MLF-adjusted revenue, dispatch, capacity factor, and estimated SRMC from AEMO 5‑minute dispatch data. Data through 05 Nov 2026, 11:25 AEST.
Energy revenue = cleared MW × (5/60 h) × regional RRP × MLF. FCAS revenue = sum of cleared FCAS MW × (5/60 h) × regional FCAS price × MLF (raise/lower 6s, 60s, 5min, reg). FCAS volume = total FCAS enablement MWh across all services. Capacity factor = dispatched MWh ÷ (nameplate MW × period hours). SRMC from financial assumptions. Not AEMO settlement data.
| Site | DUID | Region | Tech | Energy rev. (× MLF) | FCAS rev. (× MLF) | FCAS MWh | MWh dispatch | MWh available | Capacity factor | Est. SRMC | |
|---|---|---|---|---|---|---|---|---|---|---|---|
| Bayswater | BW04 |
NSW1 | Turbine - Steam Sub Critical | $51.98M | $10.4k | 7,552.6 | 403,470.1 | 484,922.4 | 81.8% | $55.48 | View |
| Bayswater | BW02 |
NSW1 | Turbine - Steam Sub Critical | $51.57M | $9.6k | 7,025.7 | 396,835.8 | 487,409.6 | 80.5% | $26.23 | View |
| Mt Piper | MP1 |
NSW1 | Turbine - Steam Sub Critical | $50.24M | $0 | — | 337,243.9 | 518,563.3 | 64.2% | $49.24 | View |
| Vales Point B | VP6 |
NSW1 | Turbine - Steam Sub Critical | $41.44M | $41 | 236.6 | 274,595.4 | 442,267.2 | 57.8% | $52.60 | View |
| Bayswater | BW01 |
NSW1 | Turbine - Steam Sub Critical | $39.51M | $8.8k | 6,048.9 | 315,465.6 | 380,028.7 | 66.4% | $53.57 | View |
| Eraring | ER04 |
NSW1 | Turbine - Steam Sub Critical | $39.15M | $4.3k | 601.9 | 278,686.2 | 414,697.3 | 53.8% | $55.48 | View |
| Vales Point B | VP5 |
NSW1 | Turbine - Steam Sub Critical | $34.90M | $39 | 218.2 | 259,034.5 | 395,984.2 | 54.5% | $52.60 | View |
| Eraring | ER02 |
NSW1 | Turbine - Steam Sub Critical | $29.49M | $2.9k | 420.9 | 191,092.2 | 251,945.7 | 36.9% | $59.45 | View |
| Millmerran Power Plant | MPP_2 |
QLD1 | Turbine - Steam Super Critical | $29.01M | $0 | — | 301,139.8 | 304,020.8 | 98.2% | $52.60 | View |
| Callide C | CPP_3 |
QLD1 | Turbine - Steam Super Critical | $25.46M | $0 | — | 273,859.1 | 296,994.5 | 89.7% | $44.41 | View |
| Callide C | CPP_4 |
QLD1 | Turbine - Steam Super Critical | $25.19M | $0 | — | 270,980.0 | 291,813.0 | 89.6% | $101.94 | View |
| Tarong North | TNPS1 |
QLD1 | Turbine - Steam Super Critical | $23.94M | $0 | — | 240,377.2 | 280,134.2 | 74.2% | $52.60 | View |
| Tumut 3 | TUMUT3 |
NSW1 | Hydro - Dam | $23.73M | $2.4k | 8,114.7 | 50,926.3 | 1,219,251.4 | 4.7% | $1.05 | View |
| Stanwell | STAN-1 |
QLD1 | Turbine - Steam Sub Critical | $20.95M | $5.3k | 1,633.4 | 221,824.9 | 249,319.6 | 84.4% | $52.60 | View |
| Loy Yang B | LOYYB2 |
VIC1 | Turbine - Steam Sub Critical | $20.73M | $3.6k | 8,068.1 | 405,284.1 | 406,084.1 | 97.1% | $47.20 | View |
| Stanwell | STAN-2 |
QLD1 | Turbine - Steam Sub Critical | $20.49M | $5.4k | 748.3 | 217,014.9 | 244,881.2 | 82.6% | $52.60 | View |
| Loy Yang A Power Station | LYA3 |
VIC1 | Turbine - Steam Sub Critical | $20.43M | $2.2k | 5,608.5 | 314,357.0 | 392,555.0 | 78.0% | $47.20 | View |
| Tarong | TARONG#2 |
QLD1 | Turbine - Steam Sub Critical | $20.31M | $5.5k | 731.5 | 200,290.8 | 232,505.4 | 79.5% | $55.48 | View |
| Callide B | CALL_B_1 |
QLD1 | Turbine - Steam Sub Critical | $20.21M | $7.3k | 4,631.1 | 217,412.1 | 248,425.4 | 86.3% | $32.60 | View |
| Stanwell | STAN-3 |
QLD1 | Turbine - Steam Sub Critical | $19.83M | $154 | 8.7 | 208,146.5 | 237,989.6 | 79.2% | $52.60 | View |
| Loy Yang A Power Station | LYA4 |
VIC1 | Turbine - Steam Sub Critical | $19.81M | $2.1k | 5,365.9 | 304,319.3 | 382,445.4 | 75.5% | $47.20 | View |
| Upper Tumut | UPPTUMUT |
NSW1 | Hydro - Dam | $19.74M | $11.9k | 12,991.5 | 138,873.8 | 410,867.1 | 31.3% | $1.00 | View |
| Loy Yang A Power Station | LYA2 |
VIC1 | Turbine - Steam Sub Critical | $19.60M | $3.4k | 1,799.0 | 323,005.6 | 375,575.0 | 84.6% | $47.20 | View |
| Tarong | TARONG#4 |
QLD1 | Turbine - Steam Sub Critical | $19.53M | $5.9k | 833.7 | 193,573.3 | 220,862.9 | 76.8% | $52.58 | View |
| Loy Yang B | LOYYB1 |
VIC1 | Turbine - Steam Sub Critical | $19.01M | $4.6k | 8,371.2 | 385,285.3 | 383,294.3 | 92.3% | $47.20 | View |
| Callide B | CALL_B_2 |
QLD1 | Turbine - Steam Sub Critical | $19.01M | $4.1k | 2,553.3 | 208,546.3 | 217,780.0 | 82.8% | $55.48 | View |
| Tarong | TARONG#1 |
QLD1 | Turbine - Steam Sub Critical | $17.76M | $1.2k | 3.3 | 183,704.5 | 209,751.7 | 72.9% | $52.60 | View |
| MacIntyre Wind Farm | MCINTYR1 |
QLD1 | Wind Turbine - Onshore | $16.07M | $0 | — | 170,672.3 | 169,584.4 | 25.7% | $0.58 | View |
| Eraring | ER01 |
NSW1 | Turbine - Steam Sub Critical | $15.12M | $1.3k | 191.6 | 149,364.1 | 179,828.7 | 28.8% | $48.29 | View |
| Gladstone | GSTONE4 |
QLD1 | Turbine - Steam Sub Critical | $13.45M | $5.6k | 3,517.0 | 137,571.8 | 191,699.6 | 68.2% | $52.60 | View |
| Yallourn W | YWPS4 |
VIC1 | Turbine - Steam Sub Critical | $13.32M | $0 | — | 247,454.5 | 269,334.7 | 91.6% | $47.20 | View |
| Eraring | ER03 |
NSW1 | Turbine - Steam Sub Critical | $13.18M | $1.5k | 201.9 | 128,613.2 | 192,506.8 | 24.8% | $49.77 | View |
| Stanwell | STAN-4 |
QLD1 | Turbine - Steam Sub Critical | $12.60M | $0 | — | 139,739.6 | 147,080.0 | 53.2% | $52.60 | View |
| Gladstone | GSTONE5 |
QLD1 | Turbine - Steam Sub Critical | $12.37M | $5.7k | 3,635.6 | 125,854.7 | 194,850.8 | 62.4% | $58.48 | View |
| Gladstone | GSTONE2 |
QLD1 | Turbine - Steam Sub Critical | $11.87M | $2.4k | 948.0 | 122,418.0 | 195,130.8 | 60.7% | $49.17 | View |
| Gladstone | GSTONE6 |
QLD1 | Turbine - Steam Sub Critical | $11.83M | $6.5k | 3,871.8 | 121,112.7 | 193,153.7 | 60.1% | $54.96 | View |
| Murray 2 | MURRAY |
VIC1 | Hydro - Dam | $11.59M | $6.0k | 5,364.2 | 96,939.4 | 836,683.7 | 22.4% | $1.00 | View |
| Yallourn W | YWPS1 |
VIC1 | Turbine - Steam Sub Critical | $11.07M | $0 | — | 217,525.4 | 227,703.3 | 86.3% | $47.20 | View |
| Tallawarra | TALWA1 |
NSW1 | Turbine - CCGT | $10.64M | $0 | — | 46,372.0 | 67,587.7 | 16.1% | $84.30 | View |
| Yallourn W | YWPS3 |
VIC1 | Turbine - Steam Sub Critical | $10.58M | $0 | — | 212,671.1 | 234,197.1 | 78.8% | $47.20 | View |
| Clarke Creek Wind Farm | CLRKCWF1 |
QLD1 | Wind Turbine - Onshore | $10.17M | $0 | — | 100,979.2 | 113,117.6 | 40.5% | $0.00 | View |
| Coopers Gap Wind Farm | COOPGWF1 |
QLD1 | Wind Turbine - Onshore | $9.86M | $0 | — | 107,533.6 | 109,007.6 | 33.0% | $0.68 | View |
| Gordon | GORDON |
TAS1 | Hydro - Dam | $9.33M | $152.2k | 47,203.4 | 122,058.6 | 171,785.2 | 39.2% | $1.05 | View |
| Rye Park Wind Farm | RYEPARK1 |
NSW1 | Wind Turbine - Onshore | $8.27M | $0 | — | 88,666.8 | 89,985.9 | 31.1% | $0.50 | View |
| Gladstone | GSTONE3 |
QLD1 | Turbine - Steam Sub Critical | $6.94M | $3.1k | 2,281.9 | 64,855.0 | 93,031.2 | 32.2% | $128.75 | View |
| Pelican Point | PPCCGT |
SA1 | Turbine - CCGT | $5.61M | $0 | — | 65,203.0 | 85,758.7 | 17.1% | $84.30 | View |
| Wollar Solar Farm | WOLARSF1 |
NSW1 | Solar PV - Single axis tracking | $5.36M | $0 | — | 58,788.1 | 57,670.7 | 29.2% | $0.25 | View |
| Poatina | POAT220 |
TAS1 | Hydro - Dam | $5.33M | $210.8k | 22,953.9 | 60,729.2 | 171,060.0 | 42.2% | $1.00 | View |
| Dulacca Wind Farm | DULAWF1 |
QLD1 | Wind Turbine - Onshore | $5.03M | $0 | — | 53,018.6 | 52,836.9 | 42.6% | $0.53 | View |
| Gladstone | GSTONE1 |
QLD1 | Turbine - Steam Sub Critical | $4.91M | $2.0k | 1,082.9 | 56,136.9 | 83,521.2 | 27.8% | $52.99 | View |
| Wellington North Solar Farm (Lightsource) | WELNSF1 |
NSW1 | Solar PV - Single axis tracking | $4.58M | $0 | — | 64,228.6 | 62,798.5 | 20.4% | $0.25 | View |
| Barker Inlet Power Station | BARKIPS1 |
SA1 | Reciprocating Engine - Spark ignition | $4.12M | $0 | — | 37,329.9 | 130,362.1 | 24.7% | $9.00 | View |
| Catagunya / Liapootah / Wayatinah | LI_WY_CA |
TAS1 | Hydro - Dam | $4.07M | $17.0k | 4,551.5 | 57,311.3 | 125,589.6 | 45.0% | $1.05 | View |
| Bango 973 Wind Farm | BANGOWF1 |
NSW1 | Wind Turbine - Onshore | $4.00M | $0 | — | 31,203.5 | 31,959.3 | 27.3% | $0.00 | View |
| Western Downs Green Power Hub P/L | WDGPH1 |
QLD1 | Solar PV - Single axis tracking | $3.96M | $2.1k | 178.0 | 72,119.2 | 70,401.8 | 25.0% | $0.32 | View |
| Stubbo Solar Farm | STUBSF1 |
NSW1 | Solar PV - Single axis tracking | $3.94M | $0 | — | 48,263.0 | 47,293.9 | 33.9% | $0.25 | View |
| Culcairn Solar Farm | CUSF1 |
NSW1 | Solar PV - Single axis tracking | $3.89M | $0 | — | 37,974.5 | 93,139.8 | 15.1% | $0.25 | View |
| Darling Downs | DDPS1 |
QLD1 | Turbine - CCGT | $3.78M | $0 | — | 25,046.1 | 26,538.2 | 5.4% | $3.31 | View |
| White Rock Wind Farm - Stage 1 | WRWF1 |
NSW1 | Wind Turbine - Onshore | $3.68M | $0 | — | 40,448.7 | 40,207.8 | 32.1% | $0.50 | View |
| Flyers Creek Wind Farm | FLYCRKWF |
NSW1 | Wind Turbine - Onshore | $3.66M | $0 | — | 34,438.1 | 34,035.1 | 32.9% | $0.58 | View |
