MLF-adjusted revenue, dispatch, capacity factor, and estimated SRMC from AEMO 5‑minute dispatch data. Data through 05 Nov 2026, 12:10 AEST.
Energy revenue = cleared MW × (5/60 h) × regional RRP × MLF. FCAS revenue = sum of cleared FCAS MW × (5/60 h) × regional FCAS price × MLF (raise/lower 6s, 60s, 5min, reg). FCAS volume = total FCAS enablement MWh across all services. Capacity factor = dispatched MWh ÷ (nameplate MW × period hours). SRMC from financial assumptions. Not AEMO settlement data.
| Site | DUID | Region | Tech | Energy rev. (× MLF) | FCAS rev. (× MLF) | FCAS MWh | MWh dispatch | MWh available | Capacity factor | Est. SRMC | |
|---|---|---|---|---|---|---|---|---|---|---|---|
| Bayswater | BW02 |
NSW1 | Turbine - Steam Sub Critical | $6.10M | $1.4k | 989.5 | 61,720.2 | 68,131.7 | 83.3% | $26.23 | View |
| Bayswater | BW04 |
NSW1 | Turbine - Steam Sub Critical | $6.04M | $1.3k | 982.5 | 61,115.6 | 67,217.8 | 82.5% | $55.48 | View |
| Eraring | ER03 |
NSW1 | Turbine - Steam Sub Critical | $5.93M | $267 | 38.0 | 56,258.1 | 65,905.8 | 72.2% | $49.77 | View |
| Bayswater | BW01 |
NSW1 | Turbine - Steam Sub Critical | $5.93M | $1.2k | 854.3 | 59,824.3 | 65,674.6 | 83.8% | $53.57 | View |
| Mt Piper | MP1 |
NSW1 | Turbine - Steam Sub Critical | $5.47M | $0 | — | 50,984.6 | 72,900.0 | 64.6% | $49.24 | View |
| Eraring | ER01 |
NSW1 | Turbine - Steam Sub Critical | $5.42M | $153 | 23.6 | 52,744.7 | 61,460.8 | 67.7% | $48.29 | View |
| Loy Yang B | LOYYB1 |
VIC1 | Turbine - Steam Sub Critical | $4.65M | $273 | 968.9 | 60,664.6 | 57,347.0 | 96.7% | $47.20 | View |
| Loy Yang B | LOYYB2 |
VIC1 | Turbine - Steam Sub Critical | $4.61M | $192 | 1,069.4 | 60,500.5 | 57,033.6 | 96.4% | $47.20 | View |
| Vales Point B | VP5 |
NSW1 | Turbine - Steam Sub Critical | $4.41M | $3 | 17.1 | 42,061.4 | 65,515.0 | 58.9% | $52.60 | View |
| Loy Yang A Power Station | LYA4 |
VIC1 | Turbine - Steam Sub Critical | $4.23M | $259 | 912.4 | 50,296.3 | 53,137.1 | 83.0% | $47.20 | View |
| Loy Yang A Power Station | LYA3 |
VIC1 | Turbine - Steam Sub Critical | $4.23M | $246 | 879.5 | 50,292.8 | 53,555.0 | 83.0% | $47.20 | View |
| Loy Yang A Power Station | LYA2 |
VIC1 | Turbine - Steam Sub Critical | $4.12M | $300 | 235.2 | 50,699.9 | 52,487.5 | 88.4% | $47.20 | View |
| Vales Point B | VP6 |
NSW1 | Turbine - Steam Sub Critical | $3.90M | $3 | 17.3 | 38,317.0 | 50,320.8 | 53.7% | $52.60 | View |
| Millmerran Power Plant | MPP_2 |
QLD1 | Turbine - Steam Super Critical | $3.54M | $0 | — | 43,212.6 | 41,759.1 | 93.8% | $52.60 | View |
| Callide C | CPP_4 |
QLD1 | Turbine - Steam Super Critical | $3.17M | $0 | — | 39,015.7 | 40,301.7 | 85.9% | $101.94 | View |
| Callide C | CPP_3 |
QLD1 | Turbine - Steam Super Critical | $3.16M | $0 | — | 38,734.8 | 39,722.0 | 84.5% | $44.41 | View |
| Yallourn W | YWPS4 |
VIC1 | Turbine - Steam Sub Critical | $2.98M | $0 | — | 38,985.8 | 37,890.0 | 96.1% | $47.20 | View |
| Tarong | TARONG#1 |
QLD1 | Turbine - Steam Sub Critical | $2.80M | $6 | 0.4 | 32,394.8 | 33,808.3 | 85.6% | $52.60 | View |
| Tarong North | TNPS1 |
QLD1 | Turbine - Steam Super Critical | $2.80M | $0 | — | 33,615.7 | 36,555.0 | 69.1% | $52.60 | View |
| Tarong | TARONG#2 |
QLD1 | Turbine - Steam Sub Critical | $2.80M | $519 | 82.3 | 32,364.4 | 33,808.3 | 85.5% | $55.48 | View |
| Tarong | TARONG#4 |
QLD1 | Turbine - Steam Sub Critical | $2.80M | $525 | 92.8 | 32,448.3 | 33,653.3 | 85.7% | $52.58 | View |
| Murray 2 | MURRAY |
VIC1 | Hydro - Dam | $2.79M | $1.3k | 1,143.6 | 22,857.6 | 105,027.3 | 35.2% | $1.00 | View |
| Stanwell | STAN-1 |
QLD1 | Turbine - Steam Sub Critical | $2.66M | $365 | 92.2 | 32,348.7 | 34,329.6 | 81.9% | $52.60 | View |
| Yallourn W | YWPS1 |
VIC1 | Turbine - Steam Sub Critical | $2.62M | $0 | — | 35,309.4 | 32,847.5 | 93.3% | $47.20 | View |
| Stanwell | STAN-2 |
QLD1 | Turbine - Steam Sub Critical | $2.53M | $427 | 77.0 | 31,194.4 | 33,632.1 | 79.0% | $52.60 | View |
| Gordon | GORDON |
TAS1 | Hydro - Dam | $2.52M | $7.5k | 3,122.5 | 26,182.4 | 28,411.8 | 56.0% | $1.05 | View |
| Kogan Creek | KPP_1 |
QLD1 | Turbine - Steam Super Critical | $2.24M | $0 | — | 31,704.7 | 27,686.8 | 39.4% | $52.60 | View |
| Callide B | CALL_B_1 |
QLD1 | Turbine - Steam Sub Critical | $2.10M | $42 | 5.4 | 26,356.6 | 34,952.9 | 69.6% | $32.60 | View |
| Callide B | CALL_B_2 |
QLD1 | Turbine - Steam Sub Critical | $1.93M | $0 | — | 25,629.3 | 25,019.2 | 67.7% | $55.48 | View |
| Upper Tumut | UPPTUMUT |
NSW1 | Hydro - Dam | $1.89M | $1.8k | 2,063.1 | 16,251.9 | 52,279.6 | 24.4% | $1.00 | View |
| Poatina | POAT220 |
TAS1 | Hydro - Dam | $1.80M | $6.8k | 3,518.2 | 16,206.3 | 24,020.0 | 74.9% | $1.00 | View |
| Gladstone | GSTONE4 |
QLD1 | Turbine - Steam Sub Critical | $1.71M | $259 | 76.0 | 20,223.4 | 26,816.7 | 66.8% | $52.60 | View |
| Gladstone | GSTONE2 |
QLD1 | Turbine - Steam Sub Critical | $1.66M | $686 | 178.7 | 19,476.5 | 27,638.3 | 64.3% | $49.17 | View |
| Gladstone | GSTONE5 |
QLD1 | Turbine - Steam Sub Critical | $1.66M | $661 | 198.7 | 19,441.5 | 26,380.8 | 64.2% | $58.48 | View |
| Stanwell | STAN-3 |
QLD1 | Turbine - Steam Sub Critical | $1.64M | $20 | 1.7 | 20,786.6 | 22,385.0 | 52.6% | $52.60 | View |
| Stanwell | STAN-4 |
QLD1 | Turbine - Steam Sub Critical | $1.63M | $0 | — | 21,476.8 | 21,108.3 | 54.4% | $52.60 | View |
| Gladstone | GSTONE1 |
QLD1 | Turbine - Steam Sub Critical | $1.63M | $487 | 159.3 | 19,171.3 | 25,197.5 | 63.3% | $52.99 | View |
| Gladstone | GSTONE6 |
QLD1 | Turbine - Steam Sub Critical | $1.54M | $679 | 212.0 | 18,289.6 | 26,923.7 | 60.4% | $54.96 | View |
| MacIntyre Wind Farm | MCINTYR1 |
QLD1 | Wind Turbine - Onshore | $1.36M | $0 | — | 18,067.9 | 16,681.8 | 18.1% | $0.58 | View |
| Clarke Creek Wind Farm | CLRKCWF1 |
QLD1 | Wind Turbine - Onshore | $1.16M | $0 | — | 11,976.7 | 12,245.8 | 32.0% | $0.00 | View |
| Rye Park Wind Farm | RYEPARK1 |
NSW1 | Wind Turbine - Onshore | $1.09M | $0 | — | 12,639.3 | 11,063.8 | 29.5% | $0.50 | View |
| Pelican Point | PPCCGT |
SA1 | Turbine - CCGT | $1.07M | $0 | — | 10,758.9 | 12,690.7 | 18.8% | $84.30 | View |
| Coopers Gap Wind Farm | COOPGWF1 |
QLD1 | Wind Turbine - Onshore | $952.4k | $0 | — | 10,592.9 | 11,380.5 | 21.6% | $0.68 | View |
| John Butters | JBUTTERS |
TAS1 | Hydro - Dam | $909.8k | $4.6k | 1,171.1 | 8,257.8 | 14,412.0 | 53.0% | $0.00 | View |
| Stockyard Hill Wind Farm | STOCKYD1 |
VIC1 | Wind Turbine - Onshore | $858.6k | $0 | — | 15,171.2 | 14,650.2 | 26.6% | $0.50 | View |
| Wellington North Solar Farm (Lightsource) | WELNSF1 |
NSW1 | Solar PV - Single axis tracking | $854.0k | $0 | — | 13,123.7 | 11,351.5 | 27.8% | $0.25 | View |
| Tallawarra | TALWA1 |
NSW1 | Turbine - CCGT | $800.0k | $0 | — | 6,539.0 | 9,576.5 | 15.1% | $84.30 | View |
| Barker Inlet Power Station | BARKIPS1 |
SA1 | Reciprocating Engine - Spark ignition | $723.0k | $0 | — | 5,326.7 | 18,525.3 | 23.5% | $9.00 | View |
| Catagunya / Liapootah / Wayatinah | LI_WY_CA |
TAS1 | Hydro - Dam | $716.0k | $276 | 268.6 | 7,481.8 | 17,507.6 | 39.1% | $1.05 | View |
| Tumut 3 | TUMUT3 |
NSW1 | Hydro - Dam | $689.8k | $600 | 1,279.8 | 6,712.1 | 178,208.4 | 4.1% | $1.05 | View |
| Mortlake | MORTLK11 |
VIC1 | Turbine - OCGT | $677.1k | $0 | — | 5,255.7 | 23,545.1 | 16.6% | $128.50 | View |
| Reece | REECE2 |
TAS1 | Hydro - Dam | $656.2k | $2.8k | 2,168.7 | 6,017.0 | 10,473.7 | 48.1% | $1.00 | View |
| Silverton Wind Farm | STWF1 |
NSW1 | Wind Turbine - Onshore | $649.4k | $0 | — | 6,881.7 | 6,135.4 | 32.0% | $0.50 | View |
| Wollar Solar Farm | WOLARSF1 |
NSW1 | Solar PV - Single axis tracking | $621.8k | $0 | — | 9,596.0 | 8,227.5 | 31.7% | $0.25 | View |
| Torrens Island B | TORRB3 |
SA1 | Turbine - Steam Sub Critical | $555.3k | $759 | 821.5 | 6,049.4 | 15,216.7 | 28.0% | $2.00 | View |
| Tarraleah | TARRALEA |
TAS1 | Hydro - Dam | $552.2k | $0 | — | 6,272.7 | 5,767.6 | 64.4% | $1.00 | View |
| Tribute | TRIBUTE |
TAS1 | Hydro - Dam | $550.1k | $1.2k | 728.3 | 5,229.3 | 9,187.7 | 58.4% | $1.00 | View |
| Stubbo Solar Farm | STUBSF1 |
NSW1 | Solar PV - Single axis tracking | $535.0k | $0 | — | 8,052.5 | 6,926.4 | 37.6% | $0.25 | View |
| Stubbo Solar Farm | STUBSF2 |
NSW1 | Solar PV - Single axis tracking | $533.8k | $0 | — | 7,995.4 | 6,903.1 | 36.6% | $0.25 | View |
| Yallourn W | YWPS3 |
VIC1 | Turbine - Steam Sub Critical | $527.8k | $0 | — | 7,467.3 | 7,301.2 | 18.4% | $47.20 | View |
| Western Downs Green Power Hub P/L | WDGPH1 |
