MLF-adjusted revenue, dispatch, capacity factor, and estimated SRMC from AEMO 5‑minute dispatch data. Data through 06 Nov 2026, 06:10 AEST.
Energy revenue = cleared MW × (5/60 h) × regional RRP × MLF. FCAS revenue = sum of cleared FCAS MW × (5/60 h) × regional FCAS price × MLF (raise/lower 6s, 60s, 5min, reg). FCAS volume = total FCAS enablement MWh across all services. Capacity factor = dispatched MWh ÷ (nameplate MW × period hours). SRMC from financial assumptions. Not AEMO settlement data.
| Site | DUID | Region | Tech | Energy rev. (× MLF) | FCAS rev. (× MLF) | FCAS MWh | MWh dispatch | MWh available | Capacity factor | Est. SRMC | |
|---|---|---|---|---|---|---|---|---|---|---|---|
| Bayswater | BW04 |
NSW1 | Turbine - Steam Sub Critical | $51.77M | $10.6k | 7,612.0 | 402,241.9 | 488,575.7 | 81.6% | $55.48 | View |
| Bayswater | BW02 |
NSW1 | Turbine - Steam Sub Critical | $51.37M | $9.9k | 7,054.2 | 395,613.7 | 491,062.9 | 80.2% | $26.23 | View |
| Mt Piper | MP1 |
NSW1 | Turbine - Steam Sub Critical | $49.90M | $0 | — | 334,631.4 | 522,526.7 | 63.7% | $49.24 | View |
| Vales Point B | VP6 |
NSW1 | Turbine - Steam Sub Critical | $41.27M | $41 | 235.2 | 273,928.4 | 445,708.0 | 57.6% | $52.60 | View |
| Bayswater | BW01 |
NSW1 | Turbine - Steam Sub Critical | $40.41M | $9.1k | 6,168.6 | 325,790.6 | 395,868.7 | 68.6% | $53.57 | View |
| Eraring | ER04 |
NSW1 | Turbine - Steam Sub Critical | $38.09M | $4.0k | 577.3 | 268,235.3 | 402,190.7 | 51.7% | $55.48 | View |
| Vales Point B | VP5 |
NSW1 | Turbine - Steam Sub Critical | $34.75M | $44 | 239.8 | 258,521.4 | 398,685.8 | 54.4% | $52.60 | View |
| Millmerran Power Plant | MPP_2 |
QLD1 | Turbine - Steam Super Critical | $28.85M | $0 | — | 300,410.4 | 306,174.3 | 97.9% | $52.60 | View |
| Eraring | ER02 |
NSW1 | Turbine - Steam Sub Critical | $28.48M | $2.8k | 403.7 | 180,999.5 | 240,268.2 | 34.9% | $59.45 | View |
| Callide C | CPP_3 |
QLD1 | Turbine - Steam Super Critical | $25.32M | $0 | — | 272,917.7 | 299,255.8 | 89.4% | $44.41 | View |
| Callide C | CPP_4 |
QLD1 | Turbine - Steam Super Critical | $25.06M | $0 | — | 270,196.2 | 294,053.0 | 89.4% | $101.94 | View |
| Tumut 3 | TUMUT3 |
NSW1 | Hydro - Dam | $24.24M | $2.7k | 8,284.3 | 55,861.9 | 1,230,436.7 | 5.2% | $1.05 | View |
| Tarong North | TNPS1 |
QLD1 | Turbine - Steam Super Critical | $23.86M | $0 | — | 240,482.2 | 283,574.2 | 74.2% | $52.60 | View |
| Loy Yang B | LOYYB2 |
VIC1 | Turbine - Steam Sub Critical | $20.86M | $3.9k | 8,247.2 | 403,575.8 | 409,037.4 | 96.6% | $47.20 | View |
| Stanwell | STAN-1 |
QLD1 | Turbine - Steam Sub Critical | $20.84M | $5.3k | 1,654.6 | 221,851.7 | 250,967.5 | 84.4% | $52.60 | View |
| Loy Yang A Power Station | LYA3 |
VIC1 | Turbine - Steam Sub Critical | $20.55M | $2.1k | 5,600.7 | 314,462.0 | 395,541.7 | 78.0% | $47.20 | View |
| Stanwell | STAN-2 |
QLD1 | Turbine - Steam Sub Critical | $20.37M | $5.6k | 759.9 | 216,563.0 | 246,546.7 | 82.4% | $52.60 | View |
| Tarong | TARONG#2 |
QLD1 | Turbine - Steam Sub Critical | $20.34M | $5.6k | 737.6 | 201,435.1 | 234,925.0 | 79.9% | $55.48 | View |
| Callide B | CALL_B_1 |
QLD1 | Turbine - Steam Sub Critical | $19.96M | $7.2k | 4,604.0 | 215,479.0 | 250,292.1 | 85.5% | $32.60 | View |
| Loy Yang A Power Station | LYA4 |
VIC1 | Turbine - Steam Sub Critical | $19.93M | $2.0k | 5,345.1 | 304,450.4 | 385,432.1 | 75.5% | $47.20 | View |
| Loy Yang A Power Station | LYA2 |
VIC1 | Turbine - Steam Sub Critical | $19.69M | $3.4k | 1,780.3 | 322,899.0 | 378,230.0 | 84.6% | $47.20 | View |
| Stanwell | STAN-3 |
QLD1 | Turbine - Steam Sub Critical | $19.62M | $139 | 8.0 | 206,606.0 | 236,731.2 | 78.6% | $52.60 | View |
| Tarong | TARONG#4 |
QLD1 | Turbine - Steam Sub Critical | $19.58M | $5.8k | 825.5 | 194,963.9 | 223,331.2 | 77.4% | $52.58 | View |
| Loy Yang B | LOYYB1 |
VIC1 | Turbine - Steam Sub Critical | $19.15M | $4.4k | 8,390.9 | 383,614.0 | 386,374.3 | 91.9% | $47.20 | View |
| Upper Tumut | UPPTUMUT |
NSW1 | Hydro - Dam | $19.10M | $11.3k | 12,581.4 | 133,145.0 | 409,481.6 | 30.0% | $1.00 | View |
| Callide B | CALL_B_2 |
QLD1 | Turbine - Steam Sub Critical | $18.79M | $4.0k | 2,527.1 | 207,072.3 | 219,197.9 | 82.2% | $55.48 | View |
| Tarong | TARONG#1 |
QLD1 | Turbine - Steam Sub Critical | $17.82M | $1.2k | 3.3 | 185,109.9 | 212,232.5 | 73.5% | $52.60 | View |
| MacIntyre Wind Farm | MCINTYR1 |
QLD1 | Wind Turbine - Onshore | $16.45M | $0 | — | 177,185.5 | 176,077.0 | 26.7% | $0.58 | View |
| Eraring | ER01 |
NSW1 | Turbine - Steam Sub Critical | $15.91M | $1.6k | 225.7 | 158,252.5 | 194,356.2 | 30.5% | $48.29 | View |
| Eraring | ER03 |
NSW1 | Turbine - Steam Sub Critical | $14.00M | $1.9k | 244.4 | 137,311.8 | 208,691.8 | 26.5% | $49.77 | View |
| Yallourn W | YWPS4 |
VIC1 | Turbine - Steam Sub Critical | $13.39M | $0 | — | 247,535.5 | 271,261.3 | 91.7% | $47.20 | View |
| Gladstone | GSTONE4 |
QLD1 | Turbine - Steam Sub Critical | $13.37M | $5.4k | 3,452.4 | 137,217.4 | 193,431.2 | 68.1% | $52.60 | View |
| Stanwell | STAN-4 |
QLD1 | Turbine - Steam Sub Critical | $12.53M | $0 | — | 139,494.8 | 148,173.3 | 53.1% | $52.60 | View |
| Gladstone | GSTONE5 |
QLD1 | Turbine - Steam Sub Critical | $12.21M | $5.5k | 3,569.3 | 124,568.5 | 194,825.8 | 61.8% | $58.48 | View |
| Gladstone | GSTONE2 |
QLD1 | Turbine - Steam Sub Critical | $11.79M | $2.4k | 948.0 | 122,123.5 | 196,624.2 | 60.6% | $49.17 | View |
| Murray 2 | MURRAY |
VIC1 | Hydro - Dam | $11.76M | $5.7k | 5,338.2 | 98,063.5 | 839,736.6 | 22.7% | $1.00 | View |
| Gladstone | GSTONE6 |
QLD1 | Turbine - Steam Sub Critical | $11.75M | $6.3k | 3,807.7 | 120,795.3 | 194,647.1 | 59.9% | $54.96 | View |
| Yallourn W | YWPS1 |
VIC1 | Turbine - Steam Sub Critical | $11.23M | $0 | — | 218,940.7 | 230,837.5 | 86.9% | $47.20 | View |
| Tallawarra | TALWA1 |
NSW1 | Turbine - CCGT | $10.28M | $0 | — | 43,162.3 | 64,254.4 | 15.0% | $84.30 | View |
| Yallourn W | YWPS3 |
VIC1 | Turbine - Steam Sub Critical | $10.24M | $0 | — | 207,519.9 | 228,802.1 | 76.9% | $47.20 | View |
| Coopers Gap Wind Farm | COOPGWF1 |
QLD1 | Wind Turbine - Onshore | $10.18M | $0 | — | 110,856.0 | 113,719.9 | 34.0% | $0.68 | View |
| Clarke Creek Wind Farm | CLRKCWF1 |
QLD1 | Wind Turbine - Onshore | $10.05M | $0 | — | 99,884.1 | 112,009.4 | 40.0% | $0.00 | View |
| Gordon | GORDON |
TAS1 | Hydro - Dam | $9.73M | $143.3k | 46,321.0 | 125,094.6 | 175,985.2 | 40.2% | $1.05 | View |
| Rye Park Wind Farm | RYEPARK1 |
NSW1 | Wind Turbine - Onshore | $8.08M | $0 | — | 87,406.2 | 90,097.2 | 30.7% | $0.50 | View |
| Gladstone | GSTONE3 |
QLD1 | Turbine - Steam Sub Critical | $6.58M | $2.9k | 2,221.1 | 60,872.4 | 87,991.2 | 30.2% | $128.75 | View |
| Pelican Point | PPCCGT |
SA1 | Turbine - CCGT | $5.96M | $0 | — | 67,394.5 | 88,492.3 | 17.7% | $84.30 | View |
| Poatina | POAT220 |
TAS1 | Hydro - Dam | $5.65M | $210.8k | 23,673.7 | 63,607.1 | 172,340.0 | 44.2% | $1.00 | View |
| Wollar Solar Farm | WOLARSF1 |
NSW1 | Solar PV - Single axis tracking | $5.31M | $0 | — | 58,945.1 | 59,033.7 | 29.2% | $0.25 | View |
| Gladstone | GSTONE1 |
QLD1 | Turbine - Steam Sub Critical | $5.19M | $2.0k | 1,082.9 | 59,665.4 | 89,412.9 | 29.6% | $52.99 | View |
| Dulacca Wind Farm | DULAWF1 |
QLD1 | Wind Turbine - Onshore | $5.12M | $0 | — | 54,667.8 | 54,555.6 | 43.9% | $0.53 | View |
| Wellington North Solar Farm (Lightsource) | WELNSF1 |
NSW1 | Solar PV - Single axis tracking | $4.58M | $0 | — | 65,798.1 | 65,945.8 | 20.9% | $0.25 | View |
| Barker Inlet Power Station | BARKIPS1 |
SA1 | Reciprocating Engine - Spark ignition | $4.22M | $0 | — | 37,690.2 | 131,206.4 | 24.9% | $9.00 | View |
| Catagunya / Liapootah / Wayatinah | LI_WY_CA |
TAS1 | Hydro - Dam | $4.07M | $16.3k | 4,458.5 | 57,117.7 | 126,401.4 | 44.9% | $1.05 | View |
| Bango 973 Wind Farm | BANGOWF1 |
NSW1 | Wind Turbine - Onshore | $3.92M | $0 | — | 30,257.5 | 31,875.1 | 26.4% | $0.00 | View |
| Western Downs Green Power Hub P/L | WDGPH1 |
QLD1 | Solar PV - Single axis tracking | $3.91M | $2.1k | 179.4 | 73,087.1 | 73,383.8 | 25.4% | $0.32 | View |
| Stubbo Solar Farm | STUBSF1 |
NSW1 | Solar PV - Single axis tracking | $3.90M | $0 | — | 48,282.7 | 48,417.9 | 33.9% | $0.25 | View |
| Darling Downs | DDPS1 |
