NEM Gas Baseload Stats

CCGT and steam-cycle gas thermal plant across the NEM — baseload and mid-merit units, not open-cycle peakers. Stats for the selected period. Data through 14 Jun 2026, 23:59 AEST.

Browse by type
Energy revenue (× MLF)
$574.2k
FCAS revenue (× MLF)
$18
FCAS volume
94.6 MWh
Dispatched
10,503.4 MWh
Capacity factor
14.4%
Generators
12

Energy revenue = cleared MW × (5/60 h) × regional RRP × MLF. FCAS revenue = sum of cleared FCAS MW × (5/60 h) × regional FCAS price × MLF (raise/lower 6s, 60s, 5min, reg). FCAS volume = total FCAS enablement MWh across all services. Capacity factor = dispatched MWh ÷ (nameplate MW × period hours). SRMC from financial assumptions. Not AEMO settlement data.

Site DUID Region Tech Energy rev. (× MLF) FCAS rev. (× MLF) FCAS MWh MWh dispatch MWh available Capacity factor Est. SRMC
Yarwun 1 YARWUN_1 QLD1 Turbine - CCGT $196.5k $0 3,370.4 3,960.0 78.0% $84.30 View
Osborne OSB-AG SA1 Turbine - CCGT $183.6k $0 3,247.6 3,406.1 75.2% $84.30 View
Pelican Point PPCCGT SA1 Turbine - CCGT $155.1k $0 2,934.3 4,392.0 23.1% $84.30 View
Torrens Island B TORRB2 SA1 Turbine - Steam Sub Critical $39.0k $18 94.6 951.2 4,266.7 19.8% $5.47 View
Newport NPS VIC1 Turbine - Steam Sub Critical $0 $0 0.0% $2.00 View
Tallawarra TALWA1 NSW1 Turbine - CCGT $0 $0 0.0% $84.30 View
Torrens Island B TORRB1 SA1 Turbine - Steam Sub Critical $0 $0 0.0% $2.00 View
Torrens Island B TORRB3 SA1 Turbine - Steam Sub Critical $0 $0 0.0% $2.00 View
Torrens Island B TORRB4 SA1 Turbine - Steam Sub Critical $0 $0 0.0% $2.00 View
Tamar Valley Combined Cycle TVCC201 TAS1 Turbine - CCGT $0 $0 0.0% $84.30 View
Townsville Power Station YABULU QLD1 Turbine - CCGT $0 $0 0.0% $84.30 View
Townsville Power Station YABULU2 QLD1 Turbine - CCGT $0 $0 0.0% $84.30 View