NEM Gas Baseload Stats

CCGT and steam-cycle gas thermal plant across the NEM — baseload and mid-merit units, not open-cycle peakers. Stats for the selected period. Data through 07 Nov 2026, 03:50 AEST.

Browse by type
Energy revenue (× MLF)
$3.26M
FCAS revenue (× MLF)
$1.1k
FCAS volume
1,253.1 MWh
Dispatched
32,190.4 MWh
Capacity factor
7.7%
Generators
11

Energy revenue = cleared MW × (5/60 h) × regional RRP × MLF. FCAS revenue = sum of cleared FCAS MW × (5/60 h) × regional FCAS price × MLF (raise/lower 6s, 60s, 5min, reg). FCAS volume = total FCAS enablement MWh across all services. Capacity factor = dispatched MWh ÷ (nameplate MW × period hours). SRMC from financial assumptions. Not AEMO settlement data.

Site DUID Region Tech Energy rev. (× MLF) FCAS rev. (× MLF) FCAS MWh MWh dispatch MWh available Capacity factor Est. SRMC
Pelican Point PPCCGT SA1 Turbine - CCGT $1.66M $0 — 16,467.9 18,668.9 21.1% $84.30 View
Torrens Island B TORRB3 SA1 Turbine - Steam Sub Critical $800.3k $1.1k 1,253.1 9,183.6 20,016.7 31.1% $2.00 View
Tallawarra TALWA1 NSW1 Turbine - CCGT $800.0k $0 — 6,539.0 9,576.5 11.1% $84.30 View
Newport NPS VIC1 Turbine - Steam Sub Critical $0 $0 — — — 0.0% $2.00 View
Osborne OSB-AG SA1 Turbine - CCGT $0 $0 — — — 0.0% $84.30 View
Torrens Island B TORRB2 SA1 Turbine - Steam Sub Critical $0 $0 — — — 0.0% $5.47 View
Torrens Island B TORRB4 SA1 Turbine - Steam Sub Critical $0 $0 — — — 0.0% $2.00 View
Tamar Valley Combined Cycle TVCC201 TAS1 Turbine - CCGT $0 $0 — — — 0.0% $84.30 View
Townsville Power Station YABULU QLD1 Turbine - CCGT $0 $0 — — — 0.0% $84.30 View
Townsville Power Station YABULU2 QLD1 Turbine - CCGT $0 $0 — — — 0.0% $84.30 View
Yarwun 1 YARWUN_1 QLD1 Turbine - CCGT $0 $0 — — — 0.0% $84.30 View