QLD1 | Turbine - CCGT | $3.89M | $0 | — | 26,215.5 | 27,715.7 | 5.6% | $3.31 | View |
| Culcairn Solar Farm | CUSF1 |
NSW1 | Solar PV - Single axis tracking | $3.88M | $0 | — | 37,837.9 | 95,193.7 | 15.0% | $0.25 | View |
| Flyers Creek Wind Farm | FLYCRKWF |
NSW1 | Wind Turbine - Onshore | $3.64M | $0 | — | 34,493.5 | 34,526.7 | 32.9% | $0.58 | View |
| White Rock Wind Farm - Stage 1 | WRWF1 |
NSW1 | Wind Turbine - Onshore | $3.61M | $0 | — | 39,572.3 | 39,725.4 | 31.4% | $0.50 | View |
| Darlington Point Solar Farm | DARLSF1 |
NSW1 | Solar PV - Single axis tracking | $3.53M | $0 | — | 45,705.2 | 55,062.7 | 23.1% | $0.33 | View |
| Sapphire Wind Farm | SAPHWF1 |
SA1 | Wind Turbine - Onshore | $3.41M | $0 | — | 70,644.5 | 70,269.2 | 36.3% | $0.50 | View |
| Stockyard Hill Wind Farm | STOCKYD1 |
VIC1 | Wind Turbine - Onshore | $3.36M | $0 | — | 137,673.1 | 140,299.4 | 36.2% | $0.50 | View |
| Silverton Wind Farm | STWF1 |
NSW1 | Wind Turbine - Onshore | $3.35M | $0 | — | 35,428.5 | 35,852.5 | 24.7% | $0.50 | View |
| Avonlie Solar Farm | AVLSF1 |
NSW1 | Solar PV - Single axis tracking | $3.34M | $0 | — | 42,459.2 | 46,955.7 | 23.2% | $0.00 | View |
| Shoalhaven | SHOAL1 |
NSW1 | Storage - Pumped hydro | $3.18M | $0 | — | 24,882.4 | — | 14.0% | $1.20 | View |
| Kogan Creek | KPP_1 |
QLD1 | Turbine - Steam Super Critical | $3.14M | $0 | — | 43,371.1 | 42,140.2 | 8.1% | $52.60 | View |
| Clarke Creek Wind Farm | CLRKCWF2 |
QLD1 | Wind Turbine - Onshore | $3.14M | $0 | — | 32,023.0 | 33,547.1 | 43.0% | $0.58 | View |
| Stubbo Solar Farm | STUBSF2 |
NSW1 | Solar PV - Single axis tracking | $3.10M | $0 | — | 46,673.4 | 46,804.2 | 32.1% | $0.25 | View |
| Taralga Wind Farm | TARALGA1 |
NSW1 | Wind Turbine - Onshore | $3.09M | $0 | — | 19,607.2 | 19,599.4 | 25.5% | $0.50 | View |
| Cattle Hill Wind Farm | CTHLWF1 |
TAS1 | Wind Turbine - Onshore | $3.02M | $0 | — | 43,060.2 | 44,603.1 | 41.5% | $0.66 | View |
| Hume Dam NSW | HUMENSW |
NSW1 | Hydro - Dam | $3.00M | $0 | — | 25,329.7 | 25,962.5 | 100.0% | $1.05 | View |
| Broadsound Solar Farm | BRDDSF01 |
QLD1 | Solar PV - Single axis tracking | $2.92M | $0 | — | 45,660.3 | 51,666.3 | 17.2% | $0.27 | View |
| Collector | COLWF01 |
NSW1 | Wind Turbine - Onshore | $2.88M | $0 | — | 31,936.1 | 33,526.3 | 19.6% | $0.65 | View |
| Torrens Island B | TORRB3 |
SA1 | Turbine - Steam Sub Critical | $2.74M | $5.7k | 6,476.3 | 35,847.4 | 111,424.0 | 24.9% | $2.00 | View |
| Boco Rock Wind Farm | BOCORWF1 |
NSW1 | Wind Turbine - Onshore | $2.72M | $0 | — | 26,853.4 | 27,566.3 | 33.0% | $0.00 | View |
| John Butters | JBUTTERS |
TAS1 | Hydro - Dam | $2.71M | $25.8k | 11,721.0 | 26,950.7 | 78,384.0 | 26.0% | $0.00 | View |
| Uranquinty | URANQ13 |
NSW1 | Turbine - OCGT | $2.71M | $0 | — | 3,818.5 | 109,279.7 | 3.1% | $128.50 | View |
| Limondale Solar Farm 1 | LIMOSF11 |
NSW1 | Solar PV - Single axis tracking | $2.69M | $0 | — | 40,729.3 | 43,931.0 | 24.6% | $0.25 | View |
| Bodangora Wind Farm | BODWF1 |
NSW1 | Wind Turbine - Onshore | $2.68M | $0 | — | 26,345.0 | 26,354.7 | 32.3% | $0.68 | View |
| Gullen Range Wind Farm | GULLRWF1 |
NSW1 | Wind Turbine - Onshore | $2.68M | $0 | — | 28,669.1 | 30,453.3 | 24.1% | $0.53 | View |
| Crudine Ridge Wind Farm | CRURWF1 |
NSW1 | Wind Turbine - Onshore | $2.63M | $0 | — | 27,877.3 | 27,957.8 | 27.3% | $0.53 | View |
| Glenellen Solar Farm | GESF1 |
NSW1 | Solar PV - Fixed | $2.61M | $0 | — | 36,129.3 | 40,568.6 | 19.3% | $0.00 | View |
| Tarraleah | TARRALEA |
TAS1 | Hydro - Dam | $2.59M | $0 | — | 42,483.1 | 42,304.8 | 65.6% | $1.00 | View |
| Eraring Big Battery | ERB01 |
NSW1 | Storage - Battery | $2.56M | $82 | 7,993.8 | -5,683.5 | 285,598.4 | -3.3% | $1.58 | View |
| Capital Wind Farm | CAPTL_WF |
NSW1 | Wind Turbine - Onshore | $2.55M | $0 | — | 18,800.3 | — | 18.6% | $0.00 | View |
| Wellington Solar Farm | WELLSF1 |
NSW1 | Solar PV - Single axis tracking | $2.47M | $0 | — | 31,905.4 | 33,127.3 | 20.5% | $0.25 | View |
| Bango 999 Wind Farm | BANGOWF2 |
NSW1 | Wind Turbine - Onshore | $2.46M | $0 | — | 20,346.8 | 20,821.0 | 33.3% | $0.00 | View |
| Reece | REECE2 |
TAS1 | Hydro - Dam | $2.42M | $120.7k | 20,355.6 | 25,060.5 | 74,830.0 | 30.1% | $1.00 | View |
| Gullen Range Wind Farm 2 | GULLRWF2 |
NSW1 | Wind Turbine - Onshore | $2.36M | $0 | — | 25,696.1 | 27,077.8 | 32.2% | $0.50 | View |
| Blowering | BLOWERNG |
NSW1 | Hydro - Dam | $2.35M | $0 | — | 17,747.1 | 17,650.3 | 30.8% | $0.00 | View |
| New England Solar Farm | NEWENSF1 |
NSW1 | Solar PV - Single axis tracking | $2.33M | $0 | — | 29,643.9 | 29,655.2 | 20.6% | $0.25 | View |
| Sunraysia Solar Farm | SUNRSF1 |
NSW1 | Solar PV - Single axis tracking | $2.31M | $0 | — | 34,877.3 | 37,062.6 | 21.2% | $0.25 | View |
| Goyder South Wind Farm 1A | GSWF1A |
SA1 | Wind Turbine - Onshore | $2.27M | $0 | — | 42,136.3 | 49,509.0 | 28.0% | $0.55 | View |
| Mount Emerald | MEWF1 |
QLD1 | Wind Turbine - Onshore | $2.25M | $0 | — | 22,388.9 | 28,971.0 | 17.2% | $0.50 | View |
| Mortlake | MORTLK11 |
VIC1 | Turbine - OCGT | $2.25M | $0 | — | 16,443.3 | 147,312.2 | 7.8% | $128.50 | View |
| Uranquinty | URANQ14 |
NSW1 | Turbine - OCGT | $2.25M | $0 | — | 3,506.4 | 104,041.1 | 2.8% | $128.50 | View |
| Musselroe Wind Farm | MUSSELR1 |
TAS1 | Wind Turbine - Onshore | $2.16M | $0 | — | 38,523.3 | 39,192.9 | 31.8% | $0.50 | View |
| New England Solar Farm | NEWENSF2 |
NSW1 | Solar PV - Single axis tracking | $2.15M | $0 | — | 27,402.6 | 27,414.3 | 19.0% | $0.25 | View |
| Kaban Wind Farm | KABANWF1 |
QLD1 | Wind Turbine - Onshore | $2.10M | $0 | — | 20,810.6 | 23,964.8 | 18.4% | $0.00 | View |
| Gunnedah Solar Farm | GNNDHSF1 |
NSW1 | Solar PV - Single axis tracking | $2.05M | $0 | — | 20,124.7 | 24,583.5 | 25.4% | $0.33 | View |
| Murra Warra Wind Farm - stage 1 | MUWAWF1 |
VIC1 | Wind Turbine - Onshore | $2.04M | $0 | — | 36,052.6 | 61,307.8 | 22.2% | $0.50 | View |
| Smithfield Energy Facility | SITHE01 |
NSW1 | Turbine - OCGT | $1.99M | $0 | — | 4,279.6 | 4,619.2 | 4.7% | $128.50 | View |
| Reece | REECE1 |
TAS1 | Hydro - Dam | $1.98M | $118.2k | 16,854.7 | 20,656.6 | 78,492.7 | 24.8% | $1.00 | View |
| Colongra | CG3 |
NSW1 | Turbine - OCGT | $1.97M | $0 | — | 6,856.6 | 121,881.4 | 5.3% | $144.24 | View |
| Mackintosh | MACKNTSH |
TAS1 | Hydro - Dam | $1.96M | $2.9k | 1,140.9 | 21,382.6 | 58,239.6 | 37.2% | $1.00 | View |
| Bastyan | BASTYAN |
TAS1 | Hydro - Dam | $1.92M | $2.9k | 1,574.5 | 22,053.3 | 53,380.0 | 38.3% | $0.00 | View |
| Woolnorth Studland Bay / Bluff Point | WOOLNTH1 |
TAS1 | Wind Turbine - Onshore | $1.90M | $0 | — | 35,010.2 | — | 35.2% | $0.53 | View |
| Goyder South Wind Farm 1B | GSWF1B1 |
SA1 | Wind Turbine - Onshore | $1.90M | $0 | — | 32,914.9 | 44,465.4 | 22.5% | $0.00 | View |
| Orana BESS | ORABESS1 |
NSW1 | Storage - Battery | $1.89M | $14.6k | 11,425.5 | -6,684.2 | 230,856.6 | -2.2% | $1.50 | View |
| Moorabool Wind Farm | MOORAWF1 |
VIC1 | Wind Turbine - Onshore | $1.83M | $0 | — | 56,755.4 | 67,803.8 | 25.3% | $0.50 | View |
| Ryan Corner Wind Farm | RYANCWF1 |
VIC1 | Wind Turbine - Onshore | $1.77M | $0 | — | 44,014.3 | 57,710.8 | 28.0% | $0.50 | View |
| Macarthur Wind Farm | MACARTH1 |
VIC1 | Wind Turbine - Onshore | $1.77M | $0 | — | 52,924.1 | 71,569.1 | 17.5% | $0.50 | View |
| Crookwell 2 Wind Farm | CROOKWF2 |
NSW1 | Wind Turbine - Onshore | $1.77M | $0 | — | 18,729.7 | 20,164.7 | 27.1% | $0.69 | View |
| Coleambally Solar Farm | COLEASF1 |
NSW1 | Solar PV - Single axis tracking | $1.71M | $0 | — | 22,016.9 | 25,130.1 | 20.3% | $0.00 | View |
| Aldoga Solar Farm | ALDGASF1 |
QLD1 | Solar PV - Single axis tracking | $1.71M | $0 | — | 41,510.4 | 66,132.9 | 14.9% | $0.00 | View |
| Golden Plains Wind Farm West | GPWFWST2 |
VIC1 | Wind Turbine - Onshore | $1.71M | $0 | — | 30,507.0 | 68,124.6 | 7.6% | $0.53 | View |
| Braemar | BRAEMAR1 |
QLD1 | Turbine - OCGT | $1.67M | $0 | — | 9,318.6 | 129,539.9 | 6.9% | $133.75 | View |
| Golden Plains Wind Farm East | GPWFEST1 |
VIC1 | Wind Turbine - Onshore | $1.66M | $0 | — | 25,209.9 | 53,968.3 | 14.1% | $0.00 | View |
| Suntop Solar Farm | SUNTPSF1 |
NSW1 | Solar PV - Single axis tracking | $1.65M | $0 | — | 23,715.0 | 26,457.6 | 22.0% | $0.25 | View |
| Murra Warra Wind Farm - stage 2 | MUWAWF2 |