| Stockyard Hill Wind Farm | STOCKYD1 |
VIC1 | Wind Turbine - Onshore | $3.58M | $0 | — | 142,642.2 | 144,881.1 | 37.6% | $0.50 | View |
| Darlington Point Solar Farm | DARLSF1 |
NSW1 | Solar PV - Single axis tracking | $3.56M | $0 | — | 45,042.8 | 53,516.8 | 22.8% | $0.33 | View |
| Silverton Wind Farm | STWF1 |
NSW1 | Wind Turbine - Onshore | $3.50M | $0 | — | 36,877.2 | 36,434.9 | 25.7% | $0.50 | View |
| Sapphire Wind Farm | SAPHWF1 |
SA1 | Wind Turbine - Onshore | $3.40M | $0 | — | 70,778.9 | 70,310.4 | 36.4% | $0.50 | View |
| Avonlie Solar Farm | AVLSF1 |
NSW1 | Solar PV - Single axis tracking | $3.36M | $0 | — | 42,557.6 | 45,819.3 | 23.3% | $0.00 | View |
| Clarke Creek Wind Farm | CLRKCWF2 |
QLD1 | Wind Turbine - Onshore | $3.19M | $0 | — | 32,488.2 | 33,977.4 | 43.6% | $0.58 | View |
| Shoalhaven | SHOAL1 |
NSW1 | Storage - Pumped hydro | $3.18M | $0 | — | 24,837.7 | — | 14.0% | $1.20 | View |
| Taralga Wind Farm | TARALGA1 |
NSW1 | Wind Turbine - Onshore | $3.14M | $0 | — | 20,003.9 | 19,547.1 | 26.0% | $0.50 | View |
| Stubbo Solar Farm | STUBSF2 |
NSW1 | Solar PV - Single axis tracking | $3.14M | $0 | — | 46,661.2 | 45,723.5 | 32.1% | $0.25 | View |
| Collector | COLWF01 |
NSW1 | Wind Turbine - Onshore | $2.99M | $0 | — | 33,089.2 | 34,343.0 | 20.3% | $0.65 | View |
| Hume Dam NSW | HUMENSW |
NSW1 | Hydro - Dam | $2.99M | $0 | — | 25,111.8 | 25,536.7 | 100.0% | $1.05 | View |
| Broadsound Solar Farm | BRDDSF01 |
QLD1 | Solar PV - Single axis tracking | $2.98M | $0 | — | 45,602.6 | 50,356.4 | 17.2% | $0.27 | View |
| Cattle Hill Wind Farm | CTHLWF1 |
TAS1 | Wind Turbine - Onshore | $2.94M | $0 | — | 43,213.7 | 44,764.0 | 41.7% | $0.66 | View |
| Boco Rock Wind Farm | BOCORWF1 |
NSW1 | Wind Turbine - Onshore | $2.82M | $0 | — | 27,513.1 | 27,704.0 | 33.8% | $0.00 | View |
| Limondale Solar Farm 1 | LIMOSF11 |
NSW1 | Solar PV - Single axis tracking | $2.72M | $0 | — | 40,552.8 | 42,769.7 | 24.5% | $0.25 | View |
| Gullen Range Wind Farm | GULLRWF1 |
NSW1 | Wind Turbine - Onshore | $2.71M | $0 | — | 28,866.4 | 30,183.5 | 24.2% | $0.53 | View |
| Uranquinty | URANQ13 |
NSW1 | Turbine - OCGT | $2.71M | $0 | — | 3,818.5 | 108,442.7 | 3.1% | $128.50 | View |
| Bodangora Wind Farm | BODWF1 |
NSW1 | Wind Turbine - Onshore | $2.69M | $0 | — | 26,141.7 | 25,772.6 | 32.1% | $0.68 | View |
| Glenellen Solar Farm | GESF1 |
NSW1 | Solar PV - Fixed | $2.65M | $0 | — | 36,899.3 | 39,323.9 | 19.7% | $0.00 | View |
| Crudine Ridge Wind Farm | CRURWF1 |
NSW1 | Wind Turbine - Onshore | $2.64M | $0 | — | 27,553.6 | 27,098.2 | 27.0% | $0.53 | View |
| Capital Wind Farm | CAPTL_WF |
NSW1 | Wind Turbine - Onshore | $2.59M | $0 | — | 19,193.8 | — | 18.9% | $0.00 | View |
| Torrens Island B | TORRB3 |
SA1 | Turbine - Steam Sub Critical | $2.59M | $5.9k | 6,359.8 | 34,770.2 | 110,357.3 | 24.1% | $2.00 | View |
| Tarraleah | TARRALEA |
TAS1 | Hydro - Dam | $2.55M | $0 | — | 42,533.0 | 42,056.8 | 65.6% | $1.00 | View |
| Reece | REECE2 |
TAS1 | Hydro - Dam | $2.54M | $121.0k | 19,939.1 | 26,261.8 | 74,270.0 | 31.6% | $1.00 | View |
| Eraring Big Battery | ERB01 |
NSW1 | Storage - Battery | $2.51M | $82 | 7,993.8 | -6,401.0 | 283,145.1 | -3.7% | $1.58 | View |
| Bango 999 Wind Farm | BANGOWF2 |
NSW1 | Wind Turbine - Onshore | $2.51M | $0 | — | 20,807.1 | 20,724.9 | 34.1% | $0.00 | View |
| John Butters | JBUTTERS |
TAS1 | Hydro - Dam | $2.51M | $24.2k | 11,351.0 | 25,012.1 | 77,280.0 | 24.1% | $0.00 | View |
| Wellington Solar Farm | WELLSF1 |
NSW1 | Solar PV - Single axis tracking | $2.50M | $0 | — | 31,766.9 | 32,241.3 | 20.4% | $0.25 | View |
| Gullen Range Wind Farm 2 | GULLRWF2 |
NSW1 | Wind Turbine - Onshore | $2.41M | $0 | — | 26,066.8 | 27,173.0 | 32.7% | $0.50 | View |
| Goyder South Wind Farm 1A | GSWF1A |
SA1 | Wind Turbine - Onshore | $2.36M | $0 | — | 43,217.6 | 50,465.9 | 28.7% | $0.55 | View |
| New England Solar Farm | NEWENSF1 |
NSW1 | Solar PV - Single axis tracking | $2.35M | $0 | — | 29,764.2 | 29,477.1 | 20.7% | $0.25 | View |
| Sunraysia Solar Farm | SUNRSF1 |
NSW1 | Solar PV - Single axis tracking | $2.33M | $0 | — | 34,439.6 | 35,872.3 | 20.9% | $0.25 | View |
| Blowering | BLOWERNG |
NSW1 | Hydro - Dam | $2.29M | $0 | — | 16,968.2 | 16,750.7 | 29.5% | $0.00 | View |
| Mount Emerald | MEWF1 |
QLD1 | Wind Turbine - Onshore | $2.29M | $0 | — | 22,745.1 | 29,202.6 | 17.5% | $0.50 | View |
| Kogan Creek | KPP_1 |
QLD1 | Turbine - Steam Super Critical | $2.25M | $0 | — | 31,370.8 | 27,686.8 | 5.9% | $52.60 | View |
| Uranquinty | URANQ14 |
NSW1 | Turbine - OCGT | $2.25M | $0 | — | 3,506.4 | 103,205.6 | 2.8% | $128.50 | View |
| New England Solar Farm | NEWENSF2 |
NSW1 | Solar PV - Single axis tracking | $2.17M | $0 | — | 27,445.9 | 27,065.2 | 19.1% | $0.25 | View |
| Kaban Wind Farm | KABANWF1 |
QLD1 | Wind Turbine - Onshore | $2.13M | $0 | — | 21,029.3 | 24,253.6 | 18.6% | $0.00 | View |
| Murra Warra Wind Farm - stage 1 | MUWAWF1 |
VIC1 | Wind Turbine - Onshore | $2.10M | $0 | — | 36,927.7 | 62,088.4 | 22.7% | $0.50 | View |
| Reece | REECE1 |
TAS1 | Hydro - Dam | $2.09M | $118.8k | 16,552.5 | 21,801.2 | 77,826.0 | 26.2% | $1.00 | View |
| Gunnedah Solar Farm | GNNDHSF1 |
NSW1 | Solar PV - Single axis tracking | $2.06M | $0 | — | 20,212.1 | 23,872.4 | 25.5% | $0.33 | View |
| Mackintosh | MACKNTSH |
TAS1 | Hydro - Dam | $2.06M | $2.9k | 1,150.5 | 22,368.0 | 57,826.2 | 38.9% | $1.00 | View |
| Bastyan | BASTYAN |
TAS1 | Hydro - Dam | $2.02M | $2.9k | 1,578.7 | 23,013.3 | 53,833.3 | 40.0% | $0.00 | View |
| Smithfield Energy Facility | SITHE01 |
NSW1 | Turbine - OCGT | $1.99M | $0 | — | 4,279.6 | 4,619.2 | 4.7% | $128.50 | View |
| Musselroe Wind Farm | MUSSELR1 |
TAS1 | Wind Turbine - Onshore | $1.98M | $0 | — | 37,810.2 | 38,739.8 | 31.3% | $0.50 | View |
| Colongra | CG3 |
NSW1 | Turbine - OCGT | $1.97M | $0 | — | 6,856.6 | 120,760.7 | 5.3% | $144.24 | View |
| Goyder South Wind Farm 1B | GSWF1B1 |
SA1 | Wind Turbine - Onshore | $1.95M | $0 | — | 33,529.4 | 45,212.4 | 22.9% | $0.00 | View |
| Moorabool Wind Farm | MOORAWF1 |
VIC1 | Wind Turbine - Onshore | $1.91M | $0 | — | 58,488.3 | 69,109.8 | 26.0% | $0.50 | View |
| Mortlake | MORTLK11 |
VIC1 | Turbine - OCGT | $1.87M | $0 | — | 13,253.7 | 144,913.8 | 6.3% | $128.50 | View |
| Crookwell 2 Wind Farm | CROOKWF2 |
NSW1 | Wind Turbine - Onshore | $1.82M | $0 | — | 19,099.8 | 20,381.5 | 27.6% | $0.69 | View |
| Woolnorth Studland Bay / Bluff Point | WOOLNTH1 |
TAS1 | Wind Turbine - Onshore | $1.82M | $0 | — | 34,771.3 | — | 35.0% | $0.53 | View |
| Orana BESS | ORABESS1 |
NSW1 | Storage - Battery | $1.74M | $13.4k | 10,671.0 | -7,480.0 | 223,480.1 | -2.5% | $1.50 | View |
| Aldoga Solar Farm | ALDGASF1 |
QLD1 | Solar PV - Single axis tracking | $1.73M | $0 | — | 40,186.2 | 63,529.8 | 14.4% | $0.00 | View |
| Coleambally Solar Farm | COLEASF1 |
NSW1 | Solar PV - Single axis tracking | $1.73M | $0 | — | 22,132.5 | 25,418.5 | 20.5% | $0.00 | View |
| Murra Warra Wind Farm - stage 2 | MUWAWF2 |
VIC1 | Wind Turbine - Onshore | $1.72M | $0 | — | 39,069.2 | 56,480.5 | 26.0% | $0.50 | View |
| Macarthur Wind Farm | MACARTH1 |
VIC1 | Wind Turbine - Onshore | $1.71M | $0 | — | 53,675.6 | 72,233.9 | 17.7% | $0.50 | View |
| Golden Plains Wind Farm West | GPWFWST2 |
VIC1 | Wind Turbine - Onshore | $1.71M | $0 | — | 30,771.6 | 69,466.4 | 7.7% | $0.53 | View |
| Ryan Corner Wind Farm | RYANCWF1 |
VIC1 | Wind Turbine - Onshore | $1.70M | $0 | — | 43,817.5 | 57,339.8 | 27.9% | $0.50 | View |
| Golden Plains Wind Farm East | GPWFEST1 |
VIC1 | Wind Turbine - Onshore | $1.69M | $0 | — | 25,659.5 | 55,042.8 | 14.4% | $0.00 | View |
| Braemar | BRAEMAR1 |
QLD1 | Turbine - OCGT | $1.67M | $0 | — | 9,318.6 | 128,559.1 | 6.9% | $133.75 | View |
| Suntop Solar Farm | SUNTPSF1 |
NSW1 | Solar PV - Single axis tracking | $1.64M | $0 | — | 23,302.0 | 25,024.2 | 21.6% | $0.25 | View |
| Uranquinty | URANQ11 |
NSW1 | Turbine - OCGT | $1.64M | $0 | — | 2,317.8 | 55,892.8 | 1.9% | $128.50 | View |
| Broadwater | BWTR1 |
NSW1 | Turbine - Steam Sub Critical | $1.63M | $0 | — | 12,693.0 | — | 46.4% | $124.22 | View |
| Lincoln Gap Wind Farm - stage 1 | LGAPWF1 |
SA1 | Wind Turbine - Onshore | $1.59M | $0 | — | 23,002.8 | 28,285.3 | 25.4% | $0.50 | View |
| Columboola Solar Farm | COLUMSF1 |
QLD1 | Solar PV - Single axis tracking | $1.57M | $0 | — | 29,041.8 | 28,276.5 | 18.6% | $0.32 | View |
| Granville Harbour Wind Farm | GRANWF1 |
TAS1 | Wind Turbine - Onshore | $1.53M | $0 | — | 32,949.9 | 32,782.4 | 41.0% | $0.66 | View |
| Moranbah North | MBAHNTH |
QLD1 | Reciprocating Engine - Spark ignition | $1.53M | $0 | — | 15,964.5 | — | 34.7% | $57.00 | View |
