MLF-adjusted revenue, dispatch, capacity factor, and estimated SRMC from AEMO 5‑minute dispatch data. Data through 06 Nov 2026, 11:20 AEST.
Energy revenue = cleared MW × (5/60 h) × regional RRP × MLF. FCAS revenue = sum of cleared FCAS MW × (5/60 h) × regional FCAS price × MLF (raise/lower 6s, 60s, 5min, reg). FCAS volume = total FCAS enablement MWh across all services. Capacity factor = dispatched MWh ÷ (nameplate MW × period hours). SRMC from financial assumptions. Not AEMO settlement data.
| Site | DUID | Region | Tech | Energy rev. (× MLF) | FCAS rev. (× MLF) | FCAS MWh | MWh dispatch | MWh available | Capacity factor | Est. SRMC | |
|---|---|---|---|---|---|---|---|---|---|---|---|
| Bayswater | BW02 |
NSW1 | Turbine - Steam Sub Critical | $8.72M | $2.1k | 1,516.1 | 92,885.0 | 109,745.4 | 80.7% | $26.23 | View |
| Bayswater | BW04 |
NSW1 | Turbine - Steam Sub Critical | $8.66M | $2.2k | 1,638.0 | 92,790.2 | 108,831.6 | 80.6% | $55.48 | View |
| Bayswater | BW01 |
NSW1 | Turbine - Steam Sub Critical | $8.47M | $2.0k | 1,339.9 | 90,658.1 | 105,544.6 | 81.8% | $53.57 | View |
| Eraring | ER03 |
NSW1 | Turbine - Steam Sub Critical | $7.76M | $783 | 92.6 | 77,061.9 | 107,080.8 | 63.7% | $49.77 | View |
| Eraring | ER01 |
NSW1 | Turbine - Steam Sub Critical | $7.41M | $504 | 64.5 | 76,883.5 | 97,488.3 | 63.6% | $48.29 | View |
| Mt Piper | MP1 |
NSW1 | Turbine - Steam Sub Critical | $7.24M | $0 | — | 71,091.8 | 117,247.5 | 58.0% | $49.24 | View |
| Vales Point B | VP5 |
NSW1 | Turbine - Steam Sub Critical | $6.01M | $8 | 44.6 | 61,226.9 | 103,224.2 | 55.2% | $52.60 | View |
| Loy Yang B | LOYYB1 |
VIC1 | Turbine - Steam Sub Critical | $5.97M | $776 | 2,055.1 | 92,319.5 | 92,047.8 | 94.7% | $47.20 | View |
| Loy Yang B | LOYYB2 |
VIC1 | Turbine - Steam Sub Critical | $5.93M | $839 | 2,086.7 | 91,744.7 | 91,552.7 | 94.2% | $47.20 | View |
| Loy Yang A Power Station | LYA3 |
VIC1 | Turbine - Steam Sub Critical | $5.50M | $389 | 1,336.7 | 73,466.3 | 87,078.3 | 78.1% | $47.20 | View |
| Loy Yang A Power Station | LYA4 |
VIC1 | Turbine - Steam Sub Critical | $5.48M | $408 | 1,380.2 | 73,203.6 | 86,137.1 | 77.8% | $47.20 | View |
| Vales Point B | VP6 |
NSW1 | Turbine - Steam Sub Critical | $5.47M | $3 | 21.4 | 57,127.0 | 81,774.2 | 51.5% | $52.60 | View |
| Loy Yang A Power Station | LYA2 |
VIC1 | Turbine - Steam Sub Critical | $5.31M | $487 | 337.1 | 74,544.8 | 84,513.3 | 83.7% | $47.20 | View |
| Millmerran Power Plant | MPP_2 |
QLD1 | Turbine - Steam Super Critical | $5.21M | $0 | — | 66,840.3 | 67,201.3 | 93.4% | $52.60 | View |
| Callide C | CPP_3 |
QLD1 | Turbine - Steam Super Critical | $4.67M | $0 | — | 60,512.0 | 65,158.0 | 85.0% | $44.41 | View |
| Callide C | CPP_4 |
QLD1 | Turbine - Steam Super Critical | $4.63M | $0 | — | 60,056.2 | 64,056.7 | 85.1% | $101.94 | View |
| Tarong North | TNPS1 |
QLD1 | Turbine - Steam Super Critical | $4.16M | $0 | — | 52,708.2 | 60,855.0 | 69.7% | $52.60 | View |
| Tarong | TARONG#1 |
QLD1 | Turbine - Steam Sub Critical | $4.11M | $6 | 0.4 | 50,188.9 | 54,470.4 | 85.4% | $52.60 | View |
| Tarong | TARONG#2 |
QLD1 | Turbine - Steam Sub Critical | $4.09M | $798 | 130.4 | 50,068.5 | 54,470.4 | 85.2% | $55.48 | View |
| Tarong | TARONG#4 |
QLD1 | Turbine - Steam Sub Critical | $4.09M | $824 | 151.9 | 50,029.0 | 54,064.6 | 85.1% | $52.58 | View |
| Stanwell | STAN-1 |
QLD1 | Turbine - Steam Sub Critical | $3.87M | $502 | 168.2 | 49,931.4 | 55,545.4 | 81.4% | $52.60 | View |
| Yallourn W | YWPS4 |
VIC1 | Turbine - Steam Sub Critical | $3.82M | $0 | — | 59,023.3 | 60,791.2 | 93.7% | $47.20 | View |
| Stanwell | STAN-2 |
QLD1 | Turbine - Steam Sub Critical | $3.64M | $760 | 122.4 | 47,123.8 | 52,921.7 | 76.8% | $52.60 | View |
| Yallourn W | YWPS1 |
VIC1 | Turbine - Steam Sub Critical | $3.35M | $0 | — | 54,769.9 | 52,639.2 | 93.1% | $47.20 | View |
| Murray 2 | MURRAY |
VIC1 | Hydro - Dam | $3.31M | $1.6k | 1,497.2 | 27,721.2 | 173,036.5 | 27.5% | $1.00 | View |
| Gordon | GORDON |
TAS1 | Hydro - Dam | $3.28M | $18.9k | 6,807.3 | 38,265.3 | 45,597.3 | 52.7% | $1.05 | View |
| Callide B | CALL_B_1 |
QLD1 | Turbine - Steam Sub Critical | $3.16M | $224 | 111.3 | 42,364.0 | 56,200.4 | 72.0% | $32.60 | View |
| Kogan Creek | KPP_1 |
QLD1 | Turbine - Steam Super Critical | $3.13M | $0 | — | 46,639.2 | 42,140.2 | 37.3% | $52.60 | View |
| Callide B | CALL_B_2 |
QLD1 | Turbine - Steam Sub Critical | $2.91M | $0 | — | 40,809.8 | 42,838.3 | 69.4% | $55.48 | View |
| Stanwell | STAN-3 |
QLD1 | Turbine - Steam Sub Critical | $2.60M | $20 | 1.7 | 35,392.8 | 38,257.9 | 57.7% | $52.60 | View |
| Gladstone | GSTONE4 |
QLD1 | Turbine - Steam Sub Critical | $2.50M | $293 | 88.1 | 31,274.8 | 42,947.5 | 66.5% | $52.60 | View |
| Gladstone | GSTONE2 |
QLD1 | Turbine - Steam Sub Critical | $2.45M | $748 | 211.7 | 30,515.1 | 44,648.3 | 64.9% | $49.17 | View |
| Gladstone | GSTONE1 |
QLD1 | Turbine - Steam Sub Critical | $2.38M | $543 | 212.8 | 29,772.4 | 40,770.0 | 63.3% | $52.99 | View |
| Stanwell | STAN-4 |
QLD1 | Turbine - Steam Sub Critical | $2.38M | $0 | — | 32,996.5 | 33,562.1 | 53.8% | $52.60 | View |
| Gladstone | GSTONE5 |
QLD1 | Turbine - Steam Sub Critical | $2.38M | $723 | 258.4 | 29,008.4 | 41,872.5 | 61.7% | $58.48 | View |
| Upper Tumut | UPPTUMUT |
NSW1 | Hydro - Dam | $2.36M | $2.3k | 2,874.9 | 21,403.3 | 86,403.2 | 20.7% | $1.00 | View |
| MacIntyre Wind Farm | MCINTYR1 |
QLD1 | Wind Turbine - Onshore | $2.30M | $0 | — | 32,385.7 | 30,356.8 | 20.9% | $0.58 | View |
| Gladstone | GSTONE6 |
QLD1 | Turbine - Steam Sub Critical | $2.20M | $744 | 272.7 | 27,761.6 | 42,557.1 | 59.0% | $54.96 | View |
| Poatina | POAT220 |
TAS1 | Hydro - Dam | $2.19M | $12.1k | 5,075.9 | 20,260.3 | 38,600.0 | 60.3% | $1.00 | View |
| Rye Park Wind Farm | RYEPARK1 |
NSW1 | Wind Turbine - Onshore | $1.76M | $0 | — | 22,014.1 | 21,784.3 | 33.1% | $0.50 | View |
| Clarke Creek Wind Farm | CLRKCWF1 |
QLD1 | Wind Turbine - Onshore | $1.75M | $0 | — | 20,196.1 | 20,633.2 | 34.7% | $0.00 | View |
| Coopers Gap Wind Farm | COOPGWF1 |
QLD1 | Wind Turbine - Onshore | $1.73M | $0 | — | 20,027.8 | 22,017.2 | 26.3% | $0.68 | View |
| Pelican Point | PPCCGT |
SA1 | Turbine - CCGT | $1.67M | $0 | — | 18,072.5 | 21,502.5 | 20.3% | $84.30 | View |
| Tumut 3 | TUMUT3 |
NSW1 | Hydro - Dam | $1.55M | $1.1k | 2,156.3 | 15,384.6 | 268,058.4 | 6.1% | $1.05 | View |
| Eraring | ER04 |
NSW1 | Turbine - Steam Sub Critical | $1.26M | $36 | 6.2 | 15,433.6 | 36,229.0 | 12.8% | $55.48 | View |
| Wellington North Solar Farm (Lightsource) | WELNSF1 |
NSW1 | Solar PV - Single axis tracking | $1.18M | $0 | — | 20,562.4 | 19,127.5 | 28.0% | $0.25 | View |
| John Butters | JBUTTERS |
TAS1 | Hydro - Dam | $1.13M | $7.9k | 1,902.1 | 10,360.5 | 23,160.0 | 42.8% | $0.00 | View |
| Mortlake | MORTLK11 |
VIC1 | Turbine - OCGT | $1.07M | $0 | — | 8,525.4 | 37,637.8 | 17.4% | $128.50 | View |
| Barker Inlet Power Station | BARKIPS1 |
SA1 | Reciprocating Engine - Spark ignition | $1.06M | $0 | — | 8,016.1 | 29,581.3 | 22.7% | $9.00 | View |
| Stockyard Hill Wind Farm | STOCKYD1 |
VIC1 | Wind Turbine - Onshore | $1.04M | $0 | — | 27,108.3 | 26,316.3 | 30.6% | $0.50 | View |
| Dulacca Wind Farm | DULAWF1 |
QLD1 | Wind Turbine - Onshore | $962.1k | $0 | — | 12,396.0 | 12,206.9 | 42.7% | $0.53 | View |
| Silverton Wind Farm | STWF1 |
NSW1 | Wind Turbine - Onshore | $949.2k | $0 | — | 10,796.0 | 10,959.2 | 32.3% | $0.50 | View |
| Catagunya / Liapootah / Wayatinah | LI_WY_CA |
TAS1 | Hydro - Dam | $938.4k | $358 | 411.3 | 11,184.5 | 28,282.3 | 37.7% | $1.05 | View |
| Wollar Solar Farm | WOLARSF1 |
NSW1 | Solar PV - Single axis tracking | $833.3k | $0 | — | 14,722.3 | 13,647.0 | 31.3% | $0.25 | View |
| Tallawarra | TALWA1 |
NSW1 | Turbine - CCGT | $800.0k | $0 | — | 6,539.0 | 9,576.5 | 9.7% | $84.30 | View |
| Torrens Island B | TORRB3 |
SA1 | Turbine - Steam Sub Critical | $791.5k | $1.2k | 1,417.3 | 9,981.4 | 27,366.7 | 29.7% | $2.00 | View |
| Yallourn W | YWPS3 |
VIC1 | Turbine - Steam Sub Critical | $770.4k | $0 | — | 19,095.5 | 20,197.5 | 30.3% | $47.20 | View |
| Stubbo Solar Farm | STUBSF1 |
NSW1 | Solar PV - Single axis tracking | $747.7k | $0 | — | 12,594.9 | 11,767.7 | 37.9% | $0.25 | View |
| Stubbo Solar Farm | STUBSF2 |
NSW1 | Solar PV - Single axis tracking | $741.1k | $0 | — | 12,409.5 | 11,613.9 | 36.6% | $0.25 | View |
| Tarraleah | TARRALEA |
TAS1 | Hydro - Dam | $719.7k | $0 | — | 9,753.4 | 9,303.8 | 64.5% | $1.00 | View |