VIC1 | Wind Turbine - Onshore | $1.64M | $0 | — | 38,019.1 | 55,450.2 | 25.3% | $0.50 | View |
| Uranquinty | URANQ11 |
NSW1 | Turbine - OCGT | $1.64M | $0 | — | 2,317.8 | 56,726.1 | 1.9% | $128.50 | View |
| Broadwater | BWTR1 |
NSW1 | Turbine - Steam Sub Critical | $1.63M | $0 | — | 12,785.6 | — | 46.7% | $124.22 | View |
| Lincoln Gap Wind Farm - stage 1 | LGAPWF1 |
SA1 | Wind Turbine - Onshore | $1.59M | $0 | — | 22,773.0 | 28,146.9 | 25.1% | $0.50 | View |
| Granville Harbour Wind Farm | GRANWF1 |
TAS1 | Wind Turbine - Onshore | $1.56M | $0 | — | 32,485.3 | 32,323.5 | 40.4% | $0.66 | View |
| Columboola Solar Farm | COLUMSF1 |
QLD1 | Solar PV - Single axis tracking | $1.55M | $0 | — | 29,460.0 | 29,479.3 | 18.8% | $0.32 | View |
| Poatina | POAT110 |
TAS1 | Hydro - Dam | $1.52M | $290.3k | 19,499.2 | 19,937.1 | 42,214.2 | 27.7% | $1.00 | View |
| Moranbah North | MBAHNTH |
QLD1 | Reciprocating Engine - Spark ignition | $1.52M | $0 | — | 15,972.6 | — | 34.7% | $57.00 | View |
| Gunning Wind Farm | GUNNING1 |
NSW1 | Wind Turbine - Onshore | $1.50M | $0 | — | 10,996.7 | 11,491.1 | 32.8% | $0.50 | View |
| Uranquinty | URANQ12 |
NSW1 | Turbine - OCGT | $1.45M | $0 | — | 3,040.4 | 59,682.3 | 2.4% | $128.50 | View |
| Woodlawn Wind Farm | WOODLWN1 |
NSW1 | Wind Turbine - Onshore | $1.44M | $0 | — | 9,456.1 | 9,455.0 | 27.2% | $0.50 | View |
| Supernode BESS | SNB02 |
QLD1 | Storage - Battery | $1.42M | $11.9k | 7,380.8 | -3,416.5 | 165,918.6 | -1.8% | $1.50 | View |
| Edenvale Solar Park | EDENVSF1 |
QLD1 | Solar PV - Single axis tracking | $1.42M | $0 | — | 26,768.8 | 26,825.0 | 20.7% | $0.00 | View |
| Woolooga Solar Farm | WOOLGSF1 |
QLD1 | Solar PV - Single axis tracking | $1.41M | $0 | — | 22,761.8 | 26,680.7 | 14.2% | $0.25 | View |
| Waubra | WAUBRAWF |
VIC1 | Wind Turbine - Onshore | $1.36M | $0 | — | 33,631.6 | — | 24.3% | $0.50 | View |
| Walla Walla Solar Farm | WLWLSF1 |
NSW1 | Solar PV - Single axis tracking | $1.35M | $0 | — | 13,943.3 | 34,813.0 | 12.7% | $0.25 | View |
| Walla Walla Solar Farm | WLWLSF2 |
NSW1 | Solar PV - Single axis tracking | $1.35M | $0 | — | 13,983.7 | 35,736.2 | 12.8% | $0.25 | View |
| Golden Plains Wind Farm West | GPWFWST1 |
VIC1 | Wind Turbine - Onshore | $1.35M | $0 | — | 33,210.9 | 55,067.7 | 8.3% | $0.53 | View |
| Metz Solar Farm | METZSF1 |
NSW1 | Solar PV - Single axis tracking | $1.34M | $0 | — | 18,841.5 | 19,033.0 | 19.4% | $0.25 | View |
| Templers B BESS | TEMPB1 |
SA1 | Storage - Battery | $1.33M | $0 | — | -1,612.4 | 54,128.8 | -2.0% | $1.50 | View |
| Golden Plains Wind Farm East | GPWFEST2 |
VIC1 | Wind Turbine - Onshore | $1.33M | $0 | — | 21,954.2 | 51,814.8 | 11.7% | $0.50 | View |
| Waratah Super Battery | WTAHB1 |
NSW1 | Storage - Battery | $1.31M | $0 | — | -8,240.0 | 432,198.0 | -1.3% | $1.50 | View |
| Condong | CONDONG1 |
NSW1 | Turbine - Steam Sub Critical | $1.31M | $0 | — | 10,739.0 | — | 49.7% | $112.12 | View |
| Hillston Sun Farm | HILLSTN1 |
NSW1 | Solar PV - Single axis tracking | $1.30M | $0 | — | 17,030.1 | 19,058.5 | 21.5% | $0.00 | View |
| Blyth BESS | BLYTHB1 |
SA1 | Storage - Battery | $1.30M | $50.6k | 44,387.2 | -5,070.2 | 130,110.0 | -3.5% | $4.86 | View |
| Snowtown Wind Farm | SNOWTWN1 |
SA1 | Wind Turbine - Onshore | $1.30M | $0 | — | 20,131.9 | 27,178.5 | 28.3% | $0.50 | View |
| Snowtown S2 Wind Farm | SNOWSTH1 |
SA1 | Wind Turbine - Onshore | $1.29M | $0 | — | 32,045.0 | 32,733.7 | 35.3% | $0.74 | View |
| Kareeya | KAREEYA3 |
QLD1 | Hydro - Run of River | $1.26M | $1.6k | 1,370.4 | 13,697.3 | 15,797.5 | 88.1% | $1.05 | View |
| New England Solar Farm BESS | NESBESS1 |
NSW1 | Storage - Battery | $1.26M | $0 | — | -1,216.4 | 26,105.2 | -0.8% | $1.50 | View |
| Sebastopol Solar Farm | SEBSF1 |
NSW1 | Solar PV - Single axis tracking | $1.23M | $0 | — | 11,986.1 | 22,317.3 | 18.5% | $0.25 | View |
| Lincoln Gap Wind Farm - Stage 2 | LGAPWF2 |
SA1 | Wind Turbine - Onshore | $1.22M | $0 | — | 18,801.7 | 23,592.1 | 30.2% | $0.50 | View |
| Bogong / Mackay | MCKAY1 |
VIC1 | Hydro - Dam | $1.20M | $0 | — | 11,512.0 | 100,412.1 | 5.3% | $1.00 | View |
| Nevertire Solar Farm | NEVERSF1 |
NSW1 | Solar PV - Single axis tracking | $1.20M | $0 | — | 16,920.1 | 18,523.6 | 22.5% | $0.25 | View |
| Bald Hills Wind Farm | BALDHWF1 |
VIC1 | Wind Turbine - Onshore | $1.18M | $0 | — | 26,636.3 | 26,568.6 | 34.7% | $0.00 | View |
| Golden Plains Wind Farm East | GPWFEST3 |
VIC1 | Wind Turbine - Onshore | $1.17M | $0 | — | 42,925.7 | 49,017.9 | 24.0% | $0.50 | View |
| Barron Gorge | BARRON-1 |
QLD1 | Hydro - Run of River | $1.16M | $0 | — | 10,381.1 | 14,298.9 | 41.2% | $0.00 | View |
| Kareeya | KAREEYA4 |
QLD1 | Hydro - Run of River | $1.14M | $1.5k | 1,309.6 | 12,110.4 | 14,279.5 | 77.9% | $1.66 | View |
| Snowtown S2 Wind Farm | SNOWNTH1 |
SA1 | Wind Turbine - Onshore | $1.13M | $0 | — | 31,175.4 | 31,732.0 | 30.1% | $0.50 | View |
| Barron Gorge | BARRON-2 |
QLD1 | Hydro - Run of River | $1.11M | $0 | — | 9,896.0 | 14,435.6 | 39.3% | $0.00 | View |
| Goorambat East Solar Farm (ENGIE) | GOESF1 |
VIC1 | Solar PV - Single axis tracking | $1.09M | $0 | — | 57,403.2 | 65,518.1 | 31.9% | $0.25 | View |
| Wandoan South Solar Stage 2 | WANDSF2 |
QLD1 | Solar PV - Single axis tracking | $1.09M | $0 | — | 14,016.7 | 16,567.0 | 6.1% | $0.25 | View |
| Mornington BESS | MRNBESS1 |
VIC1 | Storage - Battery | $1.08M | $0 | — | -2,208.0 | 103,794.9 | -1.3% | $1.50 | View |
| Dundonnell Wind Farm | DUNDWF1 |
VIC1 | Wind Turbine - Onshore | $1.08M | $0 | — | 22,534.2 | 36,566.3 | 18.6% | $0.66 | View |
| Hallett 4 North Brown Hill | NBHWF1 |
SA1 | Wind Turbine - Onshore | $1.07M | $0 | — | 18,300.4 | 24,238.3 | 19.2% | $0.80 | View |
| Portland Wind Farm | PORTWF |
VIC1 | Wind Turbine - Onshore | $1.07M | $0 | — | 24,367.9 | — | 22.3% | $0.50 | View |
| Bulgana Green Power Hub - Wind Farm | BULGANA1 |
VIC1 | Wind Turbine - Onshore | $1.06M | $0 | — | 35,553.7 | 36,904.6 | 24.2% | $0.00 | View |
| Somerton | AGLSOM |
VIC1 | Turbine - OCGT | $1.05M | $0 | — | 8,906.1 | 64,206.0 | 7.3% | $128.50 | View |
| Crookwell 3 Wind Farm | CROOKWF3 |
NSW1 | Wind Turbine - Onshore | $1.03M | $0 | — | 11,308.0 | 12,172.6 | 27.3% | $0.76 | View |
| Wandoan South Solar Stage 1 | WANDSF1 |
QLD1 | Solar PV - Single axis tracking | $1.03M | $0 | — | 15,209.0 | 18,588.4 | 13.2% | $0.25 | View |
| Waterloo Wind Farm | WATERLWF |
SA1 | Wind Turbine - Onshore | $1.02M | $0 | — | 25,391.1 | 27,199.9 | 27.0% | $0.50 | View |
| Guthega | GUTHEGA |
NSW1 | Hydro - Dam | $1.00M | $0 | — | 8,873.8 | 40,281.5 | 20.5% | $1.05 | View |
| Mortlake South Wind Farm | MRTLSWF1 |
VIC1 | Wind Turbine - Onshore | $1.00M | $0 | — | 34,806.8 | 36,747.2 | 30.7% | $0.50 | View |
| Lake Bonney 2 Wind Farm | LKBONNY2 |
SA1 | Wind Turbine - Onshore | $989.8k | $0 | — | 20,128.8 | 28,910.7 | 17.6% | $0.86 | View |
| Hawkesdale Wind Farm | HD1WF1 |
VIC1 | Wind Turbine - Onshore | $980.0k | $0 | — | 20,309.5 | 28,568.8 | 29.2% | $0.00 | View |
| Mt Gellibrand Wind Farm | MTGELWF1 |
VIC1 | Wind Turbine - Onshore | $969.1k | $0 | — | 26,320.6 | 27,764.5 | 26.4% | $0.50 | View |
| Willogoleche Wind Farm | WGWF1 |
SA1 | Wind Turbine - Onshore | $968.1k | $0 | — | 23,562.6 | 25,045.1 | 27.3% | $0.50 | View |
| Trevallyn | TREVALLN |
TAS1 | Hydro - Dam | $959.1k | $10.9k | 438.0 | 11,533.9 | 67,937.6 | 17.2% | $1.00 | View |
| Bomen Solar Farm | BOMENSF1 |
NSW1 | Solar PV - Single axis tracking | $955.5k | $0 | — | 11,670.9 | 19,345.3 | 13.4% | $0.25 | View |
| West Wyalong Solar Farm | WSTWYSF1 |
NSW1 | Solar PV - Single axis tracking | $952.3k | $0 | — | 9,487.8 | 14,617.7 | 12.5% | $0.25 | View |
| Nyngan Solar Plant | NYNGAN1 |
NSW1 | Solar PV - Fixed | $951.2k | $0 | — | 12,725.4 | 14,170.5 | 17.3% | $0.20 | View |
| Daydream Solar Farm | DAYDSF1 |
QLD1 | Solar PV - Single axis tracking | $939.7k | $0 | — | 20,196.7 | 24,208.2 | 16.7% | $0.00 | View |
| Beryl Solar Farm | BERYLSF1 |
NSW1 | Solar PV - Single axis tracking | $935.5k | $0 | — | 13,681.6 | 13,791.5 | 19.3% | $0.25 | View |
| Munna Creek Solar Farm | MUCRKSF1 |
QLD1 | Solar PV - Single axis tracking | $916.1k | $0 | — | 18,107.1 | 19,025.6 | 16.3% | $0.25 | View |
| Gunsynd Solar Farm | GUSF1 |