| Gunning Wind Farm | GUNNING1 |
NSW1 | Wind Turbine - Onshore | $1.52M | $0 | — | 11,230.6 | 11,556.2 | 33.5% | $0.50 | View |
| Woodlawn Wind Farm | WOODLWN1 |
NSW1 | Wind Turbine - Onshore | $1.46M | $0 | — | 9,779.0 | 9,673.5 | 28.1% | $0.50 | View |
| Uranquinty | URANQ12 |
NSW1 | Turbine - OCGT | $1.45M | $0 | — | 3,040.4 | 58,833.8 | 2.4% | $128.50 | View |
| Poatina | POAT110 |
TAS1 | Hydro - Dam | $1.44M | $291.8k | 19,945.2 | 19,268.8 | 41,894.2 | 26.8% | $1.00 | View |
| Edenvale Solar Park | EDENVSF1 |
QLD1 | Solar PV - Single axis tracking | $1.44M | $0 | — | 26,433.8 | 25,774.6 | 20.4% | $0.00 | View |
| Waubra | WAUBRAWF |
VIC1 | Wind Turbine - Onshore | $1.43M | $0 | — | 34,613.8 | — | 25.0% | $0.50 | View |
| Woolooga Solar Farm | WOOLGSF1 |
QLD1 | Solar PV - Single axis tracking | $1.42M | $0 | — | 22,985.0 | 25,430.9 | 14.3% | $0.25 | View |
| Supernode BESS | SNB02 |
QLD1 | Storage - Battery | $1.38M | $11.5k | 6,902.5 | -4,146.1 | 164,519.1 | -2.2% | $1.50 | View |
| Golden Plains Wind Farm West | GPWFWST1 |
VIC1 | Wind Turbine - Onshore | $1.37M | $0 | — | 33,762.8 | 56,212.0 | 8.4% | $0.53 | View |
| Golden Plains Wind Farm East | GPWFEST2 |
VIC1 | Wind Turbine - Onshore | $1.36M | $0 | — | 22,362.4 | 52,946.5 | 11.9% | $0.50 | View |
| Walla Walla Solar Farm | WLWLSF1 |
NSW1 | Solar PV - Single axis tracking | $1.36M | $0 | — | 14,064.5 | 33,985.6 | 12.9% | $0.25 | View |
| Walla Walla Solar Farm | WLWLSF2 |
NSW1 | Solar PV - Single axis tracking | $1.36M | $0 | — | 14,104.3 | 34,909.9 | 12.9% | $0.25 | View |
| Metz Solar Farm | METZSF1 |
NSW1 | Solar PV - Single axis tracking | $1.35M | $0 | — | 18,883.0 | 18,890.5 | 19.4% | $0.25 | View |
| Snowtown Wind Farm | SNOWTWN1 |
SA1 | Wind Turbine - Onshore | $1.34M | $0 | — | 20,630.4 | 27,625.6 | 29.0% | $0.50 | View |
| Snowtown S2 Wind Farm | SNOWSTH1 |
SA1 | Wind Turbine - Onshore | $1.33M | $0 | — | 32,466.3 | 33,065.6 | 35.8% | $0.74 | View |
| Blyth BESS | BLYTHB1 |
SA1 | Storage - Battery | $1.32M | $50.0k | 43,740.1 | -4,873.2 | 130,514.8 | -3.4% | $4.86 | View |
| Hillston Sun Farm | HILLSTN1 |
NSW1 | Solar PV - Single axis tracking | $1.31M | $0 | — | 16,998.0 | 18,618.5 | 21.5% | $0.00 | View |
| Condong | CONDONG1 |
NSW1 | Turbine - Steam Sub Critical | $1.31M | $0 | — | 10,694.5 | — | 49.5% | $112.12 | View |
| Bogong / Mackay | MCKAY1 |
VIC1 | Hydro - Dam | $1.30M | $0 | — | 12,700.5 | 99,918.7 | 5.9% | $1.00 | View |
| Templers B BESS | TEMPB1 |
SA1 | Storage - Battery | $1.29M | $0 | — | -1,501.0 | 52,868.2 | -1.9% | $1.50 | View |
| Kareeya | KAREEYA3 |
QLD1 | Hydro - Run of River | $1.27M | $1.6k | 1,370.4 | 13,774.5 | 15,680.2 | 88.6% | $1.05 | View |
| New England Solar Farm BESS | NESBESS1 |
NSW1 | Storage - Battery | $1.26M | $0 | — | -1,301.1 | 24,406.1 | -0.9% | $1.50 | View |
| Sebastopol Solar Farm | SEBSF1 |
NSW1 | Solar PV - Single axis tracking | $1.24M | $0 | — | 11,863.5 | 21,812.7 | 18.3% | $0.25 | View |
| Lincoln Gap Wind Farm - Stage 2 | LGAPWF2 |
SA1 | Wind Turbine - Onshore | $1.22M | $0 | — | 19,007.7 | 23,673.7 | 30.6% | $0.50 | View |
| Bald Hills Wind Farm | BALDHWF1 |
VIC1 | Wind Turbine - Onshore | $1.20M | $0 | — | 27,228.5 | 26,622.5 | 35.5% | $0.00 | View |
| Nevertire Solar Farm | NEVERSF1 |
NSW1 | Solar PV - Single axis tracking | $1.19M | $0 | — | 16,511.0 | 17,528.3 | 21.9% | $0.25 | View |
| Golden Plains Wind Farm East | GPWFEST3 |
VIC1 | Wind Turbine - Onshore | $1.19M | $0 | — | 44,229.6 | 50,091.0 | 24.8% | $0.50 | View |
| Waratah Super Battery | WTAHB1 |
NSW1 | Storage - Battery | $1.18M | $0 | — | -9,230.1 | 422,994.2 | -1.5% | $1.50 | View |
| Kareeya | KAREEYA4 |
QLD1 | Hydro - Run of River | $1.17M | $1.5k | 1,309.6 | 12,512.7 | 14,690.2 | 80.5% | $1.66 | View |
| Snowtown S2 Wind Farm | SNOWNTH1 |
SA1 | Wind Turbine - Onshore | $1.17M | $0 | — | 31,559.7 | 32,016.1 | 30.4% | $0.50 | View |
| Barron Gorge | BARRON-1 |
QLD1 | Hydro - Run of River | $1.17M | $0 | — | 10,482.7 | 14,316.6 | 41.6% | $0.00 | View |
| Bulgana Green Power Hub - Wind Farm | BULGANA1 |
VIC1 | Wind Turbine - Onshore | $1.16M | $0 | — | 37,291.0 | 38,206.3 | 25.3% | $0.00 | View |
| Hallett 4 North Brown Hill | NBHWF1 |
SA1 | Wind Turbine - Onshore | $1.14M | $0 | — | 18,975.9 | 24,860.2 | 19.9% | $0.80 | View |
| Barron Gorge | BARRON-2 |
QLD1 | Hydro - Run of River | $1.12M | $0 | — | 9,910.7 | 14,379.2 | 39.3% | $0.00 | View |
| Wandoan South Solar Stage 2 | WANDSF2 |
QLD1 | Solar PV - Single axis tracking | $1.09M | $0 | — | 14,113.8 | 16,478.9 | 6.1% | $0.25 | View |
| Goorambat East Solar Farm (ENGIE) | GOESF1 |
VIC1 | Solar PV - Single axis tracking | $1.08M | $0 | — | 56,970.2 | 64,106.1 | 31.7% | $0.25 | View |
| Waterloo Wind Farm | WATERLWF |
SA1 | Wind Turbine - Onshore | $1.08M | $0 | — | 26,132.2 | 27,874.1 | 27.7% | $0.50 | View |
| Crookwell 3 Wind Farm | CROOKWF3 |
NSW1 | Wind Turbine - Onshore | $1.06M | $0 | — | 11,463.7 | 12,151.5 | 27.6% | $0.76 | View |
| Dundonnell Wind Farm | DUNDWF1 |
VIC1 | Wind Turbine - Onshore | $1.03M | $0 | — | 22,143.7 | 35,989.2 | 18.3% | $0.66 | View |
| Willogoleche Wind Farm | WGWF1 |
SA1 | Wind Turbine - Onshore | $1.03M | $0 | — | 24,327.6 | 25,810.0 | 28.2% | $0.50 | View |
| Wandoan South Solar Stage 1 | WANDSF1 |
QLD1 | Solar PV - Single axis tracking | $1.02M | $0 | — | 15,082.9 | 17,879.3 | 13.1% | $0.25 | View |
| Mornington BESS | MRNBESS1 |
VIC1 | Storage - Battery | $1.02M | $0 | — | -2,891.4 | 99,980.1 | -1.7% | $1.50 | View |
| Somerton | AGLSOM |
VIC1 | Turbine - OCGT | $1.01M | $0 | — | 8,640.1 | 64,502.3 | 7.1% | $128.50 | View |
| Guthega | GUTHEGA |
NSW1 | Hydro - Dam | $1.00M | $0 | — | 8,851.5 | 39,814.0 | 20.5% | $1.05 | View |
| Portland Wind Farm | PORTWF |
VIC1 | Wind Turbine - Onshore | $1.00M | $0 | — | 23,382.1 | — | 21.4% | $0.50 | View |
| Mortlake South Wind Farm | MRTLSWF1 |
VIC1 | Wind Turbine - Onshore | $971.8k | $0 | — | 35,249.8 | 37,035.6 | 31.1% | $0.50 | View |
| Trevallyn | TREVALLN |
TAS1 | Hydro - Dam | $971.8k | $11.1k | 441.0 | 11,678.0 | 67,430.7 | 17.4% | $1.00 | View |
| Swanbank E GT | SWAN_E |
QLD1 | Turbine - CCGT | $969.6k | $0 | — | 7,991.4 | 9,345.0 | 2.9% | $2.00 | View |
| Ararat Wind Farm | ARWF1 |
VIC1 | Wind Turbine - Onshore | $966.6k | $0 | — | 37,906.0 | 38,096.7 | 21.9% | $0.00 | View |
| Bomen Solar Farm | BOMENSF1 |
NSW1 | Solar PV - Single axis tracking | $963.6k | $0 | — | 11,530.2 | 18,952.4 | 13.2% | $0.25 | View |
| Hawkesdale Wind Farm | HD1WF1 |
VIC1 | Wind Turbine - Onshore | $957.6k | $0 | — | 20,288.5 | 28,834.7 | 29.2% | $0.00 | View |
| Daydream Solar Farm | DAYDSF1 |
QLD1 | Solar PV - Single axis tracking | $956.0k | $0 | — | 20,043.5 | 23,536.8 | 16.6% | $0.00 | View |
| Nyngan Solar Plant | NYNGAN1 |
NSW1 | Solar PV - Fixed | $951.6k | $0 | — | 12,691.6 | 13,441.3 | 17.3% | $0.20 | View |
| West Wyalong Solar Farm | WSTWYSF1 |
NSW1 | Solar PV - Single axis tracking | $947.7k | $0 | — | 9,024.7 | 13,793.8 | 11.9% | $0.25 | View |
| Beryl Solar Farm | BERYLSF1 |
NSW1 | Solar PV - Single axis tracking | $934.3k | $0 | — | 13,363.5 | 13,065.4 | 18.9% | $0.25 | View |
| Mt Gellibrand Wind Farm | MTGELWF1 |
VIC1 | Wind Turbine - Onshore | $932.8k | $0 | — | 26,271.9 | 27,849.9 | 26.3% | $0.50 | View |
| Munna Creek Solar Farm | MUCRKSF1 |
QLD1 | Solar PV - Single axis tracking | $929.0k | $0 | — | 17,995.5 | 18,247.1 | 16.2% | $0.25 | View |
| Hornsdale Wind Farm Stage 2 | HDWF2 |
SA1 | Wind Turbine - Onshore | $923.3k | $0 | 0.4 | 27,950.2 | 27,831.7 | 37.9% | $0.69 | View |
| Gunsynd Solar Farm | GUSF1 |
QLD1 | Solar PV - Fixed | $922.1k | $0 | — | 15,951.1 | 16,211.1 | 23.6% | $0.00 | View |
| Lake Bonney 2 Wind Farm | LKBONNY2 |
SA1 | Wind Turbine - Onshore | $915.7k | $0 | — | 19,539.4 | 28,375.3 | 17.1% | $0.86 | View |
| Port Augusta Renewable Energy Park - Wind | PAREPW1 |
SA1 | Wind Turbine - Onshore | $909.3k | $0 | — | 21,064.6 | 27,368.6 | 14.6% | $0.50 | View |
| Hornsdale Wind Farm Stage 1 | HDWF1 |
SA1 | Wind Turbine - Onshore | $906.8k | $0 | — | 27,281.4 | 27,157.5 | 37.0% | $0.50 | View |
| Victorian Big Battery | VBB1 |
VIC1 | Storage - Battery | $900.3k | $10.7k | 6,885.9 | -3,049.4 | 123,627.9 | -1.4% | $1.50 | View |
| Hornsdale Wind Farm Stage 3 | HDWF3 |
SA1 | Wind Turbine - Onshore | $899.9k | $0 | — | 28,919.3 | 28,804.1 | 35.9% | $0.68 | View |
| Gangarri Solar Farm | GANGARR1 |
QLD1 | Solar PV - Single axis tracking | $898.4k | $0 | — | 15,887.8 | 15,956.0 | 13.6% | $0.26 | View |
| Kennedy Energy Park - Phase 1 - Wind | KEPWF1 |
QLD1 | Wind Turbine - Onshore | $896.3k | $0 | — | 9,052.7 | 10,963.6 | 29.1% | $0.68 | View |
| Clare Solar Farm | CLARESF1 |
