NEM Gas Baseload Stats

CCGT and steam-cycle gas thermal plant across the NEM — baseload and mid-merit units, not open-cycle peakers. Stats for the selected period. Data through 15 Jun 2026, 12:20 AEST.

Browse by type
Energy revenue (× MLF)
$178.4k
FCAS revenue (× MLF)
$0
FCAS volume
MWh
Dispatched
3,038.9 MWh
Capacity factor
8.1%
Generators
12

Energy revenue = cleared MW × (5/60 h) × regional RRP × MLF. FCAS revenue = sum of cleared FCAS MW × (5/60 h) × regional FCAS price × MLF (raise/lower 6s, 60s, 5min, reg). FCAS volume = total FCAS enablement MWh across all services. Capacity factor = dispatched MWh ÷ (nameplate MW × period hours). SRMC from financial assumptions. Not AEMO settlement data.

Site DUID Region Tech Energy rev. (× MLF) FCAS rev. (× MLF) FCAS MWh MWh dispatch MWh available Capacity factor Est. SRMC
Osborne OSB-AG SA1 Turbine - CCGT $66.8k $0 1,109.9 779.9 50.0% $84.30 View
Pelican Point PPCCGT SA1 Turbine - CCGT $58.4k $0 976.4 939.2 15.0% $84.30 View
Yarwun 1 YARWUN_1 QLD1 Turbine - CCGT $53.2k $0 952.6 673.7 42.9% $84.30 View
Newport NPS VIC1 Turbine - Steam Sub Critical $0 $0 0.0% $2.00 View
Tallawarra TALWA1 NSW1 Turbine - CCGT $0 $0 0.0% $84.30 View
Torrens Island B TORRB1 SA1 Turbine - Steam Sub Critical $0 $0 0.0% $2.00 View
Torrens Island B TORRB2 SA1 Turbine - Steam Sub Critical $0 $0 0.0% $5.47 View
Torrens Island B TORRB3 SA1 Turbine - Steam Sub Critical $0 $0 0.0% $2.00 View
Torrens Island B TORRB4 SA1 Turbine - Steam Sub Critical $0 $0 0.0% $2.00 View
Tamar Valley Combined Cycle TVCC201 TAS1 Turbine - CCGT $0 $0 0.0% $84.30 View
Townsville Power Station YABULU QLD1 Turbine - CCGT $0 $0 0.0% $84.30 View
Townsville Power Station YABULU2 QLD1 Turbine - CCGT $0 $0 0.0% $84.30 View