QLD1 | Solar PV - Fixed | $908.8k | $0 | — | 15,811.6 | 16,697.5 | 23.4% | $0.00 | View |
| Kareeya | KAREEYA2 |
QLD1 | Hydro - Run of River | $897.6k | $1.3k | 1,178.4 | 10,414.9 | 12,417.2 | 67.0% | $1.00 | View |
| Gangarri Solar Farm | GANGARR1 |
QLD1 | Solar PV - Single axis tracking | $894.9k | $0 | — | 15,995.2 | 16,788.8 | 13.7% | $0.26 | View |
| Victorian Big Battery | VBB1 |
VIC1 | Storage - Battery | $893.7k | $9.1k | 6,473.9 | -2,835.0 | 120,337.5 | -1.3% | $1.50 | View |
| Ararat Wind Farm | ARWF1 |
VIC1 | Wind Turbine - Onshore | $890.2k | $0 | — | 36,296.6 | 36,896.1 | 21.0% | $0.00 | View |
| Kennedy Energy Park - Phase 1 - Wind | KEPWF1 |
QLD1 | Wind Turbine - Onshore | $880.0k | $0 | — | 8,904.7 | 10,836.5 | 28.6% | $0.68 | View |
| Swanbank BESS | SWANBBF1 |
QLD1 | Storage - Battery | $873.1k | $0 | — | -2,217.7 | 116,740.3 | -1.2% | $1.50 | View |
| Clare Solar Farm | CLARESF1 |
QLD1 | Solar PV - Single axis tracking | $872.2k | $0 | — | 16,020.6 | 21,726.0 | 20.2% | $0.00 | View |
| Liddell BESS | LDBESS1 |
NSW1 | Storage - Battery | $871.5k | $19.0k | 33,673.7 | -5,333.4 | 221,830.1 | -1.5% | $1.50 | View |
| Berrybank Wind Farm | BRYB1WF1 |
VIC1 | Wind Turbine - Onshore | $870.7k | $0 | — | 40,639.9 | 41,537.4 | 31.3% | $0.50 | View |
| Rangebank BESS | RANGEB1 |
VIC1 | Storage - Battery | $868.0k | $86 | 23.4 | -1,898.7 | 106,588.2 | -1.3% | $1.50 | View |
| Hornsdale Wind Farm Stage 2 | HDWF2 |
SA1 | Wind Turbine - Onshore | $854.3k | $0 | 0.4 | 27,190.5 | 27,182.7 | 36.9% | $0.69 | View |
| Yarranlea Solar Farm | YARANSF1 |
QLD1 | Solar PV - Single axis tracking | $849.2k | $0 | — | 13,191.2 | 14,916.3 | 15.1% | $0.25 | View |
| Cullerin Range Wind Farm | CULLRGWF |
NSW1 | Wind Turbine - Onshore | $848.2k | $0 | — | 6,525.9 | — | 30.2% | $0.68 | View |
| Hornsdale Wind Farm Stage 1 | HDWF1 |
SA1 | Wind Turbine - Onshore | $847.6k | $0 | — | 26,609.5 | 26,599.3 | 36.1% | $0.50 | View |
| Jemalong Solar | JEMALNG1 |
NSW1 | Solar PV - Single axis tracking | $840.2k | $0 | — | 9,069.8 | 11,595.1 | 22.9% | $0.32 | View |
| Hornsdale Wind Farm Stage 3 | HDWF3 |
SA1 | Wind Turbine - Onshore | $836.8k | $0 | — | 28,204.8 | 28,194.7 | 35.0% | $0.68 | View |
| Hallett Stage 1 Brown Hill | HALLWF1 |
SA1 | Wind Turbine - Onshore | $815.4k | $0 | — | 14,430.7 | 20,179.0 | 21.2% | $0.71 | View |
| Mannum BESS | MANNUMB1 |
SA1 | Storage - Battery | $805.4k | $21.6k | 10,449.7 | -2,069.9 | 67,323.2 | -2.9% | $1.50 | View |
| Port Augusta Renewable Energy Park - Wind | PAREPW1 |
SA1 | Wind Turbine - Onshore | $798.0k | $0 | — | 19,764.8 | 25,589.9 | 13.7% | $0.50 | View |
| Lilyvale Solar Farm | LILYSF1 |
QLD1 | Solar PV - Single axis tracking | $787.8k | $0 | — | 11,748.0 | 15,025.1 | 13.8% | $0.25 | View |
| Torrens Island BESS | TIB1 |
SA1 | Storage - Battery | $782.2k | $28.2k | 113,123.6 | -3,138.5 | 93,930.4 | -1.7% | $1.50 | View |
| Sun Metals Corporation Solar Farm | SMCSF1 |
QLD1 | Solar PV - Fixed | $774.8k | $0 | — | 14,879.5 | 21,565.7 | 14.5% | $0.00 | View |
| Haughton Solar Farm Stage 1 | HAUGHT11 |
QLD1 | Solar PV - Single axis tracking | $753.0k | $0 | — | 15,547.8 | 22,464.5 | 16.3% | $0.00 | View |
| Finley Solar Farm | FINLYSF1 |
NSW1 | Solar PV - Single axis tracking | $751.7k | $0 | — | 11,379.7 | 13,280.1 | 9.7% | $0.25 | View |
| Hallett Stage 2 Hallett Hill | HALLWF2 |
SA1 | Wind Turbine - Onshore | $731.6k | $0 | — | 12,727.7 | 17,739.8 | 24.8% | $0.00 | View |
| Yendon Wind Farm | YENDWF1 |
VIC1 | Wind Turbine - Onshore | $729.3k | $0 | — | 19,378.6 | 24,559.7 | 18.6% | $0.50 | View |
| West Kiewa | WKIEWA1 |
VIC1 | Hydro - Dam | $728.2k | $0 | — | 7,973.5 | 31,401.5 | 32.6% | $10.00 | View |
| Ross River Solar Farm | RRSF1 |
QLD1 | Solar PV - Single axis tracking | $724.4k | $0 | — | 15,756.2 | 22,103.3 | 17.1% | $0.25 | View |
| Moura Solar Farm | MOUSF1 |
QLD1 | Solar PV - Single axis tracking | $715.6k | $0 | — | 13,896.9 | 14,669.0 | 19.5% | $0.25 | View |
| Koorangie Energy Storage System | KESSB1 |
VIC1 | Storage - Battery | $714.4k | $0 | — | -1,287.0 | 86,178.2 | -1.0% | $1.50 | View |
| Tarong BESS - Stanwell | TARBESS1 |
QLD1 | Storage - Battery | $711.4k | $15.7k | 85,372.2 | -1,553.2 | 96,555.0 | -0.7% | $1.50 | View |
| Dundonnell Wind Farm | DUNDWF3 |
VIC1 | Wind Turbine - Onshore | $706.9k | $0 | — | 23,116.4 | 25,379.0 | 26.4% | $0.53 | View |
| Darling Downs Solar Farm | DDSF1 |
QLD1 | Solar PV - Fixed | $705.2k | $0 | — | 14,032.8 | 14,297.6 | 16.1% | $0.28 | View |
| Western Downs Battery - Stage 1 And 2 | WDBESS1 |
QLD1 | Storage - Battery | $690.8k | $27.3k | 14,834.5 | -2,559.3 | 155,807.4 | -1.4% | $1.58 | View |
| Meadowbank | MEADOWBK |
TAS1 | Hydro - Dam | $689.1k | $22.7k | 632.1 | 9,286.7 | 29,380.0 | 32.2% | $1.00 | View |
| Clermont Solar Farm | CLERMSF1 |
QLD1 | Solar PV - Single axis tracking | $678.7k | $0 | — | 11,549.8 | 13,078.9 | 17.3% | $0.34 | View |
| Limondale BESS | LIMBESS1 |
NSW1 | Storage - Battery | $676.7k | $4.0k | 924.3 | -1,562.7 | 35,185.9 | -4.3% | $1.50 | View |
| New England Solar Farm BESS | NESBESS2 |
NSW1 | Storage - Battery | $662.2k | $0 | — | -799.8 | 18,660.1 | -0.6% | $1.50 | View |
| Crowlands Wind Farm | CROWLWF1 |
VIC1 | Wind Turbine - Onshore | $656.7k | $0 | — | 15,583.1 | 20,323.6 | 27.1% | $0.68 | View |
| Clements Gap - BESS | CGBESS01 |
SA1 | Storage - Battery | $656.1k | $0 | — | -979.2 | 35,311.8 | -2.3% | $1.58 | View |
| German Creek | GERMCRK |
QLD1 | Reciprocating Engine - Spark ignition | $646.0k | $0 | — | 7,268.9 | — | 22.4% | $122.81 | View |
| Tribute | TRIBUTE |
TAS1 | Hydro - Dam | $645.3k | $2.3k | 1,068.8 | 6,223.8 | 14,366.6 | 10.4% | $1.00 | View |
| Mt Mercer Wind Farm | MERCER01 |
VIC1 | Wind Turbine - Onshore | $644.4k | $0 | — | 17,607.4 | 26,060.2 | 18.6% | $0.50 | View |
| Wattle Point | WPWF |
SA1 | Wind Turbine - Onshore | $635.1k | $0 | — | 11,927.0 | 16,536.4 | 18.3% | $0.50 | View |
| Eildon | EILDON2 |
VIC1 | Hydro - Dam | $622.4k | $0 | — | 8,256.0 | 35,550.0 | 17.0% | $1.00 | View |
| Clements Gap Wind Farm | CLEMGPWF |
SA1 | Wind Turbine - Onshore | $618.1k | $0 | — | 11,887.9 | 12,637.1 | 29.1% | $0.80 | View |
| Kiamal Solar Farm - Stage 1 | KIAMSF1 |
VIC1 | Solar PV - Single axis tracking | $617.0k | $0 | — | 38,053.5 | 44,645.6 | 26.4% | $0.00 | View |
| Colongra | CG1 |
NSW1 | Turbine - OCGT | $616.1k | $0 | — | 833.6 | 121,430.5 | 0.6% | $197.00 | View |
| Cathedral Rocks | CATHROCK |
SA1 | Wind Turbine - Onshore | $613.6k | $0 | — | 9,630.2 | 14,404.4 | 21.6% | $0.53 | View |
| Bluegrass Solar Farm | BLUEGSF1 |
QLD1 | Solar PV - Single axis tracking | $612.6k | $0 | — | 13,650.3 | 13,642.8 | 12.8% | $0.29 | View |
| Yarwun 1 | YARWUN_1 |
QLD1 | Turbine - CCGT | $612.3k | $0 | — | 6,530.3 | 23,642.2 | 5.0% | $84.30 | View |
| Berrybank Wind Farm | BRYB2WF2 |
VIC1 | Wind Turbine - Onshore | $611.6k | $0 | — | 21,027.6 | 24,223.7 | 26.7% | $0.65 | View |
| Devils Gate | DEVILS_G |
TAS1 | Hydro - Dam | $609.0k | $49.0k | 5,381.3 | 5,839.1 | 45,637.3 | 13.5% | $1.00 | View |
| Rugby Run Solar Farm | RUGBYR1 |
QLD1 | Solar PV - Single axis tracking | $601.2k | $0 | — | 10,736.2 | 12,316.2 | 22.9% | $0.25 | View |
| Wyalong Solar Farm | WYASF1 |
NSW1 | Solar PV - Single axis tracking | $599.4k | $0 | — | 5,999.2 | 10,581.0 | 13.4% | $0.25 | View |
| Tamar Valley Peaking | TVPP104 |
TAS1 | Turbine - OCGT | $598.9k | $0 | — | 5,617.4 | 23,250.2 | 13.5% | $128.50 | View |
| Quorn Park Solar Hybrid | QPSFB1 |
NSW1 | Solar PV - Single axis tracking | $597.6k | $0 | — | 7,778.8 | 15,588.1 | 11.2% | $0.26 | View |
| Braemar 2 Power Station | BRAEMAR6 |
QLD1 | Turbine - OCGT | $594.7k | $0 | — | 3,182.8 | 78,102.9 | 2.6% | $133.36 | View |
| Bundaberg Solar Farm | BUSF1 |
QLD1 | Solar PV - Single axis tracking | $588.7k | $0 | — | 11,182.2 | 11,460.7 | 19.9% | $14.55 | View |
| Moree Solar Farm | MOREESF1 |
NSW1 | Solar PV - Single axis tracking | $586.7k | $0 | — | 7,799.4 | 8,276.5 | 19.3% | $0.25 | View |
| Repulse | REPULSE |
TAS1 | Hydro - Dam | $579.6k | $0 | — | 7,361.2 | — | 36.5% | $1.00 | View |
| Mt Millar Wind Farm | MTMILLAR |
SA1 | Wind Turbine - Onshore | $579.1k | $0 | — | 10,122.4 | 13,817.2 | 19.5% | $0.50 | View |
| Fisher | FISHER |