QLD1 | Solar PV - Single axis tracking | $521.5k | $227 | 34.2 | 14,541.5 | 12,204.4 | 33.6% | $0.32 | View |
| Dulacca Wind Farm | DULAWF1 |
QLD1 | Wind Turbine - Onshore | $518.5k | $0 | — | 6,523.4 | 6,225.7 | 34.9% | $0.53 | View |
| Poatina | POAT110 |
TAS1 | Hydro - Dam | $515.9k | $5.9k | 1,049.7 | 5,359.3 | 6,005.0 | 49.5% | $1.00 | View |
| Darling Downs | DDPS1 |
QLD1 | Turbine - CCGT | $450.1k | $0 | — | 4,178.7 | 4,364.7 | 6.0% | $3.31 | View |
| Goyder South Wind Farm 1A | GSWF1A |
SA1 | Wind Turbine - Onshore | $449.8k | $0 | — | 6,683.4 | 7,475.0 | 29.6% | $0.55 | View |
| Broadsound Solar Farm | BRDDSF01 |
QLD1 | Solar PV - Single axis tracking | $440.8k | $0 | — | 10,798.9 | 9,923.2 | 27.1% | $0.27 | View |
| Culcairn Solar Farm | CUSF1 |
NSW1 | Solar PV - Single axis tracking | $430.9k | $0 | — | 7,003.1 | 9,310.8 | 18.5% | $0.25 | View |
| Bastyan | BASTYAN |
TAS1 | Hydro - Dam | $422.4k | $1.2k | 443.5 | 3,882.8 | 5,540.0 | 44.9% | $0.00 | View |
| Mackintosh | MACKNTSH |
TAS1 | Hydro - Dam | $414.4k | $1.1k | 461.6 | 3,843.8 | 8,082.7 | 44.5% | $1.00 | View |
| Flyers Creek Wind Farm | FLYCRKWF |
NSW1 | Wind Turbine - Onshore | $407.6k | $0 | — | 4,100.2 | 3,653.6 | 26.0% | $0.58 | View |
| Goyder South Wind Farm 1B | GSWF1B1 |
SA1 | Wind Turbine - Onshore | $406.1k | $0 | — | 5,661.3 | 6,917.8 | 25.7% | $0.00 | View |
| Collector | COLWF01 |
NSW1 | Wind Turbine - Onshore | $398.0k | $0 | — | 4,724.0 | 4,269.9 | 19.3% | $0.65 | View |
| Eraring | ER04 |
NSW1 | Turbine - Steam Sub Critical | $377.8k | $9 | 1.2 | 4,873.7 | 12,341.5 | 6.3% | $55.48 | View |
| Murra Warra Wind Farm - stage 1 | MUWAWF1 |
VIC1 | Wind Turbine - Onshore | $377.5k | $0 | — | 5,717.2 | 6,530.5 | 23.4% | $0.50 | View |
| Darlington Point Solar Farm | DARLSF1 |
NSW1 | Solar PV - Single axis tracking | $370.0k | $0 | — | 6,194.8 | 4,799.6 | 20.8% | $0.33 | View |
| Reece | REECE1 |
TAS1 | Hydro - Dam | $362.7k | $4.7k | 1,952.2 | 3,328.6 | 7,955.0 | 26.6% | $1.00 | View |
| Gullen Range Wind Farm | GULLRWF1 |
NSW1 | Wind Turbine - Onshore | $361.5k | $0 | — | 4,431.1 | 3,787.1 | 24.8% | $0.53 | View |
| Musselroe Wind Farm | MUSSELR1 |
TAS1 | Wind Turbine - Onshore | $361.1k | $0 | — | 4,801.1 | 4,757.9 | 26.4% | $0.50 | View |
| Hume Dam NSW | HUMENSW |
NSW1 | Hydro - Dam | $359.3k | $0 | — | 3,919.0 | 3,703.1 | 100.0% | $1.05 | View |
| Clarke Creek Wind Farm | CLRKCWF2 |
QLD1 | Wind Turbine - Onshore | $357.1k | $0 | — | 3,733.9 | 3,734.4 | 33.4% | $0.58 | View |
| Wellington Solar Farm | WELLSF1 |
NSW1 | Solar PV - Single axis tracking | $342.4k | $0 | — | 5,586.0 | 5,140.6 | 23.9% | $0.25 | View |
| Bango 973 Wind Farm | BANGOWF1 |
NSW1 | Wind Turbine - Onshore | $337.6k | $0 | — | 3,948.8 | 3,619.0 | 23.0% | $0.00 | View |
| Moorabool Wind Farm | MOORAWF1 |
VIC1 | Wind Turbine - Onshore | $336.3k | $0 | — | 7,239.0 | 7,083.6 | 21.5% | $0.50 | View |
| New England Solar Farm | NEWENSF2 |
NSW1 | Solar PV - Single axis tracking | $331.1k | $0 | — | 4,768.0 | 4,336.1 | 22.0% | $0.25 | View |
| Suntop Solar Farm | SUNTPSF1 |
NSW1 | Solar PV - Single axis tracking | $327.5k | $0 | — | 5,176.5 | 4,805.1 | 31.9% | $0.25 | View |
| Bodangora Wind Farm | BODWF1 |
NSW1 | Wind Turbine - Onshore | $320.8k | $0 | — | 3,473.2 | 3,031.0 | 28.4% | $0.68 | View |
| Sapphire Wind Farm | SAPHWF1 |
SA1 | Wind Turbine - Onshore | $317.3k | $0 | — | 6,347.3 | 5,830.9 | 21.7% | $0.50 | View |
| Aldoga Solar Farm | ALDGASF1 |
QLD1 | Solar PV - Single axis tracking | $312.8k | $0 | — | 11,239.3 | 11,532.1 | 26.8% | $0.00 | View |
| Crudine Ridge Wind Farm | CRURWF1 |
NSW1 | Wind Turbine - Onshore | $312.3k | $0 | — | 3,863.2 | 3,286.7 | 25.2% | $0.53 | View |
| Gullen Range Wind Farm 2 | GULLRWF2 |
NSW1 | Wind Turbine - Onshore | $311.5k | $0 | — | 3,606.8 | 3,192.4 | 30.1% | $0.50 | View |
| Capital Wind Farm | CAPTL_WF |
NSW1 | Wind Turbine - Onshore | $304.8k | $0 | — | 3,536.4 | — | 23.2% | $0.00 | View |
| Avonlie Solar Farm | AVLSF1 |
NSW1 | Solar PV - Single axis tracking | $294.1k | $0 | — | 5,324.9 | 4,360.9 | 19.4% | $0.00 | View |
| New England Solar Farm | NEWENSF1 |
NSW1 | Solar PV - Single axis tracking | $292.7k | $0 | — | 4,241.0 | 3,909.2 | 19.6% | $0.25 | View |
| Murra Warra Wind Farm - stage 2 | MUWAWF2 |
VIC1 | Wind Turbine - Onshore | $291.0k | $0 | — | 4,626.9 | 5,282.5 | 20.5% | $0.50 | View |
| Waubra | WAUBRAWF |
VIC1 | Wind Turbine - Onshore | $282.7k | $0 | — | 5,243.0 | — | 25.2% | $0.50 | View |
| Supernode BESS | SNB02 |
QLD1 | Storage - Battery | $281.7k | $4.8k | 2,065.5 | -1,386.3 | 23,233.0 | -4.9% | $1.50 | View |
| Blowering | BLOWERNG |
NSW1 | Hydro - Dam | $271.0k | $0 | — | 2,986.4 | 2,744.7 | 34.5% | $0.00 | View |
| Lincoln Gap Wind Farm - stage 1 | LGAPWF1 |
SA1 | Wind Turbine - Onshore | $263.3k | $0 | — | 3,467.3 | 3,917.0 | 25.4% | $0.50 | View |
| Hallett 4 North Brown Hill | NBHWF1 |
SA1 | Wind Turbine - Onshore | $262.6k | $0 | — | 3,387.2 | 4,532.3 | 23.7% | $0.80 | View |
| Taralga Wind Farm | TARALGA1 |
NSW1 | Wind Turbine - Onshore | $260.1k | $0 | — | 3,120.2 | 2,612.2 | 27.0% | $0.50 | View |
| Boco Rock Wind Farm | BOCORWF1 |
NSW1 | Wind Turbine - Onshore | $256.8k | $0 | — | 3,227.2 | 2,636.0 | 26.4% | $0.00 | View |
| Cattle Hill Wind Farm | CTHLWF1 |
TAS1 | Wind Turbine - Onshore | $255.5k | $0 | — | 2,714.2 | 2,471.4 | 17.4% | $0.66 | View |
| Ararat Wind Farm | ARWF1 |
VIC1 | Wind Turbine - Onshore | $252.5k | $0 | — | 4,640.5 | 4,389.3 | 17.9% | $0.00 | View |
| Bango 999 Wind Farm | BANGOWF2 |
NSW1 | Wind Turbine - Onshore | $244.1k | $0 | — | 2,909.0 | 2,474.5 | 31.7% | $0.00 | View |
| Nevertire Solar Farm | NEVERSF1 |
NSW1 | Solar PV - Single axis tracking | $243.7k | $0 | — | 3,759.6 | 3,710.2 | 33.2% | $0.25 | View |
| Golden Plains Wind Farm West | GPWFWST2 |
VIC1 | Wind Turbine - Onshore | $240.4k | $0 | — | 3,904.2 | 4,929.8 | 6.5% | $0.53 | View |
| Goorambat East Solar Farm (ENGIE) | GOESF1 |
VIC1 | Solar PV - Single axis tracking | $240.3k | $0 | — | 7,886.2 | 7,170.2 | 29.2% | $0.25 | View |
| Snowtown S2 Wind Farm | SNOWNTH1 |
SA1 | Wind Turbine - Onshore | $235.6k | $0 | — | 4,738.8 | 4,717.1 | 30.4% | $0.50 | View |
| White Rock Wind Farm - Stage 1 | WRWF1 |
NSW1 | Wind Turbine - Onshore | $234.6k | $0 | — | 3,065.5 | 2,705.2 | 16.2% | $0.50 | View |
| Sunraysia Solar Farm | SUNRSF1 |
NSW1 | Solar PV - Single axis tracking | $234.0k | $0 | — | 4,044.5 | 3,184.3 | 16.3% | $0.25 | View |
| Bulgana Green Power Hub - Wind Farm | BULGANA1 |
VIC1 | Wind Turbine - Onshore | $232.6k | $0 | — | 4,311.4 | 3,957.6 | 19.5% | $0.00 | View |
| Snowtown S2 Wind Farm | SNOWSTH1 |
SA1 | Wind Turbine - Onshore | $231.7k | $0 | — | 4,728.8 | 4,765.2 | 34.7% | $0.74 | View |
| Limondale Solar Farm 1 | LIMOSF11 |
NSW1 | Solar PV - Single axis tracking | $226.0k | $0 | — | 3,958.2 | 2,950.7 | 15.9% | $0.25 | View |
| Golden Plains Wind Farm East | GPWFEST1 |
VIC1 | Wind Turbine - Onshore | $225.7k | $0 | — | 3,669.8 | 5,020.9 | 13.7% | $0.00 | View |
| Gunnedah Solar Farm | GNNDHSF1 |
NSW1 | Solar PV - Single axis tracking | $222.3k | $0 | — | 3,597.0 | 3,735.3 | 30.2% | $0.33 | View |
| Somerton | AGLSOM |
VIC1 | Turbine - OCGT | $218.1k | $0 | — | 1,658.0 | 9,941.9 | 9.0% | $128.50 | View |
| Templers B BESS | TEMPB1 |
SA1 | Storage - Battery | $217.3k | $0 | — | -169.6 | 9,242.3 | -1.4% | $1.50 | View |
| Blyth BESS | BLYTHB1 |
SA1 | Storage - Battery | $217.2k | $7.7k | 6,214.6 | -604.1 | 19,931.2 | -2.8% | $4.86 | View |
| Snowtown Wind Farm | SNOWTWN1 |
SA1 | Wind Turbine - Onshore | $216.1k | $0 | — | 2,931.3 | 3,649.8 | 27.5% | $0.50 | View |
| Devils Gate | DEVILS_G |
TAS1 | Hydro - Dam | $215.9k | $1.2k | 481.5 | 1,849.7 | 6,405.3 | 28.5% | $1.00 | View |
| Columboola Solar Farm | COLUMSF1 |
QLD1 | Solar PV - Single axis tracking | $215.2k | $0 | — | 6,118.8 | 5,213.5 | 26.0% | $0.32 | View |
| Kiamal Solar Farm - Stage 1 | KIAMSF1 |
VIC1 | Solar PV - Single axis tracking | $214.8k | $0 | — | 6,719.0 | 6,758.6 | 31.1% | $0.00 | View |
| Moranbah North | MBAHNTH |
QLD1 | Reciprocating Engine - Spark ignition | $211.5k | $0 | — | 2,602.3 | — | 37.7% | $57.00 | View |
| Lincoln Gap Wind Farm - Stage 2 | LGAPWF2 |
SA1 | Wind Turbine - Onshore | $211.4k | $0 | — | 2,863.9 | 3,318.9 | 30.6% | $0.50 | View |
| Barron Gorge | BARRON-2 |
QLD1 | Hydro - Run of River | $209.2k | $0 | — | 2,096.9 | 2,395.7 | 55.4% | $0.00 | View |