QLD1 | Solar PV - Single axis tracking | $887.7k | $0 | — | 16,200.1 | 21,513.4 | 20.4% | $0.00 | View |
| Kareeya | KAREEYA2 |
QLD1 | Hydro - Run of River | $869.1k | $1.3k | 1,178.4 | 10,062.5 | 11,889.2 | 64.7% | $1.00 | View |
| Berrybank Wind Farm | BRYB1WF1 |
VIC1 | Wind Turbine - Onshore | $864.3k | $0 | — | 41,377.2 | 42,217.8 | 31.8% | $0.50 | View |
| Yarranlea Solar Farm | YARANSF1 |
QLD1 | Solar PV - Single axis tracking | $863.3k | $0 | — | 13,466.9 | 15,178.5 | 15.5% | $0.25 | View |
| Rangebank BESS | RANGEB1 |
VIC1 | Storage - Battery | $861.2k | $86 | 23.4 | -1,846.2 | 107,170.6 | -1.3% | $1.50 | View |
| Cullerin Range Wind Farm | CULLRGWF |
NSW1 | Wind Turbine - Onshore | $859.8k | $0 | — | 6,608.2 | — | 30.6% | $0.68 | View |
| Jemalong Solar | JEMALNG1 |
NSW1 | Solar PV - Single axis tracking | $848.6k | $0 | — | 9,223.8 | 11,335.1 | 23.3% | $0.32 | View |
| Swanbank BESS | SWANBBF1 |
QLD1 | Storage - Battery | $846.4k | $0 | — | -2,526.5 | 116,927.8 | -1.4% | $1.50 | View |
| Hallett Stage 1 Brown Hill | HALLWF1 |
SA1 | Wind Turbine - Onshore | $836.5k | $0 | — | 14,657.8 | 20,384.4 | 21.5% | $0.71 | View |
| Liddell BESS | LDBESS1 |
NSW1 | Storage - Battery | $826.2k | $19.6k | 37,860.1 | -5,849.3 | 216,971.4 | -1.6% | $1.50 | View |
| Lilyvale Solar Farm | LILYSF1 |
QLD1 | Solar PV - Single axis tracking | $803.1k | $0 | — | 12,075.6 | 14,553.5 | 14.2% | $0.25 | View |
| Sun Metals Corporation Solar Farm | SMCSF1 |
QLD1 | Solar PV - Fixed | $791.6k | $0 | — | 14,838.6 | 21,493.4 | 14.4% | $0.00 | View |
| Mannum BESS | MANNUMB1 |
SA1 | Storage - Battery | $779.3k | $20.8k | 10,285.8 | -2,187.6 | 66,796.1 | -3.0% | $1.50 | View |
| Haughton Solar Farm Stage 1 | HAUGHT11 |
QLD1 | Solar PV - Single axis tracking | $774.1k | $0 | — | 15,758.6 | 22,210.6 | 16.5% | $0.00 | View |
| Yendon Wind Farm | YENDWF1 |
VIC1 | Wind Turbine - Onshore | $772.3k | $0 | — | 20,064.9 | 25,178.7 | 19.3% | $0.50 | View |
| Torrens Island BESS | TIB1 |
SA1 | Storage - Battery | $765.3k | $28.2k | 112,833.1 | -3,194.5 | 93,404.4 | -1.8% | $1.50 | View |
| Finley Solar Farm | FINLYSF1 |
NSW1 | Solar PV - Single axis tracking | $761.7k | $0 | — | 11,310.7 | 12,837.1 | 9.7% | $0.25 | View |
| Hallett Stage 2 Hallett Hill | HALLWF2 |
SA1 | Wind Turbine - Onshore | $755.6k | $0 | — | 12,983.1 | 18,007.4 | 25.3% | $0.00 | View |
| Yarwun 1 | YARWUN_1 |
QLD1 | Turbine - CCGT | $751.8k | $0 | — | 8,125.6 | 25,276.3 | 6.3% | $84.30 | View |
| Ross River Solar Farm | RRSF1 |
QLD1 | Solar PV - Single axis tracking | $745.1k | $0 | — | 15,688.6 | 21,917.8 | 17.0% | $0.25 | View |
| Moura Solar Farm | MOUSF1 |
QLD1 | Solar PV - Single axis tracking | $727.4k | $0 | — | 13,815.5 | 14,191.3 | 19.4% | $0.25 | View |
| Darling Downs Solar Farm | DDSF1 |
QLD1 | Solar PV - Fixed | $718.9k | $0 | — | 13,867.1 | 13,761.2 | 15.9% | $0.28 | View |
| West Kiewa | WKIEWA1 |
VIC1 | Hydro - Dam | $714.6k | $0 | — | 7,930.1 | 30,694.2 | 32.4% | $10.00 | View |
| Meadowbank | MEADOWBK |
TAS1 | Hydro - Dam | $699.8k | $23.0k | 645.5 | 9,428.0 | 29,298.3 | 32.7% | $1.00 | View |
| Koorangie Energy Storage System | KESSB1 |
VIC1 | Storage - Battery | $699.8k | $0 | — | -1,390.1 | 86,373.2 | -1.0% | $1.50 | View |
| Clermont Solar Farm | CLERMSF1 |
QLD1 | Solar PV - Single axis tracking | $691.4k | $0 | — | 11,709.8 | 12,702.0 | 17.6% | $0.34 | View |
| Crowlands Wind Farm | CROWLWF1 |
VIC1 | Wind Turbine - Onshore | $688.4k | $0 | — | 16,113.3 | 20,730.1 | 28.0% | $0.68 | View |
| Limondale BESS | LIMBESS1 |
NSW1 | Storage - Battery | $674.7k | $4.0k | 939.5 | -1,726.2 | 34,919.2 | -4.8% | $1.50 | View |
| Tarong BESS - Stanwell | TARBESS1 |
QLD1 | Storage - Battery | $669.1k | $14.6k | 84,081.7 | -1,980.3 | 93,967.5 | -0.9% | $1.50 | View |
| Dundonnell Wind Farm | DUNDWF3 |
VIC1 | Wind Turbine - Onshore | $667.1k | $0 | — | 22,643.2 | 24,832.5 | 25.8% | $0.53 | View |
| Wattle Point | WPWF |
SA1 | Wind Turbine - Onshore | $665.8k | $0 | — | 12,282.2 | 16,868.5 | 18.8% | $0.50 | View |
| Western Downs Battery - Stage 1 And 2 | WDBESS1 |
QLD1 | Storage - Battery | $659.9k | $26.5k | 13,324.6 | -2,860.4 | 155,589.7 | -1.6% | $1.58 | View |
| Devils Gate | DEVILS_G |
TAS1 | Hydro - Dam | $658.5k | $49.0k | 5,173.8 | 6,329.8 | 45,296.0 | 14.7% | $1.00 | View |
| New England Solar Farm BESS | NESBESS2 |
NSW1 | Storage - Battery | $653.8k | $0 | — | -841.1 | 16,864.9 | -0.6% | $1.50 | View |
| Clements Gap Wind Farm | CLEMGPWF |
SA1 | Wind Turbine - Onshore | $653.4k | $0 | — | 12,261.4 | 12,985.3 | 30.0% | $0.80 | View |
| Mt Mercer Wind Farm | MERCER01 |
VIC1 | Wind Turbine - Onshore | $650.6k | $0 | — | 17,997.2 | 26,565.3 | 19.1% | $0.50 | View |
| German Creek | GERMCRK |
QLD1 | Reciprocating Engine - Spark ignition | $647.0k | $0 | — | 7,235.3 | — | 22.3% | $122.81 | View |
| Cathedral Rocks | CATHROCK |
SA1 | Wind Turbine - Onshore | $634.7k | $0 | — | 9,859.8 | 14,603.3 | 22.1% | $0.53 | View |
| Clements Gap - BESS | CGBESS01 |
SA1 | Storage - Battery | $633.2k | $0 | — | -1,044.4 | 35,098.5 | -2.4% | $1.58 | View |
| Bluegrass Solar Farm | BLUEGSF1 |
QLD1 | Solar PV - Single axis tracking | $622.7k | $0 | — | 13,358.2 | 12,942.1 | 12.5% | $0.29 | View |
| Colongra | CG1 |
NSW1 | Turbine - OCGT | $616.1k | $0 | — | 833.6 | 120,472.9 | 0.6% | $197.00 | View |
| Kiamal Solar Farm - Stage 1 | KIAMSF1 |
VIC1 | Solar PV - Single axis tracking | $612.8k | $0 | — | 37,666.2 | 43,319.8 | 26.2% | $0.00 | View |
| Berrybank Wind Farm | BRYB2WF2 |
VIC1 | Wind Turbine - Onshore | $606.6k | $0 | — | 21,499.5 | 24,628.3 | 27.3% | $0.65 | View |
| Wyalong Solar Farm | WYASF1 |
NSW1 | Solar PV - Single axis tracking | $605.7k | $0 | — | 5,938.7 | 10,334.6 | 13.2% | $0.25 | View |
| Rugby Run Solar Farm | RUGBYR1 |
QLD1 | Solar PV - Single axis tracking | $605.6k | $0 | — | 10,648.4 | 11,940.5 | 22.8% | $0.25 | View |
| Bundaberg Solar Farm | BUSF1 |
QLD1 | Solar PV - Single axis tracking | $601.3k | $0 | — | 11,096.5 | 11,038.6 | 19.8% | $14.55 | View |
| Eildon | EILDON2 |
VIC1 | Hydro - Dam | $598.7k | $0 | — | 8,056.1 | 35,283.3 | 16.6% | $1.00 | View |
| Cherry Tree Wind Farm | CHYTWF1 |
VIC1 | Wind Turbine - Onshore | $597.6k | $0 | — | 9,909.6 | 11,471.6 | 23.9% | $0.53 | View |
| Quorn Park Solar Hybrid | QPSFB1 |
NSW1 | Solar PV - Single axis tracking | $596.3k | $0 | — | 7,721.8 | 14,754.8 | 11.1% | $0.26 | View |
| Moree Solar Farm | MOREESF1 |
NSW1 | Solar PV - Single axis tracking | $595.8k | $0 | — | 7,918.1 | 8,298.6 | 19.6% | $0.25 | View |
| Braemar 2 Power Station | BRAEMAR6 |
QLD1 | Turbine - OCGT | $594.7k | $0 | — | 3,182.8 | 77,297.4 | 2.6% | $133.36 | View |
| Fisher | FISHER |
TAS1 | Hydro - Dam | $592.4k | $28.6k | 5,941.0 | 7,060.2 | 31,877.2 | 22.7% | $1.05 | View |
| Mt Millar Wind Farm | MTMILLAR |
SA1 | Wind Turbine - Onshore | $586.3k | $0 | — | 10,232.3 | 13,936.2 | 19.7% | $0.50 | View |
| Tribute | TRIBUTE |
TAS1 | Hydro - Dam | $583.1k | $1.3k | 772.5 | 5,640.5 | 12,158.6 | 9.5% | $1.00 | View |
| Repulse | REPULSE |
TAS1 | Hydro - Dam | $578.4k | $0 | — | 7,362.8 | — | 36.5% | $1.00 | View |
| Tamar Valley Peaking | TVPP104 |
TAS1 | Turbine - OCGT | $576.8k | $0 | — | 5,451.2 | 22,863.9 | 13.1% | $128.50 | View |
| Limondale Solar Farm 2 | LIMOSF21 |
NSW1 | Solar PV - Single axis tracking | $560.0k | $0 | — | 6,041.8 | 6,531.3 | 29.0% | $0.25 | View |
| Eildon | EILDON1 |
VIC1 | Hydro - Dam | $529.7k | $0 | — | 5,861.9 | 35,989.0 | 12.1% | $1.05 | View |
| Broken Hill Solar Plant | BROKENH1 |
NSW1 | Solar PV - Fixed | $529.1k | $0 | — | 8,486.3 | 9,137.1 | 22.2% | $0.28 | View |
| Glenrowan West Solar Farm | GLRWNSF1 |
VIC1 | Solar PV - Single axis tracking | $517.6k | $0 | — | 13,799.0 | 26,076.8 | 14.5% | $0.32 | View |
| Greenbank BESS | GREENB1 |
QLD1 | Storage - Battery | $517.1k | $35.3k | 49,273.6 | -2,067.9 | 100,946.4 | -1.4% | $1.54 | View |
| Numurkah Solar Farm | NUMURSF1 |
VIC1 | Solar PV - Single axis tracking | $506.4k | $0 | — | 14,778.8 | 21,843.2 | 20.3% | $0.25 | View |
| Elaine Wind Farm | ELAINWF1 |
VIC1 | Wind Turbine - Onshore | $495.3k | $0 | — | 13,444.3 | 17,998.4 | 22.3% | $0.53 | View |
| Goonumbla Solar Farm | GOONSF1 |
NSW1 | Solar PV - Single axis tracking | $485.7k | $0 | — | 6,074.2 | 11,316.1 | 12.1% | $0.25 | View |
| Colongra | CG2 |
NSW1 | Turbine - OCGT | $481.2k | $0 | — | 1,317.6 | 121,270.0 | 1.0% | $135.55 | View |
| Griffith Solar Farm | GRIFSF1 |
NSW1 | Solar PV - Single axis tracking | $478.9k | $0 | — | 5,392.6 | — | 27.5% | $0.35 | View |
| Supernode BESS | SNB01 |
QLD1 | Storage - Battery | $476.5k | $16.2k | 16,340.0 | -2,546.7 | 163,471.8 | -1.4% | $1.50 | View |