TAS1 | Hydro - Dam | $577.1k | $27.5k | 5,683.2 | 6,915.7 | 32,122.6 | 22.2% | $1.05 | View |
| Eildon | EILDON1 |
VIC1 | Hydro - Dam | $557.0k | $0 | — | 6,091.4 | 36,261.0 | 12.5% | $1.05 | View |
| Limondale Solar Farm 2 | LIMOSF21 |
NSW1 | Solar PV - Single axis tracking | $554.6k | $0 | — | 5,927.3 | 6,392.5 | 28.4% | $0.25 | View |
| Swanbank E GT | SWAN_E |
QLD1 | Turbine - CCGT | $550.1k | $0 | — | 4,185.6 | 4,722.1 | 1.5% | $2.00 | View |
| Cherry Tree Wind Farm | CHYTWF1 |
VIC1 | Wind Turbine - Onshore | $535.1k | $0 | — | 9,305.7 | 11,039.0 | 22.4% | $0.53 | View |
| Greenbank BESS | GREENB1 |
QLD1 | Storage - Battery | $532.9k | $36.1k | 49,959.9 | -1,858.0 | 101,314.5 | -1.3% | $1.54 | View |
| Glenrowan West Solar Farm | GLRWNSF1 |
VIC1 | Solar PV - Single axis tracking | $525.0k | $0 | — | 13,779.8 | 26,860.7 | 14.5% | $0.32 | View |
| Broken Hill Solar Plant | BROKENH1 |
NSW1 | Solar PV - Fixed | $519.4k | $0 | — | 8,250.7 | 9,312.6 | 21.6% | $0.28 | View |
| Numurkah Solar Farm | NUMURSF1 |
VIC1 | Solar PV - Single axis tracking | $515.5k | $0 | — | 14,714.1 | 22,460.6 | 20.2% | $0.25 | View |
| Supernode BESS | SNB01 |
QLD1 | Storage - Battery | $495.8k | $17.0k | 17,249.8 | -2,218.8 | 164,784.8 | -1.2% | $1.50 | View |
| Goonumbla Solar Farm | GOONSF1 |
NSW1 | Solar PV - Single axis tracking | $486.3k | $0 | — | 6,195.5 | 11,871.4 | 12.3% | $0.25 | View |
| Colongra | CG2 |
NSW1 | Turbine - OCGT | $481.2k | $0 | — | 1,317.6 | 122,777.1 | 1.0% | $135.55 | View |
| Griffith Solar Farm | GRIFSF1 |
NSW1 | Solar PV - Single axis tracking | $476.1k | $0 | — | 5,439.4 | — | 27.8% | $0.35 | View |
| Condamine A | CPSA |
QLD1 | Turbine - CCGT | $473.0k | $0 | — | 2,719.1 | 3,328.2 | 4.3% | $95.40 | View |
| Elaine Wind Farm | ELAINWF1 |
VIC1 | Wind Turbine - Onshore | $472.8k | $0 | — | 13,024.8 | 17,566.5 | 21.6% | $0.53 | View |
| LaTrobe Valley BESS | LVES1 |
VIC1 | Storage - Battery | $471.3k | $8.0k | 164,427.1 | -1,316.9 | 62,368.2 | -1.8% | $1.54 | View |
| Hornsdale Power Reserve Unit 1 | HPR1 |
SA1 | Storage - Battery | $468.5k | $6.9k | 4,164.4 | -1,449.4 | 43,119.5 | -1.3% | $1.50 | View |
| Shoalhaven | SHGEN |
NSW1 | Storage - Pumped hydro | $459.2k | $0 | — | 4,150.1 | 23,774.2 | 2.3% | $1.20 | View |
| Corowa Solar Farm | CRWASF1 |
NSW1 | Solar PV - Single axis tracking | $457.5k | $0 | — | 5,105.1 | 7,427.6 | 19.7% | $0.33 | View |
| Salt Creek Wind Farm | SALTCRK1 |
SA1 | Wind Turbine - Onshore | $448.4k | $0 | — | 7,392.0 | 13,912.8 | 19.0% | $0.50 | View |
| Susan River Solar Farm | SRSF1 |
QLD1 | Solar PV - Single axis tracking | $443.7k | $0 | — | 8,503.9 | 9,022.6 | 13.9% | $0.25 | View |
| Oakey 2 Solar Farm | OAKEY2SF |
QLD1 | Solar PV - Single axis tracking | $443.6k | $0 | — | 7,718.7 | 8,399.3 | 19.3% | $0.25 | View |
| Wagga North Solar Farm | WAGGNSF1 |
NSW1 | Solar PV - Single axis tracking | $432.4k | $0 | — | 5,332.7 | 10,375.2 | 13.3% | $0.25 | View |
| Lake Bonney 1 Wind Farm | LKBONNY1 |
SA1 | Wind Turbine - Onshore | $428.3k | $0 | — | 9,141.6 | 12,912.2 | 15.8% | $0.79 | View |
| Terang BESS | TRGBESS1 |
VIC1 | Storage - Battery | $424.9k | $35.4k | 14,099.0 | -4,426.2 | 62,873.4 | -6.1% | $1.50 | View |
| Colongra | CG4 |
NSW1 | Turbine - OCGT | $400.5k | $0 | — | 390.7 | 121,750.4 | 0.3% | $194.33 | View |
| Whitsunday Solar Farm | WHITSF1 |
QLD1 | Solar PV - Single axis tracking | $398.7k | $0 | — | 7,179.6 | 9,758.6 | 17.3% | $0.25 | View |
| Kiata Wind Farm | KIATAWF1 |
VIC1 | Wind Turbine - Onshore | $397.4k | $0 | — | 8,725.2 | 10,544.4 | 39.0% | $0.68 | View |
| Wunghnu Solar Farm | WUNUSF1 |
VIC1 | Solar PV - Single axis tracking | $392.8k | $0 | — | 8,786.3 | 17,489.0 | 13.1% | $0.25 | View |
| Oakey Power Station | OAKEY1 |
QLD1 | Turbine - OCGT | $390.5k | $0 | — | 1,815.5 | 31,128.6 | 1.5% | $128.50 | View |
| Girgarre Solar Farm | GIRGSF |
VIC1 | Solar PV - Single axis tracking | $390.4k | $0 | — | 12,483.8 | 18,260.6 | 18.5% | $0.00 | View |
| Williamsdale BESS | WILLBES1 |
NSW1 | Storage - Battery | $385.0k | $1.1k | 65,234.8 | -1,411.7 | 108,237.5 | -0.8% | $1.50 | View |
| Hallett 5 The Bluff WF | BLUFF1 |
SA1 | Wind Turbine - Onshore | $384.6k | $0 | — | 7,018.8 | 9,991.5 | 18.6% | $0.77 | View |
| Glenrowan Solar Farm | GLENSF1 |
VIC1 | Solar PV - Single axis tracking | $379.9k | $0 | — | 24,699.5 | 25,886.0 | 27.2% | $0.25 | View |
| Ladbroke Grove | LADBROK2 |
SA1 | Turbine - OCGT | $377.9k | $0 | — | 2,873.3 | 24,366.4 | 10.0% | $145.06 | View |
| Parkes Solar Farm | PARSF1 |
NSW1 | Solar PV - Single axis tracking | $377.6k | $0 | — | 4,831.8 | 9,335.4 | 13.6% | $0.25 | View |
| Junee Solar Farm | JUNEESF1 |
NSW1 | Solar PV - Single axis tracking | $367.9k | $0 | — | 3,527.7 | 6,687.9 | 13.6% | $0.00 | View |
| Oakey Power Station | OAKEY2 |
QLD1 | Turbine - OCGT | $367.5k | $0 | — | 1,747.4 | 19,370.5 | 1.4% | $128.50 | View |
| Childers Solar Farm | CHILDSF1 |
QLD1 | Solar PV - Single axis tracking | $367.2k | $0 | — | 6,720.2 | 7,084.1 | 14.5% | $0.34 | View |
| Kingaroy Solar Farm | KINGASF1 |
QLD1 | Solar PV - Single axis tracking | $366.2k | $0 | — | 6,214.2 | 6,468.3 | 21.6% | $0.25 | View |
| Western Downs Gas Peaking Plant - KCI | WDBESS2 |
QLD1 | Turbine - CCGT | $365.8k | $118.5k | 50,730.0 | -5,878.7 | 161,442.2 | -2.0% | $2.00 | View |
| Smithfield BESS | SMTHBES1 |
NSW1 | Storage - Battery | $363.3k | $12.7k | 106,522.4 | -1,218.4 | 39,201.4 | -2.0% | $1.50 | View |
| Hamilton Solar Farm | HAMISF1 |
QLD1 | Solar PV - Single axis tracking | $359.2k | $0 | — | 6,831.8 | 8,714.6 | 16.5% | $18.64 | View |
| Brendale BESS | BRNDBES1 |
QLD1 | Storage - Battery | $353.7k | $63.9k | 17,842.8 | -4,729.7 | 134,989.2 | -3.2% | $1.58 | View |
| Cluny | CLUNY |
TAS1 | Hydro - Dam | $352.1k | $0 | — | 4,556.7 | — | 33.3% | $1.00 | View |
| Oaklands Hill Wind Farm | OAKLAND1 |
VIC1 | Wind Turbine - Onshore | $346.8k | $0 | — | 11,521.5 | 14,248.1 | 23.8% | $0.50 | View |
| Ladbroke Grove | LADBROK1 |
SA1 | Turbine - OCGT | $337.9k | $0 | — | 2,512.1 | 24,589.5 | 8.7% | $153.02 | View |
| Lemonthyme / Wilmot | LEM_WIL |
TAS1 | Hydro - Dam | $333.4k | $6.7k | 2,279.4 | 3,560.2 | 22,250.4 | 6.1% | $1.00 | View |
| Riverina Energy Storage System 1 | RESS1 |
NSW1 | Storage - Battery | $329.2k | $322 | 124.3 | -546.0 | 33,160.1 | -1.3% | $1.50 | View |
| Mulwala Solar Farm | MULWASF1 |
NSW1 | Solar PV - Single axis tracking | $326.2k | $0 | — | 3,924.6 | 5,349.1 | 17.6% | $0.25 | View |
| Hayman Solar Farm | HAYMSF1 |
QLD1 | Solar PV - Single axis tracking | $325.1k | $0 | — | 6,745.8 | 9,636.0 | 16.2% | $0.34 | View |
| Lancaster Solar Farm | LANCSF1 |
VIC1 | Solar PV - Single axis tracking | $321.7k | $0 | — | 8,813.1 | 14,961.4 | 11.5% | $0.25 | View |
| Broadsound Solar Farm | BRDDBES1 |
QLD1 | Solar PV - Single axis tracking | $309.6k | $35.3k | 15,365.9 | -2,974.5 | 111,940.0 | -1.1% | $0.27 | View |
| Rocky Point Sugar Mill Cogeneration Plant | RPCG |
QLD1 | Other - Other | $307.6k | $0 | — | 3,145.4 | — | 14.6% | $117.00 | View |
| Canunda | CNUNDAWF |
SA1 | Wind Turbine - Onshore | $295.3k | $0 | — | 5,604.5 | 8,934.9 | 16.9% | $0.50 | View |
| Braemar | BRAEMAR2 |
QLD1 | Turbine - OCGT | $288.9k | $0 | — | 1,593.9 | 128,785.3 | 1.2% | $130.94 | View |
| Butlers Gorge | BUTLERSG |
TAS1 | Hydro - Dam | $281.3k | $0 | — | 4,492.1 | — | 51.1% | $1.00 | View |
| Karadoc Solar Farm | KARSF1 |
VIC1 | Solar PV - Single axis tracking | $280.9k | $0 | — | 16,777.0 | 21,207.7 | 22.3% | $0.00 | View |
| Bungala Two Solar Farm | BNGSF2 |
SA1 | Solar PV - Single axis tracking | $267.5k | $0 | — | 10,343.7 | 26,186.1 | 10.6% | $0.33 | View |
| Quarantine | QPS5 |
SA1 | Turbine - OCGT | $267.3k | $0 | — | 1,824.0 | 86,506.6 | 2.0% | $209.05 | View |
| Starfish Hill | STARHLWF |
SA1 | Wind Turbine - Onshore | $252.9k | $0 | — | 5,768.0 | 5,774.4 | 24.3% | $0.50 | View |
| Dundonnell Wind Farm | DUNDWF2 |
VIC1 | Wind Turbine - Onshore | $252.1k | $0 | — | 7,871.1 | 9,330.6 | 23.7% | $0.66 | View |
| Collinsville PV | CSPVPS1 |
QLD1 | Solar PV - Fixed | $249.4k | $0 | — | 5,092.3 | 6,466.2 | 16.6% | $0.28 | View |
| Wallgrove Grid Battery project | WALGRV1 |
NSW1 | Storage - Battery | $246.6k | $2.4k | 75,353.4 | -391.1 | 23,681.4 | -1.1% | $1.50 | View |