| Crookwell 2 Wind Farm | CROOKWF2 |
NSW1 | Wind Turbine - Onshore | $208.9k | $0 | — | 2,577.2 | 2,174.5 | 24.8% | $0.69 | View |
| Ryan Corner Wind Farm | RYANCWF1 |
VIC1 | Wind Turbine - Onshore | $202.2k | $0 | — | 4,785.7 | 4,743.2 | 20.3% | $0.50 | View |
| Metz Solar Farm | METZSF1 |
NSW1 | Solar PV - Single axis tracking | $200.9k | $0 | — | 2,972.8 | 2,781.4 | 20.4% | $0.25 | View |
| Hornsdale Wind Farm Stage 3 | HDWF3 |
SA1 | Wind Turbine - Onshore | $198.5k | $0 | — | 4,539.5 | 4,424.3 | 37.5% | $0.68 | View |
| Waterloo Wind Farm | WATERLWF |
SA1 | Wind Turbine - Onshore | $197.9k | $0 | — | 3,991.3 | 4,178.4 | 28.2% | $0.50 | View |
| Hornsdale Wind Farm Stage 1 | HDWF1 |
SA1 | Wind Turbine - Onshore | $197.6k | $0 | — | 4,265.2 | 4,141.3 | 38.5% | $0.50 | View |
| Beryl Solar Farm | BERYLSF1 |
NSW1 | Solar PV - Single axis tracking | $194.6k | $0 | — | 3,027.3 | 2,650.3 | 28.4% | $0.25 | View |
| Hallett Stage 1 Brown Hill | HALLWF1 |
SA1 | Wind Turbine - Onshore | $194.1k | $0 | — | 2,323.8 | 3,432.9 | 22.7% | $0.71 | View |
| Dundonnell Wind Farm | DUNDWF1 |
VIC1 | Wind Turbine - Onshore | $193.3k | $0 | — | 2,868.1 | 3,703.4 | 15.8% | $0.66 | View |
| Edenvale Solar Park | EDENVSF1 |
QLD1 | Solar PV - Single axis tracking | $192.8k | $0 | — | 5,428.7 | 4,600.2 | 27.9% | $0.00 | View |
| Macarthur Wind Farm | MACARTH1 |
VIC1 | Wind Turbine - Onshore | $191.7k | $0 | — | 5,698.1 | 5,400.1 | 12.5% | $0.50 | View |
| Hornsdale Wind Farm Stage 2 | HDWF2 |
SA1 | Wind Turbine - Onshore | $190.9k | $0 | 0.4 | 4,187.4 | 4,068.2 | 37.8% | $0.69 | View |
| Nyngan Solar Plant | NYNGAN1 |
NSW1 | Solar PV - Fixed | $190.2k | $0 | — | 2,631.8 | 2,732.4 | 23.8% | $0.20 | View |
| Wandoan South Solar Stage 2 | WANDSF2 |
QLD1 | Solar PV - Single axis tracking | $189.6k | $0 | — | 3,085.7 | 4,067.1 | 8.9% | $0.25 | View |
| Golden Plains Wind Farm East | GPWFEST2 |
VIC1 | Wind Turbine - Onshore | $189.2k | $0 | — | 3,153.0 | 4,505.9 | 11.2% | $0.50 | View |
| Tamar Valley Peaking | TVPP104 |
TAS1 | Turbine - OCGT | $188.5k | $0 | — | 1,649.4 | 3,641.5 | 26.3% | $128.50 | View |
| Willogoleche Wind Farm | WGWF1 |
SA1 | Wind Turbine - Onshore | $188.3k | $0 | — | 2,702.6 | 2,702.6 | 20.9% | $0.50 | View |
| Trevallyn | TREVALLN |
TAS1 | Hydro - Dam | $186.1k | $29 | 43.5 | 1,894.9 | 8,786.7 | 18.8% | $1.00 | View |
| Kaban Wind Farm | KABANWF1 |
QLD1 | Wind Turbine - Onshore | $185.8k | $0 | — | 1,884.7 | 1,903.7 | 11.1% | $0.00 | View |
| Broadwater | BWTR1 |
NSW1 | Turbine - Steam Sub Critical | $185.1k | $0 | — | 1,935.5 | — | 47.1% | $124.22 | View |
| Woolnorth Studland Bay / Bluff Point | WOOLNTH1 |
TAS1 | Wind Turbine - Onshore | $184.9k | $0 | — | 2,844.4 | — | 19.1% | $0.53 | View |
| Daydream Solar Farm | DAYDSF1 |
QLD1 | Solar PV - Single axis tracking | $183.4k | $0 | — | 5,142.9 | 4,540.0 | 28.3% | $0.00 | View |
| Golden Plains Wind Farm West | GPWFWST1 |
VIC1 | Wind Turbine - Onshore | $179.5k | $0 | — | 3,399.4 | 3,828.2 | 5.6% | $0.53 | View |
| Kareeya | KAREEYA2 |
QLD1 | Hydro - Run of River | $178.2k | $0 | — | 2,240.2 | 2,201.8 | 95.9% | $1.00 | View |
| Kareeya | KAREEYA3 |
QLD1 | Hydro - Run of River | $177.8k | $0 | — | 2,213.5 | 2,201.8 | 94.7% | $1.05 | View |
| Eraring Big Battery | ERB01 |
NSW1 | Storage - Battery | $174.6k | $8 | 431.2 | -2,666.9 | 37,409.7 | -10.3% | $1.58 | View |
| Wandoan South Solar Stage 1 | WANDSF1 |
QLD1 | Solar PV - Single axis tracking | $170.2k | $0 | — | 2,905.3 | 3,828.1 | 16.8% | $0.25 | View |
| Waratah Super Battery | WTAHB1 |
NSW1 | Storage - Battery | $167.9k | $0 | — | -1,787.6 | 78,452.2 | -1.9% | $1.50 | View |
| Woolooga Solar Farm | WOOLGSF1 |
QLD1 | Solar PV - Single axis tracking | $165.7k | $0 | — | 3,882.7 | 4,391.5 | 16.1% | $0.25 | View |
| Golden Plains Wind Farm East | GPWFEST3 |
VIC1 | Wind Turbine - Onshore | $163.8k | $0 | — | 4,512.4 | 4,207.3 | 16.8% | $0.50 | View |
| Hallett Stage 2 Hallett Hill | HALLWF2 |
SA1 | Wind Turbine - Onshore | $162.3k | $0 | — | 1,964.8 | 2,899.0 | 25.4% | $0.00 | View |
| Ross River Solar Farm | RRSF1 |
QLD1 | Solar PV - Single axis tracking | $159.3k | $0 | — | 4,128.3 | 4,026.9 | 29.8% | $0.25 | View |
| Tarong BESS - Stanwell | TARBESS1 |
QLD1 | Storage - Battery | $159.1k | $3.9k | 11,809.3 | -912.2 | 18,680.8 | -2.8% | $1.50 | View |
| Cherry Tree Wind Farm | CHYTWF1 |
VIC1 | Wind Turbine - Onshore | $156.7k | $0 | — | 2,081.8 | 2,039.1 | 33.4% | $0.53 | View |
| Berrybank Wind Farm | BRYB1WF1 |
VIC1 | Wind Turbine - Onshore | $156.6k | $0 | — | 3,970.2 | 3,775.4 | 20.3% | $0.50 | View |
| Mortlake South Wind Farm | MRTLSWF1 |
VIC1 | Wind Turbine - Onshore | $153.4k | $0 | — | 3,553.5 | 3,293.3 | 20.9% | $0.50 | View |
| Swanbank BESS | SWANBBF1 |
QLD1 | Storage - Battery | $151.9k | $0 | — | -635.0 | 12,885.1 | -2.3% | $1.50 | View |
| Yendon Wind Farm | YENDWF1 |
VIC1 | Wind Turbine - Onshore | $150.9k | $0 | — | 2,954.7 | 2,909.7 | 18.9% | $0.50 | View |
| Haughton Solar Farm Stage 1 | HAUGHT11 |
QLD1 | Solar PV - Single axis tracking | $150.3k | $0 | — | 3,845.0 | 3,593.3 | 26.8% | $0.00 | View |
| Crookwell 3 Wind Farm | CROOKWF3 |
NSW1 | Wind Turbine - Onshore | $146.2k | $0 | — | 1,812.6 | 1,477.5 | 29.1% | $0.76 | View |
| Clare Solar Farm | CLARESF1 |
QLD1 | Solar PV - Single axis tracking | $145.3k | $0 | — | 3,423.1 | 3,411.8 | 28.7% | $0.00 | View |
| Gangarri Solar Farm | GANGARR1 |
QLD1 | Solar PV - Single axis tracking | $144.0k | $0 | — | 3,722.6 | 3,260.1 | 21.2% | $0.26 | View |
| Sun Metals Corporation Solar Farm | SMCSF1 |
QLD1 | Solar PV - Fixed | $141.9k | $0 | — | 3,362.9 | 3,278.7 | 21.7% | $0.00 | View |
| Dundonnell Wind Farm | DUNDWF3 |
VIC1 | Wind Turbine - Onshore | $141.6k | $0 | — | 2,706.3 | 2,808.9 | 20.5% | $0.53 | View |
| Orana BESS | ORABESS1 |
NSW1 | Storage - Battery | $139.7k | $5.1k | 3,288.6 | -2,293.2 | 37,442.8 | -5.1% | $1.50 | View |
| Coleambally Solar Farm | COLEASF1 |
NSW1 | Solar PV - Single axis tracking | $139.1k | $0 | — | 1,626.4 | 1,634.4 | 10.0% | $0.00 | View |
| Gunning Wind Farm | GUNNING1 |
NSW1 | Wind Turbine - Onshore | $138.8k | $0 | — | 1,650.2 | 1,470.7 | 32.8% | $0.50 | View |
| Lake Bonney 2 Wind Farm | LKBONNY2 |
SA1 | Wind Turbine - Onshore | $136.7k | $0 | — | 2,134.5 | 3,335.5 | 12.4% | $0.86 | View |
| Western Downs Battery - Stage 1 And 2 | WDBESS1 |
QLD1 | Storage - Battery | $135.0k | $4.7k | 3,157.8 | -530.4 | 19,689.7 | -1.9% | $1.58 | View |
| Torrens Island BESS | TIB1 |
SA1 | Storage - Battery | $135.0k | $3.9k | 14,948.9 | -583.1 | 15,674.8 | -2.2% | $1.50 | View |
| Barron Gorge | BARRON-1 |
QLD1 | Hydro - Run of River | $134.6k | $0 | — | 1,286.1 | 2,230.2 | 34.0% | $0.00 | View |
| Granville Harbour Wind Farm | GRANWF1 |
TAS1 | Wind Turbine - Onshore | $133.4k | $0 | — | 1,595.6 | 1,418.5 | 13.2% | $0.66 | View |
| Crowlands Wind Farm | CROWLWF1 |
VIC1 | Wind Turbine - Onshore | $130.8k | $0 | — | 2,244.2 | 2,205.9 | 26.0% | $0.68 | View |
| Bluegrass Solar Farm | BLUEGSF1 |
QLD1 | Solar PV - Single axis tracking | $130.3k | $0 | — | 3,798.6 | 3,314.6 | 23.7% | $0.29 | View |
| Bald Hills Wind Farm | BALDHWF1 |
VIC1 | Wind Turbine - Onshore | $128.8k | $0 | — | 3,115.2 | 2,451.6 | 27.0% | $0.00 | View |
| Walla Walla Solar Farm | WLWLSF1 |
NSW1 | Solar PV - Single axis tracking | $127.3k | $0 | — | 1,848.8 | 3,470.6 | 11.2% | $0.25 | View |
| Mannum BESS | MANNUMB1 |
SA1 | Storage - Battery | $126.1k | $4.4k | 1,951.8 | -415.0 | 9,609.6 | -3.8% | $1.50 | View |
| Walla Walla Solar Farm | WLWLSF2 |
NSW1 | Solar PV - Single axis tracking | $125.4k | $0 | — | 1,830.2 | 3,478.1 | 11.1% | $0.25 | View |
| Mount Emerald | MEWF1 |
QLD1 | Wind Turbine - Onshore | $125.0k | $0 | — | 1,438.8 | 1,467.4 | 7.4% | $0.50 | View |
| Glenellen Solar Farm | GESF1 |
NSW1 | Solar PV - Fixed | $123.2k | $0 | — | 1,976.7 | 3,607.3 | 7.0% | $0.00 | View |
| Portland Wind Farm | PORTWF |
VIC1 | Wind Turbine - Onshore | $122.9k | $0 | — | 3,062.6 | — | 18.7% | $0.50 | View |
| Clements Gap Wind Farm | CLEMGPWF |
SA1 | Wind Turbine - Onshore | $122.0k | $0 | — | 2,080.1 | 2,175.9 | 33.9% | $0.80 | View |
| Gunsynd Solar Farm | GUSF1 |
QLD1 | Solar PV - Fixed | $121.6k | $0 | — | 3,112.7 | 2,873.8 | 30.6% | $0.00 | View |
| Bomen Solar Farm | BOMENSF1 |
NSW1 | Solar PV - Single axis tracking | $120.4k | $0 | — | 2,146.6 | 2,068.3 | 16.4% | $0.25 | View |
| Woodlawn Wind Farm | WOODLWN1 |