| Musselroe Wind Farm | MUSSELR1 |
TAS1 | Wind Turbine - Onshore | $698.5k | $0 | — | 10,118.4 | 9,109.2 | 35.9% | $0.50 | View |
| Reece | REECE2 |
TAS1 | Hydro - Dam | $656.5k | $3.9k | 4,662.6 | 6,019.9 | 16,852.5 | 31.0% | $1.00 | View |
| Western Downs Green Power Hub P/L | WDGPH1 |
QLD1 | Solar PV - Single axis tracking | $654.0k | $232 | 35.6 | 20,775.4 | 18,843.6 | 30.9% | $0.32 | View |
| Tribute | TRIBUTE |
TAS1 | Hydro - Dam | $647.6k | $2.3k | 1,057.1 | 6,209.1 | 14,332.1 | 44.6% | $1.00 | View |
| Poatina | POAT110 |
TAS1 | Hydro - Dam | $639.3k | $14.3k | 1,639.6 | 7,222.8 | 9,650.0 | 43.0% | $1.00 | View |
| Flyers Creek Wind Farm | FLYCRKWF |
NSW1 | Wind Turbine - Onshore | $621.7k | $0 | — | 6,887.3 | 6,896.5 | 28.2% | $0.58 | View |
| Gullen Range Wind Farm | GULLRWF1 |
NSW1 | Wind Turbine - Onshore | $592.7k | $0 | — | 7,633.4 | 7,524.7 | 27.5% | $0.53 | View |
| Collector | COLWF01 |
NSW1 | Wind Turbine - Onshore | $585.3k | $0 | — | 7,551.6 | 7,456.7 | 19.8% | $0.65 | View |
| Darlington Point Solar Farm | DARLSF1 |
NSW1 | Solar PV - Single axis tracking | $576.0k | $0 | — | 11,517.0 | 10,731.1 | 24.9% | $0.33 | View |
| Darling Downs | DDPS1 |
QLD1 | Turbine - CCGT | $568.5k | $0 | — | 5,348.0 | 5,542.2 | 4.9% | $3.31 | View |
| Goyder South Wind Farm 1A | GSWF1A |
SA1 | Wind Turbine - Onshore | $564.1k | $0 | — | 9,833.9 | 12,222.4 | 28.0% | $0.55 | View |
| Murra Warra Wind Farm - stage 1 | MUWAWF1 |
VIC1 | Wind Turbine - Onshore | $561.7k | $0 | — | 9,094.8 | 12,851.9 | 24.0% | $0.50 | View |
| Culcairn Solar Farm | CUSF1 |
NSW1 | Solar PV - Single axis tracking | $544.4k | $0 | — | 8,645.6 | 16,765.9 | 14.7% | $0.25 | View |
| Bango 973 Wind Farm | BANGOWF1 |
NSW1 | Wind Turbine - Onshore | $538.8k | $0 | — | 6,673.6 | 7,325.3 | 25.0% | $0.00 | View |
| Goyder South Wind Farm 1B | GSWF1B1 |
SA1 | Wind Turbine - Onshore | $523.4k | $0 | — | 8,274.0 | 11,681.4 | 24.2% | $0.00 | View |
| Clarke Creek Wind Farm | CLRKCWF2 |
QLD1 | Wind Turbine - Onshore | $522.6k | $0 | — | 6,008.2 | 6,040.3 | 34.6% | $0.58 | View |
| Cattle Hill Wind Farm | CTHLWF1 |
TAS1 | Wind Turbine - Onshore | $520.6k | $0 | — | 7,549.9 | 7,265.6 | 31.2% | $0.66 | View |
| Hume Dam NSW | HUMENSW |
NSW1 | Hydro - Dam | $519.8k | $0 | — | 6,085.5 | 5,988.0 | 100.0% | $1.05 | View |
| Broadsound Solar Farm | BRDDSF01 |
QLD1 | Solar PV - Single axis tracking | $518.7k | $0 | — | 14,532.9 | 14,042.8 | 23.5% | $0.27 | View |
| Boco Rock Wind Farm | BOCORWF1 |
NSW1 | Wind Turbine - Onshore | $502.5k | $0 | — | 6,699.7 | 6,699.3 | 35.3% | $0.00 | View |
| Gullen Range Wind Farm 2 | GULLRWF2 |
NSW1 | Wind Turbine - Onshore | $499.1k | $0 | — | 6,139.2 | 6,106.1 | 33.0% | $0.50 | View |
| Eraring Big Battery | ERB01 |
NSW1 | Storage - Battery | $480.9k | $8 | 431.3 | -1,282.2 | 63,323.0 | -3.2% | $1.58 | View |
| Wellington Solar Farm | WELLSF1 |
NSW1 | Solar PV - Single axis tracking | $477.3k | $0 | — | 8,904.6 | 8,782.4 | 24.5% | $0.25 | View |
| Sapphire Wind Farm | SAPHWF1 |
SA1 | Wind Turbine - Onshore | $477.0k | $0 | — | 10,448.1 | 10,000.5 | 23.0% | $0.50 | View |
| Avonlie Solar Farm | AVLSF1 |
NSW1 | Solar PV - Single axis tracking | $471.3k | $0 | — | 9,208.7 | 8,916.5 | 21.6% | $0.00 | View |
| Supernode BESS | SNB02 |
QLD1 | Storage - Battery | $464.9k | $5.1k | 2,543.9 | -794.5 | 38,910.2 | -1.8% | $1.50 | View |
| Bodangora Wind Farm | BODWF1 |
NSW1 | Wind Turbine - Onshore | $453.7k | $0 | — | 5,411.5 | 5,349.3 | 28.5% | $0.68 | View |
| Crudine Ridge Wind Farm | CRURWF1 |
NSW1 | Wind Turbine - Onshore | $453.2k | $0 | — | 6,123.4 | 6,134.3 | 25.7% | $0.53 | View |
| Capital Wind Farm | CAPTL_WF |
NSW1 | Wind Turbine - Onshore | $446.4k | $0 | — | 5,510.8 | — | 23.3% | $0.00 | View |
| Bastyan | BASTYAN |
TAS1 | Hydro - Dam | $440.4k | $1.2k | 445.7 | 4,081.0 | 9,520.0 | 30.4% | $0.00 | View |
| New England Solar Farm | NEWENSF2 |
NSW1 | Solar PV - Single axis tracking | $438.6k | $0 | — | 7,230.9 | 6,880.8 | 21.5% | $0.25 | View |
| Suntop Solar Farm | SUNTPSF1 |
NSW1 | Solar PV - Single axis tracking | $433.3k | $0 | — | 7,403.3 | 7,807.9 | 29.4% | $0.25 | View |
| Mackintosh | MACKNTSH |
TAS1 | Hydro - Dam | $430.6k | $1.1k | 463.6 | 4,024.4 | 13,003.5 | 30.0% | $1.00 | View |
| Blowering | BLOWERNG |
NSW1 | Hydro - Dam | $428.3k | $0 | — | 5,123.6 | 4,786.6 | 38.1% | $0.00 | View |
| Taralga Wind Farm | TARALGA1 |
NSW1 | Wind Turbine - Onshore | $419.4k | $0 | — | 5,375.5 | 5,286.5 | 30.0% | $0.50 | View |
| Murra Warra Wind Farm - stage 2 | MUWAWF2 |
VIC1 | Wind Turbine - Onshore | $411.3k | $0 | — | 7,587.1 | 11,003.8 | 21.6% | $0.50 | View |
| Limondale Solar Farm 1 | LIMOSF11 |
NSW1 | Solar PV - Single axis tracking | $405.8k | $0 | — | 8,153.5 | 7,725.3 | 21.1% | $0.25 | View |
| Moorabool Wind Farm | MOORAWF1 |
VIC1 | Wind Turbine - Onshore | $404.6k | $0 | — | 12,791.3 | 12,930.8 | 24.4% | $0.50 | View |
| New England Solar Farm | NEWENSF1 |
NSW1 | Solar PV - Single axis tracking | $401.2k | $0 | — | 6,729.5 | 6,408.7 | 20.0% | $0.25 | View |
| Templers B BESS | TEMPB1 |
SA1 | Storage - Battery | $400.2k | $0 | — | -320.4 | 13,695.8 | -1.7% | $1.50 | View |
| Golden Plains Wind Farm West | GPWFWST2 |
VIC1 | Wind Turbine - Onshore | $390.6k | $0 | — | 7,146.5 | 9,926.7 | 7.6% | $0.53 | View |
| Aldoga Solar Farm | ALDGASF1 |
QLD1 | Solar PV - Single axis tracking | $387.8k | $0 | — | 16,155.9 | 16,672.6 | 24.8% | $0.00 | View |
| Woolnorth Studland Bay / Bluff Point | WOOLNTH1 |
TAS1 | Wind Turbine - Onshore | $384.3k | $0 | — | 6,831.5 | — | 29.5% | $0.53 | View |
| Bango 999 Wind Farm | BANGOWF2 |
NSW1 | Wind Turbine - Onshore | $380.8k | $0 | — | 4,756.2 | 4,864.4 | 33.4% | $0.00 | View |
| Ryan Corner Wind Farm | RYANCWF1 |
VIC1 | Wind Turbine - Onshore | $378.5k | $0 | — | 8,699.6 | 10,327.2 | 23.7% | $0.50 | View |
| Sunraysia Solar Farm | SUNRSF1 |
NSW1 | Solar PV - Single axis tracking | $377.1k | $0 | — | 7,649.9 | 7,208.0 | 19.9% | $0.25 | View |
| Reece | REECE1 |
TAS1 | Hydro - Dam | $368.2k | $6.0k | 3,718.5 | 3,382.4 | 15,050.0 | 17.4% | $1.00 | View |
| Lincoln Gap Wind Farm - stage 1 | LGAPWF1 |
SA1 | Wind Turbine - Onshore | $363.5k | $0 | — | 4,851.6 | 6,103.9 | 22.9% | $0.50 | View |
| Blyth BESS | BLYTHB1 |
SA1 | Storage - Battery | $360.7k | $10.9k | 9,169.2 | -1,285.4 | 30,472.1 | -3.8% | $4.86 | View |
| Orana BESS | ORABESS1 |
NSW1 | Storage - Battery | $355.0k | $8.6k | 5,488.9 | -2,305.9 | 60,980.2 | -3.3% | $1.50 | View |
| Crookwell 2 Wind Farm | CROOKWF2 |
NSW1 | Wind Turbine - Onshore | $354.1k | $0 | — | 4,673.4 | 4,715.3 | 29.0% | $0.69 | View |
| Macarthur Wind Farm | MACARTH1 |
VIC1 | Wind Turbine - Onshore | $353.8k | $0 | — | 10,903.5 | 12,310.2 | 15.5% | $0.50 | View |
| Somerton | AGLSOM |
VIC1 | Turbine - OCGT | $351.8k | $0 | — | 2,766.8 | 14,491.9 | 9.7% | $128.50 | View |
| Golden Plains Wind Farm East | GPWFEST1 |
VIC1 | Wind Turbine - Onshore | $347.6k | $0 | — | 5,898.8 | 9,907.8 | 14.2% | $0.00 | View |
| Waratah Super Battery | WTAHB1 |
NSW1 | Storage - Battery | $346.8k | $0 | — | -1,740.9 | 123,664.1 | -1.2% | $1.50 | View |
| White Rock Wind Farm - Stage 1 | WRWF1 |
NSW1 | Wind Turbine - Onshore | $344.5k | $0 | — | 4,587.7 | 4,637.1 | 15.6% | $0.50 | View |
| Waubra | WAUBRAWF |
VIC1 | Wind Turbine - Onshore | $338.1k | $0 | — | 8,016.8 | — | 24.9% | $0.50 | View |
| Kaban Wind Farm | KABANWF1 |
QLD1 | Wind Turbine - Onshore | $327.7k | $0 | — | 3,767.1 | 3,641.4 | 14.3% | $0.00 | View |
| Nevertire Solar Farm | NEVERSF1 |
NSW1 | Solar PV - Single axis tracking | $320.4k | $0 | — | 5,550.4 | 5,955.1 | 31.6% | $0.25 | View |
| Barron Gorge | BARRON-2 |
QLD1 | Hydro - Run of River | $303.8k | $0 | — | 3,226.0 | 3,791.1 | 54.9% | $0.00 | View |
| Moranbah North | MBAHNTH |
QLD1 | Reciprocating Engine - Spark ignition | $302.7k | $0 | — | 3,947.9 | — | 36.8% | $57.00 | View |
| Gunnedah Solar Farm | GNNDHSF1 |
NSW1 | Solar PV - Single axis tracking | $294.6k | $0 | — | 5,162.8 | 5,971.6 | 27.9% | $0.33 | View |
| Ararat Wind Farm | ARWF1 |
VIC1 | Wind Turbine - Onshore | $288.5k | $0 | — | 7,403.2 | 7,555.8 | 18.4% | $0.00 | View |
| Lake Bonney 2 Wind Farm | LKBONNY2 |
SA1 | Wind Turbine - Onshore | $286.4k | $0 | — | 4,479.1 | 6,749.2 | 16.8% | $0.86 | View |
| Tarong BESS - Stanwell | TARBESS1 |
QLD1 | Storage - Battery | $286.2k | $5.1k | 18,394.8 | -288.0 | 29,955.8 | -0.6% | $1.50 | View |
| Golden Plains Wind Farm West | GPWFWST1 |
