% $84.30 View