NSW1 | Wind Turbine - Onshore | $120.2k | $0 | — | 1,314.6 | 1,203.4 | 25.2% | $0.50 | View |
| Condong | CONDONG1 |
NSW1 | Turbine - Steam Sub Critical | $119.4k | $0 | — | 1,347.3 | — | 41.5% | $112.12 | View |
| Mt Gellibrand Wind Farm | MTGELWF1 |
VIC1 | Wind Turbine - Onshore | $117.7k | $0 | — | 2,702.5 | 2,526.0 | 18.0% | $0.50 | View |
| Clements Gap - BESS | CGBESS01 |
SA1 | Storage - Battery | $117.3k | $0 | — | -125.3 | 5,503.8 | -1.9% | $1.58 | View |
| Supernode BESS | SNB01 |
QLD1 | Storage - Battery | $112.4k | $6.1k | 2,906.4 | -807.9 | 22,542.3 | -2.9% | $1.50 | View |
| Meadowbank | MEADOWBK |
TAS1 | Hydro - Dam | $111.0k | $362 | 73.8 | 1,114.1 | 4,016.7 | 25.7% | $1.00 | View |
| Hillston Sun Farm | HILLSTN1 |
NSW1 | Solar PV - Single axis tracking | $111.0k | $0 | — | 1,913.6 | 1,468.0 | 16.1% | $0.00 | View |
| Lilyvale Solar Farm | LILYSF1 |
QLD1 | Solar PV - Single axis tracking | $110.2k | $0 | — | 2,128.0 | 2,656.8 | 16.6% | $0.25 | View |
| Berrybank Wind Farm | BRYB2WF2 |
VIC1 | Wind Turbine - Onshore | $109.3k | $0 | — | 2,481.3 | 2,393.6 | 21.0% | $0.65 | View |
| Shoalhaven | SHGEN |
NSW1 | Storage - Pumped hydro | $107.5k | $0 | — | 1,056.2 | 2,686.7 | 4.0% | $1.20 | View |
| Yarranlea Solar Farm | YARANSF1 |
QLD1 | Solar PV - Single axis tracking | $106.4k | $0 | — | 1,870.1 | 2,387.0 | 14.3% | $0.25 | View |
| Kareeya | KAREEYA4 |
QLD1 | Hydro - Run of River | $106.2k | $0 | — | 1,197.2 | 1,211.8 | 51.2% | $1.66 | View |
| Greenbank BESS | GREENB1 |
QLD1 | Storage - Battery | $104.7k | $1.6k | 5,002.5 | -661.3 | 9,893.2 | -3.1% | $1.54 | View |
| Mt Mercer Wind Farm | MERCER01 |
VIC1 | Wind Turbine - Onshore | $103.3k | $0 | — | 2,079.3 | 2,198.7 | 14.7% | $0.50 | View |
| Darling Downs Solar Farm | DDSF1 |
QLD1 | Solar PV - Fixed | $102.1k | $0 | — | 3,054.0 | 2,610.8 | 23.3% | $0.28 | View |
| Guthega | GUTHEGA |
NSW1 | Hydro - Dam | $102.0k | $0 | — | 968.5 | 6,256.0 | 14.9% | $1.05 | View |
| Mornington BESS | MRNBESS1 |
VIC1 | Storage - Battery | $101.8k | $0 | — | -711.8 | 17,568.3 | -2.7% | $1.50 | View |
| Hallett 5 The Bluff WF | BLUFF1 |
SA1 | Wind Turbine - Onshore | $101.4k | $0 | — | 1,325.6 | 1,895.1 | 23.3% | $0.77 | View |
| Wemen Solar Farm | WEMENSF1 |
VIC1 | Solar PV - Single axis tracking | $100.7k | $0 | — | 2,673.6 | 2,921.1 | 25.4% | $0.25 | View |
| Glenrowan West Solar Farm | GLRWNSF1 |
VIC1 | Solar PV - Single axis tracking | $100.4k | $0 | — | 2,645.2 | 3,069.6 | 18.5% | $0.32 | View |
| Ladbroke Grove | LADBROK2 |
SA1 | Turbine - OCGT | $100.4k | $0 | — | 668.3 | 4,137.6 | 15.4% | $145.06 | View |
| Repulse | REPULSE |
TAS1 | Hydro - Dam | $98.6k | $0 | — | 1,004.1 | — | 33.2% | $1.00 | View |
| Sebastopol Solar Farm | SEBSF1 |
NSW1 | Solar PV - Single axis tracking | $97.9k | $0 | — | 1,602.4 | 1,602.0 | 16.5% | $0.25 | View |
| Munna Creek Solar Farm | MUCRKSF1 |
QLD1 | Solar PV - Single axis tracking | $97.4k | $0 | — | 3,387.6 | 2,968.6 | 20.3% | $0.25 | View |
| Wattle Point | WPWF |
SA1 | Wind Turbine - Onshore | $96.5k | $0 | — | 1,410.5 | 2,138.3 | 14.4% | $0.50 | View |
| Cullerin Range Wind Farm | CULLRGWF |
NSW1 | Wind Turbine - Onshore | $96.1k | $0 | — | 1,156.3 | — | 35.6% | $0.68 | View |
| Ladbroke Grove | LADBROK1 |
SA1 | Turbine - OCGT | $95.0k | $0 | — | 631.5 | 4,168.2 | 14.6% | $153.02 | View |
| Hawkesdale Wind Farm | HD1WF1 |
VIC1 | Wind Turbine - Onshore | $93.5k | $0 | — | 1,900.1 | 2,122.8 | 18.2% | $0.00 | View |
| West Wyalong Solar Farm | WSTWYSF1 |
NSW1 | Solar PV - Single axis tracking | $92.9k | $0 | — | 1,590.0 | 1,361.4 | 14.0% | $0.25 | View |
| Numurkah Solar Farm | NUMURSF1 |
VIC1 | Solar PV - Single axis tracking | $92.3k | $0 | — | 2,603.1 | 2,578.1 | 23.8% | $0.25 | View |
| Clermont Solar Farm | CLERMSF1 |
QLD1 | Solar PV - Single axis tracking | $92.2k | $0 | — | 2,530.0 | 2,274.6 | 25.3% | $0.34 | View |
| Glenrowan Solar Farm | GLENSF1 |
VIC1 | Solar PV - Single axis tracking | $91.4k | $0 | — | 3,036.9 | 2,630.8 | 22.3% | $0.25 | View |
| Moura Solar Farm | MOUSF1 |
QLD1 | Solar PV - Single axis tracking | $90.0k | $0 | — | 2,882.7 | 2,486.3 | 26.9% | $0.25 | View |
| Moree Solar Farm | MOREESF1 |
NSW1 | Solar PV - Single axis tracking | $89.5k | $0 | — | 1,350.2 | 1,301.2 | 22.3% | $0.25 | View |
| Bannerton Solar Park | BANN1 |
VIC1 | Solar PV - Single axis tracking | $88.9k | $0 | — | 2,447.0 | 2,644.7 | 22.6% | $0.34 | View |
| Rugby Run Solar Farm | RUGBYR1 |
QLD1 | Solar PV - Single axis tracking | $88.2k | $0 | — | 2,383.4 | 2,060.7 | 33.9% | $0.25 | View |
| Finley Solar Farm | FINLYSF1 |
NSW1 | Solar PV - Single axis tracking | $87.6k | $0 | — | 1,482.9 | 1,175.5 | 8.4% | $0.25 | View |
| Girgarre Solar Farm | GIRGSF |
VIC1 | Solar PV - Single axis tracking | $85.3k | $0 | — | 2,461.4 | 2,205.7 | 24.3% | $0.00 | View |
| Broadsound Solar Farm | BRDDBES1 |
QLD1 | Solar PV - Single axis tracking | $84.0k | $4.5k | 3,294.9 | -531.9 | 16,186.7 | -1.3% | $0.27 | View |
| Cathedral Rocks | CATHROCK |
SA1 | Wind Turbine - Onshore | $83.8k | $0 | — | 1,036.9 | 1,664.5 | 15.5% | $0.53 | View |
| Brendale BESS | BRNDBES1 |
QLD1 | Storage - Battery | $82.0k | $7.2k | 3,435.4 | -858.6 | 18,251.4 | -3.9% | $1.58 | View |
| Lancaster Solar Farm | LANCSF1 |
VIC1 | Solar PV - Single axis tracking | $81.7k | $0 | — | 2,167.5 | 2,036.5 | 18.9% | $0.25 | View |
| West Kiewa | WKIEWA1 |
VIC1 | Hydro - Dam | $81.0k | $0 | — | 717.7 | 4,900.2 | 19.5% | $10.00 | View |
| Emerald Solar Park | EMERASF1 |
QLD1 | Solar PV - Single axis tracking | $78.9k | $0 | — | 1,878.4 | 2,081.3 | 24.1% | $0.25 | View |
| Western Downs Gas Peaking Plant - KCI | WDBESS2 |
QLD1 | Turbine - CCGT | $78.3k | $13.7k | 7,857.1 | -1,250.2 | 22,750.7 | -2.9% | $2.00 | View |
| Williamsdale BESS | WILLBES1 |
NSW1 | Storage - Battery | $78.2k | $474 | 28,504.3 | -42.2 | 21,993.2 | -0.2% | $1.50 | View |
| Bungala Two Solar Farm | BNGSF2 |
SA1 | Solar PV - Single axis tracking | $76.9k | $0 | — | 2,788.4 | 4,214.7 | 19.1% | $0.33 | View |
| Jemalong Solar | JEMALNG1 |
NSW1 | Solar PV - Single axis tracking | $76.8k | $0 | — | 1,029.8 | 1,580.8 | 17.3% | $0.32 | View |
| Bogong / Mackay | MCKAY1 |
VIC1 | Hydro - Dam | $76.4k | $0 | — | 580.2 | 14,512.1 | 1.8% | $1.00 | View |
| German Creek | GERMCRK |
QLD1 | Reciprocating Engine - Spark ignition | $76.2k | $0 | — | 1,060.2 | — | 21.8% | $122.81 | View |
| Elaine Wind Farm | ELAINWF1 |
VIC1 | Wind Turbine - Onshore | $76.0k | $0 | — | 1,580.4 | 1,645.4 | 17.5% | $0.53 | View |
| Karadoc Solar Farm | KARSF1 |
VIC1 | Solar PV - Single axis tracking | $74.0k | $0 | — | 2,193.4 | 2,407.3 | 19.4% | $0.00 | View |
| Wunghnu Solar Farm | WUNUSF1 |
VIC1 | Solar PV - Single axis tracking | $72.9k | $0 | — | 1,885.1 | 2,004.8 | 18.6% | $0.25 | View |
| Quorn Park Solar Hybrid | QPSFB1 |
NSW1 | Solar PV - Single axis tracking | $71.5k | $0 | — | 894.6 | 2,852.1 | 8.5% | $0.26 | View |
| Bundaberg Solar Farm | BUSF1 |
QLD1 | Solar PV - Single axis tracking | $71.0k | $0 | — | 2,198.4 | 1,878.6 | 26.1% | $14.55 | View |
| Hornsdale Power Reserve Unit 1 | HPR1 |
SA1 | Storage - Battery | $70.9k | $475 | 793.5 | -218.4 | 6,137.0 | -1.3% | $1.50 | View |
| Kennedy Energy Park - Phase 1 - Wind | KEPWF1 |
QLD1 | Wind Turbine - Onshore | $70.1k | $0 | — | 790.8 | 776.3 | 16.9% | $0.68 | View |
| Whitsunday Solar Farm | WHITSF1 |
QLD1 | Solar PV - Single axis tracking | $69.9k | $0 | — | 1,634.7 | 1,646.8 | 26.3% | $0.25 | View |
| Liddell BESS | LDBESS1 |
NSW1 | Storage - Battery | $69.3k | $2.2k | 4,668.4 | -1,149.2 | 23,755.6 | -2.1% | $1.50 | View |
| Mt Millar Wind Farm | MTMILLAR |
SA1 | Wind Turbine - Onshore | $68.6k | $0 | — | 1,081.9 | 1,379.0 | 13.8% | $0.50 | View |
| Fisher | FISHER |
TAS1 | Hydro - Dam | $68.3k | $1.9k | 458.5 | 749.7 | 3,694.6 | 16.0% | $1.05 | View |
| LaTrobe Valley BESS | LVES1 |
VIC1 | Storage - Battery | $66.6k | $848 | 23,819.3 | -108.6 | 8,676.9 | -1.0% | $1.54 | View |
| Rangebank BESS | RANGEB1 |
VIC1 | Storage - Battery | $66.3k | $0 | — | -195.2 | 16,261.2 | -0.9% | $1.50 | View |
| Kiata Wind Farm | KIATAWF1 |
VIC1 | Wind Turbine - Onshore | $66.0k | $0 | — | 1,114.6 | 1,042.8 | 33.2% | $0.68 | View |
| Broken Hill Solar Plant | BROKENH1 |
NSW1 | Solar PV - Fixed | $65.8k | $0 | — | 961.3 | 889.8 | 16.8% | $0.28 | View |
| Koorangie Energy Storage System | KESSB1 |
VIC1 | Storage - Battery | $65.0k | $0 | — | -215.9 | 14,128.5 | -1.1% | $1.50 | View |
| Winton Solar Farm | WINTSF1 |