VIC1 | Wind Turbine - Onshore | $286.1k | $0 | — | 6,196.5 | 7,665.4 | 6.6% | $0.53 | View |
| Lincoln Gap Wind Farm - Stage 2 | LGAPWF2 |
SA1 | Wind Turbine - Onshore | $284.0k | $0 | — | 3,953.2 | 5,104.6 | 27.2% | $0.50 | View |
| Dundonnell Wind Farm | DUNDWF1 |
VIC1 | Wind Turbine - Onshore | $283.3k | $0 | — | 5,392.3 | 7,725.9 | 19.1% | $0.66 | View |
| Hallett 4 North Brown Hill | NBHWF1 |
SA1 | Wind Turbine - Onshore | $280.9k | $0 | — | 3,595.3 | 4,877.9 | 16.2% | $0.80 | View |
| Granville Harbour Wind Farm | GRANWF1 |
TAS1 | Wind Turbine - Onshore | $279.5k | $0 | — | 5,091.5 | 4,597.1 | 27.2% | $0.66 | View |
| Broadwater | BWTR1 |
NSW1 | Turbine - Steam Sub Critical | $278.0k | $0 | — | 3,082.3 | — | 48.3% | $124.22 | View |
| Metz Solar Farm | METZSF1 |
NSW1 | Solar PV - Single axis tracking | $276.9k | $0 | — | 4,690.5 | 4,545.7 | 20.7% | $0.25 | View |
| Bulgana Green Power Hub - Wind Farm | BULGANA1 |
VIC1 | Wind Turbine - Onshore | $275.6k | $0 | — | 7,273.3 | 7,329.7 | 21.2% | $0.00 | View |
| Snowtown Wind Farm | SNOWTWN1 |
SA1 | Wind Turbine - Onshore | $271.8k | $0 | — | 4,279.6 | 6,151.1 | 25.8% | $0.50 | View |
| Beryl Solar Farm | BERYLSF1 |
NSW1 | Solar PV - Single axis tracking | $271.4k | $0 | — | 4,743.8 | 4,451.8 | 28.7% | $0.25 | View |
| Golden Plains Wind Farm East | GPWFEST2 |
VIC1 | Wind Turbine - Onshore | $270.2k | $0 | — | 5,029.3 | 9,002.1 | 11.5% | $0.50 | View |
| Columboola Solar Farm | COLUMSF1 |
QLD1 | Solar PV - Single axis tracking | $267.9k | $0 | — | 8,605.9 | 7,861.5 | 23.6% | $0.32 | View |
| Kareeya | KAREEYA2 |
QLD1 | Hydro - Run of River | $264.5k | $0 | — | 3,499.5 | 3,538.3 | 96.4% | $1.00 | View |
| Kareeya | KAREEYA3 |
QLD1 | Hydro - Run of River | $264.3k | $0 | — | 3,452.9 | 3,538.3 | 95.2% | $1.05 | View |
| Tamar Valley Peaking | TVPP104 |
TAS1 | Turbine - OCGT | $263.0k | $0 | — | 2,311.5 | 5,971.0 | 23.7% | $128.50 | View |
| Trevallyn | TREVALLN |
TAS1 | Hydro - Dam | $261.8k | $55 | 69.7 | 2,978.7 | 14,657.3 | 19.1% | $1.00 | View |
| Portland Wind Farm | PORTWF |
VIC1 | Wind Turbine - Onshore | $259.2k | $0 | — | 6,023.4 | — | 23.6% | $0.50 | View |
| Torrens Island BESS | TIB1 |
SA1 | Storage - Battery | $257.5k | $5.4k | 23,163.3 | -737.7 | 23,320.7 | -1.8% | $1.50 | View |
| Nyngan Solar Plant | NYNGAN1 |
NSW1 | Solar PV - Fixed | $255.7k | $0 | — | 3,920.2 | 4,537.8 | 22.9% | $0.20 | View |
| Swanbank BESS | SWANBBF1 |
QLD1 | Storage - Battery | $252.7k | $0 | — | -518.9 | 22,477.2 | -1.2% | $1.50 | View |
| Snowtown S2 Wind Farm | SNOWNTH1 |
SA1 | Wind Turbine - Onshore | $248.4k | $0 | — | 7,776.6 | 7,919.1 | 32.1% | $0.50 | View |
| Daydream Solar Farm | DAYDSF1 |
QLD1 | Solar PV - Single axis tracking | $248.0k | $0 | — | 7,300.2 | 6,825.6 | 25.9% | $0.00 | View |
| Mornington BESS | MRNBESS1 |
VIC1 | Storage - Battery | $245.0k | $0 | — | -480.5 | 27,314.8 | -1.2% | $1.50 | View |
| Edenvale Solar Park | EDENVSF1 |
QLD1 | Solar PV - Single axis tracking | $244.0k | $0 | — | 7,784.4 | 7,092.0 | 25.7% | $0.00 | View |
| Waterloo Wind Farm | WATERLWF |
SA1 | Wind Turbine - Onshore | $243.9k | $0 | — | 6,741.8 | 7,382.8 | 30.7% | $0.50 | View |
| Coleambally Solar Farm | COLEASF1 |
NSW1 | Solar PV - Single axis tracking | $242.8k | $0 | — | 4,034.8 | 3,446.8 | 16.0% | $0.00 | View |
| Goorambat East Solar Farm (ENGIE) | GOESF1 |
VIC1 | Solar PV - Single axis tracking | $241.7k | $0 | — | 12,898.2 | 12,262.2 | 30.7% | $0.25 | View |
| Snowtown S2 Wind Farm | SNOWSTH1 |
SA1 | Wind Turbine - Onshore | $238.8k | $0 | — | 7,710.8 | 7,932.0 | 36.4% | $0.74 | View |
| Shoalhaven | SHOAL1 |
NSW1 | Storage - Pumped hydro | $238.6k | $0 | — | 3,122.7 | — | 7.5% | $1.20 | View |
| Crookwell 3 Wind Farm | CROOKWF3 |
NSW1 | Wind Turbine - Onshore | $237.9k | $0 | — | 3,114.1 | 3,147.4 | 32.2% | $0.76 | View |
| Mortlake South Wind Farm | MRTLSWF1 |
VIC1 | Wind Turbine - Onshore | $237.5k | $0 | — | 7,424.0 | 6,959.2 | 28.1% | $0.50 | View |
| Mannum BESS | MANNUMB1 |
SA1 | Storage - Battery | $235.5k | $6.4k | 2,843.2 | -472.3 | 15,139.7 | -2.8% | $1.50 | View |
| Mount Emerald | MEWF1 |
QLD1 | Wind Turbine - Onshore | $234.0k | $0 | — | 2,845.5 | 3,003.5 | 9.4% | $0.50 | View |
| Glenellen Solar Farm | GESF1 |
NSW1 | Solar PV - Fixed | $232.3k | $0 | — | 4,017.8 | 7,669.0 | 9.2% | $0.00 | View |
| Golden Plains Wind Farm East | GPWFEST3 |
VIC1 | Wind Turbine - Onshore | $231.0k | $0 | — | 9,162.8 | 8,720.2 | 22.0% | $0.50 | View |
| Devils Gate | DEVILS_G |
TAS1 | Hydro - Dam | $230.5k | $2.2k | 936.3 | 1,984.3 | 10,293.3 | 19.7% | $1.00 | View |
| Wandoan South Solar Stage 2 | WANDSF2 |
QLD1 | Solar PV - Single axis tracking | $229.9k | $0 | — | 3,792.0 | 4,958.7 | 7.1% | $0.25 | View |
| Berrybank Wind Farm | BRYB1WF1 |
VIC1 | Wind Turbine - Onshore | $227.0k | $0 | — | 6,643.6 | 6,085.4 | 21.9% | $0.50 | View |
| Woolooga Solar Farm | WOOLGSF1 |
QLD1 | Solar PV - Single axis tracking | $226.1k | $0 | — | 5,531.0 | 7,161.8 | 14.8% | $0.25 | View |
| Bald Hills Wind Farm | BALDHWF1 |
VIC1 | Wind Turbine - Onshore | $219.3k | $0 | — | 5,852.8 | 5,428.6 | 32.7% | $0.00 | View |
| Barron Gorge | BARRON-1 |
QLD1 | Hydro - Run of River | $218.3k | $0 | — | 2,298.9 | 3,650.7 | 39.1% | $0.00 | View |
| Gunning Wind Farm | GUNNING1 |
NSW1 | Wind Turbine - Onshore | $216.9k | $0 | — | 2,739.9 | 2,700.4 | 35.1% | $0.50 | View |
| Liddell BESS | LDBESS1 |
NSW1 | Storage - Battery | $214.3k | $3.5k | 6,952.0 | -1,130.2 | 46,620.7 | -1.3% | $1.50 | View |
| Kiamal Solar Farm - Stage 1 | KIAMSF1 |
VIC1 | Solar PV - Single axis tracking | $212.0k | $0 | — | 10,901.9 | 11,258.4 | 32.5% | $0.00 | View |
| Wandoan South Solar Stage 1 | WANDSF1 |
QLD1 | Solar PV - Single axis tracking | $210.7k | $0 | — | 3,632.3 | 5,160.8 | 13.5% | $0.25 | View |
| Western Downs Battery - Stage 1 And 2 | WDBESS1 |
QLD1 | Storage - Battery | $208.6k | $5.9k | 4,933.1 | -739.6 | 33,954.7 | -1.7% | $1.58 | View |
| Dundonnell Wind Farm | DUNDWF3 |
VIC1 | Wind Turbine - Onshore | $208.2k | $0 | — | 5,667.3 | 5,742.5 | 27.7% | $0.53 | View |
| Hallett Stage 2 Hallett Hill | HALLWF2 |
SA1 | Wind Turbine - Onshore | $207.0k | $0 | — | 3,071.5 | 4,894.2 | 25.6% | $0.00 | View |
| Hallett Stage 1 Brown Hill | HALLWF1 |
SA1 | Wind Turbine - Onshore | $206.8k | $0 | — | 2,448.4 | 3,661.9 | 15.4% | $0.71 | View |
| Ross River Solar Farm | RRSF1 |
QLD1 | Solar PV - Single axis tracking | $201.8k | $0 | — | 5,804.7 | 5,601.9 | 27.0% | $0.25 | View |
| Willogoleche Wind Farm | WGWF1 |
SA1 | Wind Turbine - Onshore | $200.8k | $0 | — | 4,798.8 | 5,207.0 | 23.9% | $0.50 | View |
| Mt Gellibrand Wind Farm | MTGELWF1 |
VIC1 | Wind Turbine - Onshore | $200.3k | $0 | — | 5,592.0 | 5,043.0 | 24.0% | $0.50 | View |
| Clements Gap - BESS | CGBESS01 |
SA1 | Storage - Battery | $199.5k | $0 | — | -238.7 | 8,205.7 | -2.4% | $1.58 | View |
| Haughton Solar Farm Stage 1 | HAUGHT11 |
QLD1 | Solar PV - Single axis tracking | $196.5k | $0 | — | 5,282.2 | 5,175.2 | 23.7% | $0.00 | View |
| Sun Metals Corporation Solar Farm | SMCSF1 |
QLD1 | Solar PV - Fixed | $190.9k | $0 | — | 4,839.1 | 4,713.6 | 20.1% | $0.00 | View |
| Woodlawn Wind Farm | WOODLWN1 |
NSW1 | Wind Turbine - Onshore | $187.0k | $0 | — | 2,205.1 | 2,159.2 | 27.2% | $0.50 | View |
| Clare Solar Farm | CLARESF1 |
QLD1 | Solar PV - Single axis tracking | $186.0k | $0 | — | 4,677.7 | 4,901.0 | 25.2% | $0.00 | View |
| Hillston Sun Farm | HILLSTN1 |
NSW1 | Solar PV - Single axis tracking | $183.7k | $0 | — | 3,480.5 | 3,403.6 | 18.8% | $0.00 | View |
| Supernode BESS | SNB01 |
QLD1 | Storage - Battery | $182.7k | $6.9k | 3,816.3 | -781.3 | 38,116.7 | -1.8% | $1.50 | View |
| Hawkesdale Wind Farm | HD1WF1 |
VIC1 | Wind Turbine - Onshore | $180.8k | $0 | — | 3,791.5 | 4,700.1 | 23.4% | $0.00 | View |
| Condong | CONDONG1 |
NSW1 | Turbine - Steam Sub Critical | $178.4k | $0 | — | 2,184.6 | — | 43.3% | $112.12 | View |
| Yendon Wind Farm | YENDWF1 |
VIC1 | Wind Turbine - Onshore | $178.3k | $0 | — | 4,499.0 | 5,203.2 | 18.5% | $0.50 | View |
| Cherry Tree Wind Farm | CHYTWF1 |
VIC1 | Wind Turbine - Onshore | $178.1k | $0 | — | 2,855.8 | 3,309.4 | 29.5% | $0.53 | View |
| Bomen Solar Farm | BOMENSF1 |
NSW1 | Solar PV - Single axis tracking | $177.5k | $0 | — | 3,445.8 | 3,824.6 | 17.0% | $0.25 | View |
| Gangarri Solar Farm | GANGARR1 |
QLD1 | Solar PV - Single axis tracking | $175.5k | $0 | — | 4,919.6 | 4,820.7 | 18.1% | $0.26 | View |
| Greenbank BESS | GREENB1 |