| Wemen Solar Farm | WEMENSF1 |
VIC1 | Solar PV - Single axis tracking | $244.9k | $0 | — | 15,074.1 | 21,216.3 | 21.5% | $0.25 | View |
| Newport | NPS |
VIC1 | Turbine - Steam Sub Critical | $238.6k | $0 | — | 1,819.2 | 2,540.0 | 0.5% | $2.00 | View |
| Yatpool Solar Farm | YATSF1 |
VIC1 | Solar PV - Single axis tracking | $234.4k | $0 | — | 10,140.4 | 12,336.0 | 15.0% | $0.25 | View |
| Clover | CLOVER |
VIC1 | Hydro - Dam | $231.9k | $0 | — | 2,420.6 | — | 11.6% | $1.17 | View |
| Mortlake | MORTLK12 |
VIC1 | Turbine - OCGT | $230.0k | $0 | — | 1,699.6 | 157,607.2 | 0.8% | $128.50 | View |
| Yambuk | YAMBUKWF |
VIC1 | Wind Turbine - Onshore | $227.9k | $0 | — | 5,269.7 | — | 24.4% | $0.50 | View |
| Maryrorough Solar Farm | MARYRSF1 |
QLD1 | Solar PV - Single axis tracking | $225.7k | $0 | — | 3,975.2 | 4,389.3 | 16.0% | $0.25 | View |
| Mokoan Solar Farm (LightsourceBP) | MOKOSF1 |
VIC1 | Solar PV - Single axis tracking | $224.1k | $0 | — | 6,402.2 | 11,250.2 | 19.3% | $0.25 | View |
| Hazelwood Battery Energy Storage System (HBESS) | HBESS1 |
VIC1 | Storage - Battery | $220.9k | $16.5k | 7,733.7 | -3,711.7 | 80,695.1 | -2.6% | $1.87 | View |
| Challicum Hills | CHALLHWF |
VIC1 | Wind Turbine - Onshore | $220.4k | $0 | — | 5,908.2 | — | 15.6% | $0.53 | View |
| Braemar | BRAEMAR3 |
QLD1 | Turbine - OCGT | $219.6k | $0 | — | 4,015.1 | 4,087.8 | 3.0% | $128.50 | View |
| Tailem Bend Stage 2 Solar Project | TB2SF1 |
SA1 | Solar PV - Single axis tracking | $219.2k | $0 | — | 6,609.7 | 18,869.1 | 8.7% | $0.25 | View |
| Warwick Solar Farm | WARWSF1 |
QLD1 | Solar PV - Single axis tracking | $218.5k | $0 | — | 3,296.3 | 3,744.5 | 14.3% | $0.25 | View |
| Lake Bonney 3 Wind Farm | LKBONNY3 |
SA1 | Wind Turbine - Onshore | $215.5k | $0 | — | 4,523.4 | 6,206.4 | 16.1% | $0.53 | View |
| Manildra Solar Farm | MANSLR1 |
NSW1 | Solar PV - Single axis tracking | $215.0k | $0 | — | 2,477.5 | 7,755.3 | 6.9% | $0.25 | View |
| Oakey Solar Farm | OAKEY1SF |
QLD1 | Solar PV - Fixed | $210.4k | $0 | — | 3,654.2 | 4,014.1 | 20.3% | $0.20 | View |
| Dartmouth | DARTM1 |
VIC1 | Hydro - Dam | $209.0k | $0 | — | 1,751.2 | 104,503.8 | 1.3% | $0.00 | View |
| Wambo Wind Farm | WAMBOWF1 |
QLD1 | Wind Turbine - Onshore | $206.2k | $0 | — | 1,200.5 | 1,200.5 | 0.7% | $0.50 | View |
| Capital Battery | CAPBES1 |
NSW1 | Storage - Battery | $202.0k | $83 | 121.4 | -879.5 | 64,854.4 | -1.2% | $1.50 | View |
| Chinchilla BESS | CHBESS1 |
QLD1 | Storage - Battery | $199.1k | $17.3k | 23,436.0 | -1,053.9 | 45,620.1 | -1.5% | $1.75 | View |
| Wandoan South BESS | WANDB1 |
QLD1 | Storage - Battery | $197.5k | $23.6k | 172,515.9 | -760.3 | 32,150.8 | -1.1% | $1.50 | View |
| Middlemount Solar Farm | MIDDLSF1 |
QLD1 | Solar PV - Single axis tracking | $197.4k | $0 | — | 3,633.5 | 4,490.1 | 19.4% | $0.25 | View |
| Winton Solar Farm | WINTSF1 |
VIC1 | Solar PV - Single axis tracking | $196.9k | $0 | — | 15,985.1 | 18,538.5 | 26.1% | $0.25 | View |
| Bannerton Solar Park | BANN1 |
VIC1 | Solar PV - Single axis tracking | $194.5k | $0 | — | 14,152.2 | 19,329.7 | 19.7% | $0.34 | View |
| Kidston Solar Project Phase One 50MW | KSP1 |
QLD1 | Solar PV - Fixed | $193.8k | $0 | — | 4,516.3 | 8,712.2 | 12.5% | $0.20 | View |
| Molong Solar Farm | MOLNGSF1 |
NSW1 | Solar PV - Single axis tracking | $191.3k | $0 | — | 2,408.5 | 5,468.3 | 9.3% | $0.25 | View |
| Tallawarra B | TALWB1 |
NSW1 | Turbine - OCGT | $190.1k | $0 | — | 817.4 | 225,671.2 | 0.4% | $128.50 | View |
| Royalla Solar Farm | ROYALLA1 |
NSW1 | Solar PV - Fixed | $185.2k | $0 | — | 1,750.5 | — | 12.2% | $0.20 | View |
| Ulinda Park BESS | ULPBESS1 |
QLD1 | Storage - Battery | $182.9k | $18.4k | 8,579.2 | -4,116.2 | 94,090.3 | -3.7% | $1.50 | View |
| Bungala One Solar Farm | BNGSF1 |
SA1 | Solar PV - Single axis tracking | $166.4k | $0 | — | 6,432.8 | 13,306.5 | 6.6% | $0.34 | View |
| Quorn Park Solar Hybrid | QPSFB2 |
NSW1 | Storage - Battery | $163.2k | $0 | — | 576.0 | 5,391.7 | 2.9% | $1.58 | View |
| Warwick Solar Farm | WARWSF2 |
QLD1 | Solar PV - Single axis tracking | $162.9k | $0 | — | 2,482.8 | 3,135.4 | 10.7% | $0.25 | View |
| Barcaldine Remote Community Solar Farm | BARCSF1 |
QLD1 | Solar PV - Single axis tracking | $160.3k | $0 | — | 2,468.9 | — | 17.1% | $0.00 | View |
| Hunter Power Station | HUNTER1 |
NSW1 | Turbine - OCGT | $158.8k | $0 | — | 1,484.5 | 1,589.6 | 0.5% | $142.99 | View |
| Longreach Solar Farm | LRSF1 |
QLD1 | Solar PV - Fixed | $156.6k | $0 | — | 2,478.9 | — | 23.0% | $0.20 | View |
| Lake Bonney Battery Energy Storage | LBB1 |
SA1 | Storage - Battery | $153.2k | $2.4k | 38,121.4 | -175.2 | 12,486.1 | -1.0% | $1.98 | View |
| Emerald Solar Park | EMERASF1 |
QLD1 | Solar PV - Single axis tracking | $147.3k | $0 | — | 4,793.9 | 11,178.5 | 9.2% | $0.25 | View |
| Kerang Hybrid | KERNGSP1 |
VIC1 | Solar PV - Single axis tracking | $144.6k | $0 | — | 2,654.3 | 6,936.9 | 2.3% | $0.26 | View |
| Bairnsdale | BDL01 |
VIC1 | Turbine - OCGT | $144.1k | $0 | — | 949.2 | 28,886.8 | 2.8% | $142.10 | View |
| Yaloak South Wind Farm | YSWF1 |
VIC1 | Wind Turbine - Onshore | $140.6k | $0 | — | 3,306.0 | — | 16.0% | $0.50 | View |
| Tailem Bend Battery Project | TB2B1 |
SA1 | Storage - Battery | $138.5k | $13.4k | 22,107.1 | -1,111.5 | 25,550.5 | -3.7% | $1.50 | View |
| Tailem Bend - Solar | TBSF1 |
SA1 | Solar PV - Fixed | $137.8k | $0 | — | 6,265.9 | 18,647.5 | 8.1% | $0.20 | View |
| Gullen Range Solar Farm | GULLRSF1 |
NSW1 | Solar PV - Fixed | $135.2k | $0 | — | 1,939.7 | 2,073.9 | 26.9% | $0.27 | View |
| Bolivar Power Station | BOLIVPS1 |
SA1 | Turbine - OCGT | $132.1k | $0 | — | 706.0 | 932.2 | 0.8% | $151.37 | View |
| Rubicon Mountain Streams | RUBICON |
VIC1 | Hydro - Dam | $120.0k | $0 | — | 2,038.5 | — | 21.0% | $1.00 | View |
| White Rock Solar Farm | WRSF1 |
NSW1 | Solar PV - Fixed | $111.4k | $0 | — | 2,056.1 | 2,055.8 | 14.3% | $0.20 | View |
| Gannawarra Solar Farm | GANNSF1 |
VIC1 | Solar PV - Single axis tracking | $109.6k | $0 | — | 10,553.7 | 11,039.4 | 26.7% | $0.34 | View |
| Cohuna Solar Farm | COHUNSF1 |
VIC1 | Solar PV - Single axis tracking | $106.5k | $0 | — | 2,400.8 | 4,042.4 | 10.7% | $0.33 | View |
| Riverina Energy Storage System 2 | RIVNB2 |
NSW1 | Storage - Battery | $105.9k | $0 | — | -527.0 | 19,905.6 | -1.1% | $1.50 | View |
| Tully Sugar Mill | TULLYSM1 |
QLD1 | Turbine - Steam Super Critical | $104.8k | $0 | — | 967.5 | — | 4.2% | $117.00 | View |
| Diapur Wind Farm | DIAPURWF1 |
VIC1 | Wind Turbine - Onshore | $99.7k | $0 | — | 2,720.2 | — | 47.2% | $0.00 | View |
| Bouldercombe Battery project | BBATTERY1 |
QLD1 | Storage - Battery | $99.5k | $2.9k | 11,878.5 | -535.6 | 27,888.6 | -1.5% | $1.64 | View |
| Mortons Lane Wind Farm | MLWF1 |
VIC1 | Wind Turbine - Onshore | $97.2k | $0 | — | 4,367.8 | — | 31.1% | $0.50 | View |
| Broken Hill GT | GB01 |
NSW1 | Turbine - OCGT | $95.2k | $0 | — | 959.5 | — | 2.7% | $2.11 | View |
| Hughenden Sun Farm | HUGSF1 |
QLD1 | Solar PV - Single axis tracking | $84.4k | $0 | — | 1,437.9 | — | 9.5% | $0.00 | View |
| Kennedy Energy Park - Phase 1 - Solar | KEPSF1 |
QLD1 | Solar PV - Single axis tracking | $73.2k | $0 | — | 1,252.0 | 1,867.4 | 11.6% | $0.34 | View |
| Osborne | OSB-AG |
SA1 | Turbine - CCGT | $70.1k | $0 | — | 695.0 | 797.0 | 0.5% | $84.30 | View |
| Roma | ROMA_8 |
QLD1 | Turbine - OCGT | $60.6k | $0 | — | 308.4 | 23,301.8 | 1.1% | $128.50 | View |
| Roma | ROMA_7 |
QLD1 | Turbine - OCGT | $59.5k | $0 | — | 300.2 | 23,879.9 | 1.0% | $128.50 | View |
| Gannawarra Energy Storage System | GANNB1 |
VIC1 | Storage - Battery | $57.7k | $0 | — | -43.8 | 2,632.3 | -0.2% | $1.98 | View |
| Jeeralang B | JLB03 |
VIC1 | Turbine - OCGT | $55.0k | $0 | — | 292.4 | 55,763.5 | 0.5% | $137.85 | View |
| Snapper Point Power Station | SNAPPER1 |
SA1 | Turbine - OCGT | $54.2k | $0 | — | 79.7 | 105,489.3 | 0.1% | $128.50 | View |
| Hunter EconomicZone | HEZ1 |
NSW1 | Reciprocating Engine - Compression ignition | $53.1k | $0 | — | 32.3 | 13,753.7 | 0.2% | $308.00 | View |
| Mannum Solar Farm 2 | MANNSF2 |
SA1 | Solar PV - Single axis tracking | $52.4k | $0 | — | 2,616.4 | 3,995.6 | 12.1% | $0.25 | View |
| Torrens Island B | TORRB4 |