VIC1 | Solar PV - Single axis tracking | $63.9k | $0 | — | 2,296.7 | 2,224.3 | 25.0% | $0.25 | View |
| Cluny | CLUNY |
TAS1 | Hydro - Dam | $62.6k | $0 | — | 636.0 | — | 30.9% | $1.00 | View |
| Butlers Gorge | BUTLERSG |
TAS1 | Hydro - Dam | $62.3k | $0 | — | 717.5 | — | 54.4% | $1.00 | View |
| Wyalong Solar Farm | WYASF1 |
NSW1 | Solar PV - Single axis tracking | $61.8k | $0 | — | 991.5 | 928.6 | 14.7% | $0.25 | View |
| Hayman Solar Farm | HAYMSF1 |
QLD1 | Solar PV - Single axis tracking | $61.7k | $0 | — | 1,706.9 | 1,560.0 | 27.3% | $0.34 | View |
| Hamilton Solar Farm | HAMISF1 |
QLD1 | Solar PV - Single axis tracking | $61.2k | $0 | — | 1,621.5 | 1,475.1 | 26.1% | $18.64 | View |
| Yatpool Solar Farm | YATSF1 |
VIC1 | Solar PV - Single axis tracking | $59.7k | $0 | — | 1,885.4 | 1,767.1 | 18.5% | $0.25 | View |
| Eildon | EILDON2 |
VIC1 | Hydro - Dam | $58.4k | $0 | — | 448.7 | 4,729.2 | 6.1% | $1.00 | View |
| Terang BESS | TRGBESS1 |
VIC1 | Storage - Battery | $58.1k | $2.4k | 850.7 | -379.4 | 9,336.8 | -3.5% | $1.50 | View |
| Shoalhaven | SHOAL1 |
NSW1 | Storage - Pumped hydro | $57.9k | $0 | — | 869.3 | — | 3.3% | $1.20 | View |
| Lake Bonney 1 Wind Farm | LKBONNY1 |
SA1 | Wind Turbine - Onshore | $57.5k | $0 | — | 963.6 | 1,551.0 | 11.1% | $0.79 | View |
| Corowa Solar Farm | CRWASF1 |
NSW1 | Solar PV - Single axis tracking | $56.4k | $0 | — | 936.6 | 839.8 | 24.0% | $0.33 | View |
| Eildon | EILDON1 |
VIC1 | Hydro - Dam | $55.5k | $0 | — | 433.7 | 4,823.7 | 5.9% | $1.05 | View |
| Limondale BESS | LIMBESS1 |
NSW1 | Storage - Battery | $54.4k | $452 | 87.4 | -334.1 | 4,631.7 | -6.2% | $1.50 | View |
| Wagga North Solar Farm | WAGGNSF1 |
NSW1 | Solar PV - Single axis tracking | $54.3k | $0 | — | 1,034.8 | 1,035.1 | 17.2% | $0.25 | View |
| Oakey 2 Solar Farm | OAKEY2SF |
QLD1 | Solar PV - Single axis tracking | $53.9k | $0 | — | 1,558.4 | 1,315.4 | 25.9% | $0.25 | View |
| Summerfield BESS | SMFBESS1 |
SA1 | Storage - Battery | $51.7k | $0 | — | 58.2 | 1,000.0 | 0.2% | $1.50 | View |
| Dundonnell Wind Farm | DUNDWF2 |
VIC1 | Wind Turbine - Onshore | $51.6k | $0 | — | 977.2 | 1,022.7 | 19.6% | $0.66 | View |
| Susan River Solar Farm | SRSF1 |
QLD1 | Solar PV - Single axis tracking | $51.4k | $0 | — | 1,656.8 | 1,390.1 | 18.0% | $0.25 | View |
| Oaklands Hill Wind Farm | OAKLAND1 |
VIC1 | Wind Turbine - Onshore | $50.6k | $0 | — | 1,247.7 | 1,147.6 | 17.2% | $0.50 | View |
| Challicum Hills | CHALLHWF |
VIC1 | Wind Turbine - Onshore | $49.8k | $0 | — | 938.3 | — | 16.5% | $0.53 | View |
| Salt Creek Wind Farm | SALTCRK1 |
SA1 | Wind Turbine - Onshore | $49.7k | $0 | — | 920.8 | 1,182.6 | 15.8% | $0.50 | View |
| Gannawarra Solar Farm | GANNSF1 |
VIC1 | Solar PV - Single axis tracking | $49.5k | $0 | — | 1,408.8 | 1,350.6 | 23.7% | $0.34 | View |
| Mulwala Solar Farm | MULWASF1 |
NSW1 | Solar PV - Single axis tracking | $46.8k | $0 | — | 746.3 | 736.3 | 22.3% | $0.25 | View |
| Quarantine | QPS5 |
SA1 | Turbine - OCGT | $46.4k | $0 | — | 288.0 | 10,987.1 | 2.1% | $209.05 | View |
| Tailem Bend Stage 2 Solar Project | TB2SF1 |
SA1 | Solar PV - Single axis tracking | $44.7k | $0 | — | 1,155.0 | 2,514.9 | 10.2% | $0.25 | View |
| Parkes Solar Farm | PARSF1 |
NSW1 | Solar PV - Single axis tracking | $44.1k | $0 | — | 565.1 | 1,752.3 | 10.6% | $0.25 | View |
| Kidston Solar Project Phase One 50MW | KSP1 |
QLD1 | Solar PV - Fixed | $43.0k | $0 | — | 1,277.9 | 1,431.4 | 23.6% | $0.20 | View |
| Rubicon Mountain Streams | RUBICON |
VIC1 | Hydro - Dam | $42.1k | $0 | — | 549.7 | — | 37.6% | $1.00 | View |
| Mokoan Solar Farm (LightsourceBP) | MOKOSF1 |
VIC1 | Solar PV - Single axis tracking | $40.2k | $0 | — | 1,103.9 | 1,266.1 | 22.2% | $0.25 | View |
| Victorian Big Battery | VBB1 |
VIC1 | Storage - Battery | $40.1k | $6 | 41.3 | -199.7 | 4,254.4 | -0.6% | $1.50 | View |
| Childers Solar Farm | CHILDSF1 |
QLD1 | Solar PV - Single axis tracking | $40.0k | $0 | — | 1,319.0 | 1,082.4 | 18.9% | $0.34 | View |
| Chinchilla BESS | CHBESS1 |
QLD1 | Storage - Battery | $39.8k | $1.6k | 2,660.5 | -285.5 | 4,022.2 | -2.6% | $1.75 | View |
| Collinsville PV | CSPVPS1 |
QLD1 | Solar PV - Fixed | $38.1k | $0 | — | 1,076.9 | 962.4 | 23.4% | $0.28 | View |
| Goonumbla Solar Farm | GOONSF1 |
NSW1 | Solar PV - Single axis tracking | $37.6k | $0 | — | 478.7 | 1,537.3 | 6.3% | $0.25 | View |
| Wandoan South BESS | WANDB1 |
QLD1 | Storage - Battery | $37.0k | $3.1k | 25,737.0 | -208.4 | 3,826.3 | -1.9% | $1.50 | View |
| Griffith Solar Farm | GRIFSF1 |
NSW1 | Solar PV - Single axis tracking | $36.9k | $0 | — | 632.0 | — | 21.5% | $0.35 | View |
| Starfish Hill | STARHLWF |
SA1 | Wind Turbine - Onshore | $35.7k | $0 | — | 660.9 | 649.6 | 18.5% | $0.50 | View |
| Kingaroy Solar Farm | KINGASF1 |
QLD1 | Solar PV - Single axis tracking | $35.4k | $0 | — | 833.0 | 629.7 | 19.3% | $0.25 | View |
| Canunda | CNUNDAWF |
SA1 | Wind Turbine - Onshore | $35.3k | $0 | — | 568.1 | 1,006.1 | 11.4% | $0.50 | View |
| Braemar | BRAEMAR3 |
QLD1 | Turbine - OCGT | $35.2k | $0 | — | 1,441.4 | 1,128.7 | 7.1% | $128.50 | View |
| Bungala One Solar Farm | BNGSF1 |
SA1 | Solar PV - Single axis tracking | $34.9k | $0 | — | 771.4 | 798.5 | 5.3% | $0.34 | View |
| Middlemount Solar Farm | MIDDLSF1 |
QLD1 | Solar PV - Single axis tracking | $34.0k | $0 | — | 860.0 | 865.1 | 30.6% | $0.25 | View |
| Maryrorough Solar Farm | MARYRSF1 |
QLD1 | Solar PV - Single axis tracking | $30.0k | $0 | — | 740.7 | 728.4 | 19.8% | $0.25 | View |
| Braemar | BRAEMAR1 |
QLD1 | Turbine - OCGT | $29.9k | $0 | — | 291.4 | 17,855.2 | 1.4% | $133.75 | View |
| Junee Solar Farm | JUNEESF1 |
NSW1 | Solar PV - Single axis tracking | $29.8k | $0 | — | 499.5 | 501.8 | 12.8% | $0.00 | View |
| Tailem Bend - Solar | TBSF1 |
SA1 | Solar PV - Fixed | $29.8k | $0 | — | 933.1 | 2,401.2 | 8.0% | $0.20 | View |
| Yambuk | YAMBUKWF |
VIC1 | Wind Turbine - Onshore | $29.3k | $0 | — | 722.2 | — | 22.3% | $0.50 | View |
| Molong Solar Farm | MOLNGSF1 |
NSW1 | Solar PV - Single axis tracking | $29.2k | $0 | — | 402.9 | 1,014.9 | 10.3% | $0.25 | View |
| Warwick Solar Farm | WARWSF1 |
QLD1 | Solar PV - Single axis tracking | $28.9k | $0 | — | 496.0 | 574.1 | 14.3% | $0.25 | View |
| Ulinda Park BESS | ULPBESS1 |
QLD1 | Storage - Battery | $28.8k | $1.1k | 493.7 | -583.6 | 10,803.4 | -3.5% | $1.50 | View |
| Lake Bonney 3 Wind Farm | LKBONNY3 |
SA1 | Wind Turbine - Onshore | $28.3k | $0 | — | 458.0 | 713.4 | 10.9% | $0.53 | View |
| Hazelwood Battery Energy Storage System (HBESS) | HBESS1 |
VIC1 | Storage - Battery | $27.0k | $3.0k | 1,159.7 | -376.3 | 12,862.9 | -1.7% | $1.87 | View |
| Cohuna Solar Farm | COHUNSF1 |
VIC1 | Solar PV - Single axis tracking | $26.3k | $0 | — | 530.6 | 629.4 | 15.7% | $0.33 | View |
| Oakey Solar Farm | OAKEY1SF |
QLD1 | Solar PV - Fixed | $25.8k | $0 | — | 656.7 | 637.4 | 24.3% | $0.20 | View |
| Lemonthyme / Wilmot | LEM_WIL |
TAS1 | Hydro - Dam | $24.9k | $1.2k | 273.9 | 200.5 | 3,202.7 | 2.3% | $1.00 | View |
| Yaloak South Wind Farm | YSWF1 |
VIC1 | Wind Turbine - Onshore | $24.7k | $0 | — | 513.8 | — | 16.5% | $0.50 | View |
| Limondale Solar Farm 2 | LIMOSF21 |
NSW1 | Solar PV - Single axis tracking | $24.1k | $0 | — | 255.3 | 255.3 | 8.1% | $0.25 | View |
| Kerang Hybrid | KERNGSP1 |
VIC1 | Solar PV - Single axis tracking | $23.6k | $0 | — | 375.2 | 553.0 | 2.2% | $0.26 | View |
| Barcaldine Remote Community Solar Farm | BARCSF1 |
QLD1 | Solar PV - Single axis tracking | $23.0k | $0 | — | 463.5 | — | 21.4% | $0.00 | View |
| Clover | CLOVER |
VIC1 | Hydro - Dam | $22.7k | $0 | — | 178.9 | — | 5.7% | $1.17 | View |
| Manildra Solar Farm | MANSLR1 |
NSW1 | Solar PV - Single axis tracking | $21.5k | $0 | — | 216.8 | 1,448.3 | 4.0% | $0.25 | View |
| Lake Bonney Battery Energy Storage | LBB1 |
SA1 | Storage - Battery | $21.3k | $231 | 5,268.4 | -27.2 | 1,643.7 | -1.0% | $1.98 | View |
| Longreach Solar Farm | LRSF1 |
QLD1 | Solar PV - Fixed | $20.8k | $0 | — | 449.3 | — | 27.7% | $0.20 | View |
| Diapur Wind Farm | DIAPURWF1 |
VIC1 | Wind Turbine - Onshore | $20.3k | $0 | — | 335.8 | — | 38.8% | $0.00 | View |
| Warwick Solar Farm | WARWSF2 |
QLD1 | Solar PV - Single axis tracking | $19.7k | $0 | — | 347.4 | 462.4 | 10.0% | $0.25 | View |
| Rocky Point Sugar Mill Cogeneration Plant | RPCG |
QLD1 | Other - Other | $19.6k | $0 | — | 414.0 | — | 12.8% | $117.00 | View |
| Gullen Range Solar Farm | GULLRSF1 |