| Condamine A | CPSA |
QLD1 | Turbine - CCGT | $473.0k | $0 | — | 2,719.1 | 3,328.2 | 4.3% | $95.40 | View |
| LaTrobe Valley BESS | LVES1 |
VIC1 | Storage - Battery | $460.8k | $8.0k | 163,809.2 | -1,384.0 | 62,429.2 | -1.9% | $1.54 | View |
| Corowa Solar Farm | CRWASF1 |
NSW1 | Solar PV - Single axis tracking | $459.5k | $0 | — | 5,087.9 | 7,255.8 | 19.6% | $0.33 | View |
| Hornsdale Power Reserve Unit 1 | HPR1 |
SA1 | Storage - Battery | $452.6k | $6.7k | 2,879.3 | -1,498.0 | 42,937.4 | -1.4% | $1.50 | View |
| Oakey 2 Solar Farm | OAKEY2SF |
QLD1 | Solar PV - Single axis tracking | $450.5k | $0 | — | 7,759.6 | 8,093.7 | 19.4% | $0.25 | View |
| Susan River Solar Farm | SRSF1 |
QLD1 | Solar PV - Single axis tracking | $448.7k | $0 | — | 8,449.2 | 8,634.0 | 13.8% | $0.25 | View |
| Shoalhaven | SHGEN |
NSW1 | Storage - Pumped hydro | $439.3k | $0 | — | 3,913.7 | 24,006.7 | 2.2% | $1.20 | View |
| Salt Creek Wind Farm | SALTCRK1 |
SA1 | Wind Turbine - Onshore | $437.0k | $0 | — | 7,362.8 | 14,077.1 | 18.9% | $0.50 | View |
| Wagga North Solar Farm | WAGGNSF1 |
NSW1 | Solar PV - Single axis tracking | $435.5k | $0 | — | 5,313.0 | 10,137.4 | 13.3% | $0.25 | View |
| Kiata Wind Farm | KIATAWF1 |
VIC1 | Wind Turbine - Onshore | $410.0k | $0 | — | 8,938.4 | 10,683.0 | 40.0% | $0.68 | View |
| Lake Bonney 1 Wind Farm | LKBONNY1 |
SA1 | Wind Turbine - Onshore | $403.9k | $0 | — | 8,945.8 | 12,736.8 | 15.4% | $0.79 | View |
| Whitsunday Solar Farm | WHITSF1 |
QLD1 | Solar PV - Single axis tracking | $403.3k | $0 | — | 7,231.6 | 9,568.6 | 17.5% | $0.25 | View |
| Colongra | CG4 |
NSW1 | Turbine - OCGT | $400.5k | $0 | — | 390.7 | 122,899.1 | 0.3% | $194.33 | View |
| Terang BESS | TRGBESS1 |
VIC1 | Storage - Battery | $396.7k | $34.9k | 13,997.0 | -4,408.0 | 60,604.5 | -6.1% | $1.50 | View |
| Hallett 5 The Bluff WF | BLUFF1 |
SA1 | Wind Turbine - Onshore | $390.7k | $0 | — | 7,086.6 | 10,078.7 | 18.7% | $0.77 | View |
| Oakey Power Station | OAKEY1 |
QLD1 | Turbine - OCGT | $390.5k | $0 | — | 1,815.5 | 30,033.1 | 1.5% | $128.50 | View |
| Wunghnu Solar Farm | WUNUSF1 |
VIC1 | Solar PV - Single axis tracking | $387.6k | $0 | — | 8,720.2 | 16,977.5 | 13.0% | $0.25 | View |
| Girgarre Solar Farm | GIRGSF |
VIC1 | Solar PV - Single axis tracking | $382.8k | $0 | — | 12,658.4 | 17,741.7 | 18.8% | $0.00 | View |
| Glenrowan Solar Farm | GLENSF1 |
VIC1 | Solar PV - Single axis tracking | $380.2k | $0 | — | 24,380.7 | 25,181.1 | 26.9% | $0.25 | View |
| Parkes Solar Farm | PARSF1 |
NSW1 | Solar PV - Single axis tracking | $377.6k | $0 | — | 4,698.1 | 8,818.0 | 13.2% | $0.25 | View |
| Childers Solar Farm | CHILDSF1 |
QLD1 | Solar PV - Single axis tracking | $373.2k | $0 | — | 6,724.7 | 6,765.7 | 14.5% | $0.34 | View |
| Kingaroy Solar Farm | KINGASF1 |
QLD1 | Solar PV - Single axis tracking | $371.0k | $0 | — | 6,174.1 | 6,201.3 | 21.4% | $0.25 | View |
| Junee Solar Farm | JUNEESF1 |
NSW1 | Solar PV - Single axis tracking | $370.5k | $0 | — | 3,523.1 | 6,546.1 | 13.6% | $0.00 | View |
| Oakey Power Station | OAKEY2 |
QLD1 | Turbine - OCGT | $367.5k | $0 | — | 1,747.4 | 19,370.5 | 1.4% | $128.50 | View |
| Lemonthyme / Wilmot | LEM_WIL |
TAS1 | Hydro - Dam | $367.0k | $7.0k | 2,368.9 | 3,882.6 | 22,043.0 | 6.6% | $1.00 | View |
| Hamilton Solar Farm | HAMISF1 |
QLD1 | Solar PV - Single axis tracking | $363.5k | $0 | — | 6,881.0 | 8,559.7 | 16.6% | $18.64 | View |
| Smithfield BESS | SMTHBES1 |
NSW1 | Storage - Battery | $352.4k | $13.1k | 106,238.7 | -1,387.3 | 38,871.6 | -2.2% | $1.50 | View |
| Cluny | CLUNY |
TAS1 | Hydro - Dam | $351.1k | $0 | — | 4,563.3 | — | 33.4% | $1.00 | View |
| Oaklands Hill Wind Farm | OAKLAND1 |
VIC1 | Wind Turbine - Onshore | $347.7k | $0 | — | 11,802.4 | 14,446.3 | 24.4% | $0.50 | View |
| Western Downs Gas Peaking Plant - KCI | WDBESS2 |
QLD1 | Turbine - CCGT | $333.1k | $117.2k | 49,429.6 | -6,202.3 | 160,953.5 | -2.2% | $2.00 | View |
| Hayman Solar Farm | HAYMSF1 |
QLD1 | Solar PV - Single axis tracking | $330.6k | $0 | — | 6,742.2 | 9,480.2 | 16.2% | $0.34 | View |
| Brendale BESS | BRNDBES1 |
QLD1 | Storage - Battery | $329.9k | $62.8k | 17,003.1 | -4,864.2 | 134,506.0 | -3.3% | $1.58 | View |
| Mulwala Solar Farm | MULWASF1 |
NSW1 | Solar PV - Single axis tracking | $329.2k | $0 | — | 3,910.1 | 5,225.7 | 17.5% | $0.25 | View |
| Riverina Energy Storage System 1 | RESS1 |
NSW1 | Storage - Battery | $326.8k | $322 | 124.3 | -488.7 | 33,091.3 | -1.1% | $1.50 | View |
| Williamsdale BESS | WILLBES1 |
NSW1 | Storage - Battery | $325.6k | $963 | 59,545.6 | -1,362.4 | 103,377.4 | -0.8% | $1.50 | View |
| Lancaster Solar Farm | LANCSF1 |
VIC1 | Solar PV - Single axis tracking | $315.6k | $0 | — | 8,723.5 | 14,392.3 | 11.4% | $0.25 | View |
| Ladbroke Grove | LADBROK2 |
SA1 | Turbine - OCGT | $315.3k | $0 | — | 2,399.8 | 24,148.2 | 8.3% | $145.06 | View |
| Rocky Point Sugar Mill Cogeneration Plant | RPCG |
QLD1 | Other - Other | $306.1k | $0 | — | 3,072.0 | — | 14.2% | $117.00 | View |
| Broadsound Solar Farm | BRDDBES1 |
QLD1 | Solar PV - Single axis tracking | $298.3k | $34.3k | 14,345.2 | -3,126.5 | 111,332.6 | -1.2% | $0.27 | View |
| Braemar | BRAEMAR2 |
QLD1 | Turbine - OCGT | $288.9k | $0 | — | 1,593.9 | 127,804.5 | 1.2% | $130.94 | View |
| Ladbroke Grove | LADBROK1 |
SA1 | Turbine - OCGT | $283.4k | $0 | — | 2,104.6 | 24,365.5 | 7.3% | $153.02 | View |
| Karadoc Solar Farm | KARSF1 |
VIC1 | Solar PV - Single axis tracking | $279.6k | $0 | — | 16,572.9 | 20,632.8 | 22.0% | $0.00 | View |
| Butlers Gorge | BUTLERSG |
TAS1 | Hydro - Dam | $274.3k | $0 | — | 4,460.8 | — | 50.8% | $1.00 | View |
| Starfish Hill | STARHLWF |
SA1 | Wind Turbine - Onshore | $273.5k | $0 | — | 6,062.4 | 6,059.1 | 25.5% | $0.50 | View |
| Canunda | CNUNDAWF |
SA1 | Wind Turbine - Onshore | $270.9k | $0 | — | 5,392.1 | 8,792.1 | 16.3% | $0.50 | View |
| Bungala Two Solar Farm | BNGSF2 |
SA1 | Solar PV - Single axis tracking | $263.6k | $0 | — | 10,306.5 | 25,676.0 | 10.6% | $0.33 | View |
| Collinsville PV | CSPVPS1 |
QLD1 | Solar PV - Fixed | $253.3k | $0 | — | 5,052.8 | 6,398.6 | 16.5% | $0.28 | View |
| Dundonnell Wind Farm | DUNDWF2 |
VIC1 | Wind Turbine - Onshore | $249.8k | $0 | — | 7,817.8 | 9,235.6 | 23.5% | $0.66 | View |
| Wemen Solar Farm | WEMENSF1 |
VIC1 | Solar PV - Single axis tracking | $242.5k | $0 | — | 14,853.4 | 20,603.9 | 21.2% | $0.25 | View |
| Wallgrove Grid Battery project | WALGRV1 |
NSW1 | Storage - Battery | $241.3k | $2.4k | 75,226.7 | -476.0 | 23,509.9 | -1.3% | $1.50 | View |
| Newport | NPS |
VIC1 | Turbine - Steam Sub Critical | $238.6k | $0 | — | 1,819.2 | 2,540.0 | 0.5% | $2.00 | View |
| Challicum Hills | CHALLHWF |
VIC1 | Wind Turbine - Onshore | $237.5k | $0 | — | 6,085.9 | — | 16.1% | $0.53 | View |
| Yatpool Solar Farm | YATSF1 |
VIC1 | Solar PV - Single axis tracking | $232.1k | $0 | — | 10,014.6 | 11,904.2 | 14.8% | $0.25 | View |
| Mortlake | MORTLK12 |
VIC1 | Turbine - OCGT | $230.0k | $0 | — | 1,699.6 | 155,163.1 | 0.8% | $128.50 | View |
| Maryrorough Solar Farm | MARYRSF1 |
QLD1 | Solar PV - Single axis tracking | $229.7k | $0 | — | 4,038.9 | 4,240.2 | 16.3% | $0.25 | View |
| Warwick Solar Farm | WARWSF1 |
QLD1 | Solar PV - Single axis tracking | $221.5k | $0 | — | 3,368.6 | 3,675.8 | 14.6% | $0.25 | View |
| Mokoan Solar Farm (LightsourceBP) | MOKOSF1 |
VIC1 | Solar PV - Single axis tracking | $221.4k | $0 | — | 6,388.1 | 10,932.8 | 19.3% | $0.25 | View |
| Yambuk | YAMBUKWF |
VIC1 | Wind Turbine - Onshore | $221.3k | $0 | — | 5,125.1 | — | 23.7% | $0.50 | View |
| Braemar | BRAEMAR3 |
QLD1 | Turbine - OCGT | $217.7k | $0 | — | 3,406.4 | 3,260.7 | 2.5% | $128.50 | View |
| Tailem Bend Stage 2 Solar Project | TB2SF1 |
SA1 | Solar PV - Single axis tracking | $216.7k | $0 | — | 6,571.9 | 18,430.3 | 8.7% | $0.25 | View |
| Hazelwood Battery Energy Storage System (HBESS) | HBESS1 |
VIC1 | Storage - Battery | $216.6k | $17.2k | 7,876.3 | -3,853.4 | 80,244.8 | -2.7% | $1.87 | View |
| Manildra Solar Farm | MANSLR1 |
NSW1 | Solar PV - Single axis tracking | $215.8k | $0 | — | 2,466.9 | 7,464.4 | 6.9% | $0.25 | View |
| Oakey Solar Farm | OAKEY1SF |
QLD1 | Solar PV - Fixed | $212.7k | $0 | — | 3,687.4 | 3,837.9 | 20.5% | $0.20 | View |
| Wambo Wind Farm | WAMBOWF1 |
QLD1 | Wind Turbine - Onshore | $206.2k | $0 | — | 1,200.5 | 1,200.5 | 0.7% | $0.50 | View |
| Clover | CLOVER |
VIC1 | Hydro - Dam | $205.5k | $0 | — | 2,202.2 | — | 10.5% | $1.17 | View |
| Middlemount Solar Farm | MIDDLSF1 |
QLD1 | Solar PV - Single axis tracking | $200.8k | $0 | — | 3,639.6 | 4,375.2 | 19.4% | $0.25 | View |
| Kidston Solar Project Phase One 50MW | KSP1 |