QLD1 | Storage - Battery | $175.3k | $3.1k | 9,055.4 | -650.9 | 18,052.4 | -1.9% | $1.54 | View |
| Quarantine | QPS5 |
SA1 | Turbine - OCGT | $169.8k | $0 | — | 1,229.0 | 17,319.2 | 5.7% | $209.05 | View |
| Bogong / Mackay | MCKAY1 |
VIC1 | Hydro - Dam | $167.8k | $0 | — | 1,377.6 | 23,320.8 | 2.7% | $1.00 | View |
| Ladbroke Grove | LADBROK2 |
SA1 | Turbine - OCGT | $165.8k | $0 | — | 1,176.2 | 6,632.9 | 17.5% | $145.06 | View |
| Kareeya | KAREEYA4 |
QLD1 | Hydro - Run of River | $164.1k | $0 | — | 2,045.4 | 2,020.3 | 56.4% | $1.66 | View |
| Walla Walla Solar Farm | WLWLSF1 |
NSW1 | Solar PV - Single axis tracking | $164.0k | $0 | — | 2,441.0 | 6,217.7 | 9.6% | $0.25 | View |
| Guthega | GUTHEGA |
NSW1 | Hydro - Dam | $162.9k | $0 | — | 1,621.3 | 9,973.3 | 16.1% | $1.05 | View |
| Crowlands Wind Farm | CROWLWF1 |
VIC1 | Wind Turbine - Onshore | $161.8k | $0 | — | 3,513.4 | 4,141.8 | 26.2% | $0.68 | View |
| Walla Walla Solar Farm | WLWLSF2 |
NSW1 | Solar PV - Single axis tracking | $161.5k | $0 | — | 2,416.3 | 6,233.9 | 9.5% | $0.25 | View |
| Shoalhaven | SHGEN |
NSW1 | Storage - Pumped hydro | $160.5k | $0 | — | 1,613.4 | 4,607.5 | 3.9% | $1.20 | View |
| Williamsdale BESS | WILLBES1 |
NSW1 | Storage - Battery | $159.1k | $741 | 45,626.5 | -217.5 | 35,084.6 | -0.5% | $1.50 | View |
| Sebastopol Solar Farm | SEBSF1 |
NSW1 | Solar PV - Single axis tracking | $158.6k | $0 | — | 2,939.3 | 3,683.5 | 19.4% | $0.25 | View |
| Bluegrass Solar Farm | BLUEGSF1 |
QLD1 | Solar PV - Single axis tracking | $158.5k | $0 | — | 5,332.1 | 4,849.2 | 21.4% | $0.29 | View |
| West Kiewa | WKIEWA1 |
VIC1 | Hydro - Dam | $157.9k | $0 | — | 1,482.5 | 7,998.5 | 26.0% | $10.00 | View |
| Berrybank Wind Farm | BRYB2WF2 |
VIC1 | Wind Turbine - Onshore | $156.9k | $0 | — | 4,727.9 | 4,547.4 | 25.8% | $0.65 | View |
| Hornsdale Wind Farm Stage 1 | HDWF1 |
SA1 | Wind Turbine - Onshore | $156.6k | $0 | — | 6,556.8 | 6,500.7 | 38.1% | $0.50 | View |
| Hornsdale Wind Farm Stage 2 | HDWF2 |
SA1 | Wind Turbine - Onshore | $156.1k | $0 | 0.4 | 6,344.3 | 6,292.4 | 36.9% | $0.69 | View |
| Hornsdale Wind Farm Stage 3 | HDWF3 |
SA1 | Wind Turbine - Onshore | $152.0k | $0 | — | 6,931.0 | 6,877.7 | 36.8% | $0.68 | View |
| Ladbroke Grove | LADBROK1 |
SA1 | Turbine - OCGT | $151.7k | $0 | — | 1,063.9 | 6,693.0 | 15.8% | $153.02 | View |
| Rangebank BESS | RANGEB1 |
VIC1 | Storage - Battery | $151.4k | $86 | 23.4 | -434.6 | 23,858.7 | -1.3% | $1.50 | View |
| Gunsynd Solar Farm | GUSF1 |
QLD1 | Solar PV - Fixed | $149.8k | $0 | — | 4,172.7 | 4,212.0 | 26.4% | $0.00 | View |
| Western Downs Gas Peaking Plant - KCI | WDBESS2 |
QLD1 | Turbine - CCGT | $148.7k | $19.8k | 12,320.3 | -1,327.1 | 37,092.6 | -2.0% | $2.00 | View |
| Munna Creek Solar Farm | MUCRKSF1 |
QLD1 | Solar PV - Single axis tracking | $144.7k | $0 | — | 5,058.3 | 4,935.7 | 19.6% | $0.25 | View |
| West Wyalong Solar Farm | WSTWYSF1 |
NSW1 | Solar PV - Single axis tracking | $143.2k | $0 | — | 2,826.4 | 2,963.6 | 16.0% | $0.25 | View |
| Koorangie Energy Storage System | KESSB1 |
VIC1 | Storage - Battery | $142.1k | $0 | — | -262.6 | 20,456.7 | -0.8% | $1.50 | View |
| Brendale BESS | BRNDBES1 |
QLD1 | Storage - Battery | $141.3k | $10.1k | 4,937.6 | -1,149.1 | 29,632.3 | -3.3% | $1.58 | View |
| Clements Gap Wind Farm | CLEMGPWF |
SA1 | Wind Turbine - Onshore | $141.0k | $0 | — | 3,088.0 | 3,338.8 | 32.4% | $0.80 | View |
| Meadowbank | MEADOWBK |
TAS1 | Hydro - Dam | $140.7k | $377 | 92.9 | 1,581.7 | 6,536.7 | 23.5% | $1.00 | View |
| Lilyvale Solar Farm | LILYSF1 |
QLD1 | Solar PV - Single axis tracking | $140.1k | $0 | — | 2,723.4 | 4,007.1 | 13.7% | $0.25 | View |
| Mt Mercer Wind Farm | MERCER01 |
VIC1 | Wind Turbine - Onshore | $139.8k | $0 | — | 3,358.7 | 4,166.4 | 15.2% | $0.50 | View |
| Yarranlea Solar Farm | YARANSF1 |
QLD1 | Solar PV - Single axis tracking | $138.5k | $0 | — | 2,602.0 | 3,068.0 | 12.8% | $0.25 | View |
| Finley Solar Farm | FINLYSF1 |
NSW1 | Solar PV - Single axis tracking | $134.9k | $0 | — | 2,663.2 | 2,662.6 | 9.8% | $0.25 | View |
| Hornsdale Power Reserve Unit 1 | HPR1 |
SA1 | Storage - Battery | $134.3k | $708 | 2,086.3 | -284.0 | 9,568.9 | -1.1% | $1.50 | View |
| Cullerin Range Wind Farm | CULLRGWF |
NSW1 | Wind Turbine - Onshore | $134.0k | $0 | — | 1,708.7 | — | 33.9% | $0.68 | View |
| Hallett 5 The Bluff WF | BLUFF1 |
SA1 | Wind Turbine - Onshore | $129.0k | $0 | — | 2,032.5 | 3,035.7 | 23.0% | $0.77 | View |
| Kennedy Energy Park - Phase 1 - Wind | KEPWF1 |
QLD1 | Wind Turbine - Onshore | $124.5k | $0 | — | 1,474.4 | 1,475.3 | 20.3% | $0.68 | View |
| Darling Downs Solar Farm | DDSF1 |
QLD1 | Solar PV - Fixed | $124.2k | $0 | — | 4,285.0 | 3,940.5 | 21.1% | $0.28 | View |
| Wattle Point | WPWF |
SA1 | Wind Turbine - Onshore | $123.6k | $0 | — | 2,248.1 | 3,793.5 | 14.7% | $0.50 | View |
| Repulse | REPULSE |
TAS1 | Hydro - Dam | $123.0k | $0 | — | 1,336.2 | — | 28.4% | $1.00 | View |
| Quorn Park Solar Hybrid | QPSFB1 |
NSW1 | Solar PV - Single axis tracking | $121.3k | $0 | — | 1,804.2 | 4,739.9 | 11.1% | $0.26 | View |
| Broadsound Solar Farm | BRDDBES1 |
QLD1 | Solar PV - Single axis tracking | $121.3k | $5.8k | 4,736.9 | -622.1 | 23,573.6 | -1.0% | $0.27 | View |
| Rugby Run Solar Farm | RUGBYR1 |
QLD1 | Solar PV - Single axis tracking | $119.9k | $0 | — | 3,369.4 | 3,200.7 | 30.9% | $0.25 | View |
| Clermont Solar Farm | CLERMSF1 |
QLD1 | Solar PV - Single axis tracking | $118.9k | $0 | — | 3,373.4 | 3,404.3 | 21.7% | $0.34 | View |
| LaTrobe Valley BESS | LVES1 |
VIC1 | Storage - Battery | $118.6k | $1.6k | 36,642.0 | -283.5 | 13,107.8 | -1.7% | $1.54 | View |
| Glenrowan West Solar Farm | GLRWNSF1 |
VIC1 | Solar PV - Single axis tracking | $117.9k | $0 | — | 3,541.7 | 5,334.5 | 16.0% | $0.32 | View |
| German Creek | GERMCRK |
QLD1 | Reciprocating Engine - Spark ignition | $117.7k | $0 | — | 1,722.0 | — | 22.8% | $122.81 | View |
| Moree Solar Farm | MOREESF1 |
NSW1 | Solar PV - Single axis tracking | $115.0k | $0 | — | 1,908.6 | 1,881.9 | 20.3% | $0.25 | View |
| Limondale BESS | LIMBESS1 |
NSW1 | Storage - Battery | $113.3k | $737 | 138.2 | 45.8 | 7,669.2 | 0.5% | $1.50 | View |
| Moura Solar Farm | MOUSF1 |
QLD1 | Solar PV - Single axis tracking | $110.9k | $0 | — | 4,020.7 | 3,713.0 | 24.2% | $0.25 | View |
| Numurkah Solar Farm | NUMURSF1 |
VIC1 | Solar PV - Single axis tracking | $110.7k | $0 | — | 3,564.8 | 4,817.2 | 21.0% | $0.25 | View |
| Lake Bonney 1 Wind Farm | LKBONNY1 |
SA1 | Wind Turbine - Onshore | $110.2k | $0 | — | 1,804.7 | 2,890.3 | 13.3% | $0.79 | View |
| Terang BESS | TRGBESS1 |
VIC1 | Storage - Battery | $109.3k | $3.8k | 1,232.7 | -700.1 | 15,099.3 | -4.2% | $1.50 | View |
| Jemalong Solar | JEMALNG1 |
NSW1 | Solar PV - Single axis tracking | $107.0k | $0 | — | 1,603.3 | 2,577.2 | 17.4% | $0.32 | View |
| Wemen Solar Farm | WEMENSF1 |
VIC1 | Solar PV - Single axis tracking | $104.7k | $0 | — | 4,233.4 | 4,862.5 | 25.8% | $0.25 | View |
| Elaine Wind Farm | ELAINWF1 |
VIC1 | Wind Turbine - Onshore | $103.7k | $0 | — | 2,750.8 | 3,147.0 | 19.6% | $0.53 | View |
| Broken Hill Solar Plant | BROKENH1 |
NSW1 | Solar PV - Fixed | $103.0k | $0 | — | 1,747.3 | 2,005.5 | 19.6% | $0.28 | View |
| Eildon | EILDON1 |
VIC1 | Hydro - Dam | $102.0k | $0 | — | 918.3 | 7,922.0 | 8.1% | $1.05 | View |
| Eildon | EILDON2 |
VIC1 | Hydro - Dam | $101.1k | $0 | — | 923.7 | 7,766.7 | 8.1% | $1.00 | View |
| Kiata Wind Farm | KIATAWF1 |
VIC1 | Wind Turbine - Onshore | $100.3k | $0 | — | 1,951.7 | 2,162.3 | 37.4% | $0.68 | View |
| Cathedral Rocks | CATHROCK |
SA1 | Wind Turbine - Onshore | $99.9k | $0 | — | 1,411.2 | 2,523.0 | 13.5% | $0.53 | View |
| Mt Millar Wind Farm | MTMILLAR |
SA1 | Wind Turbine - Onshore | $99.6k | $0 | — | 1,791.2 | 2,516.3 | 14.8% | $0.50 | View |
| Girgarre Solar Farm | GIRGSF |
VIC1 | Solar PV - Single axis tracking | $98.3k | $0 | — | 3,211.9 | 3,844.7 | 20.5% | $0.00 | View |
| Wyalong Solar Farm | WYASF1 |
NSW1 | Solar PV - Single axis tracking | $96.4k | $0 | — | 1,759.3 | 2,027.4 | 16.8% | $0.25 | View |
| Emerald Solar Park | EMERASF1 |
QLD1 | Solar PV - Single axis tracking | $95.5k | $0 | — | 2,722.4 | 3,102.3 | 22.5% | $0.25 | View |
| Lancaster Solar Farm | LANCSF1 |
VIC1 | Solar PV - Single axis tracking | $94.7k | $0 | — | 2,873.3 | 3,517.8 | 16.1% | $0.25 | View |
| Whitsunday Solar Farm | WHITSF1 |
QLD1 | Solar PV - Single axis tracking | $92.3k | $0 | — | 2,263.7 | 2,423.0 | 23.4% | $0.25 | View |