SA1 | Turbine - Steam Sub Critical | $52.4k | $0 | — | 1,248.3 | 6,105.0 | 0.9% | $2.00 | View |
| Barcaldine Power Station | BARCALDN |
QLD1 | Turbine - OCGT | $48.7k | $0 | — | 247.4 | 274.4 | 0.9% | $141.78 | View |
| Ballarat Energy Storage System | BALB1 |
VIC1 | Storage - Battery | $41.1k | $0 | — | -112.0 | 5,803.8 | -0.5% | $0.00 | View |
| Adelaide Desalination Plant | ADPBA1 |
SA1 | Storage - Battery | $40.7k | $731 | 7,961.9 | -94.6 | 3,880.0 | -1.7% | $0.00 | View |
| Darlington Point Energy Storage System | DPNTB1 |
NSW1 | Storage - Battery | $38.9k | $0 | — | -190.0 | 6,934.0 | -1.1% | $0.00 | View |
| Adelaide Desalination Plant | ADPPV1 |
SA1 | Solar PV - Fixed | $34.1k | $0 | — | 1,215.9 | 3,752.9 | 15.4% | $0.00 | View |
| Port Augusta Renewable Energy Park - Solar | PAREPS1 |
SA1 | Solar PV - Fixed | $32.7k | $0 | — | 1,267.9 | 6,329.5 | 1.8% | $0.20 | View |
| Bulgana Green Power Hub - BESS | BULBES1 |
VIC1 | Storage - Battery | $30.0k | $5.1k | 2,547.4 | -662.1 | 12,189.0 | -4.6% | $1.98 | View |
| Hallett GT | AGLHAL |
SA1 | Turbine - OCGT | $24.0k | $0 | — | 500.4 | 128,922.7 | 0.3% | $100.22 | View |
| Quarantine | QPS1 |
SA1 | Turbine - OCGT | $24.0k | $0 | — | 188.2 | 20,197.0 | 0.9% | $128.50 | View |
| Quarantine | QPS3 |
SA1 | Turbine - OCGT | $22.9k | $0 | — | 181.1 | 20,501.4 | 0.9% | $128.50 | View |
| Happy Valley Reservoir | HVWWBA1 |
SA1 | Storage - Battery | $22.1k | $464 | 3,507.1 | -28.0 | 1,799.2 | -0.7% | $1.58 | View |
| Summerfield BESS | SMFBESS1 |
SA1 | Storage - Battery | $20.9k | $0 | — | 17.6 | 2,653.3 | 0.0% | $1.50 | View |
| Dalrymple BESS | DALNTH1 |
SA1 | Storage - Battery | $19.5k | $0 | — | -175.1 | 7,709.5 | -0.8% | $2.03 | View |
| Broken Hill | BHB1 |
NSW1 | Storage - Battery | $18.6k | $0 | — | -345.6 | 13,294.1 | -1.0% | $1.50 | View |
| Quarantine | QPS2 |
SA1 | Turbine - OCGT | $16.7k | $0 | — | 107.9 | 15,921.7 | 0.6% | $128.50 | View |
| Bolivar Waste Water Treatment | BOWWBA1 |
SA1 | Storage - Battery | $16.4k | $155 | 18.8 | -23.3 | 1,295.1 | -1.0% | $1.58 | View |
| Jeeralang A | JLA04 |
VIC1 | Turbine - OCGT | $15.9k | $0 | — | 95.5 | 29,589.8 | 0.3% | $177.20 | View |
| Jeeralang B | JLB02 |
VIC1 | Turbine - OCGT | $15.8k | $0 | — | 87.3 | 53,650.0 | 0.2% | $137.71 | View |
| Murray Bridge - Onkaparinga Pipeline Pump 2 | MBPS2PV1 |
SA1 | Solar PV - Single axis tracking | $15.0k | $0 | — | 447.3 | 1,341.8 | 4.5% | $0.25 | View |
| Philip Island BESS | PIBESS1 |
VIC1 | Storage - Battery | $14.7k | $3.9k | 5,545.8 | -350.4 | 2,767.4 | -9.7% | $1.50 | View |
| Christies Beach Wastewater Treatment Plant | CBWWBA1 |
SA1 | Storage - Battery | $13.8k | $155 | 20.6 | -34.7 | 1,228.2 | -2.2% | $1.50 | View |
| Mannum Adelaide Pumping Station No 2 - MAPL2 (Palmer) | MAPS2PV1 |
SA1 | Solar PV - Single axis tracking | $12.6k | $0 | — | 959.9 | 1,728.1 | 8.1% | $0.26 | View |
| Valley Power | VPGS2 |
VIC1 | Turbine - OCGT | $10.5k | $0 | — | 126.7 | 39,404.0 | 0.4% | $128.50 | View |
| Morgan To Whyalla Pipeline No 4 PS | MWPS4PV1 |
SA1 | Solar PV - Single axis tracking | $8.7k | $0 | — | 246.1 | 671.6 | 6.2% | $0.25 | View |
| Morgan To Whyalla Pipeline No 1 PS And Water Filtration Plant | MWPS1PV1 |
SA1 | Solar PV - Single axis tracking | $7.3k | $0 | — | 231.6 | 716.0 | 5.8% | $0.25 | View |
| Bell Bay Three | BBTHREE1 |
TAS1 | Turbine - OCGT | $7.2k | $0 | — | 76.2 | 17,731.2 | 0.3% | $182.63 | View |
| Summerfield BESS | SMFBESS2 |
SA1 | Storage - Battery | $6.6k | $0 | — | -234.4 | 467.9 | -0.1% | $1.50 | View |
| Happy Valley Reservoir | HVWWPV1 |
SA1 | Solar PV - Single axis tracking | $6.4k | $0 | — | 586.6 | 1,097.5 | 7.4% | $0.00 | View |
| Morgan To Whyalla Pipeline No 3 PS | MWPS3PV1 |
SA1 | Solar PV - Single axis tracking | $6.4k | $0 | — | 219.0 | 620.8 | 4.1% | $0.25 | View |
| Bolivar Waste Water Treatment | BOWWPV1 |
SA1 | Solar PV - Fixed | $6.2k | $0 | — | 684.9 | 1,215.6 | 11.5% | $0.23 | View |
| Port Stanvac 1 | PTSTAN1 |
SA1 | Reciprocating Engine - Compression ignition | $6.1k | $0 | — | 56.0 | 40,112.2 | 0.1% | $308.00 | View |
| Mannum Adelaide Pumping Station No 3 - MAPL3 (Tungkillo) | MAPS3PV1 |
SA1 | Solar PV - Single axis tracking | $6.0k | $0 | — | 493.0 | 770.3 | 4.2% | $0.25 | View |
| Jeeralang A | JLA02 |
VIC1 | Turbine - OCGT | $6.0k | $0 | — | 38.5 | 26,401.5 | 0.1% | $128.50 | View |
| LINCOLN GAP BESSBDU | LGAPBS1 |
SA1 | Storage - Battery | $5.9k | $0 | — | -31.1 | 1,273.2 | -0.4% | $1.50 | View |
| Valley Power | VPGS3 |
VIC1 | Turbine - OCGT | $5.0k | $0 | — | 64.8 | 30,174.0 | 0.2% | $128.50 | View |
| Angaston | ANGAST1 |
SA1 | Reciprocating Engine - Compression ignition | $4.9k | $0 | — | 69.4 | 31,805.1 | 0.2% | $0.00 | View |
| Valley Power | VPGS4 |
VIC1 | Turbine - OCGT | $4.5k | $0 | — | 47.2 | 37,251.4 | 0.1% | $128.50 | View |
| Bell Bay Three | BBTHREE3 |
TAS1 | Turbine - OCGT | $4.1k | $0 | — | 39.7 | 15,402.3 | 0.1% | $141.97 | View |
| Morgan To Whyalla Pipeline No 2 PS | MWPS2PV1 |
SA1 | Solar PV - Single axis tracking | $3.9k | $0 | — | 142.9 | 421.1 | 3.6% | $0.25 | View |
| Dry Creek GT | DRYCGT3 |
SA1 | Turbine - OCGT | $3.8k | $0 | — | 44.2 | 33,418.2 | 0.1% | $210.15 | View |
| Bell Bay Three | BBTHREE2 |
TAS1 | Turbine - OCGT | $2.5k | $0 | — | 43.7 | 16,359.6 | 0.2% | $137.22 | View |
| Dry Creek GT | DRYCGT1 |
SA1 | Turbine - OCGT | $1.4k | $0 | — | 27.6 | 32,224.5 | 0.1% | $141.50 | View |
| Lonsdale | LONSDALE |
SA1 | Reciprocating Engine - Compression ignition | $1.3k | $0 | — | 20.8 | 11,773.8 | 0.1% | $308.00 | View |
| Jeeralang B | JLB01 |
VIC1 | Turbine - OCGT | $156 | $0 | — | 1.4 | — | 0.0% | $128.50 | View |
| Yallourn W | YWPS2 |
VIC1 | Turbine - Steam Sub Critical | $152 | $0 | — | 1.4 | — | 0.0% | $47.20 | View |
| Mt Stuart | MSTUART1 |
QLD1 | Turbine - OCGT | $85 | $0 | — | 1.1 | 99,061.0 | 0.0% | $2.00 | View |
| Braemar 2 Power Station | BRAEMAR5 |
QLD1 | Turbine - OCGT | $24 | $0 | — | 0.3 | 17,714.0 | 0.0% | $3.14 | View |
| Mintaro GT | MINTARO |
SA1 | Turbine - OCGT | $21 | $0 | — | 0.2 | 61,083.9 | 0.0% | $128.50 | View |
| Valley Power | VPGS6 |
VIC1 | Turbine - OCGT | $0 | $0 | — | — | 37,250.6 | 0.0% | $128.50 | View |
| VSNEL2S1 | VSNEL2S1 |
$0 | $0 | — | — | — | — | — | View | ||
| Valley Power | VPGS5 |
VIC1 | Turbine - OCGT | $0 | $0 | — | — | 37,255.3 | 0.0% | $128.50 | View |
| DG_SA1 | DG_SA1 |
$0 | $0 | — | — | — | — | — | View | ||
| Uungula Wind Farm | UWF1 |
NSW1 | Wind Turbine - Onshore | $0 | $0 | — | — | — | 0.0% | $0.50 | View |
| Valley Power | VPGS1 |
VIC1 | Turbine - OCGT | $0 | $0 | — | — | 39,408.8 | 0.0% | $128.50 | View |
| DG_NSW1 | DG_NSW1 |
$0 | $0 | — | — | — | — | — | View | ||
| DG_TAS1 | DG_TAS1 |
$0 | $0 | — | — | — | — | — | View | ||
| VENUS1 | VENUS1 |
$0 | $0 | 1,066.3 | — | — | — | — | View | ||
| DG_VIC1 | DG_VIC1 |
$0 | $0 | — | — | — | — | — | View | ||
| DG_QLD1 | DG_QLD1 |
$0 | $0 | — | — | — | — | — | View | ||
| DRACAN1 | DRACAN1 |
$0 | $0 | 591.2 | — | — | — | — | View | ||
| DRHTVP01 | DRHTVP01 |
$0 | $0 | — | — | — | — | — | View | ||
| DRHTVP03 | DRHTVP03 |
$0 | $0 | — | — | — | — | — | View | ||
| DROZVP01 | DROZVP01 |
$0 | $0 | 11.1 | — | — | — | — | View | ||
| TB3B1 | TB3B1 |
$0 | $0 | — | -87.4 | 1,006.5 | — | — | View | ||
| DROZVP02 | DROZVP02 |
$0 | $0 | 0.8 | — | — | — | — | View | ||
| DROZVP03 | DROZVP03 |
$0 | $0 | 34.7 | — | — | — | — | View | ||
| DRPSTQ01 | DRPSTQ01 |
$0 | $0 | 715.3 | — | — | — | — | View | ||
| DRPSTV01 | DRPSTV01 |
$0 | $0 | 1,917.5 | — | — | — | — | View | ||
| Tarong | TARONG#3 |
QLD1 | Turbine - Steam Sub Critical | $0 | $0 | — | — | — | 0.0% | $55.48 | View |
| DRSHVN01 | DRSHVN01 |
$0 | $0 | — | — | — | — | — | View | ||
| DRSHVN02 | DRSHVN02 |
$0 | $0 | 34,529.0 | — | — | — | — | View | ||
| DRGBND04 | DRGBND04 |
$0 | $0 | 12,775.5 | — | — | — | — | View | ||
| Torrens Island B | TORRB2 |
SA1 | Turbine - Steam Sub Critical | $0 | $0 | — | — | — | 0.0% | $5.47 | View |
| DRGBND03 | DRGBND03 |
$0 | $0 | 17,596.1 | — | — | — | — | View | ||
| RT_VIC12 | RT_VIC12 |
$0 | $0 | — | — | — | — | — | View | ||
| DRACAV1 | DRACAV1 |
$0 | $0 | — | — | — | — | — | View | ||
| DRAESN3 | DRAESN3 |
$0 | $0 | 2,106.6 | — | — | — | — | View | ||
| Tamar Valley Combined Cycle | TVCC201 |