QLD1 | Solar PV - Fixed | $200.1k | $0 | — | 4,552.1 | 8,712.1 | 12.6% | $0.20 | View |
| Winton Solar Farm | WINTSF1 |
VIC1 | Solar PV - Single axis tracking | $197.8k | $0 | — | 15,754.4 | 17,982.7 | 25.7% | $0.25 | View |
| Wandoan South BESS | WANDB1 |
QLD1 | Storage - Battery | $195.8k | $23.0k | 171,995.5 | -752.0 | 31,251.0 | -1.0% | $1.50 | View |
| Lake Bonney 3 Wind Farm | LKBONNY3 |
SA1 | Wind Turbine - Onshore | $195.3k | $0 | — | 4,356.6 | 6,047.1 | 15.5% | $0.53 | View |
| Bannerton Solar Park | BANN1 |
VIC1 | Solar PV - Single axis tracking | $194.5k | $0 | — | 13,936.3 | 18,748.3 | 19.4% | $0.34 | View |
| Chinchilla BESS | CHBESS1 |
QLD1 | Storage - Battery | $194.0k | $17.0k | 23,066.7 | -1,106.0 | 45,544.5 | -1.5% | $1.75 | View |
| Molong Solar Farm | MOLNGSF1 |
NSW1 | Solar PV - Single axis tracking | $191.9k | $0 | — | 2,332.6 | 5,186.1 | 9.0% | $0.25 | View |
| Capital Battery | CAPBES1 |
NSW1 | Storage - Battery | $191.7k | $83 | 121.4 | -924.9 | 64,362.3 | -1.3% | $1.50 | View |
| Tallawarra B | TALWB1 |
NSW1 | Turbine - OCGT | $190.1k | $0 | — | 817.4 | 223,991.2 | 0.4% | $128.50 | View |
| Royalla Solar Farm | ROYALLA1 |
NSW1 | Solar PV - Fixed | $186.7k | $0 | — | 1,748.0 | — | 12.1% | $0.20 | View |
| Bungala One Solar Farm | BNGSF1 |
SA1 | Solar PV - Single axis tracking | $168.3k | $0 | — | 6,502.0 | 13,663.4 | 6.7% | $0.34 | View |
| Warwick Solar Farm | WARWSF2 |
QLD1 | Solar PV - Single axis tracking | $165.9k | $0 | — | 2,548.5 | 3,028.3 | 11.0% | $0.25 | View |
| Ulinda Park BESS | ULPBESS1 |
QLD1 | Storage - Battery | $161.1k | $18.2k | 8,207.2 | -4,263.8 | 94,041.9 | -3.8% | $1.50 | View |
| Quorn Park Solar Hybrid | QPSFB2 |
NSW1 | Storage - Battery | $160.3k | $0 | — | 541.7 | 5,331.3 | 2.7% | $1.58 | View |
| Barcaldine Remote Community Solar Farm | BARCSF1 |
QLD1 | Solar PV - Single axis tracking | $160.3k | $0 | — | 2,474.2 | — | 17.2% | $0.00 | View |
| Hunter Power Station | HUNTER1 |
NSW1 | Turbine - OCGT | $158.8k | $0 | — | 1,484.5 | 1,589.6 | 0.5% | $142.99 | View |
| Longreach Solar Farm | LRSF1 |
QLD1 | Solar PV - Fixed | $157.2k | $0 | — | 2,489.1 | — | 23.0% | $0.20 | View |
| Emerald Solar Park | EMERASF1 |
QLD1 | Solar PV - Single axis tracking | $153.9k | $0 | — | 4,753.6 | 10,809.9 | 9.2% | $0.25 | View |
| Dartmouth | DARTM1 |
VIC1 | Hydro - Dam | $153.6k | $0 | — | 1,277.2 | 103,661.2 | 1.0% | $0.00 | View |
| Lake Bonney Battery Energy Storage | LBB1 |
SA1 | Storage - Battery | $148.8k | $2.4k | 37,835.7 | -186.3 | 12,184.1 | -1.0% | $1.98 | View |
| Yaloak South Wind Farm | YSWF1 |
VIC1 | Wind Turbine - Onshore | $144.8k | $0 | — | 3,332.6 | — | 16.1% | $0.50 | View |
| Bairnsdale | BDL01 |
VIC1 | Turbine - OCGT | $144.1k | $0 | — | 949.2 | 27,868.5 | 2.8% | $142.10 | View |
| Quarantine | QPS5 |
SA1 | Turbine - OCGT | $143.9k | $0 | — | 883.0 | 85,885.7 | 1.0% | $209.05 | View |
| Kerang Hybrid | KERNGSP1 |
VIC1 | Solar PV - Single axis tracking | $142.8k | $0 | — | 2,624.9 | 6,794.7 | 2.3% | $0.26 | View |
| Gullen Range Solar Farm | GULLRSF1 |
NSW1 | Solar PV - Fixed | $136.4k | $0 | — | 1,946.9 | 2,032.1 | 27.0% | $0.27 | View |
| Tailem Bend - Solar | TBSF1 |
SA1 | Solar PV - Fixed | $136.4k | $0 | — | 6,281.6 | 18,351.0 | 8.1% | $0.20 | View |
| Bolivar Power Station | BOLIVPS1 |
SA1 | Turbine - OCGT | $132.1k | $0 | — | 706.0 | 932.2 | 0.8% | $151.37 | View |
| Tailem Bend Battery Project | TB2B1 |
SA1 | Storage - Battery | $131.7k | $13.2k | 21,954.5 | -1,124.2 | 25,378.7 | -3.8% | $1.50 | View |
| Rubicon Mountain Streams | RUBICON |
VIC1 | Hydro - Dam | $117.9k | $0 | — | 2,021.3 | — | 20.8% | $1.00 | View |
| White Rock Solar Farm | WRSF1 |
NSW1 | Solar PV - Fixed | $113.3k | $0 | — | 2,106.2 | 2,105.2 | 14.6% | $0.20 | View |
| Tully Sugar Mill | TULLYSM1 |
QLD1 | Turbine - Steam Super Critical | $111.3k | $0 | — | 1,037.3 | — | 4.5% | $117.00 | View |
| Gannawarra Solar Farm | GANNSF1 |
VIC1 | Solar PV - Single axis tracking | $109.1k | $0 | — | 10,418.0 | 10,777.2 | 26.3% | $0.34 | View |
| Cohuna Solar Farm | COHUNSF1 |
VIC1 | Solar PV - Single axis tracking | $105.1k | $0 | — | 2,377.5 | 3,957.6 | 10.6% | $0.33 | View |
| Riverina Energy Storage System 2 | RIVNB2 |
NSW1 | Storage - Battery | $101.3k | $0 | — | -528.2 | 20,331.2 | -1.1% | $1.50 | View |
| Diapur Wind Farm | DIAPURWF1 |
VIC1 | Wind Turbine - Onshore | $99.9k | $0 | — | 2,738.8 | — | 47.5% | $0.00 | View |
| Bouldercombe Battery project | BBATTERY1 |
QLD1 | Storage - Battery | $95.7k | $2.9k | 11,691.1 | -597.0 | 28,291.9 | -1.7% | $1.64 | View |
| Broken Hill GT | GB01 |
NSW1 | Turbine - OCGT | $95.2k | $0 | — | 959.5 | — | 2.7% | $2.11 | View |
| Mortons Lane Wind Farm | MLWF1 |
VIC1 | Wind Turbine - Onshore | $94.9k | $0 | — | 4,401.8 | — | 31.4% | $0.50 | View |
| Hughenden Sun Farm | HUGSF1 |
QLD1 | Solar PV - Single axis tracking | $85.8k | $0 | — | 1,437.8 | — | 9.5% | $0.00 | View |
| Kennedy Energy Park - Phase 1 - Solar | KEPSF1 |
QLD1 | Solar PV - Single axis tracking | $76.0k | $0 | — | 1,306.5 | 1,926.6 | 12.1% | $0.34 | View |
| Osborne | OSB-AG |
SA1 | Turbine - CCGT | $70.1k | $0 | — | 695.0 | 797.0 | 0.5% | $84.30 | View |
| Roma | ROMA_8 |
QLD1 | Turbine - OCGT | $60.6k | $0 | — | 308.4 | 23,147.0 | 1.1% | $128.50 | View |
| Roma | ROMA_7 |
QLD1 | Turbine - OCGT | $59.5k | $0 | — | 300.2 | 23,716.7 | 1.0% | $128.50 | View |
| Gannawarra Energy Storage System | GANNB1 |
VIC1 | Storage - Battery | $55.1k | $0 | — | -52.0 | 2,652.9 | -0.3% | $1.98 | View |
| Jeeralang B | JLB03 |
VIC1 | Turbine - OCGT | $55.0k | $0 | — | 292.4 | 55,347.5 | 0.5% | $137.85 | View |
| Snapper Point Power Station | SNAPPER1 |
SA1 | Turbine - OCGT | $54.2k | $0 | — | 79.7 | 104,042.3 | 0.1% | $128.50 | View |
| Hunter EconomicZone | HEZ1 |
NSW1 | Reciprocating Engine - Compression ignition | $53.1k | $0 | — | 32.3 | 13,647.0 | 0.2% | $308.00 | View |
| Torrens Island B | TORRB4 |
SA1 | Turbine - Steam Sub Critical | $52.4k | $0 | — | 1,248.3 | 6,105.0 | 0.9% | $2.00 | View |
| Mannum Solar Farm 2 | MANNSF2 |
SA1 | Solar PV - Single axis tracking | $51.5k | $0 | — | 2,640.5 | 4,018.3 | 12.2% | $0.25 | View |
| Barcaldine Power Station | BARCALDN |
QLD1 | Turbine - OCGT | $48.7k | $0 | — | 247.4 | 274.4 | 0.9% | $141.78 | View |
| Ballarat Energy Storage System | BALB1 |
VIC1 | Storage - Battery | $42.7k | $0 | — | -110.1 | 6,055.2 | -0.5% | $0.00 | View |
| Adelaide Desalination Plant | ADPBA1 |
SA1 | Storage - Battery | $39.3k | $810 | 8,025.2 | -115.9 | 3,848.0 | -2.1% | $0.00 | View |
| Darlington Point Energy Storage System | DPNTB1 |
NSW1 | Storage - Battery | $38.9k | $0 | — | -222.2 | 6,867.9 | -1.2% | $0.00 | View |
| Adelaide Desalination Plant | ADPPV1 |
SA1 | Solar PV - Fixed | $33.9k | $0 | — | 1,212.0 | 3,691.2 | 15.3% | $0.00 | View |
| Port Augusta Renewable Energy Park - Solar | PAREPS1 |
SA1 | Solar PV - Fixed | $33.5k | $0 | — | 1,279.9 | 6,755.9 | 1.8% | $0.20 | View |
| Hallett GT | AGLHAL |
SA1 | Turbine - OCGT | $29.4k | $0 | — | 444.0 | 127,496.1 | 0.2% | $100.22 | View |
| Bulgana Green Power Hub - BESS | BULBES1 |
VIC1 | Storage - Battery | $27.0k | $5.3k | 3,298.4 | -686.9 | 12,095.9 | -4.8% | $1.98 | View |
| Quarantine | QPS1 |
SA1 | Turbine - OCGT | $24.0k | $0 | — | 188.2 | 20,042.3 | 0.9% | $128.50 | View |
| Quarantine | QPS3 |
SA1 | Turbine - OCGT | $22.9k | $0 | — | 181.1 | 20,346.7 | 0.9% | $128.50 | View |
| Happy Valley Reservoir | HVWWBA1 |
SA1 | Storage - Battery | $20.7k | $534 | 3,526.5 | -47.7 | 1,776.9 | -1.2% | $1.58 | View |
| Dalrymple BESS | DALNTH1 |
SA1 | Storage - Battery | $18.6k | $0 | — | -179.6 | 7,635.0 | -0.8% | $2.03 | View |
| Summerfield BESS | SMFBESS2 |
SA1 | Storage - Battery | $17.7k | $0 | — | -240.7 | 347.9 | -0.1% | $1.50 | View |
| Broken Hill | BHB1 |
NSW1 | Storage - Battery | $17.5k | $0 | — | -346.2 | 13,194.0 | -1.0% | $1.50 | View |
| Quarantine | QPS2 |
SA1 | Turbine - OCGT | $16.7k | $0 | — | 107.9 | 15,950.9 | 0.6% | $128.50 | View |
| Jeeralang A | JLA04 |
VIC1 | Turbine - OCGT | $15.9k | $0 | — | 95.5 | 29,301.8 | 0.3% | $177.20 | View |
| Jeeralang B | JLB02 |
VIC1 | Turbine - OCGT | $15.8k | $0 | — | 87.3 | 53,250.0 | 0.2% | $137.71 | View |
| Bolivar Waste Water Treatment | BOWWBA1 |
SA1 | Storage - Battery | $15.7k | $192 | 22.1 | -34.0 | 1,284.4 | -1.5% | $1.58 | View |
| Murray Bridge - Onkaparinga Pipeline Pump 2 | MBPS2PV1 |
SA1 | Solar PV - Single axis tracking | $14.8k | $0 | — | 445.0 | 1,305.8 | 4.5% | $0.25 | View |
| Philip Island BESS | PIBESS1 |
VIC1 | Storage - Battery | $14.0k | $4.0k | 5,387.7 | -363.7 | 2,750.6 | -10.1% | $1.50 | View |
| Mannum Adelaide Pumping Station No 2 - MAPL2 (Palmer) | MAPS2PV1 |