| Victorian Big Battery | VBB1 |
VIC1 | Storage - Battery | $91.7k | $121 | 168.3 | -422.5 | 10,314.8 | -0.8% | $1.50 | View |
| Bundaberg Solar Farm | BUSF1 |
QLD1 | Solar PV - Single axis tracking | $90.5k | $0 | — | 3,136.1 | 3,001.1 | 23.9% | $14.55 | View |
| Glenrowan Solar Farm | GLENSF1 |
VIC1 | Solar PV - Single axis tracking | $90.1k | $0 | — | 5,112.5 | 4,724.0 | 24.2% | $0.25 | View |
| Salt Creek Wind Farm | SALTCRK1 |
SA1 | Wind Turbine - Onshore | $89.8k | $0 | — | 1,634.3 | 2,383.5 | 18.0% | $0.50 | View |
| Bannerton Solar Park | BANN1 |
VIC1 | Solar PV - Single axis tracking | $87.9k | $0 | — | 3,923.9 | 4,453.4 | 23.4% | $0.34 | View |
| Fisher | FISHER |
TAS1 | Hydro - Dam | $86.9k | $2.1k | 499.2 | 948.2 | 6,489.1 | 13.1% | $1.05 | View |
| Wunghnu Solar Farm | WUNUSF1 |
VIC1 | Solar PV - Single axis tracking | $86.6k | $0 | — | 2,393.3 | 3,667.9 | 15.2% | $0.25 | View |
| Bungala Two Solar Farm | BNGSF2 |
SA1 | Solar PV - Single axis tracking | $86.5k | $0 | — | 3,061.2 | 6,393.8 | 13.5% | $0.33 | View |
| Oaklands Hill Wind Farm | OAKLAND1 |
VIC1 | Wind Turbine - Onshore | $86.2k | $0 | — | 2,276.9 | 2,524.2 | 20.2% | $0.50 | View |
| Wagga North Solar Farm | WAGGNSF1 |
NSW1 | Solar PV - Single axis tracking | $82.8k | $0 | — | 1,617.8 | 1,967.0 | 17.3% | $0.25 | View |
| Hayman Solar Farm | HAYMSF1 |
QLD1 | Solar PV - Single axis tracking | $82.1k | $0 | — | 2,358.9 | 2,290.2 | 24.3% | $0.34 | View |
| Canunda | CNUNDAWF |
SA1 | Wind Turbine - Onshore | $82.1k | $0 | — | 1,178.7 | 2,044.1 | 15.3% | $0.50 | View |
| Hamilton Solar Farm | HAMISF1 |
QLD1 | Solar PV - Single axis tracking | $81.9k | $0 | — | 2,217.3 | 2,200.5 | 23.0% | $18.64 | View |
| Butlers Gorge | BUTLERSG |
TAS1 | Hydro - Dam | $81.6k | $0 | — | 1,114.8 | — | 54.4% | $1.00 | View |
| Cluny | CLUNY |
TAS1 | Hydro - Dam | $78.2k | $0 | — | 850.2 | — | 26.6% | $1.00 | View |
| Ulinda Park BESS | ULPBESS1 |
QLD1 | Storage - Battery | $75.8k | $2.8k | 1,381.8 | -779.5 | 18,174.7 | -3.0% | $1.50 | View |
| Goonumbla Solar Farm | GOONSF1 |
NSW1 | Solar PV - Single axis tracking | $74.5k | $0 | — | 1,253.1 | 2,936.3 | 10.7% | $0.25 | View |
| Corowa Solar Farm | CRWASF1 |
NSW1 | Solar PV - Single axis tracking | $73.4k | $0 | — | 1,260.9 | 1,429.0 | 20.8% | $0.33 | View |
| Parkes Solar Farm | PARSF1 |
NSW1 | Solar PV - Single axis tracking | $71.8k | $0 | — | 1,189.4 | 2,898.6 | 14.3% | $0.25 | View |
| Karadoc Solar Farm | KARSF1 |
VIC1 | Solar PV - Single axis tracking | $70.7k | $0 | — | 4,043.0 | 4,388.3 | 23.0% | $0.00 | View |
| Kidston Solar Project Phase One 50MW | KSP1 |
QLD1 | Solar PV - Fixed | $69.6k | $0 | — | 2,013.0 | 2,210.3 | 24.0% | $0.20 | View |
| Oakey 2 Solar Farm | OAKEY2SF |
QLD1 | Solar PV - Single axis tracking | $69.0k | $0 | — | 2,176.6 | 2,092.9 | 23.3% | $0.25 | View |
| Chinchilla BESS | CHBESS1 |
QLD1 | Storage - Battery | $67.8k | $2.0k | 4,259.5 | -256.0 | 7,676.6 | -1.5% | $1.75 | View |
| Lake Bonney 3 Wind Farm | LKBONNY3 |
SA1 | Wind Turbine - Onshore | $67.3k | $0 | — | 1,013.1 | 1,497.0 | 15.5% | $0.53 | View |
| Susan River Solar Farm | SRSF1 |
QLD1 | Solar PV - Single axis tracking | $66.2k | $0 | — | 2,276.0 | 2,193.0 | 15.9% | $0.25 | View |
| Mulwala Solar Farm | MULWASF1 |
NSW1 | Solar PV - Single axis tracking | $64.2k | $0 | — | 1,080.6 | 1,282.0 | 20.7% | $0.25 | View |
| Challicum Hills | CHALLHWF |
VIC1 | Wind Turbine - Onshore | $62.9k | $0 | — | 1,521.9 | — | 17.3% | $0.53 | View |
| Dundonnell Wind Farm | DUNDWF2 |
VIC1 | Wind Turbine - Onshore | $61.7k | $0 | — | 1,900.6 | 1,985.1 | 24.5% | $0.66 | View |
| Winton Solar Farm | WINTSF1 |
VIC1 | Solar PV - Single axis tracking | $61.1k | $0 | — | 3,839.9 | 3,852.5 | 26.9% | $0.25 | View |
| Wandoan South BESS | WANDB1 |
QLD1 | Storage - Battery | $60.6k | $4.6k | 40,440.4 | -209.8 | 7,009.7 | -1.2% | $1.50 | View |
| Griffith Solar Farm | GRIFSF1 |
NSW1 | Solar PV - Single axis tracking | $59.9k | $0 | — | 1,175.5 | — | 25.7% | $0.35 | View |
| Yatpool Solar Farm | YATSF1 |
VIC1 | Solar PV - Single axis tracking | $59.5k | $0 | — | 2,996.3 | 3,011.7 | 19.0% | $0.25 | View |
| Summerfield BESS | SMFBESS1 |
SA1 | Storage - Battery | $57.2k | $0 | — | 216.2 | 1,661.7 | 0.5% | $1.50 | View |
| Dartmouth | DARTM1 |
VIC1 | Hydro - Dam | $55.5k | $0 | — | 474.0 | 25,411.7 | 1.5% | $0.00 | View |
| Childers Solar Farm | CHILDSF1 |
QLD1 | Solar PV - Single axis tracking | $55.4k | $0 | — | 1,866.8 | 1,818.8 | 17.3% | $0.34 | View |
| Clover | CLOVER |
VIC1 | Hydro - Dam | $54.1k | $0 | — | 459.7 | — | 9.4% | $1.17 | View |
| Hazelwood Battery Energy Storage System (HBESS) | HBESS1 |
VIC1 | Storage - Battery | $54.1k | $5.1k | 1,962.2 | -881.6 | 19,469.9 | -2.6% | $1.87 | View |
| Rubicon Mountain Streams | RUBICON |
VIC1 | Hydro - Dam | $53.5k | $0 | — | 817.3 | — | 36.0% | $1.00 | View |
| Tailem Bend Stage 2 Solar Project | TB2SF1 |
SA1 | Solar PV - Single axis tracking | $52.8k | $0 | — | 1,326.5 | 4,282.1 | 7.5% | $0.25 | View |
| Collinsville PV | CSPVPS1 |
QLD1 | Solar PV - Fixed | $52.6k | $0 | — | 1,549.6 | 1,470.8 | 21.7% | $0.28 | View |
| Yambuk | YAMBUKWF |
VIC1 | Wind Turbine - Onshore | $50.9k | $0 | — | 1,279.6 | — | 25.4% | $0.50 | View |
| Junee Solar Farm | JUNEESF1 |
NSW1 | Solar PV - Single axis tracking | $50.2k | $0 | — | 899.2 | 1,155.2 | 14.9% | $0.00 | View |
| Kingaroy Solar Farm | KINGASF1 |
QLD1 | Solar PV - Single axis tracking | $49.7k | $0 | — | 1,392.3 | 1,277.8 | 20.7% | $0.25 | View |
| Gannawarra Solar Farm | GANNSF1 |
VIC1 | Solar PV - Single axis tracking | $48.6k | $0 | — | 2,430.9 | 2,320.2 | 26.3% | $0.34 | View |
| Capital Battery | CAPBES1 |
NSW1 | Storage - Battery | $47.8k | $0 | — | -100.4 | 14,153.3 | -0.6% | $1.50 | View |
| Mokoan Solar Farm (LightsourceBP) | MOKOSF1 |
VIC1 | Solar PV - Single axis tracking | $45.9k | $0 | — | 1,524.8 | 2,193.2 | 19.7% | $0.25 | View |
| Tailem Bend Battery Project | TB2B1 |
SA1 | Storage - Battery | $45.1k | $2.7k | 3,499.9 | -230.6 | 5,940.5 | -3.3% | $1.50 | View |
| Molong Solar Farm | MOLNGSF1 |
NSW1 | Solar PV - Single axis tracking | $42.6k | $0 | — | 676.2 | 1,617.8 | 11.2% | $0.25 | View |
| Starfish Hill | STARHLWF |
SA1 | Wind Turbine - Onshore | $42.3k | $0 | — | 1,237.1 | 1,225.8 | 22.3% | $0.50 | View |
| Lake Bonney Battery Energy Storage | LBB1 |
SA1 | Storage - Battery | $42.2k | $295 | 7,953.3 | -45.5 | 2,587.9 | -1.1% | $1.98 | View |
| Limondale Solar Farm 2 | LIMOSF21 |
NSW1 | Solar PV - Single axis tracking | $42.1k | $0 | — | 617.9 | 633.0 | 12.7% | $0.25 | View |
| Middlemount Solar Farm | MIDDLSF1 |
QLD1 | Solar PV - Single axis tracking | $40.7k | $0 | — | 1,148.9 | 1,213.8 | 26.3% | $0.25 | View |
| Warwick Solar Farm | WARWSF1 |
QLD1 | Solar PV - Single axis tracking | $38.9k | $0 | — | 688.5 | 900.2 | 12.8% | $0.25 | View |
| Maryrorough Solar Farm | MARYRSF1 |
QLD1 | Solar PV - Single axis tracking | $38.1k | $0 | — | 1,037.4 | 1,137.7 | 17.9% | $0.25 | View |
| Manildra Solar Farm | MANSLR1 |
NSW1 | Solar PV - Single axis tracking | $37.6k | $0 | — | 489.9 | 2,236.9 | 5.8% | $0.25 | View |
| Braemar | BRAEMAR3 |
QLD1 | Turbine - OCGT | $37.4k | $0 | — | 2,021.7 | 1,955.8 | 6.4% | $128.50 | View |
| Bungala One Solar Farm | BNGSF1 |
SA1 | Solar PV - Single axis tracking | $36.8k | $0 | — | 821.1 | 1,733.8 | 3.6% | $0.34 | View |
| Rocky Point Sugar Mill Cogeneration Plant | RPCG |
QLD1 | Other - Other | $33.9k | $0 | — | 665.8 | — | 13.2% | $117.00 | View |
| Tailem Bend - Solar | TBSF1 |
SA1 | Solar PV - Fixed | $33.8k | $0 | — | 1,050.6 | 4,135.5 | 5.8% | $0.20 | View |
| Oakey Solar Farm | OAKEY1SF |
QLD1 | Solar PV - Fixed | $33.3k | $0 | — | 931.2 | 1,023.2 | 22.2% | $0.20 | View |
| Barcaldine Remote Community Solar Farm | BARCSF1 |
QLD1 | Solar PV - Single axis tracking | $32.5k | $0 | — | 680.7 | — | 20.3% | $0.00 | View |
| Yaloak South Wind Farm | YSWF1 |
VIC1 | Wind Turbine - Onshore | $31.7k | $0 | — | 837.7 | — | 17.4% | $0.50 | View |
| New England Solar Farm BESS | NESBESS1 |
NSW1 | Storage - Battery | $31.5k | $0 | — | -63.5 | 10,843.2 | -0.2% | $1.50 | View |
| New England Solar Farm BESS | NESBESS2 |
NSW1 | Storage - Battery | $30.9k | $0 | — | -57.2 | 10,770.0 | -0.2% | $1.50 | View |
| Bouldercombe Battery project | BBATTERY1 |
QLD1 | Storage - Battery | $30.7k | $420 | 2,283.5 | -154.8 | 4,506.0 | -1.8% | $1.64 | View |
| Braemar | BRAEMAR1 |
QLD1 | Turbine - OCGT | $29.9k | $0 | — | 291.4 | 28,759.7 | 0.9% | $133.75 | View |