NSW1 | Solar PV - Fixed | $18.7k | $0 | — | 299.3 | 251.9 | 27.7% | $0.27 | View |
| White Rock Solar Farm | WRSF1 |
NSW1 | Solar PV - Fixed | $18.5k | $0 | — | 237.3 | 236.3 | 11.0% | $0.20 | View |
| Mortons Lane Wind Farm | MLWF1 |
VIC1 | Wind Turbine - Onshore | $17.7k | $0 | — | 424.5 | — | 20.1% | $0.50 | View |
| Royalla Solar Farm | ROYALLA1 |
NSW1 | Solar PV - Fixed | $16.6k | $0 | — | 263.0 | — | 12.2% | $0.20 | View |
| Tailem Bend Battery Project | TB2B1 |
SA1 | Storage - Battery | $16.5k | $1.6k | 2,246.9 | -136.2 | 3,759.0 | -3.0% | $1.50 | View |
| Bouldercombe Battery project | BBATTERY1 |
QLD1 | Storage - Battery | $16.3k | $258 | 1,407.4 | -132.1 | 2,675.7 | -2.4% | $1.64 | View |
| Capital Battery | CAPBES1 |
NSW1 | Storage - Battery | $16.3k | $0 | — | -89.8 | 8,766.5 | -0.8% | $1.50 | View |
| New England Solar Farm BESS | NESBESS1 |
NSW1 | Storage - Battery | $14.6k | $0 | — | -272.8 | 6,961.1 | -1.3% | $1.50 | View |
| New England Solar Farm BESS | NESBESS2 |
NSW1 | Storage - Battery | $13.4k | $0 | — | -274.9 | 6,889.7 | -1.3% | $1.50 | View |
| Hughenden Sun Farm | HUGSF1 |
QLD1 | Solar PV - Single axis tracking | $9.2k | $0 | — | 270.4 | — | 11.9% | $0.00 | View |
| Quorn Park Solar Hybrid | QPSFB2 |
NSW1 | Storage - Battery | $8.4k | $0 | — | 75.0 | 799.9 | 2.5% | $1.58 | View |
| Mannum Solar Farm 2 | MANNSF2 |
SA1 | Solar PV - Single axis tracking | $7.2k | $0 | — | 227.3 | 282.1 | 7.0% | $0.25 | View |
| Port Stanvac 1 | PTSTAN1 |
SA1 | Reciprocating Engine - Compression ignition | $6.3k | $0 | — | 57.2 | 5,604.7 | 0.9% | $308.00 | View |
| Gannawarra Energy Storage System | GANNB1 |
VIC1 | Storage - Battery | $6.3k | $0 | — | -10.5 | 347.7 | -0.4% | $1.98 | View |
| Angaston | ANGAST1 |
SA1 | Reciprocating Engine - Compression ignition | $5.4k | $0 | — | 45.3 | 4,603.8 | 0.9% | $0.00 | View |
| Kennedy Energy Park - Phase 1 - Solar | KEPSF1 |
QLD1 | Solar PV - Single axis tracking | $5.4k | $0 | — | 89.3 | 96.5 | 5.5% | $0.34 | View |
| Adelaide Desalination Plant | ADPBA1 |
SA1 | Storage - Battery | $5.2k | $69 | 1,064.2 | -15.2 | 576.4 | -1.8% | $0.00 | View |
| Adelaide Desalination Plant | ADPPV1 |
SA1 | Solar PV - Fixed | $5.1k | $0 | — | 204.7 | 487.7 | 17.2% | $0.00 | View |
| Wallgrove Grid Battery project | WALGRV1 |
NSW1 | Storage - Battery | $4.8k | $202 | 11,744.2 | -127.3 | 3,989.4 | -2.4% | $1.50 | View |
| Riverina Energy Storage System 1 | RESS1 |
NSW1 | Storage - Battery | $3.6k | $0 | — | -94.9 | 3,115.3 | -1.5% | $1.50 | View |
| Ballarat Energy Storage System | BALB1 |
VIC1 | Storage - Battery | $3.2k | $0 | — | -16.1 | 622.6 | -0.5% | $0.00 | View |
| Murray Bridge - Onkaparinga Pipeline Pump 2 | MBPS2PV1 |
SA1 | Solar PV - Single axis tracking | $3.0k | $0 | — | 75.2 | 149.8 | 5.1% | $0.25 | View |
| Smithfield BESS | SMTHBES1 |
NSW1 | Storage - Battery | $2.6k | $2.1k | 15,292.2 | -308.3 | 5,573.8 | -3.3% | $1.50 | View |
| Dalrymple BESS | DALNTH1 |
SA1 | Storage - Battery | $2.5k | $0 | — | -30.8 | 1,241.6 | -0.9% | $2.03 | View |
| Morgan To Whyalla Pipeline No 4 PS | MWPS4PV1 |
SA1 | Solar PV - Single axis tracking | $2.2k | $0 | — | 53.5 | 95.3 | 9.0% | $0.25 | View |
| Bolivar Waste Water Treatment | BOWWBA1 |
SA1 | Storage - Battery | $2.1k | $13 | 1.3 | -5.9 | 191.7 | -1.8% | $1.58 | View |
| Mannum Adelaide Pumping Station No 2 - MAPL2 (Palmer) | MAPS2PV1 |
SA1 | Solar PV - Single axis tracking | $1.8k | $0 | — | 99.8 | 138.6 | 5.6% | $0.26 | View |
| Christies Beach Wastewater Treatment Plant | CBWWBA1 |
SA1 | Storage - Battery | $1.8k | $10 | 1.1 | -5.1 | 194.6 | -2.2% | $1.50 | View |
| Morgan To Whyalla Pipeline No 1 PS And Water Filtration Plant | MWPS1PV1 |
SA1 | Solar PV - Single axis tracking | $1.6k | $0 | — | 50.9 | 107.4 | 8.6% | $0.25 | View |
| Darlington Point Energy Storage System | DPNTB1 |
NSW1 | Storage - Battery | $1.5k | $0 | — | -67.5 | 695.8 | -2.5% | $0.00 | View |
| Philip Island BESS | PIBESS1 |
VIC1 | Storage - Battery | $1.5k | $446 | 875.0 | -36.2 | 441.0 | -6.7% | $1.50 | View |
| Morgan To Whyalla Pipeline No 3 PS | MWPS3PV1 |
SA1 | Solar PV - Single axis tracking | $1.4k | $0 | — | 43.4 | 100.1 | 5.4% | $0.25 | View |
| LINCOLN GAP BESSBDU | LGAPBS1 |
SA1 | Storage - Battery | $1.1k | $0 | — | -2.2 | 279.2 | -0.2% | $1.50 | View |
| Bolivar Waste Water Treatment | BOWWPV1 |
SA1 | Solar PV - Fixed | $898 | $0 | — | 102.3 | 165.8 | 11.5% | $0.23 | View |
| Morgan To Whyalla Pipeline No 2 PS | MWPS2PV1 |
SA1 | Solar PV - Single axis tracking | $891 | $0 | — | 28.3 | 57.0 | 4.8% | $0.25 | View |
| Mannum Adelaide Pumping Station No 3 - MAPL3 (Tungkillo) | MAPS3PV1 |
SA1 | Solar PV - Single axis tracking | $728 | $0 | — | 152.6 | 218.0 | 8.5% | $0.25 | View |
| Tully Sugar Mill | TULLYSM1 |
QLD1 | Turbine - Steam Super Critical | $657 | $0 | — | 7.9 | — | 0.2% | $117.00 | View |
| Bulgana Green Power Hub - BESS | BULBES1 |
VIC1 | Storage - Battery | $633 | $586 | 155.7 | -67.5 | 1,872.2 | -3.1% | $1.98 | View |
| Yallourn W | YWPS2 |
VIC1 | Turbine - Steam Sub Critical | $178 | $0 | — | 5.8 | — | 0.0% | $47.20 | View |
| Jeeralang B | JLB01 |
VIC1 | Turbine - OCGT | $169 | $0 | — | 5.5 | — | 0.1% | $128.50 | View |
| Happy Valley Reservoir | HVWWBA1 |
SA1 | Storage - Battery | $130 | $5 | 133.8 | -2.9 | 76.4 | -0.5% | $1.58 | View |
| Mt Stuart | MSTUART1 |
QLD1 | Turbine - OCGT | $103 | $0 | — | 4.2 | 13,777.0 | 0.0% | $2.00 | View |
| Swanbank E GT | SWAN_E |
QLD1 | Turbine - CCGT | $44 | $0 | — | 1.7 | — | 0.0% | $2.00 | View |
| Braemar 2 Power Station | BRAEMAR5 |
QLD1 | Turbine - OCGT | $30 | $0 | — | 1.2 | 13,233.0 | 0.0% | $3.14 | View |
| Mintaro GT | MINTARO |
SA1 | Turbine - OCGT | $18 | $0 | — | 0.7 | 8,492.3 | 0.0% | $128.50 | View |
| Wooreen Energy Storage System | WOORB1 |
VIC1 | Storage - Battery | $0 | $0 | — | 0.0 | — | 0.0% | $1.50 | View |
| Bolivar Power Station | BOLIVPS1 |
SA1 | Turbine - OCGT | $0 | $0 | — | 0.0 | — | 0.0% | $151.37 | View |
| APD01 | APD01 |
$0 | $0 | 10,191.0 | — | — | — | — | View | ||
| ASACLE01 | ASACLE01 |
$0 | $0 | 248.4 | — | — | — | — | View | ||
| ASDESA1 | ASDESA1 |
$0 | $0 | — | — | — | — | — | View | ||
| ASDEVI01 | ASDEVI01 |
$0 | $0 | 1,044.0 | — | — | — | — | View | ||
| ASDLBY01 | ASDLBY01 |
$0 | $0 | — | — | — | — | — | View | ||
| ASENGV01 | ASENGV01 |
$0 | $0 | — | — | — | — | — | View | ||
| ASENGY01 | ASENGY01 |
$0 | $0 | — | — | — | — | — | View | ||
| ASGENE01 | ASGENE01 |
$0 | $0 | — | — | — | — | — | View | ||
| ASNAES1 | ASNAES1 |
$0 | $0 | 9.0 | — | — | — | — | View | ||
| ASNBRL1 | ASNBRL1 |
$0 | $0 | 2,113.7 | — | — | — | — | View | ||
| ASNENC1 | ASNENC1 |
$0 | $0 | 334.1 | — | — | — | — | View | ||
| ASPAPM01 | ASPAPM01 |
$0 | $0 | — | — | — | — | — | View | ||
| ASPBSC01 | ASPBSC01 |
$0 | $0 | — | — | — | — | — | View | ||
| ASPSTV01 | ASPSTV01 |
$0 | $0 | — | — | — | — | — | View | ||
| ASQEEV1 | ASQEEV1 |
$0 | $0 | — | — | — | — | — | View | ||
| ASQENC1 | ASQENC1 |
$0 | $0 | 26.1 | — | — | — | — | View | ||
| ASRMGE01 | ASRMGE01 |
$0 | $0 | 0.1 | — | — | — | — | View | ||
| ASRMGE02 | ASRMGE02 |
$0 | $0 | 0.1 | — | — | — | — | View | ||
| ASRMGE03 | ASRMGE03 |
$0 | $0 | 0.0 | — | — | — | — | View | ||
| ASRMGE04 | ASRMGE04 |
$0 | $0 | — | — | — | — | — | View | ||
| ASRMGE05 | ASRMGE05 |
$0 | $0 | — | — | — | — | — | View | ||
| ASSDE1 | ASSDE1 |
$0 | $0 | — | — | — | — | — | View | ||
| ASSENC1 | ASSENC1 |
$0 | $0 | 35.1 | — | — | — | — | View | ||
| ASSERDV1 | ASSERDV1 |
$0 | $0 | — | — | — | — | — | View | ||
| ASTHYD1 | ASTHYD1 |
$0 | $0 | 705.1 | — | — | — | — | View | ||
| Barcaldine Power Station | BARCALDN |
QLD1 | Turbine - OCGT | $0 | $0 | — | — | — | 0.0% | $141.78 | View |
| Bell Bay Three | BBTHREE1 |
TAS1 | Turbine - OCGT | $0 | $0 | — | — | 2,308.3 | 0.0% | $182.63 | View |
| Bell Bay Three | BBTHREE2 |
TAS1 | Turbine - OCGT | $0 | $0 | — | — | 4,003.3 | 0.0% | $137.22 | View |
| Bell Bay Three | BBTHREE3 |
TAS1 | Turbine - OCGT | $0 | $0 | — | — | 1,544.8 | 0.0% | $141.97 | View |
| Bairnsdale | BDL01 |
VIC1 | Turbine - OCGT | $0 | $0 | — | — | 4,479.2 | 0.0% | $142.10 | View |
| Bairnsdale | BDL02 |
VIC1 | Turbine - OCGT | $0 | $0 | — | — | — | 0.0% | $158.38 | View |
| Braemar | BRAEMAR2 |
QLD1 | Turbine - OCGT | $0 | $0 | — | — | 17,151.2 | 0.0% | $130.94 | View |
| Braemar 2 Power Station | BRAEMAR6 |
QLD1 | Turbine - OCGT | $0 | $0 | — | — | 14,931.4 | 0.0% | $133.36 | View |
