NEM Other Generators Stats

Biomass, landfill gas, diesel, and other NEM units not in the main technology groups. Stats for the selected period. Data through 08 Nov 2026, 07:10 AEST.

Browse by type
Energy revenue (× MLF)
$16.8k
FCAS revenue (× MLF)
$880
FCAS volume
387.3 MWh
Dispatched
223.2 MWh
Capacity factor
2.4%
Generators
17

Energy revenue = cleared MW × (5/60 h) × regional RRP × MLF. FCAS revenue = sum of cleared FCAS MW × (5/60 h) × regional FCAS price × MLF (raise/lower 6s, 60s, 5min, reg). FCAS volume = total FCAS enablement MWh across all services. Capacity factor = dispatched MWh ÷ (nameplate MW × period hours). SRMC from financial assumptions. Not AEMO settlement data.

Site DUID Region Tech Energy rev. (× MLF) FCAS rev. (× MLF) FCAS MWh MWh dispatch MWh available Capacity factor Est. SRMC
Broadwater BWTR1 NSW1 Turbine - Steam Sub Critical $11.9k $0 — 167.4 — 61.5% $124.22 View
Condong CONDONG1 NSW1 Turbine - Steam Sub Critical $6.2k $0 — 98.3 — 45.7% $112.12 View
Mt Stuart MSTUART1 QLD1 Turbine - OCGT $58 $0 — 1.6 563.5 0.2% $2.00 View
Eraring GT ERGT01 NSW1 Turbine - OCGT $0 $0 — — — 0.0% $96.96 View
Broken Hill GT GB01 NSW1 Turbine - OCGT $0 $0 — — — 0.0% $2.11 View
Hunter EconomicZone HEZ1 NSW1 Reciprocating Engine - Compression ignition $0 $0 — — 81.7 0.0% $308.00 View
Lonsdale LONSDALE SA1 Reciprocating Engine - Compression ignition $0 $0 — — 81.7 0.0% $308.00 View
Mt Stuart MSTUART2 QLD1 Turbine - OCGT $0 $0 — — — 0.0% $148.45 View
Mt Stuart MSTUART3 QLD1 Turbine - OCGT $0 $0 — — 465.4 0.0% $2.00 View
Port Lincoln GT POR01 SA1 Turbine - OCGT $0 $0 — — — 0.0% $2.00 View
Port Lincoln GT POR03 SA1 Turbine - OCGT $0 $0 — — — 0.0% $2.00 View
Port Stanvac 1 PTSTAN1 SA1 Reciprocating Engine - Compression ignition $0 $0 — — 228.7 0.0% $308.00 View
Snuggery SNUG1 SA1 Turbine - OCGT $0 $0 — — — 0.0% $2.00 View
Tully Sugar Mill TULLYSM1 QLD1 Turbine - Steam Super Critical $0 $0 — — — 0.0% $117.00 View
Angaston ANGAST1 SA1 Reciprocating Engine - Compression ignition $-13 $0 — -0.5 187.8 -0.2% $0.00 View
Rocky Point Sugar Mill Cogeneration Plant RPCG QLD1 Other - Other $-368 $0 — -5.6 — -2.6% $117.00 View
Western Downs Gas Peaking Plant - KCI WDBESS2 QLD1 Turbine - CCGT $-895 $880 387.3 -37.9 491.3 -1.3% $2.00 View