| Diapur Wind Farm | DIAPURWF1 |
VIC1 | Wind Turbine - Onshore | $29.8k | $0 | — | 632.5 | — | 47.1% | $0.00 | View |
| Cohuna Solar Farm | COHUNSF1 |
VIC1 | Solar PV - Single axis tracking | $29.7k | $0 | — | 668.4 | 953.2 | 12.8% | $0.33 | View |
| Kerang Hybrid | KERNGSP1 |
VIC1 | Solar PV - Single axis tracking | $28.4k | $0 | — | 497.6 | 1,156.3 | 1.8% | $0.26 | View |
| Longreach Solar Farm | LRSF1 |
QLD1 | Solar PV - Fixed | $28.0k | $0 | — | 653.6 | — | 25.9% | $0.20 | View |
| Warwick Solar Farm | WARWSF2 |
QLD1 | Solar PV - Single axis tracking | $26.7k | $0 | — | 485.8 | 768.6 | 9.0% | $0.25 | View |
| Mortons Lane Wind Farm | MLWF1 |
VIC1 | Wind Turbine - Onshore | $26.5k | $0 | — | 854.2 | — | 26.1% | $0.50 | View |
| Gullen Range Solar Farm | GULLRSF1 |
NSW1 | Solar PV - Fixed | $26.2k | $0 | — | 456.6 | 437.4 | 27.2% | $0.27 | View |
| Lemonthyme / Wilmot | LEM_WIL |
TAS1 | Hydro - Dam | $25.0k | $1.2k | 286.2 | 201.8 | 5,146.7 | 1.5% | $1.00 | View |
| White Rock Solar Farm | WRSF1 |
NSW1 | Solar PV - Fixed | $24.9k | $0 | — | 392.9 | 392.6 | 11.7% | $0.20 | View |
| Riverina Energy Storage System 1 | RESS1 |
NSW1 | Storage - Battery | $23.0k | $0 | — | -74.8 | 4,962.7 | -0.7% | $1.50 | View |
| Royalla Solar Farm | ROYALLA1 |
NSW1 | Solar PV - Fixed | $21.8k | $0 | — | 392.4 | — | 11.7% | $0.20 | View |
| Smithfield BESS | SMTHBES1 |
NSW1 | Storage - Battery | $21.3k | $2.7k | 23,674.6 | -245.9 | 8,667.3 | -1.7% | $1.50 | View |
| Riverina Energy Storage System 2 | RIVNB2 |
NSW1 | Storage - Battery | $17.9k | $0 | — | -53.1 | 4,471.9 | -0.5% | $1.50 | View |
| Wallgrove Grid Battery project | WALGRV1 |
NSW1 | Storage - Battery | $15.7k | $431 | 18,432.3 | -85.0 | 6,350.0 | -1.0% | $1.50 | View |
| Gannawarra Energy Storage System | GANNB1 |
VIC1 | Storage - Battery | $15.0k | $0 | — | -9.8 | 458.2 | -0.2% | $1.98 | View |
| Hughenden Sun Farm | HUGSF1 |
QLD1 | Solar PV - Single axis tracking | $14.1k | $0 | — | 426.4 | — | 12.1% | $0.00 | View |
| Quorn Park Solar Hybrid | QPSFB2 |
NSW1 | Storage - Battery | $12.8k | $0 | — | 109.5 | 1,114.0 | 2.4% | $1.58 | View |
| Adelaide Desalination Plant | ADPBA1 |
SA1 | Storage - Battery | $10.5k | $80 | 1,601.4 | -15.8 | 888.3 | -1.2% | $0.00 | View |
| Mannum Solar Farm 2 | MANNSF2 |
SA1 | Solar PV - Single axis tracking | $9.1k | $0 | — | 299.0 | 461.0 | 5.9% | $0.25 | View |
| Bulgana Green Power Hub - BESS | BULBES1 |
VIC1 | Storage - Battery | $6.6k | $709 | 188.3 | -110.5 | 2,981.0 | -3.3% | $1.98 | View |
| Darlington Point Energy Storage System | DPNTB1 |
NSW1 | Storage - Battery | $6.5k | $0 | — | -48.3 | 1,458.5 | -1.1% | $0.00 | View |
| Ballarat Energy Storage System | BALB1 |
VIC1 | Storage - Battery | $6.2k | $0 | — | -3.8 | 1,020.6 | -0.1% | $0.00 | View |
| Port Stanvac 1 | PTSTAN1 |
SA1 | Reciprocating Engine - Compression ignition | $6.1k | $0 | — | 56.0 | 9,006.7 | 0.6% | $308.00 | View |
| Adelaide Desalination Plant | ADPPV1 |
SA1 | Solar PV - Fixed | $5.9k | $0 | — | 221.2 | 821.7 | 12.0% | $0.00 | View |
| Kennedy Energy Park - Phase 1 - Solar | KEPSF1 |
QLD1 | Solar PV - Single axis tracking | $5.7k | $0 | — | 106.3 | 106.2 | 4.2% | $0.34 | View |
| Angaston | ANGAST1 |
SA1 | Reciprocating Engine - Compression ignition | $5.5k | $0 | — | 45.5 | 7,398.3 | 0.6% | $0.00 | View |
| Dalrymple BESS | DALNTH1 |
SA1 | Storage - Battery | $5.4k | $0 | — | -43.8 | 1,892.9 | -0.9% | $2.03 | View |
| Broken Hill | BHB1 |
NSW1 | Storage - Battery | $4.7k | $0 | — | -116.4 | 2,623.0 | -1.4% | $1.50 | View |
| Bolivar Waste Water Treatment | BOWWBA1 |
SA1 | Storage - Battery | $4.4k | $14 | 1.5 | -3.1 | 299.0 | -0.6% | $1.58 | View |
| Philip Island BESS | PIBESS1 |
VIC1 | Storage - Battery | $3.7k | $714 | 1,385.0 | -67.5 | 679.7 | -8.0% | $1.50 | View |
| Murray Bridge - Onkaparinga Pipeline Pump 2 | MBPS2PV1 |
SA1 | Solar PV - Single axis tracking | $3.4k | $0 | — | 85.7 | 273.2 | 3.7% | $0.25 | View |
| Christies Beach Wastewater Treatment Plant | CBWWBA1 |
SA1 | Storage - Battery | $3.0k | $11 | 1.3 | -8.8 | 259.2 | -2.4% | $1.50 | View |
| Happy Valley Reservoir | HVWWBA1 |
SA1 | Storage - Battery | $2.6k | $10 | 233.9 | 8.1 | 171.5 | 0.9% | $1.58 | View |
| LINCOLN GAP BESSBDU | LGAPBS1 |
SA1 | Storage - Battery | $2.5k | $0 | — | -3.8 | 461.9 | -0.2% | $1.50 | View |
| Morgan To Whyalla Pipeline No 4 PS | MWPS4PV1 |
SA1 | Solar PV - Single axis tracking | $2.5k | $0 | — | 58.5 | 140.9 | 6.3% | $0.25 | View |
| Morgan To Whyalla Pipeline No 1 PS And Water Filtration Plant | MWPS1PV1 |
SA1 | Solar PV - Single axis tracking | $1.8k | $0 | — | 54.7 | 175.9 | 5.9% | $0.25 | View |
| Morgan To Whyalla Pipeline No 3 PS | MWPS3PV1 |
SA1 | Solar PV - Single axis tracking | $1.6k | $0 | — | 46.9 | 131.3 | 3.7% | $0.25 | View |
| Mannum Adelaide Pumping Station No 2 - MAPL2 (Palmer) | MAPS2PV1 |
SA1 | Solar PV - Single axis tracking | $1.0k | $0 | — | 147.2 | 294.5 | 5.3% | $0.26 | View |
| Morgan To Whyalla Pipeline No 2 PS | MWPS2PV1 |
SA1 | Solar PV - Single axis tracking | $1.0k | $0 | — | 30.0 | 90.4 | 3.2% | $0.25 | View |
| Tully Sugar Mill | TULLYSM1 |
QLD1 | Turbine - Steam Super Critical | $909 | $0 | — | 11.2 | — | 0.2% | $117.00 | View |
| Bell Bay Three | BBTHREE3 |
TAS1 | Turbine - OCGT | $765 | $0 | — | 8.2 | 2,643.1 | 0.1% | $141.97 | View |
| Bolivar Waste Water Treatment | BOWWPV1 |
SA1 | Solar PV - Fixed | $676 | $0 | — | 134.2 | 282.5 | 9.7% | $0.23 | View |
| Mannum Adelaide Pumping Station No 3 - MAPL3 (Tungkillo) | MAPS3PV1 |
SA1 | Solar PV - Single axis tracking | $492 | $0 | — | 215.0 | 401.9 | 7.8% | $0.25 | View |
| Jeeralang B | JLB01 |
VIC1 | Turbine - OCGT | $240 | $0 | — | 4.8 | — | 0.0% | $128.50 | View |
| Yallourn W | YWPS2 |
VIC1 | Turbine - Steam Sub Critical | $238 | $0 | — | 4.9 | — | 0.0% | $47.20 | View |
| Mt Stuart | MSTUART1 |
QLD1 | Turbine - OCGT | $76 | $0 | — | 3.7 | 22,160.5 | 0.0% | $2.00 | View |
| Swanbank E GT | SWAN_E |
QLD1 | Turbine - CCGT | $33 | $0 | — | 1.5 | — | 0.0% | $2.00 | View |
| Braemar 2 Power Station | BRAEMAR5 |
QLD1 | Turbine - OCGT | $22 | $0 | — | 1.0 | 16,987.0 | 0.0% | $3.14 | View |
| Mintaro GT | MINTARO |
SA1 | Turbine - OCGT | $11 | $0 | — | 0.6 | 13,652.8 | 0.0% | $128.50 | View |
| Bolivar Power Station | BOLIVPS1 |
SA1 | Turbine - OCGT | $0 | $0 | — | 0.0 | — | 0.0% | $151.37 | View |
| RT_VIC10 | RT_VIC10 |
$0 | $0 | — | — | — | — | — | View | ||
| Bayswater | BW03 |
NSW1 | Turbine - Steam Sub Critical | $0 | $0 | — | — | — | 0.0% | $28.68 | View |
| TB3B1 | TB3B1 |
$0 | $0 | — | -72.8 | 1,006.5 | — | — | View | ||
| DG_QLD1 | DG_QLD1 |
$0 | $0 | — | — | — | — | — | View | ||
| Colongra | CG2 |
NSW1 | Turbine - OCGT | $0 | $0 | — | — | 26,065.7 | 0.0% | $135.55 | View |
| Uranquinty | URANQ13 |
NSW1 | Turbine - OCGT | $0 | $0 | — | — | 23,748.5 | 0.0% | $128.50 | View |
| Uranquinty | URANQ11 |
NSW1 | Turbine - OCGT | $0 | $0 | — | — | 10,822.5 | 0.0% | $128.50 | View |
| Uranquinty | URANQ12 |
NSW1 | Turbine - OCGT | $0 | $0 | — | — | 11,036.0 | 0.0% | $128.50 | View |
| Tamar Valley Combined Cycle | TVCC201 |
TAS1 | Turbine - CCGT | $0 | $0 | — | — | — | 0.0% | $84.30 | View |
| Tungatinah | TUNGATIN |
TAS1 | Hydro - Dam | $0 | $0 | — | — | — | 0.0% | $1.00 | View |
| Colongra | CG3 |
NSW1 | Turbine - OCGT | $0 | $0 | — | — | 26,040.2 | 0.0% | $144.24 | View |
| Torrens Island B | TORRB4 |
SA1 | Turbine - Steam Sub Critical | $0 | $0 | — | — | — | 0.0% | $2.00 | View |
| Colongra | CG4 |
NSW1 | Turbine - OCGT | $0 | $0 | — | — | 26,022.7 | 0.0% | $194.33 | View |
| Torrens Island B | TORRB2 |
SA1 | Turbine - Steam Sub Critical | $0 | $0 | — | — | — | 0.0% | $5.47 | View |
| Condamine A | CPSA |
QLD1 | Turbine - CCGT | $0 | $0 | — | — | — | 0.0% | $95.40 | View |
| CRWARP1 | CRWARP1 |
$0 | $0 | — | 8,422.5 | 8,717.1 | — | — | View | ||
| Colongra | CG1 |
NSW1 | Turbine - OCGT | $0 | $0 | — | — | 25,776.4 | 0.0% | $197.00 | View |
| DG_NSW1 | DG_NSW1 |
$0 | $0 | — | — | — | — | — | View | ||
| Cethana | CETHANA |
TAS1 | Hydro - Dam | $0 | $0 | — | — | — | 0.0% | $1.09 | View |
| Uranquinty | URANQ14 |
NSW1 | Turbine - OCGT | $0 | $0 | — | — | 21,367.8 | 0.0% | $128.50 | View |
| DG_SA1 | DG_SA1 |
$0 | $0 | — | — | — | — | — | View | ||
| DG_TAS1 | DG_TAS1 |
$0 | $0 | — | — | — | — | — | View | ||
| DROZVP01 | DROZVP01 |
$0 | $0 | 2.3 | — | — | — | — | View | ||
| DROZVP02 | DROZVP02 |
$0 | $0 | 0.1 | — | — | — | — | View | ||
| DROZVP03 | DROZVP03 |