| Braemar 2 Power Station | BRAEMAR7 |
QLD1 | Turbine - OCGT | $0 | $0 | — | — | 1,437.5 | 0.0% | $132.25 | View |
| BUNGAMB1 | BUNGAMB1 |
$0 | $0 | 41,188.5 | -252.6 | 14,973.9 | — | — | View | ||
| Bayswater | BW03 |
NSW1 | Turbine - Steam Sub Critical | $0 | $0 | — | — | — | 0.0% | $28.68 | View |
| Cethana | CETHANA |
TAS1 | Hydro - Dam | $0 | $0 | — | — | — | 0.0% | $1.09 | View |
| Colongra | CG1 |
NSW1 | Turbine - OCGT | $0 | $0 | — | — | 15,157.3 | 0.0% | $197.00 | View |
| Colongra | CG2 |
NSW1 | Turbine - OCGT | $0 | $0 | — | — | 15,446.7 | 0.0% | $135.55 | View |
| Colongra | CG3 |
NSW1 | Turbine - OCGT | $0 | $0 | — | — | 15,421.2 | 0.0% | $144.24 | View |
| Colongra | CG4 |
NSW1 | Turbine - OCGT | $0 | $0 | — | — | 17,509.9 | 0.0% | $194.33 | View |
| Condamine A | CPSA |
QLD1 | Turbine - CCGT | $0 | $0 | — | — | — | 0.0% | $95.40 | View |
| CRWARP1 | CRWARP1 |
$0 | $0 | — | 5,046.7 | 5,134.9 | — | — | View | ||
| Dartmouth | DARTM1 |
VIC1 | Hydro - Dam | $0 | $0 | — | — | 15,813.2 | 0.0% | $0.00 | View |
| DG_NSW1 | DG_NSW1 |
$0 | $0 | — | — | — | — | — | View | ||
| DG_QLD1 | DG_QLD1 |
$0 | $0 | — | — | — | — | — | View | ||
| DG_SA1 | DG_SA1 |
$0 | $0 | — | — | — | — | — | View | ||
| DG_TAS1 | DG_TAS1 |
$0 | $0 | — | — | — | — | — | View | ||
| DG_VIC1 | DG_VIC1 |
$0 | $0 | — | — | — | — | — | View | ||
| DRACAN1 | DRACAN1 |
$0 | $0 | 87.5 | — | — | — | — | View | ||
| DRACAV1 | DRACAV1 |
$0 | $0 | — | — | — | — | — | View | ||
| DRAESN3 | DRAESN3 |
$0 | $0 | 373.4 | — | — | — | — | View | ||
| DRAESS1 | DRAESS1 |
$0 | $0 | — | — | — | — | — | View | ||
| DRBRLV01 | DRBRLV01 |
$0 | $0 | 479.4 | — | — | — | — | View | ||
| DRFIIN01 | DRFIIN01 |
$0 | $0 | — | — | — | — | — | View | ||
| DRFIIN02 | DRFIIN02 |
$0 | $0 | — | — | — | — | — | View | ||
| DRGBND01 | DRGBND01 |
$0 | $0 | 568.0 | — | — | — | — | View | ||
| DRGBND02 | DRGBND02 |
$0 | $0 | 100.8 | — | — | — | — | View | ||
| DRGBND03 | DRGBND03 |
$0 | $0 | 2,020.7 | — | — | — | — | View | ||
| DRGBND04 | DRGBND04 |
$0 | $0 | 1,651.3 | — | — | — | — | View | ||
| DRHTVP01 | DRHTVP01 |
$0 | $0 | — | — | — | — | — | View | ||
| DRHTVP03 | DRHTVP03 |
$0 | $0 | — | — | — | — | — | View | ||
| DROZVP01 | DROZVP01 |
$0 | $0 | 1.4 | — | — | — | — | View | ||
| DROZVP02 | DROZVP02 |
$0 | $0 | 0.1 | — | — | — | — | View | ||
| DROZVP03 | DROZVP03 |
$0 | $0 | 0.7 | — | — | — | — | View | ||
| DRPSTQ01 | DRPSTQ01 |
$0 | $0 | — | — | — | — | — | View | ||
| DRPSTV01 | DRPSTV01 |
$0 | $0 | 330.0 | — | — | — | — | View | ||
| DRSHVN01 | DRSHVN01 |
$0 | $0 | — | — | — | — | — | View | ||
| DRSHVN02 | DRSHVN02 |
$0 | $0 | 3,737.2 | — | — | — | — | View | ||
| DRSHVQ01 | DRSHVQ01 |
$0 | $0 | 288.0 | — | — | — | — | View | ||
| DRSHVS01 | DRSHVS01 |
$0 | $0 | — | — | — | — | — | View | ||
| DRSHVS02 | DRSHVS02 |
$0 | $0 | 3,060.7 | — | — | — | — | View | ||
| DRVIOT01 | DRVIOT01 |
$0 | $0 | 873.1 | — | — | — | — | View | ||
| DRVIOT02 | DRVIOT02 |
$0 | $0 | 115.0 | — | — | — | — | View | ||
| DRVIOT03 | DRVIOT03 |
$0 | $0 | 318.9 | — | — | — | — | View | ||
| DRVIOT04 | DRVIOT04 |
$0 | $0 | 7,893.0 | — | — | — | — | View | ||
| DRVIOT05 | DRVIOT05 |
$0 | $0 | 2,134.1 | — | — | — | — | View | ||
| DRVIOT06 | DRVIOT06 |
$0 | $0 | — | — | — | — | — | View | ||
| DRVIOT07 | DRVIOT07 |
$0 | $0 | — | — | — | — | — | View | ||
| DRVISB01 | DRVISB01 |
$0 | $0 | — | — | — | — | — | View | ||
| DRXNAD01 | DRXNAD01 |
$0 | $0 | — | — | — | — | — | View | ||
| DRXNAE01 | DRXNAE01 |
$0 | $0 | — | — | — | — | — | View | ||
| DRXNDA01 | DRXNDA01 |
$0 | $0 | — | — | — | — | — | View | ||
| DRXNDA02 | DRXNDA02 |
$0 | $0 | — | — | — | — | — | View | ||
| DRXNDA03 | DRXNDA03 |
$0 | $0 | — | — | — | — | — | View | ||
| DRXNDA04 | DRXNDA04 |
$0 | $0 | — | — | — | — | — | View | ||
| DRXNDB04 | DRXNDB04 |
$0 | $0 | — | — | — | — | — | View | ||
| DRXNDE01 | DRXNDE01 |
$0 | $0 | — | — | — | — | — | View | ||
| DRXNDJ01 | DRXNDJ01 |
$0 | $0 | — | — | — | — | — | View | ||
| DRXNDW01 | DRXNDW01 |
$0 | $0 | — | — | — | — | — | View | ||
| DRXNFF01 | DRXNFF01 |
$0 | $0 | — | — | — | — | — | View | ||
| DRXNFS01 | DRXNFS01 |
$0 | $0 | — | — | — | — | — | View | ||
| DRXNQX01 | DRXNQX01 |
$0 | $0 | — | — | — | — | — | View | ||
| DRXNSS01 | DRXNSS01 |
$0 | $0 | — | — | — | — | — | View | ||
| DRXNTM02 | DRXNTM02 |
$0 | $0 | — | — | — | — | — | View | ||
| DRXNVS01 | DRXNVS01 |
$0 | $0 | — | — | — | — | — | View | ||
| DRXQDA01 | DRXQDA01 |
$0 | $0 | — | — | — | — | — | View | ||
| DRXQQE01 | DRXQQE01 |
$0 | $0 | — | — | 47.3 | — | — | View | ||
| DRXSQS01 | DRXSQS01 |
$0 | $0 | — | — | — | — | — | View | ||
| DRXVAE01 | DRXVAE01 |
$0 | $0 | — | — | — | — | — | View | ||
| DRXVDJ01 | DRXVDJ01 |
$0 | $0 | — | — | — | — | — | View | ||
| DRXVDP01 | DRXVDP01 |
$0 | $0 | — | — | — | — | — | View | ||
| DRXVDX01 | DRXVDX01 |
$0 | $0 | — | — | — | — | — | View | ||
| DRXVQP01 | DRXVQP01 |
$0 | $0 | — | — | — | — | — | View | ||
| DRXVQX01 | DRXVQX01 |
$0 | $0 | — | — | — | — | — | View | ||
| DRXVQX02 | DRXVQX02 |
$0 | $0 | — | — | — | — | — | View | ||
| Dry Creek GT | DRYCGT1 |
SA1 | Turbine - OCGT | $0 | $0 | — | — | 4,505.8 | 0.0% | $141.50 | View |
| Dry Creek GT | DRYCGT2 |
SA1 | Turbine - OCGT | $0 | $0 | — | — | 3,502.9 | 0.0% | $135.55 | View |
| Dry Creek GT | DRYCGT3 |
SA1 | Turbine - OCGT | $0 | $0 | — | — | 4,735.0 | 0.0% | $210.15 | View |
| Eraring | ER02 |
NSW1 | Turbine - Steam Sub Critical | $0 | $0 | — | — | — | 0.0% | $59.45 | View |
| ERB02 | ERB02 |
$0 | $0 | — | -130.3 | 188.0 | — | — | View | ||
| Eraring GT | ERGT01 |
NSW1 | Turbine - OCGT | $0 | $0 | — | — | — | 0.0% | $96.96 | View |
| Broken Hill GT | GB01 |
NSW1 | Turbine - OCGT | $0 | $0 | — | — | — | 0.0% | $2.11 | View |
| Gladstone | GSTONE3 |
QLD1 | Turbine - Steam Sub Critical | $0 | $0 | — | — | — | 0.0% | $128.75 | View |
| Hunter EconomicZone | HEZ1 |
NSW1 | Reciprocating Engine - Compression ignition | $0 | $0 | — | — | 1,825.0 | 0.0% | $308.00 | View |
| Hume Dam VIC | HUMEV |
VIC1 | Hydro - Dam | $0 | $0 | — | — | — | 0.0% | $1.54 | View |
| Hunter Power Station | HUNTER1 |
NSW1 | Turbine - OCGT | $0 | $0 | — | — | — | 0.0% | $142.99 | View |
| Hunter Power Station | HUNTER2 |
NSW1 | Turbine - OCGT | $0 | $0 | — | — | — | 0.0% | $152.46 | View |
| Jeeralang A | JLA01 |
VIC1 | Turbine - OCGT | $0 | $0 | — | — | 5,404.5 | 0.0% | $135.55 | View |
| Jeeralang A | JLA02 |
VIC1 | Turbine - OCGT | $0 | $0 | — | — | 5,404.5 | 0.0% | $128.50 | View |
| Jeeralang A | JLA03 |
VIC1 | Turbine - OCGT | $0 | $0 | — | — | 5,404.5 | 0.0% | $141.46 | View |
| Jeeralang A | JLA04 |
VIC1 | Turbine - OCGT | $0 | $0 | — | — | 5,404.5 | 0.0% | $177.20 | View |
| Jeeralang B | JLB02 |
VIC1 | Turbine - OCGT | $0 | $0 | — | — | 7,506.2 | 0.0% | $137.71 | View |
| Jeeralang B | JLB03 |
VIC1 | Turbine - OCGT | $0 | $0 | — | — | 7,709.0 | 0.0% | $137.85 | View |
| Kareeya | KAREEYA1 |
QLD1 | Hydro - Run of River | $0 | $0 | — | — | — | 0.0% | $1.00 | View |
| Kennedy Energy Park - Phase 1 - Storage | KEPBG1 |
QLD1 | Storage - Battery | $0 | $0 | — | — | — | 0.0% | $2.03 | View |
| KEPBL1 | KEPBL1 |
$0 | $0 | — | — | — | — | — | View | ||
| KIDSPHG1 | KIDSPHG1 |
$0 | $0 | — | — | — | — | — | View | ||
| KIDSPHG2 | KIDSPHG2 |
$0 | $0 | — | — | — | — | — | View | ||
| KIDSPHL1 | KIDSPHL1 |
$0 | $0 | — | — | — | — | — | View | ||
| KIDSPHL2 | KIDSPHL2 |
$0 | $0 | — | — | — | — | — | View | ||
| Lake Echo | LK_ECHO |
TAS1 | Hydro - Dam | $0 | $0 | — | — | — | 0.0% | $1.17 | View |
| Laverton North | LNGS1 |
VIC1 | Turbine - OCGT | $0 | $0 | — | — | 16,897.7 | 0.0% | $128.50 | View |
| Laverton North | LNGS2 |
VIC1 | Turbine - OCGT | $0 | $0 | — | — | — | 0.0% | $128.50 | View |
| Lonsdale | LONSDALE |
SA1 | Reciprocating Engine - Compression ignition | $0 | $0 | — | — | 1,821.5 | 0.0% | $308.00 | View |
| Loy Yang A Power Station | LYA1 |
VIC1 | Turbine - Steam Sub Critical | $0 | $0 | — | — | — | 0.0% | $47.20 | View |
| MLB01 | MLB01 |
$0 | $0 | — | -408.1 | 22,599.4 | — | — | View | ||
| MLSP1 | MLSP1 |
$0 | $0 | — | 315.5 | — | — | — | View | ||
| Mortlake | MORTLK12 |
VIC1 | Turbine - OCGT | $0 | $0 | — | — | 23,619.9 | 0.0% | $128.50 | View |
| Mt Piper | MP2 |
NSW1 | Turbine - Steam Sub Critical | $0 | $0 | — | — | — | 0.0% | $52.60 | View |
| Millmerran Power Plant | MPP_1 |
QLD1 | Turbine - Steam Super Critical | $0 | $0 | — | — | — | 0.0% | $52.60 | View |
| MREHA1 | MREHA1 |
$0 | $0 | 3,722.4 | -307.1 | 17,865.4 | — | — | View | ||