SA1 | Solar PV - Single axis tracking | $13.9k | $0 | — | 957.1 | 1,704.5 | 8.1% | $0.26 | View |
| Christies Beach Wastewater Treatment Plant | CBWWBA1 |
SA1 | Storage - Battery | $13.7k | $172 | 22.2 | -36.9 | 1,255.6 | -2.4% | $1.50 | View |
| Bell Bay Three | BBTHREE1 |
TAS1 | Turbine - OCGT | $11.7k | $0 | — | 122.6 | 17,597.9 | 0.4% | $182.63 | View |
| Summerfield BESS | SMFBESS1 |
SA1 | Storage - Battery | $11.1k | $0 | — | -137.0 | 2,051.7 | -0.1% | $1.50 | View |
| Valley Power | VPGS2 |
VIC1 | Turbine - OCGT | $10.5k | $0 | — | 126.7 | 39,132.2 | 0.4% | $128.50 | View |
| Morgan To Whyalla Pipeline No 4 PS | MWPS4PV1 |
SA1 | Solar PV - Single axis tracking | $8.6k | $0 | — | 245.0 | 651.4 | 6.2% | $0.25 | View |
| Morgan To Whyalla Pipeline No 1 PS And Water Filtration Plant | MWPS1PV1 |
SA1 | Solar PV - Single axis tracking | $7.2k | $0 | — | 231.8 | 699.8 | 5.9% | $0.25 | View |
| Morgan To Whyalla Pipeline No 3 PS | MWPS3PV1 |
SA1 | Solar PV - Single axis tracking | $6.4k | $0 | — | 219.2 | 634.0 | 4.1% | $0.25 | View |
| Port Stanvac 1 | PTSTAN1 |
SA1 | Reciprocating Engine - Compression ignition | $6.3k | $0 | — | 57.2 | 39,813.5 | 0.1% | $308.00 | View |
| Happy Valley Reservoir | HVWWPV1 |
SA1 | Solar PV - Single axis tracking | $6.1k | $0 | — | 592.9 | 1,065.7 | 7.5% | $0.00 | View |
| Bolivar Waste Water Treatment | BOWWPV1 |
SA1 | Solar PV - Fixed | $6.0k | $0 | — | 692.4 | 1,196.5 | 11.7% | $0.23 | View |
| Jeeralang A | JLA02 |
VIC1 | Turbine - OCGT | $6.0k | $0 | — | 38.5 | 25,105.5 | 0.1% | $128.50 | View |
| Mannum Adelaide Pumping Station No 3 - MAPL3 (Tungkillo) | MAPS3PV1 |
SA1 | Solar PV - Single axis tracking | $5.9k | $0 | — | 473.9 | 687.9 | 4.0% | $0.25 | View |
| LINCOLN GAP BESSBDU | LGAPBS1 |
SA1 | Storage - Battery | $5.7k | $0 | — | -31.5 | 1,234.1 | -0.4% | $1.50 | View |
| Valley Power | VPGS3 |
VIC1 | Turbine - OCGT | $5.0k | $0 | — | 64.8 | 29,902.2 | 0.2% | $128.50 | View |
| Angaston | ANGAST1 |
SA1 | Reciprocating Engine - Compression ignition | $4.9k | $0 | — | 68.9 | 31,559.7 | 0.2% | $0.00 | View |
| Valley Power | VPGS4 |
VIC1 | Turbine - OCGT | $4.5k | $0 | — | 47.2 | 37,000.4 | 0.1% | $128.50 | View |
| Morgan To Whyalla Pipeline No 2 PS | MWPS2PV1 |
SA1 | Solar PV - Single axis tracking | $3.9k | $0 | — | 143.4 | 414.2 | 3.6% | $0.25 | View |
| Dry Creek GT | DRYCGT3 |
SA1 | Turbine - OCGT | $3.8k | $0 | — | 44.2 | 32,268.7 | 0.1% | $210.15 | View |
| Bell Bay Three | BBTHREE3 |
TAS1 | Turbine - OCGT | $3.3k | $0 | — | 31.5 | 15,578.7 | 0.1% | $141.97 | View |
| Bell Bay Three | BBTHREE2 |
TAS1 | Turbine - OCGT | $2.5k | $0 | — | 43.7 | 15,399.6 | 0.2% | $137.22 | View |
| Dry Creek GT | DRYCGT1 |
SA1 | Turbine - OCGT | $1.4k | $0 | — | 27.6 | 31,987.2 | 0.1% | $141.50 | View |
| Lonsdale | LONSDALE |
SA1 | Reciprocating Engine - Compression ignition | $1.3k | $0 | — | 20.8 | 11,516.6 | 0.1% | $308.00 | View |
| Yallourn W | YWPS2 |
VIC1 | Turbine - Steam Sub Critical | $183 | $0 | — | 5.3 | — | 0.0% | $47.20 | View |
| Jeeralang B | JLB01 |
VIC1 | Turbine - OCGT | $174 | $0 | — | 5.1 | — | 0.0% | $128.50 | View |
| Mt Stuart | MSTUART1 |
QLD1 | Turbine - OCGT | $105 | $0 | — | 3.9 | 98,325.0 | 0.0% | $2.00 | View |
| Braemar 2 Power Station | BRAEMAR5 |
QLD1 | Turbine - OCGT | $30 | $0 | — | 1.1 | 13,960.0 | 0.0% | $3.14 | View |
| Mintaro GT | MINTARO |
SA1 | Turbine - OCGT | $25 | $0 | — | 0.6 | 60,629.7 | 0.0% | $128.50 | View |
| Valley Power | VPGS6 |
VIC1 | Turbine - OCGT | $0 | $0 | — | — | 36,999.6 | 0.0% | $128.50 | View |
| VSNEL2S1 | VSNEL2S1 |
$0 | $0 | — | — | — | — | — | View | ||
| Valley Power | VPGS5 |
VIC1 | Turbine - OCGT | $0 | $0 | — | — | 37,004.3 | 0.0% | $128.50 | View |
| VENUS1 | VENUS1 |
$0 | $0 | 1,058.8 | — | — | — | — | View | ||
| Uungula Wind Farm | UWF1 |
NSW1 | Wind Turbine - Onshore | $0 | $0 | — | — | — | 0.0% | $0.50 | View |
| Valley Power | VPGS1 |
VIC1 | Turbine - OCGT | $0 | $0 | — | — | 39,137.1 | 0.0% | $128.50 | View |
| DG_NSW1 | DG_NSW1 |
$0 | $0 | — | — | — | — | — | View | ||
| DG_SA1 | DG_SA1 |
$0 | $0 | — | — | — | — | — | View | ||
| DG_TAS1 | DG_TAS1 |
$0 | $0 | — | — | — | — | — | View | ||
| DG_VIC1 | DG_VIC1 |
$0 | $0 | — | — | — | — | — | View | ||
| DG_QLD1 | DG_QLD1 |
$0 | $0 | — | — | — | — | — | View | ||
| DRACAN1 | DRACAN1 |
$0 | $0 | 586.2 | — | — | — | — | View | ||
| DRHTVP01 | DRHTVP01 |
$0 | $0 | — | — | — | — | — | View | ||
| DRHTVP03 | DRHTVP03 |
$0 | $0 | — | — | — | — | — | View | ||
| DROZVP01 | DROZVP01 |
$0 | $0 | 10.2 | — | — | — | — | View | ||
| TB3B1 | TB3B1 |
$0 | $0 | — | -13.7 | 604.9 | — | — | View | ||
| DROZVP02 | DROZVP02 |
$0 | $0 | 0.8 | — | — | — | — | View | ||
| DROZVP03 | DROZVP03 |
$0 | $0 | 34.5 | — | — | — | — | View | ||
| DRPSTQ01 | DRPSTQ01 |
$0 | $0 | 845.8 | — | — | — | — | View | ||
| DRPSTV01 | DRPSTV01 |
$0 | $0 | 1,902.4 | — | — | — | — | View | ||
| Tarong | TARONG#3 |
QLD1 | Turbine - Steam Sub Critical | $0 | $0 | — | — | — | 0.0% | $55.48 | View |
| DRSHVN01 | DRSHVN01 |
$0 | $0 | — | — | — | — | — | View | ||
| DRSHVN02 | DRSHVN02 |
$0 | $0 | 34,566.3 | — | — | — | — | View | ||
| DRGBND04 | DRGBND04 |
$0 | $0 | 12,460.9 | — | — | — | — | View | ||
| Torrens Island B | TORRB2 |
SA1 | Turbine - Steam Sub Critical | $0 | $0 | — | — | — | 0.0% | $5.47 | View |
| DRGBND03 | DRGBND03 |
$0 | $0 | 17,334.3 | — | — | — | — | View | ||
| RT_VIC12 | RT_VIC12 |
$0 | $0 | — | — | — | — | — | View | ||
| DRACAV1 | DRACAV1 |
$0 | $0 | — | — | — | — | — | View | ||
| DRAESN3 | DRAESN3 |
$0 | $0 | 2,080.9 | — | — | — | — | View | ||
| Tamar Valley Combined Cycle | TVCC201 |
TAS1 | Turbine - CCGT | $0 | $0 | — | — | — | 0.0% | $84.30 | View |
| Tungatinah | TUNGATIN |
TAS1 | Hydro - Dam | $0 | $0 | — | — | — | 0.0% | $1.00 | View |
| DRAESS1 | DRAESS1 |
$0 | $0 | 2,796.3 | — | — | — | — | View | ||
| DRBRLV01 | DRBRLV01 |
$0 | $0 | 7,455.3 | — | — | — | — | View | ||
| DRFIIN01 | DRFIIN01 |
$0 | $0 | — | — | — | — | — | View | ||
| DRFIIN02 | DRFIIN02 |
$0 | $0 | — | — | — | — | — | View | ||
| DRGBND01 | DRGBND01 |
$0 | $0 | 3,866.3 | — | — | — | — | View | ||
| DRGBND02 | DRGBND02 |
$0 | $0 | 1,215.2 | — | — | — | — | View | ||
| DRSHVQ01 | DRSHVQ01 |
$0 | $0 | 2,527.3 | — | — | — | — | View | ||
| VSQHT1V1 | VSQHT1V1 |
$0 | $0 | — | — | — | — | — | View | ||
| ASDESA1 | ASDESA1 |
$0 | $0 | — | — | — | — | — | View | ||
| ASNBRL1 | ASNBRL1 |
$0 | $0 | 12,595.8 | — | — | — | — | View | ||
| ASNENC1 | ASNENC1 |
$0 | $0 | 5,392.4 | — | — | — | — | View | ||
| ASPAPM01 | ASPAPM01 |
$0 | $0 | — | — | — | — | — | View | ||
| ASPBSC01 | ASPBSC01 |
$0 | $0 | — | — | — | — | — | View | ||
| ASPSTV01 | ASPSTV01 |
$0 | $0 | 29.8 | — | — | — | — | View | ||
| ASQEEV1 | ASQEEV1 |
$0 | $0 | — | — | — | — | — | View | ||
| ASQENC1 | ASQENC1 |
$0 | $0 | 1,290.6 | — | — | — | — | View | ||
| WOOLES1 | WOOLES1 |
$0 | $0 | — | -975.0 | 18,051.7 | — | — | View | ||
| ASRMGE01 | ASRMGE01 |
$0 | $0 | 8.5 | — | — | — | — | View | ||
| ASNAES1 | ASNAES1 |
$0 | $0 | 91.4 | — | — | — | — | View | ||
| ASGENE01 | ASGENE01 |
$0 | $0 | — | — | — | — | — | View | ||
| DRVISB01 | DRVISB01 |
$0 | $0 | — | — | — | — | — | View | ||
| APD01 | APD01 |
$0 | $0 | 74,518.9 | — | — | — | — | View | ||
| ASACLE01 | ASACLE01 |
$0 | $0 | 4,339.1 | — | — | — | — | View | ||
| ASDEVI01 | ASDEVI01 |
$0 | $0 | 6,695.8 | — | — | — | — | View | ||
| ASDLBY01 | ASDLBY01 |
$0 | $0 | — | — | — | — | — | View | ||
| ASENGV01 | ASENGV01 |
$0 | $0 | — | — | — | — | — | View | ||
| ASENGY01 | ASENGY01 |
$0 | $0 | — | — | — | — | — | View | ||
| Townsville Power Station | YABULU2 |
QLD1 | Turbine - CCGT | $0 | $0 | — | — | — | 0.0% | $84.30 | View |
| Townsville Power Station | YABULU |
QLD1 | Turbine - CCGT | $0 | $0 | — | — | — | 0.0% | $84.30 | View |
| ASRMGE02 | ASRMGE02 |
$0 | $0 | 8.6 | — | — | — | — | View | ||
| WNSF1 | WNSF1 |
$0 | $0 | — | 3,065.5 | — | — | — | View | ||
| Bayswater | BW03 |
NSW1 | Turbine - Steam Sub Critical | $0 | $0 | — | — | — | 0.0% | $28.68 | View |
| WAMBOWF2 | WAMBOWF2 |
$0 | $0 | — | 25,065.4 | 25,068.9 | — | — | View | ||
| Cethana | CETHANA |
TAS1 | Hydro - Dam | $0 | $0 | — | — | — | 0.0% | $1.09 | View |
| CRWARP1 | CRWARP1 |
$0 | $0 | — | 31,342.7 | 34,470.0 | — | — | View | ||
| W/HOE#2 | W/HOE#2 |
$0 | $0 | 1,339.1 | 24,191.1 | 134,101.6 | — | — | View | ||
| W/HOE#1 | W/HOE#1 |
$0 | $0 | 252.6 | 16,557.4 | 101,552.9 | — | — | View | ||
| VSVEL2S1 | VSVEL2S1 |
$0 | $0 | — | — | — | — | — | View | ||
| VSSSH1S1 | VSSSH1S1 |
$0 | $0 | — | — | — | — | — | View | ||
| VSSSE1V1 | VSSSE1V1 |
$0 | $0 | — | — | — | — | — | View | ||
| BUNGAMB1 | BUNGAMB1 |