$0 | $0 | 0.8 | — | — | — | — | View | ||
| STABESS1 | STABESS1 |
$0 | $0 | — | -2.9 | — | — | — | View | ||
| DRPSTQ01 | DRPSTQ01 |
$0 | $0 | — | — | — | — | — | View | ||
| Snuggery | SNUG1 |
SA1 | Turbine - OCGT | $0 | $0 | — | — | — | 0.0% | $2.00 | View |
| SNOWYP | SNOWYP |
$0 | $0 | — | 7,165.8 | 5,937.1 | — | — | View | ||
| SNOWYGJP | SNOWYGJP |
$0 | $0 | 822.5 | — | — | — | — | View | ||
| DRPSTV01 | DRPSTV01 |
$0 | $0 | 532.8 | — | — | — | — | View | ||
| DRSHVN01 | DRSHVN01 |
$0 | $0 | — | — | — | — | — | View | ||
| DRSHVN02 | DRSHVN02 |
$0 | $0 | 5,770.7 | — | — | — | — | View | ||
| DRSHVQ01 | DRSHVQ01 |
$0 | $0 | 447.1 | — | — | — | — | View | ||
| DRSHVS01 | DRSHVS01 |
$0 | $0 | — | — | — | — | — | View | ||
| DRHTVP03 | DRHTVP03 |
$0 | $0 | — | — | — | — | — | View | ||
| DRHTVP01 | DRHTVP01 |
$0 | $0 | — | — | — | — | — | View | ||
| DRGBND04 | DRGBND04 |
$0 | $0 | 2,721.3 | — | — | — | — | View | ||
| DG_VIC1 | DG_VIC1 |
$0 | $0 | — | — | — | — | — | View | ||
| Tarong | TARONG#3 |
QLD1 | Turbine - Steam Sub Critical | $0 | $0 | — | — | — | 0.0% | $55.48 | View |
| DRACAN1 | DRACAN1 |
$0 | $0 | 130.0 | — | — | — | — | View | ||
| DRACAV1 | DRACAV1 |
$0 | $0 | — | — | — | — | — | View | ||
| DRAESN3 | DRAESN3 |
$0 | $0 | 569.4 | — | — | — | — | View | ||
| Tallawarra B | TALWB1 |
NSW1 | Turbine - OCGT | $0 | $0 | — | — | 50,662.5 | 0.0% | $128.50 | View |
| DRAESS1 | DRAESS1 |
$0 | $0 | — | — | — | — | — | View | ||
| DRBRLV01 | DRBRLV01 |
$0 | $0 | 1,008.7 | — | — | — | — | View | ||
| DRFIIN01 | DRFIIN01 |
$0 | $0 | — | — | — | — | — | View | ||
| DRFIIN02 | DRFIIN02 |
$0 | $0 | — | — | — | — | — | View | ||
| DRGBND01 | DRGBND01 |
$0 | $0 | 782.1 | — | — | — | — | View | ||
| DRGBND02 | DRGBND02 |
$0 | $0 | 160.8 | — | — | — | — | View | ||
| DRGBND03 | DRGBND03 |
$0 | $0 | 3,667.2 | — | — | — | — | View | ||
| Snapper Point Power Station | SNAPPER1 |
SA1 | Turbine - OCGT | $0 | $0 | — | — | 24,054.0 | 0.0% | $128.50 | View |
| Uungula Wind Farm | UWF1 |
NSW1 | Wind Turbine - Onshore | $0 | $0 | — | — | — | 0.0% | $0.50 | View |
| WINNSF1 | WINNSF1 |
$0 | $0 | — | — | — | — | — | View | ||
| ASPAPM01 | ASPAPM01 |
$0 | $0 | — | — | — | — | — | View | ||
| ASPBSC01 | ASPBSC01 |
$0 | $0 | — | — | — | — | — | View | ||
| ASPSTV01 | ASPSTV01 |
$0 | $0 | — | — | — | — | — | View | ||
| WOOLES1 | WOOLES1 |
$0 | $0 | — | -470.0 | 4,065.0 | — | — | View | ||
| ASQEEV1 | ASQEEV1 |
$0 | $0 | — | — | — | — | — | View | ||
| ASQENC1 | ASQENC1 |
$0 | $0 | 36.4 | — | — | — | — | View | ||
| WNSF1 | WNSF1 |
$0 | $0 | — | 771.5 | — | — | — | View | ||
| ASRMGE01 | ASRMGE01 |
$0 | $0 | 0.1 | — | — | — | — | View | ||
| ASRMGE02 | ASRMGE02 |
$0 | $0 | 0.1 | — | — | — | — | View | ||
| ASRMGE03 | ASRMGE03 |
$0 | $0 | 0.0 | — | — | — | — | View | ||
| ASRMGE04 | ASRMGE04 |
$0 | $0 | — | — | — | — | — | View | ||
| ASRMGE05 | ASRMGE05 |
$0 | $0 | — | — | — | — | — | View | ||
| ASNENC1 | ASNENC1 |
$0 | $0 | 491.0 | — | — | — | — | View | ||
| ASNBRL1 | ASNBRL1 |
$0 | $0 | 3,248.7 | — | — | — | — | View | ||
| APD01 | APD01 |
$0 | $0 | 16,257.0 | — | — | — | — | View | ||
| ASACLE01 | ASACLE01 |
$0 | $0 | 355.2 | — | — | — | — | View | ||
| ASDESA1 | ASDESA1 |
$0 | $0 | — | — | — | — | — | View | ||
| Yarwun 1 | YARWUN_1 |
QLD1 | Turbine - CCGT | $0 | $0 | — | — | — | 0.0% | $84.30 | View |
| ASDEVI01 | ASDEVI01 |
$0 | $0 | 1,563.5 | — | — | — | — | View | ||
| ASDLBY01 | ASDLBY01 |
$0 | $0 | — | — | — | — | — | View | ||
| Townsville Power Station | YABULU2 |
QLD1 | Turbine - CCGT | $0 | $0 | — | — | — | 0.0% | $84.30 | View |
| Townsville Power Station | YABULU |
QLD1 | Turbine - CCGT | $0 | $0 | — | — | — | 0.0% | $84.30 | View |
| ASENGV01 | ASENGV01 |
$0 | $0 | — | — | — | — | — | View | ||
| ASENGY01 | ASENGY01 |
$0 | $0 | — | — | — | — | — | View | ||
| ASGENE01 | ASGENE01 |
$0 | $0 | — | — | — | — | — | View | ||
| ASNAES1 | ASNAES1 |
$0 | $0 | 12.4 | — | — | — | — | View | ||
| ASSDE1 | ASSDE1 |
$0 | $0 | — | — | — | — | — | View | ||
| ASSENC1 | ASSENC1 |
$0 | $0 | 42.2 | — | — | — | — | View | ||
| ASSERDV1 | ASSERDV1 |
$0 | $0 | — | — | — | — | — | View | ||
| VSSAE1V1 | VSSAE1V1 |
$0 | $0 | 245.3 | — | — | — | — | View | ||
| VSQHT1V1 | VSQHT1V1 |
$0 | $0 | — | — | — | — | — | View | ||
| VSNEL2S1 | VSNEL2S1 |
$0 | $0 | — | — | — | — | — | View | ||
| Valley Power | VPGS6 |
VIC1 | Turbine - OCGT | $0 | $0 | — | — | 8,300.7 | 0.0% | $128.50 | View |
| Valley Power | VPGS5 |
VIC1 | Turbine - OCGT | $0 | $0 | — | — | 8,300.7 | 0.0% | $128.50 | View |
| Valley Power | VPGS4 |
VIC1 | Turbine - OCGT | $0 | $0 | — | — | 8,300.7 | 0.0% | $128.50 | View |
| Valley Power | VPGS3 |
VIC1 | Turbine - OCGT | $0 | $0 | — | — | 8,783.6 | 0.0% | $128.50 | View |
| Valley Power | VPGS2 |
VIC1 | Turbine - OCGT | $0 | $0 | — | — | 8,783.6 | 0.0% | $128.50 | View |
| Valley Power | VPGS1 |
VIC1 | Turbine - OCGT | $0 | $0 | — | — | 8,783.6 | 0.0% | $128.50 | View |
| Braemar 2 Power Station | BRAEMAR6 |
QLD1 | Turbine - OCGT | $0 | $0 | — | — | 23,650.4 | 0.0% | $133.36 | View |
| Braemar 2 Power Station | BRAEMAR7 |
QLD1 | Turbine - OCGT | $0 | $0 | — | — | 7,017.0 | 0.0% | $132.25 | View |
| VENUS1 | VENUS1 |
$0 | $0 | 77.7 | — | — | — | — | View | ||
| VSSSE1V1 | VSSSE1V1 |
$0 | $0 | — | — | — | — | — | View | ||
| VSSSH1S1 | VSSSH1S1 |
$0 | $0 | — | — | — | — | — | View | ||
| ASTHYD1 | ASTHYD1 |
$0 | $0 | 1,137.4 | — | — | — | — | View | ||
| Barcaldine Power Station | BARCALDN |
QLD1 | Turbine - OCGT | $0 | $0 | — | — | — | 0.0% | $141.78 | View |
| Bell Bay Three | BBTHREE1 |
TAS1 | Turbine - OCGT | $0 | $0 | — | — | 3,827.1 | 0.0% | $182.63 | View |
| Bell Bay Three | BBTHREE2 |
TAS1 | Turbine - OCGT | $0 | $0 | — | — | 6,433.3 | 0.0% | $137.22 | View |
| Bairnsdale | BDL01 |
VIC1 | Turbine - OCGT | $0 | $0 | — | — | 7,099.7 | 0.0% | $142.10 | View |
| Bairnsdale | BDL02 |
VIC1 | Turbine - OCGT | $0 | $0 | — | — | — | 0.0% | $158.38 | View |
| WAMBOWF2 | WAMBOWF2 |
$0 | $0 | — | 5,623.1 | 5,472.8 | — | — | View | ||
| Wambo Wind Farm | WAMBOWF1 |
QLD1 | Wind Turbine - Onshore | $0 | $0 | — | — | — | 0.0% | $0.50 | View |
| Braemar | BRAEMAR2 |
QLD1 | Turbine - OCGT | $0 | $0 | — | — | 28,055.7 | 0.0% | $130.94 | View |
| W/HOE#2 | W/HOE#2 |
$0 | $0 | 875.9 | 6,354.8 | 29,203.3 | — | — | View | ||
| W/HOE#1 | W/HOE#1 |
$0 | $0 | 444.3 | 8,388.5 | 27,359.3 | — | — | View | ||
| VSVEL2S1 | VSVEL2S1 |
$0 | $0 | — | — | — | — | — | View | ||
| BUNGAMB1 | BUNGAMB1 |
$0 | $0 | 65,177.6 | -610.7 | 23,606.2 | — | — | View | ||
| PUMP1 | PUMP1 |
$0 | $0 | — | 11,694.4 | 10,938.7 | — | — | View | ||
| Oakey Power Station | OAKEY2 |
QLD1 | Turbine - OCGT | $0 | $0 | — | — | 1,442.5 | 0.0% | $128.50 | View |
| DRXVQX01 | DRXVQX01 |
$0 | $0 | — | — | — | — | — | View | ||
| Oakey Power Station | OAKEY1 |
QLD1 | Turbine - OCGT | $0 | $0 | — | — | 7,482.5 | 0.0% | $128.50 | View |
| DRXVQX02 | DRXVQX02 |
$0 | $0 | — | — | — | — | — | View | ||
| Dry Creek GT | DRYCGT1 |
SA1 | Turbine - OCGT | $0 | $0 | — | — | 7,233.3 | 0.0% | $141.50 | View |
| Newport | NPS |
VIC1 | Turbine - Steam Sub Critical | $0 | $0 | — | — | — | 0.0% | $2.00 | View |
| Dry Creek GT | DRYCGT2 |
SA1 | Turbine - OCGT | $0 | $0 | — | — | 5,629.2 | 0.0% | $135.55 | View |
| Dry Creek GT | DRYCGT3 |
SA1 | Turbine - OCGT | $0 | $0 | — | — | 7,604.8 | 0.0% | $210.15 | View |
| Eraring | ER02 |
NSW1 | Turbine - Steam Sub Critical | $0 | $0 | — | — | — | 0.0% | $59.45 | View |
| ERB02 | ERB02 |
$0 | $0 | — | -193.0 | 607.7 | — | — | View | ||
| Eraring GT | ERGT01 |
NSW1 | Turbine - OCGT | $0 | $0 | — | — | — | 0.0% | $96.96 | View |
| Broken Hill GT | GB01 |
NSW1 | Turbine - OCGT | $0 | $0 | — | — | — | 0.0% | $2.11 | View |
| Gladstone | GSTONE3 |
QLD1 | Turbine - Steam Sub Critical | $0 | $0 | — | — | — | 0.0% | $128.75 | View |
| DRXVQP01 | DRXVQP01 |
$0 | $0 | — | — | — | — | — | View | ||
| DRXVDX01 | DRXVDX01 |
$0 | $0 | — | — | — | — | — | View | ||
| DRXVDP01 | DRXVDP01 |
$0 | $0 | — | — | — | — | — | View | ||
| DRXQDA01 | DRXQDA01 |
$0 | $0 | — | — | — | — | — | View | ||
| DRXQQE01 | DRXQQE01 |
$0 | $0 | — | — | 75.7 | — | — | View | ||
| Port Lincoln GT | POR03 |
SA1 | Turbine - OCGT | $0 | $0 | — | — | — | 0.0% | $2.00 | View |
| Port Lincoln GT | POR01 |
SA1 | Turbine - OCGT | $0 | $0 | — | — | — | 0.0% | $2.00 | View |
| DRXSQS01 | DRXSQS01 |
$0 | $0 | — | — | — | — | — | View | ||
| DRXVAE01 | DRXVAE01 |
$0 | $0 | — | — | — | — | — | View | ||