| MREHA2 | MREHA2 |
$0 | $0 | 4,561.3 | -495.0 | 17,328.4 | — | — | View | ||
| MREHA3 | MREHA3 |
$0 | $0 | 8,658.9 | -794.1 | 17,037.0 | — | — | View | ||
| Mt Stuart | MSTUART2 |
QLD1 | Turbine - OCGT | $0 | $0 | — | — | — | 0.0% | $148.45 | View |
| Mt Stuart | MSTUART3 |
QLD1 | Turbine - OCGT | $0 | $0 | — | — | 11,264.5 | 0.0% | $2.00 | View |
| Newport | NPS |
VIC1 | Turbine - Steam Sub Critical | $0 | $0 | — | — | — | 0.0% | $2.00 | View |
| Oakey Power Station | OAKEY1 |
QLD1 | Turbine - OCGT | $0 | $0 | — | — | 4,452.0 | 0.0% | $128.50 | View |
| Oakey Power Station | OAKEY2 |
QLD1 | Turbine - OCGT | $0 | $0 | — | — | 1,442.5 | 0.0% | $128.50 | View |
| Osborne | OSB-AG |
SA1 | Turbine - CCGT | $0 | $0 | — | — | — | 0.0% | $84.30 | View |
| Paloona | PALOONA |
TAS1 | Hydro - Dam | $0 | $0 | — | — | — | 0.0% | $1.00 | View |
| Port Augusta Renewable Energy Park - Solar | PAREPS1 |
SA1 | Solar PV - Fixed | $0 | $0 | — | — | — | 0.0% | $0.20 | View |
| Port Augusta Renewable Energy Park - Wind | PAREPW1 |
SA1 | Wind Turbine - Onshore | $0 | $0 | — | — | — | 0.0% | $0.50 | View |
| PIONEER | PIONEER |
$0 | $0 | — | 2,707.2 | — | — | — | View | ||
| PLBESS1 | PLBESS1 |
$0 | $0 | — | -74.5 | — | — | — | View | ||
| Port Lincoln GT | POR01 |
SA1 | Turbine - OCGT | $0 | $0 | — | — | — | 0.0% | $2.00 | View |
| Port Lincoln GT | POR03 |
SA1 | Turbine - OCGT | $0 | $0 | — | — | — | 0.0% | $2.00 | View |
| PUMP1 | PUMP1 |
$0 | $0 | — | 8,030.3 | 7,053.3 | — | — | View | ||
| PUMP2 | PUMP2 |
$0 | $0 | — | 6,905.0 | 5,870.2 | — | — | View | ||
| Quarantine | QPS1 |
SA1 | Turbine - OCGT | $0 | $0 | — | — | 2,684.7 | 0.0% | $128.50 | View |
| Quarantine | QPS2 |
SA1 | Turbine - OCGT | $0 | $0 | — | — | 2,288.9 | 0.0% | $128.50 | View |
| Quarantine | QPS3 |
SA1 | Turbine - OCGT | $0 | $0 | — | — | 2,703.2 | 0.0% | $128.50 | View |
| Quarantine | QPS4 |
SA1 | Turbine - OCGT | $0 | $0 | — | — | — | 0.0% | $128.50 | View |
| Roma | ROMA_7 |
QLD1 | Turbine - OCGT | $0 | $0 | — | — | 3,247.8 | 0.0% | $128.50 | View |
| Roma | ROMA_8 |
QLD1 | Turbine - OCGT | $0 | $0 | — | — | 3,154.2 | 0.0% | $128.50 | View |
| RT_NSW1 | RT_NSW1 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_NSW2 | RT_NSW2 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_NSW3 | RT_NSW3 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_NSW4 | RT_NSW4 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_NSW5 | RT_NSW5 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_NSW6 | RT_NSW6 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_QLD1 | RT_QLD1 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_SA1 | RT_SA1 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_SA2 | RT_SA2 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_SA3 | RT_SA3 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_SA4 | RT_SA4 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_SA5 | RT_SA5 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_SA6 | RT_SA6 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_TAS1 | RT_TAS1 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_VIC1 | RT_VIC1 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_VIC10 | RT_VIC10 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_VIC11 | RT_VIC11 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_VIC12 | RT_VIC12 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_VIC2 | RT_VIC2 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_VIC3 | RT_VIC3 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_VIC4 | RT_VIC4 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_VIC5 | RT_VIC5 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_VIC6 | RT_VIC6 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_VIC7 | RT_VIC7 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_VIC8 | RT_VIC8 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_VIC9 | RT_VIC9 |
$0 | $0 | — | — | — | — | — | View | ||
| SHPUMP | SHPUMP |
$0 | $0 | — | 1,143.5 | 1,127.0 | — | — | View | ||
| Smithfield Energy Facility | SITHE01 |
NSW1 | Turbine - OCGT | $0 | $0 | — | — | — | 0.0% | $128.50 | View |
| Snapper Point Power Station | SNAPPER1 |
SA1 | Turbine - OCGT | $0 | $0 | — | — | 14,941.5 | 0.0% | $128.50 | View |
| SNOWYGJP | SNOWYGJP |
$0 | $0 | 210.5 | — | — | — | — | View | ||
| SNOWYP | SNOWYP |
$0 | $0 | — | 3,040.4 | 868.5 | — | — | View | ||
| Snuggery | SNUG1 |
SA1 | Turbine - OCGT | $0 | $0 | — | — | — | 0.0% | $2.00 | View |
| STABESS1 | STABESS1 |
$0 | $0 | — | -3.3 | — | — | — | View | ||
| Tallawarra B | TALWB1 |
NSW1 | Turbine - OCGT | $0 | $0 | — | — | 31,526.2 | 0.0% | $128.50 | View |
| Tarong | TARONG#3 |
QLD1 | Turbine - Steam Sub Critical | $0 | $0 | — | — | — | 0.0% | $55.48 | View |
| TB3B1 | TB3B1 |
$0 | $0 | — | -44.1 | 604.9 | — | — | View | ||
| Torrens Island B | TORRB2 |
SA1 | Turbine - Steam Sub Critical | $0 | $0 | — | — | — | 0.0% | $5.47 | View |
| Torrens Island B | TORRB4 |
SA1 | Turbine - Steam Sub Critical | $0 | $0 | — | — | — | 0.0% | $2.00 | View |
| Tungatinah | TUNGATIN |
TAS1 | Hydro - Dam | $0 | $0 | — | — | — | 0.0% | $1.00 | View |
| Tamar Valley Combined Cycle | TVCC201 |
TAS1 | Turbine - CCGT | $0 | $0 | — | — | — | 0.0% | $84.30 | View |
| Uranquinty | URANQ11 |
NSW1 | Turbine - OCGT | $0 | $0 | — | — | 6,614.0 | 0.0% | $128.50 | View |
| Uranquinty | URANQ12 |
NSW1 | Turbine - OCGT | $0 | $0 | — | — | 6,744.5 | 0.0% | $128.50 | View |
| Uranquinty | URANQ13 |
NSW1 | Turbine - OCGT | $0 | $0 | — | — | 14,491.0 | 0.0% | $128.50 | View |
| Uranquinty | URANQ14 |
NSW1 | Turbine - OCGT | $0 | $0 | — | — | 12,116.3 | 0.0% | $128.50 | View |
| Uungula Wind Farm | UWF1 |
NSW1 | Wind Turbine - Onshore | $0 | $0 | — | — | — | 0.0% | $0.50 | View |
| VENUS1 | VENUS1 |
$0 | $0 | 53.5 | — | — | — | — | View | ||
| Valley Power | VPGS1 |
VIC1 | Turbine - OCGT | $0 | $0 | — | — | 5,471.5 | 0.0% | $128.50 | View |
| Valley Power | VPGS2 |
VIC1 | Turbine - OCGT | $0 | $0 | — | — | 5,471.5 | 0.0% | $128.50 | View |
| Valley Power | VPGS3 |
VIC1 | Turbine - OCGT | $0 | $0 | — | — | 5,471.5 | 0.0% | $128.50 | View |
| Valley Power | VPGS4 |
VIC1 | Turbine - OCGT | $0 | $0 | — | — | 5,181.7 | 0.0% | $128.50 | View |
| Valley Power | VPGS5 |
VIC1 | Turbine - OCGT | $0 | $0 | — | — | 5,181.7 | 0.0% | $128.50 | View |
| Valley Power | VPGS6 |
VIC1 | Turbine - OCGT | $0 | $0 | — | — | 5,181.7 | 0.0% | $128.50 | View |
| VSNEL2S1 | VSNEL2S1 |
$0 | $0 | — | — | — | — | — | View | ||
| VSQHT1V1 | VSQHT1V1 |
$0 | $0 | — | — | — | — | — | View | ||
| VSSAE1V1 | VSSAE1V1 |
$0 | $0 | 158.1 | — | — | — | — | View | ||
| VSSSE1V1 | VSSSE1V1 |
$0 | $0 | — | — | — | — | — | View | ||
| VSSSH1S1 | VSSSH1S1 |
$0 | $0 | — | — | — | — | — | View | ||
| VSVEL2S1 | VSVEL2S1 |
$0 | $0 | — | — | — | — | — | View | ||
| W/HOE#1 | W/HOE#1 |
$0 | $0 | 252.6 | 4,987.4 | 16,926.1 | — | — | View | ||
| W/HOE#2 | W/HOE#2 |
$0 | $0 | 333.3 | 3,506.3 | 18,578.1 | — | — | View | ||
| Wambo Wind Farm | WAMBOWF1 |
QLD1 | Wind Turbine - Onshore | $0 | $0 | — | — | — | 0.0% | $0.50 | View |
| WAMBOWF2 | WAMBOWF2 |
$0 | $0 | — | 3,335.8 | 3,276.0 | — | — | View | ||
| WNSF1 | WNSF1 |
$0 | $0 | — | 632.3 | — | — | — | View | ||
| WOOLES1 | WOOLES1 |
$0 | $0 | — | -406.5 | 2,628.0 | — | — | View | ||
| Townsville Power Station | YABULU |
QLD1 | Turbine - CCGT | $0 | $0 | — | — | — | 0.0% | $84.30 | View |
| Townsville Power Station | YABULU2 |
QLD1 | Turbine - CCGT | $0 | $0 | — | — | — | 0.0% | $84.30 | View |
| Yarwun 1 | YARWUN_1 |
QLD1 | Turbine - CCGT | $0 | $0 | — | — | — | 0.0% | $84.30 | View |
| WINNSF1 | WINNSF1 |
$0 | $0 | — | — | — | — | — | View | ||
| Rowallan | ROWALLAN |
TAS1 | Hydro - Dam | $-42 | $0 | — | -0.5 | — | 0.0% | $1.00 | View |
| Happy Valley Reservoir | HVWWPV1 |
SA1 | Solar PV - Single axis tracking | $-72 | $0 | — | 23.1 | 44.1 | 1.9% | $0.00 | View |
| Summerfield BESS | SMFBESS2 |
SA1 | Storage - Battery | $-368 | $0 | — | -6.1 | — | 0.0% | $1.50 | View |
| Broken Hill | BHB1 |
NSW1 | Storage - Battery | $-437 | $0 | — | -96.2 | 1,373.9 | -1.8% | $1.50 | View |
| Riverina Energy Storage System 2 | RIVNB2 |
NSW1 | Storage - Battery | $-735 | $0 | — | -119.5 | 2,199.2 | -1.7% | $1.50 | View |
| Queanbeyan BESS | QBYNB1 |
NSW1 | Storage - Battery | $-1.4k | $0 | — | -12.7 | — | -1.2% | $1.50 | View |
| Hallett GT | AGLHAL |
SA1 | Turbine - OCGT | $-6.4k | $0 | — | 165.4 | 19,935.2 | 0.6% | $100.22 | View |