$0 | $0 | 251,877.4 | -2,848.3 | 101,351.8 | — | — | View | ||
| Braemar 2 Power Station | BRAEMAR7 |
QLD1 | Turbine - OCGT | $0 | $0 | — | — | 67,551.9 | 0.0% | $132.25 | View |
| ASRMGE03 | ASRMGE03 |
$0 | $0 | 8.6 | — | — | — | — | View | ||
| ASRMGE04 | ASRMGE04 |
$0 | $0 | — | — | — | — | — | View | ||
| ASRMGE05 | ASRMGE05 |
$0 | $0 | 2,778.2 | — | — | — | — | View | ||
| ASSDE1 | ASSDE1 |
$0 | $0 | — | — | — | — | — | View | ||
| ASSENC1 | ASSENC1 |
$0 | $0 | 396.5 | — | — | — | — | View | ||
| ASSERDV1 | ASSERDV1 |
$0 | $0 | — | — | — | — | — | View | ||
| ASTHYD1 | ASTHYD1 |
$0 | $0 | 5,835.1 | — | — | — | — | View | ||
| Bairnsdale | BDL02 |
VIC1 | Turbine - OCGT | $0 | $0 | — | — | — | 0.0% | $158.38 | View |
| WINNSF1 | WINNSF1 |
$0 | $0 | — | — | — | — | — | View | ||
| VSSAE1V1 | VSSAE1V1 |
$0 | $0 | 907.4 | — | — | — | — | View | ||
| DRSHVS01 | DRSHVS01 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_VIC10 | RT_VIC10 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_NSW3 | RT_NSW3 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_NSW2 | RT_NSW2 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_NSW1 | RT_NSW1 |
$0 | $0 | — | — | — | — | — | View | ||
| Dry Creek GT | DRYCGT2 |
SA1 | Turbine - OCGT | $0 | $0 | — | — | 24,946.2 | 0.0% | $135.55 | View |
| ERB02 | ERB02 |
$0 | $0 | — | -617.7 | 859.2 | — | — | View | ||
| Eraring GT | ERGT01 |
NSW1 | Turbine - OCGT | $0 | $0 | — | — | — | 0.0% | $96.96 | View |
| Hume Dam VIC | HUMEV |
VIC1 | Hydro - Dam | $0 | $0 | — | — | — | 0.0% | $1.54 | View |
| Hunter Power Station | HUNTER2 |
NSW1 | Turbine - OCGT | $0 | $0 | — | — | — | 0.0% | $152.46 | View |
| Quarantine | QPS4 |
SA1 | Turbine - OCGT | $0 | $0 | — | — | — | 0.0% | $128.50 | View |
| PUMP2 | PUMP2 |
$0 | $0 | — | 32,632.1 | 33,409.9 | — | — | View | ||
| RT_NSW4 | RT_NSW4 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_NSW5 | RT_NSW5 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_VIC1 | RT_VIC1 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_TAS1 | RT_TAS1 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_SA6 | RT_SA6 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_SA5 | RT_SA5 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_SA4 | RT_SA4 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_SA3 | RT_SA3 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_SA2 | RT_SA2 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_SA1 | RT_SA1 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_QLD1 | RT_QLD1 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_NSW6 | RT_NSW6 |
$0 | $0 | — | — | — | — | — | View | ||
| PUMP1 | PUMP1 |
$0 | $0 | — | 29,126.2 | 30,034.3 | — | — | View | ||
| Kareeya | KAREEYA1 |
QLD1 | Hydro - Run of River | $0 | $0 | — | — | — | 0.0% | $1.00 | View |
| Laverton North | LNGS2 |
VIC1 | Turbine - OCGT | $0 | $0 | — | — | — | 0.0% | $128.50 | View |
| Loy Yang A Power Station | LYA1 |
VIC1 | Turbine - Steam Sub Critical | $0 | $0 | — | — | — | 0.0% | $47.20 | View |
| MLB01 | MLB01 |
$0 | $0 | — | -3,087.8 | 163,906.9 | — | — | View | ||
| MLSP1 | MLSP1 |
$0 | $0 | — | 2,009.2 | — | — | — | View | ||
| Mt Piper | MP2 |
NSW1 | Turbine - Steam Sub Critical | $0 | $0 | — | — | — | 0.0% | $52.60 | View |
| Millmerran Power Plant | MPP_1 |
QLD1 | Turbine - Steam Super Critical | $0 | $0 | — | — | — | 0.0% | $52.60 | View |
| MREHA1 | MREHA1 |
$0 | $0 | 48,038.7 | -3,706.2 | 118,530.4 | — | — | View | ||
| MREHA2 | MREHA2 |
$0 | $0 | 50,116.7 | -4,035.2 | 114,701.7 | — | — | View | ||
| MREHA3 | MREHA3 |
$0 | $0 | 120,349.1 | -7,135.7 | 135,409.0 | — | — | View | ||
| Mt Stuart | MSTUART2 |
QLD1 | Turbine - OCGT | $0 | $0 | — | — | 64,963.5 | 0.0% | $148.45 | View |
| Laverton North | LNGS1 |
VIC1 | Turbine - OCGT | $0 | $0 | — | — | 118,739.4 | 0.0% | $128.50 | View |
| Lake Echo | LK_ECHO |
TAS1 | Hydro - Dam | $0 | $0 | — | — | — | 0.0% | $1.17 | View |
| Kennedy Energy Park - Phase 1 - Storage | KEPBG1 |
QLD1 | Storage - Battery | $0 | $0 | — | — | — | 0.0% | $2.03 | View |
| Port Lincoln GT | POR03 |
SA1 | Turbine - OCGT | $0 | $0 | — | — | — | 0.0% | $2.00 | View |
| Port Lincoln GT | POR01 |
SA1 | Turbine - OCGT | $0 | $0 | — | — | — | 0.0% | $2.00 | View |
| KEPBL1 | KEPBL1 |
$0 | $0 | — | — | — | — | — | View | ||
| KIDSPHG1 | KIDSPHG1 |
$0 | $0 | — | — | — | — | — | View | ||
| PLBESS1 | PLBESS1 |
$0 | $0 | — | -196.2 | 5,184.1 | — | — | View | ||
| PIONEER | PIONEER |
$0 | $0 | — | 18,031.0 | — | — | — | View | ||
| KIDSPHG2 | KIDSPHG2 |
$0 | $0 | — | — | — | — | — | View | ||
| KIDSPHL1 | KIDSPHL1 |
$0 | $0 | — | — | — | — | — | View | ||
| KIDSPHL2 | KIDSPHL2 |
$0 | $0 | — | — | — | — | — | View | ||
| Mt Stuart | MSTUART3 |
QLD1 | Turbine - OCGT | $0 | $0 | — | — | 80,312.5 | 0.0% | $2.00 | View |
| DRSHVS02 | DRSHVS02 |
$0 | $0 | 22,240.9 | — | — | — | — | View | ||
| DRXNDB04 | DRXNDB04 |
$0 | $0 | — | — | — | — | — | View | ||
| STABESS1 | STABESS1 |
$0 | $0 | — | -720.3 | 820.3 | — | — | View | ||
| DRXNDE01 | DRXNDE01 |
$0 | $0 | — | 4.5 | 5.8 | — | — | View | ||
| Snuggery | SNUG1 |
SA1 | Turbine - OCGT | $0 | $0 | — | — | — | 0.0% | $2.00 | View |
| SNOWYP | SNOWYP |
$0 | $0 | — | 24,425.0 | 22,847.1 | — | — | View | ||
| SNOWYGJP | SNOWYGJP |
$0 | $0 | 8,491.2 | — | — | — | — | View | ||
| DRXNDJ01 | DRXNDJ01 |
$0 | $0 | — | — | 0.9 | — | — | View | ||
| DRXNDW01 | DRXNDW01 |
$0 | $0 | — | — | 2.0 | — | — | View | ||
| DRXNFF01 | DRXNFF01 |
$0 | $0 | — | 2.2 | 2.2 | — | — | View | ||
| DRXNFS01 | DRXNFS01 |
$0 | $0 | — | — | — | — | — | View | ||
| DRXNQX01 | DRXNQX01 |
$0 | $0 | — | — | — | — | — | View | ||
| DRXNDA04 | DRXNDA04 |
$0 | $0 | — | — | — | — | — | View | ||
| DRXNDA03 | DRXNDA03 |
$0 | $0 | — | — | — | — | — | View | ||
| DRVIOT01 | DRVIOT01 |
$0 | $0 | 8,119.1 | — | — | — | — | View | ||
| DRVIOT02 | DRVIOT02 |
$0 | $0 | 1,582.8 | — | — | — | — | View | ||
| DRVIOT03 | DRVIOT03 |
$0 | $0 | 2,666.0 | — | — | — | — | View | ||
| DRVIOT04 | DRVIOT04 |
$0 | $0 | 75,441.3 | — | — | — | — | View | ||
| DRVIOT05 | DRVIOT05 |
$0 | $0 | 19,639.0 | — | — | — | — | View | ||
| DRVIOT06 | DRVIOT06 |
$0 | $0 | — | — | — | — | — | View | ||
| DRVIOT07 | DRVIOT07 |
$0 | $0 | — | — | — | — | — | View | ||
| DRXNAD01 | DRXNAD01 |
$0 | $0 | — | 17.5 | 25.6 | — | — | View | ||
| DRXNAE01 | DRXNAE01 |
$0 | $0 | — | — | — | — | — | View | ||
| DRXNDA01 | DRXNDA01 |
$0 | $0 | — | — | — | — | — | View | ||
| DRXNDA02 | DRXNDA02 |
$0 | $0 | — | — | — | — | — | View | ||
| DRXNSS01 | DRXNSS01 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_VIC11 | RT_VIC11 |
$0 | $0 | — | — | — | — | — | View | ||
| DRXVDX01 | DRXVDX01 |
$0 | $0 | — | — | — | — | — | View | ||
| DRXVQP01 | DRXVQP01 |
$0 | $0 | — | — | — | — | — | View | ||
| DRXVQX01 | DRXVQX01 |
$0 | $0 | — | — | — | — | — | View | ||
| DRXVQX02 | DRXVQX02 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_VIC9 | RT_VIC9 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_VIC8 | RT_VIC8 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_VIC7 | RT_VIC7 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_VIC6 | RT_VIC6 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_VIC5 | RT_VIC5 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_VIC4 | RT_VIC4 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_VIC3 | RT_VIC3 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_VIC2 | RT_VIC2 |
$0 | $0 | — | — | — | — | — | View | ||
| DRXVDP01 | DRXVDP01 |
$0 | $0 | — | — | — | — | — | View | ||
| DRXQDA01 | DRXQDA01 |
$0 | $0 | — | — | — | — | — | View | ||
| DRXVDJ01 | DRXVDJ01 |
$0 | $0 | — | — | 175.0 | — | — | View | ||
| DRXVAE01 | DRXVAE01 |
$0 | $0 | — | — | — | — | — | View | ||
| DRXSQS01 | DRXSQS01 |
$0 | $0 | — | — | — | — | — | View | ||
| DRXQQE01 | DRXQQE01 |
$0 | $0 | — | — | 347.7 | — | — | View | ||
| DRXNTM02 | DRXNTM02 |
$0 | $0 | — | — | — | — | — | View | ||
| SHPUMP | SHPUMP |
$0 | $0 | — | 4,986.3 | 5,068.7 | — | — | View | ||
| DRXNVS01 | DRXNVS01 |
$0 | $0 | — | 20.2 | 21.3 | — | — | View | ||
| Paloona | PALOONA |
TAS1 | Hydro - Dam | $-1 | $0 | — | 0.1 | — | 0.0% | $1.00 | View |
| Rowallan | ROWALLAN |
TAS1 | Hydro - Dam | $-398 | $0 | — | 22.9 | — | 0.3% | $1.00 | View |
| Jeeralang A | JLA03 |
VIC1 | Turbine - OCGT | $-438 | $0 | — | 18.4 | 29,582.3 | 0.0% | $141.46 | View |
| Jeeralang A | JLA01 |
VIC1 | Turbine - OCGT | $-439 | $0 | — | 18.4 | 29,582.3 | 0.0% | $135.55 | View |
| Wooreen Energy Storage System | WOORB1 |
VIC1 | Storage - Battery | $-1.4k | $0 | — | -21.1 | 133.8 | 0.0% | $1.50 | View |
| Queanbeyan BESS | QBYNB1 |
NSW1 | Storage - Battery | $-5.6k | $0 | — | -42.7 | 25.0 | -0.6% | $1.50 | View |