| PLBESS1 | PLBESS1 |
$0 | $0 | — | 10.2 | 2,541.7 | — | — | View | ||
| PIONEER | PIONEER |
$0 | $0 | — | 4,008.6 | — | — | — | View | ||
| DRXVDJ01 | DRXVDJ01 |
$0 | $0 | — | — | — | — | — | View | ||
| Port Augusta Renewable Energy Park - Wind | PAREPW1 |
SA1 | Wind Turbine - Onshore | $0 | $0 | — | — | — | 0.0% | $0.50 | View |
| Port Augusta Renewable Energy Park - Solar | PAREPS1 |
SA1 | Solar PV - Fixed | $0 | $0 | — | — | — | 0.0% | $0.20 | View |
| Paloona | PALOONA |
TAS1 | Hydro - Dam | $0 | $0 | — | — | — | 0.0% | $1.00 | View |
| Osborne | OSB-AG |
SA1 | Turbine - CCGT | $0 | $0 | — | — | — | 0.0% | $84.30 | View |
| Hunter EconomicZone | HEZ1 |
NSW1 | Reciprocating Engine - Compression ignition | $0 | $0 | — | — | 3,040.0 | 0.0% | $308.00 | View |
| Hume Dam VIC | HUMEV |
VIC1 | Hydro - Dam | $0 | $0 | — | — | — | 0.0% | $1.54 | View |
| Jeeralang B | JLB02 |
VIC1 | Turbine - OCGT | $0 | $0 | — | — | 12,062.5 | 0.0% | $137.71 | View |
| Jeeralang B | JLB03 |
VIC1 | Turbine - OCGT | $0 | $0 | — | — | 12,447.5 | 0.0% | $137.85 | View |
| Kareeya | KAREEYA1 |
QLD1 | Hydro - Run of River | $0 | $0 | — | — | — | 0.0% | $1.00 | View |
| Kennedy Energy Park - Phase 1 - Storage | KEPBG1 |
QLD1 | Storage - Battery | $0 | $0 | — | — | — | 0.0% | $2.03 | View |
| KEPBL1 | KEPBL1 |
$0 | $0 | — | — | — | — | — | View | ||
| MLSP1 | MLSP1 |
$0 | $0 | — | 483.0 | — | — | — | View | ||
| MLB01 | MLB01 |
$0 | $0 | — | -662.7 | 32,644.5 | — | — | View | ||
| KIDSPHG1 | KIDSPHG1 |
$0 | $0 | — | — | — | — | — | View | ||
| KIDSPHG2 | KIDSPHG2 |
$0 | $0 | — | — | — | — | — | View | ||
| KIDSPHL1 | KIDSPHL1 |
$0 | $0 | — | — | — | — | — | View | ||
| Lake Echo | LK_ECHO |
TAS1 | Hydro - Dam | $0 | $0 | — | — | — | 0.0% | $1.17 | View |
| Laverton North | LNGS1 |
VIC1 | Turbine - OCGT | $0 | $0 | — | — | 27,054.1 | 0.0% | $128.50 | View |
| Laverton North | LNGS2 |
VIC1 | Turbine - OCGT | $0 | $0 | — | — | — | 0.0% | $128.50 | View |
| Mortlake | MORTLK12 |
VIC1 | Turbine - OCGT | $0 | $0 | — | — | 37,742.2 | 0.0% | $128.50 | View |
| Jeeralang A | JLA04 |
VIC1 | Turbine - OCGT | $0 | $0 | — | — | 8,685.0 | 0.0% | $177.20 | View |
| Mt Piper | MP2 |
NSW1 | Turbine - Steam Sub Critical | $0 | $0 | — | — | — | 0.0% | $52.60 | View |
| Hunter Power Station | HUNTER1 |
NSW1 | Turbine - OCGT | $0 | $0 | — | — | — | 0.0% | $142.99 | View |
| KIDSPHL2 | KIDSPHL2 |
$0 | $0 | — | — | — | — | — | View | ||
| Hunter Power Station | HUNTER2 |
NSW1 | Turbine - OCGT | $0 | $0 | — | — | — | 0.0% | $152.46 | View |
| Mt Stuart | MSTUART3 |
QLD1 | Turbine - OCGT | $0 | $0 | — | — | 18,101.5 | 0.0% | $2.00 | View |
| Mt Stuart | MSTUART2 |
QLD1 | Turbine - OCGT | $0 | $0 | — | — | — | 0.0% | $148.45 | View |
| Loy Yang A Power Station | LYA1 |
VIC1 | Turbine - Steam Sub Critical | $0 | $0 | — | — | — | 0.0% | $47.20 | View |
| Jeeralang A | JLA01 |
VIC1 | Turbine - OCGT | $0 | $0 | — | — | 8,685.0 | 0.0% | $135.55 | View |
| Jeeralang A | JLA02 |
VIC1 | Turbine - OCGT | $0 | $0 | — | — | 8,685.0 | 0.0% | $128.50 | View |
| MREHA3 | MREHA3 |
$0 | $0 | 14,780.1 | -714.8 | 29,041.7 | — | — | View | ||
| MREHA2 | MREHA2 |
$0 | $0 | 6,837.6 | -897.9 | 25,909.8 | — | — | View | ||
| MREHA1 | MREHA1 |
$0 | $0 | 4,936.5 | -892.7 | 25,740.2 | — | — | View | ||
| Jeeralang A | JLA03 |
VIC1 | Turbine - OCGT | $0 | $0 | — | — | 8,685.0 | 0.0% | $141.46 | View |
| Millmerran Power Plant | MPP_1 |
QLD1 | Turbine - Steam Super Critical | $0 | $0 | — | — | — | 0.0% | $52.60 | View |
| Lonsdale | LONSDALE |
SA1 | Reciprocating Engine - Compression ignition | $0 | $0 | — | — | 2,963.7 | 0.0% | $308.00 | View |
| DRSHVS02 | DRSHVS02 |
$0 | $0 | 4,968.8 | — | — | — | — | View | ||
| RT_VIC7 | RT_VIC7 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_VIC6 | RT_VIC6 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_VIC5 | RT_VIC5 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_VIC4 | RT_VIC4 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_VIC3 | RT_VIC3 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_VIC2 | RT_VIC2 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_VIC12 | RT_VIC12 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_VIC11 | RT_VIC11 |
$0 | $0 | — | — | — | — | — | View | ||
| DRXNDA02 | DRXNDA02 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_VIC1 | RT_VIC1 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_TAS1 | RT_TAS1 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_SA6 | RT_SA6 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_SA5 | RT_SA5 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_VIC8 | RT_VIC8 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_VIC9 | RT_VIC9 |
$0 | $0 | — | — | — | — | — | View | ||
| DRVIOT01 | DRVIOT01 |
$0 | $0 | 1,328.7 | — | — | — | — | View | ||
| DRVIOT02 | DRVIOT02 |
$0 | $0 | 210.2 | — | — | — | — | View | ||
| Smithfield Energy Facility | SITHE01 |
NSW1 | Turbine - OCGT | $0 | $0 | — | — | — | 0.0% | $128.50 | View |
| SHPUMP | SHPUMP |
$0 | $0 | — | 1,705.7 | 1,678.0 | — | — | View | ||
| DRVIOT03 | DRVIOT03 |
$0 | $0 | 423.6 | — | — | — | — | View | ||
| DRVIOT04 | DRVIOT04 |
$0 | $0 | 12,501.8 | — | — | — | — | View | ||
| DRVIOT05 | DRVIOT05 |
$0 | $0 | 4,008.2 | — | — | — | — | View | ||
| DRVIOT06 | DRVIOT06 |
$0 | $0 | — | — | — | — | — | View | ||
| DRVIOT07 | DRVIOT07 |
$0 | $0 | — | — | — | — | — | View | ||
| DRVISB01 | DRVISB01 |
$0 | $0 | — | — | — | — | — | View | ||
| DRXNAD01 | DRXNAD01 |
$0 | $0 | — | — | — | — | — | View | ||
| DRXNAE01 | DRXNAE01 |
$0 | $0 | — | — | — | — | — | View | ||
| DRXNDA01 | DRXNDA01 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_SA4 | RT_SA4 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_SA3 | RT_SA3 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_SA2 | RT_SA2 |
$0 | $0 | — | — | — | — | — | View | ||
| DRXNDE01 | DRXNDE01 |
$0 | $0 | — | — | — | — | — | View | ||
| DRXNDJ01 | DRXNDJ01 |
$0 | $0 | — | — | — | — | — | View | ||
| DRXNDW01 | DRXNDW01 |
$0 | $0 | — | — | — | — | — | View | ||
| DRXNFF01 | DRXNFF01 |
$0 | $0 | — | — | — | — | — | View | ||
| DRXNFS01 | DRXNFS01 |
$0 | $0 | — | — | — | — | — | View | ||
| DRXNQX01 | DRXNQX01 |
$0 | $0 | — | — | — | — | — | View | ||
| DRXNSS01 | DRXNSS01 |
$0 | $0 | — | — | — | — | — | View | ||
| DRXNTM02 | DRXNTM02 |
$0 | $0 | — | — | — | — | — | View | ||
| DRXNVS01 | DRXNVS01 |
$0 | $0 | — | — | — | — | — | View | ||
| Quarantine | QPS4 |
SA1 | Turbine - OCGT | $0 | $0 | — | — | — | 0.0% | $128.50 | View |
| Quarantine | QPS3 |
SA1 | Turbine - OCGT | $0 | $0 | — | — | 4,462.2 | 0.0% | $128.50 | View |
| Quarantine | QPS2 |
SA1 | Turbine - OCGT | $0 | $0 | — | — | 3,522.0 | 0.0% | $128.50 | View |
| Quarantine | QPS1 |
SA1 | Turbine - OCGT | $0 | $0 | — | — | 4,433.7 | 0.0% | $128.50 | View |
| Roma | ROMA_7 |
QLD1 | Turbine - OCGT | $0 | $0 | — | — | 5,251.5 | 0.0% | $128.50 | View |
| Roma | ROMA_8 |
QLD1 | Turbine - OCGT | $0 | $0 | — | — | 5,103.7 | 0.0% | $128.50 | View |
| PUMP2 | PUMP2 |
$0 | $0 | — | 9,874.2 | 9,127.7 | — | — | View | ||
| RT_SA1 | RT_SA1 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_QLD1 | RT_QLD1 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_NSW6 | RT_NSW6 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_NSW5 | RT_NSW5 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_NSW4 | RT_NSW4 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_NSW3 | RT_NSW3 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_NSW2 | RT_NSW2 |
$0 | $0 | — | — | — | — | — | View | ||
| DRXNDB04 | DRXNDB04 |
$0 | $0 | — | — | — | — | — | View | ||
| DRXNDA04 | DRXNDA04 |
$0 | $0 | — | — | — | — | — | View | ||
| DRXNDA03 | DRXNDA03 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_NSW1 | RT_NSW1 |
$0 | $0 | — | — | — | — | — | View | ||
| Rowallan | ROWALLAN |
TAS1 | Hydro - Dam | $-54 | $0 | — | -0.7 | — | 0.0% | $1.00 | View |
| Happy Valley Reservoir | HVWWPV1 |
SA1 | Solar PV - Single axis tracking | $-100 | $0 | — | 39.6 | 112.8 | 2.1% | $0.00 | View |
| Wooreen Energy Storage System | WOORB1 |
VIC1 | Storage - Battery | $-213 | $0 | — | 14.0 | 14.0 | 0.0% | $1.50 | View |
| Queanbeyan BESS | QBYNB1 |
NSW1 | Storage - Battery | $-1.1k | $0 | — | -10.1 | 64.7 | -0.6% | $1.50 | View |
| Hallett GT | AGLHAL |
SA1 | Turbine - OCGT | $-12.0k | $0 | — | 235.6 | 26,851.9 | 0.5% | $100.22 | View |
| Summerfield BESS | SMFBESS2 |
SA1 | Storage - Battery | $-17.3k | $0 | — | 86.5 | 200.0 | 0.2% | $1.50 | View |