TAS1 | Turbine - CCGT | $0 | $0 | — | — | — | 0.0% | $84.30 | View |
| Tungatinah | TUNGATIN |
TAS1 | Hydro - Dam | $0 | $0 | — | — | — | 0.0% | $1.00 | View |
| DRAESS1 | DRAESS1 |
$0 | $0 | 1,972.6 | — | — | — | — | View | ||
| DRBRLV01 | DRBRLV01 |
$0 | $0 | 7,599.4 | — | — | — | — | View | ||
| DRFIIN01 | DRFIIN01 |
$0 | $0 | — | — | — | — | — | View | ||
| DRFIIN02 | DRFIIN02 |
$0 | $0 | — | — | — | — | — | View | ||
| DRGBND01 | DRGBND01 |
$0 | $0 | 3,872.8 | — | — | — | — | View | ||
| DRGBND02 | DRGBND02 |
$0 | $0 | 1,224.1 | — | — | — | — | View | ||
| DRSHVQ01 | DRSHVQ01 |
$0 | $0 | 2,538.0 | — | — | — | — | View | ||
| VSQHT1V1 | VSQHT1V1 |
$0 | $0 | — | — | — | — | — | View | ||
| ASDESA1 | ASDESA1 |
$0 | $0 | — | — | — | — | — | View | ||
| ASNBRL1 | ASNBRL1 |
$0 | $0 | 12,766.0 | — | — | — | — | View | ||
| ASNENC1 | ASNENC1 |
$0 | $0 | 5,458.3 | — | — | — | — | View | ||
| ASPAPM01 | ASPAPM01 |
$0 | $0 | — | — | — | — | — | View | ||
| ASPBSC01 | ASPBSC01 |
$0 | $0 | — | — | — | — | — | View | ||
| ASPSTV01 | ASPSTV01 |
$0 | $0 | 19.8 | — | — | — | — | View | ||
| ASQEEV1 | ASQEEV1 |
$0 | $0 | — | — | — | — | — | View | ||
| ASQENC1 | ASQENC1 |
$0 | $0 | 1,249.3 | — | — | — | — | View | ||
| WOOLES1 | WOOLES1 |
$0 | $0 | — | -680.3 | 18,931.0 | — | — | View | ||
| ASRMGE01 | ASRMGE01 |
$0 | $0 | 8.5 | — | — | — | — | View | ||
| ASNAES1 | ASNAES1 |
$0 | $0 | 93.6 | — | — | — | — | View | ||
| ASGENE01 | ASGENE01 |
$0 | $0 | — | — | — | — | — | View | ||
| DRVISB01 | DRVISB01 |
$0 | $0 | — | — | — | — | — | View | ||
| APD01 | APD01 |
$0 | $0 | 75,029.4 | — | — | — | — | View | ||
| ASACLE01 | ASACLE01 |
$0 | $0 | 4,176.8 | — | — | — | — | View | ||
| ASDEVI01 | ASDEVI01 |
$0 | $0 | 6,695.8 | — | — | — | — | View | ||
| ASDLBY01 | ASDLBY01 |
$0 | $0 | — | — | — | — | — | View | ||
| ASENGV01 | ASENGV01 |
$0 | $0 | — | — | — | — | — | View | ||
| ASENGY01 | ASENGY01 |
$0 | $0 | — | — | — | — | — | View | ||
| Townsville Power Station | YABULU2 |
QLD1 | Turbine - CCGT | $0 | $0 | — | — | — | 0.0% | $84.30 | View |
| Townsville Power Station | YABULU |
QLD1 | Turbine - CCGT | $0 | $0 | — | — | — | 0.0% | $84.30 | View |
| ASRMGE02 | ASRMGE02 |
$0 | $0 | 8.6 | — | — | — | — | View | ||
| WNSF1 | WNSF1 |
$0 | $0 | — | 3,044.1 | — | — | — | View | ||
| Bayswater | BW03 |
NSW1 | Turbine - Steam Sub Critical | $0 | $0 | — | — | — | 0.0% | $28.68 | View |
| WAMBOWF2 | WAMBOWF2 |
$0 | $0 | — | 25,961.0 | 25,948.5 | — | — | View | ||
| Cethana | CETHANA |
TAS1 | Hydro - Dam | $0 | $0 | — | — | — | 0.0% | $1.09 | View |
| CRWARP1 | CRWARP1 |
$0 | $0 | — | 31,667.7 | 35,494.7 | — | — | View | ||
| W/HOE#2 | W/HOE#2 |
$0 | $0 | 1,506.9 | 24,313.3 | 134,392.2 | — | — | View | ||
| W/HOE#1 | W/HOE#1 |
$0 | $0 | 444.3 | 18,759.3 | 105,328.9 | — | — | View | ||
| VSVEL2S1 | VSVEL2S1 |
$0 | $0 | — | — | — | — | — | View | ||
| VSSSH1S1 | VSSSH1S1 |
$0 | $0 | — | — | — | — | — | View | ||
| VSSSE1V1 | VSSSE1V1 |
$0 | $0 | — | — | — | — | — | View | ||
| BUNGAMB1 | BUNGAMB1 |
$0 | $0 | 253,378.4 | -2,841.4 | 102,152.3 | — | — | View | ||
| Braemar 2 Power Station | BRAEMAR7 |
QLD1 | Turbine - OCGT | $0 | $0 | — | — | 64,638.6 | 0.0% | $132.25 | View |
| ASRMGE03 | ASRMGE03 |
$0 | $0 | 8.6 | — | — | — | — | View | ||
| ASRMGE04 | ASRMGE04 |
$0 | $0 | — | — | — | — | — | View | ||
| ASRMGE05 | ASRMGE05 |
$0 | $0 | 2,510.5 | — | — | — | — | View | ||
| ASSDE1 | ASSDE1 |
$0 | $0 | — | — | — | — | — | View | ||
| ASSENC1 | ASSENC1 |
$0 | $0 | 394.3 | — | — | — | — | View | ||
| ASSERDV1 | ASSERDV1 |
$0 | $0 | — | — | — | — | — | View | ||
| ASTHYD1 | ASTHYD1 |
$0 | $0 | 5,939.2 | — | — | — | — | View | ||
| Bairnsdale | BDL02 |
VIC1 | Turbine - OCGT | $0 | $0 | — | — | — | 0.0% | $158.38 | View |
| WINNSF1 | WINNSF1 |
$0 | $0 | — | — | — | — | — | View | ||
| VSSAE1V1 | VSSAE1V1 |
$0 | $0 | 928.6 | — | — | — | — | View | ||
| DRSHVS01 | DRSHVS01 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_VIC10 | RT_VIC10 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_NSW3 | RT_NSW3 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_NSW2 | RT_NSW2 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_NSW1 | RT_NSW1 |
$0 | $0 | — | — | — | — | — | View | ||
| Dry Creek GT | DRYCGT2 |
SA1 | Turbine - OCGT | $0 | $0 | — | — | 25,132.9 | 0.0% | $135.55 | View |
| ERB02 | ERB02 |
$0 | $0 | — | -768.3 | 1,197.7 | — | — | View | ||
| Eraring GT | ERGT01 |
NSW1 | Turbine - OCGT | $0 | $0 | — | — | — | 0.0% | $96.96 | View |
| Hume Dam VIC | HUMEV |
VIC1 | Hydro - Dam | $0 | $0 | — | — | — | 0.0% | $1.54 | View |
| Hunter Power Station | HUNTER2 |
NSW1 | Turbine - OCGT | $0 | $0 | — | — | — | 0.0% | $152.46 | View |
| Quarantine | QPS4 |
SA1 | Turbine - OCGT | $0 | $0 | — | — | — | 0.0% | $128.50 | View |
| PUMP2 | PUMP2 |
$0 | $0 | — | 32,691.9 | 34,483.0 | — | — | View | ||
| RT_NSW4 | RT_NSW4 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_NSW5 | RT_NSW5 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_VIC1 | RT_VIC1 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_TAS1 | RT_TAS1 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_SA6 | RT_SA6 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_SA5 | RT_SA5 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_SA4 | RT_SA4 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_SA3 | RT_SA3 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_SA2 | RT_SA2 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_SA1 | RT_SA1 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_QLD1 | RT_QLD1 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_NSW6 | RT_NSW6 |
$0 | $0 | — | — | — | — | — | View | ||
| PUMP1 | PUMP1 |
$0 | $0 | — | 30,205.8 | 32,259.2 | — | — | View | ||
| Kareeya | KAREEYA1 |
QLD1 | Hydro - Run of River | $0 | $0 | — | — | — | 0.0% | $1.00 | View |
| Laverton North | LNGS2 |
VIC1 | Turbine - OCGT | $0 | $0 | — | — | — | 0.0% | $128.50 | View |
| Loy Yang A Power Station | LYA1 |
VIC1 | Turbine - Steam Sub Critical | $0 | $0 | — | — | — | 0.0% | $47.20 | View |
| MLB01 | MLB01 |
$0 | $0 | — | -2,957.5 | 160,549.4 | — | — | View | ||
| MLSP1 | MLSP1 |
$0 | $0 | — | 2,013.3 | — | — | — | View | ||
| Mt Piper | MP2 |
NSW1 | Turbine - Steam Sub Critical | $0 | $0 | — | — | — | 0.0% | $52.60 | View |
| Millmerran Power Plant | MPP_1 |
QLD1 | Turbine - Steam Super Critical | $0 | $0 | — | — | — | 0.0% | $52.60 | View |
| MREHA1 | MREHA1 |
$0 | $0 | 47,159.2 | -3,607.8 | 117,502.8 | — | — | View | ||
| MREHA2 | MREHA2 |
$0 | $0 | 50,060.2 | -3,902.2 | 115,103.2 | — | — | View | ||
| MREHA3 | MREHA3 |
$0 | $0 | 119,655.0 | -6,614.1 | 136,335.2 | — | — | View | ||
| Mt Stuart | MSTUART2 |
QLD1 | Turbine - OCGT | $0 | $0 | — | — | 62,387.5 | 0.0% | $148.45 | View |
| Laverton North | LNGS1 |
VIC1 | Turbine - OCGT | $0 | $0 | — | — | 119,630.8 | 0.0% | $128.50 | View |
| Lake Echo | LK_ECHO |
TAS1 | Hydro - Dam | $0 | $0 | — | — | — | 0.0% | $1.17 | View |
| Kennedy Energy Park - Phase 1 - Storage | KEPBG1 |
QLD1 | Storage - Battery | $0 | $0 | — | — | — | 0.0% | $2.03 | View |
| Port Lincoln GT | POR03 |
SA1 | Turbine - OCGT | $0 | $0 | — | — | — | 0.0% | $2.00 | View |
| Port Lincoln GT | POR01 |
SA1 | Turbine - OCGT | $0 | $0 | — | — | — | 0.0% | $2.00 | View |
| KEPBL1 | KEPBL1 |
$0 | $0 | — | — | — | — | — | View | ||
| KIDSPHG1 | KIDSPHG1 |
$0 | $0 | — | — | — | — | — | View | ||
| PLBESS1 | PLBESS1 |
$0 | $0 | — | -267.3 | 7,725.7 | — | — | View | ||
| PIONEER | PIONEER |
$0 | $0 | — | 17,794.4 | — | — | — | View | ||
| KIDSPHG2 | KIDSPHG2 |
$0 | $0 | — | — | — | — | — | View | ||
| KIDSPHL1 | KIDSPHL1 |
$0 | $0 | — | — | — | — | — | View | ||
| KIDSPHL2 | KIDSPHL2 |
$0 | $0 | — | — | — | — | — | View | ||
| Mt Stuart | MSTUART3 |
QLD1 | Turbine - OCGT | $0 | $0 | — | — | 80,855.8 | 0.0% | $2.00 | View |
| DRSHVS02 | DRSHVS02 |
$0 | $0 | 22,373.0 | — | — | — | — | View | ||
| DRXNDB04 | DRXNDB04 |
$0 | $0 | — | — | — | — | — | View | ||
| STABESS1 | STABESS1 |
$0 | $0 | — | -718.0 | 820.3 | — | — | View | ||
| DRXNDE01 | DRXNDE01 |
$0 | $0 | — | 4.5 | 5.8 | — | — | View | ||
| Snuggery | SNUG1 |
SA1 | Turbine - OCGT | $0 | $0 | — | — | — | 0.0% | $2.00 | View |
| SNOWYP | SNOWYP |
$0 | $0 | — | 26,311.1 | 26,548.6 | — | — | View | ||
| SNOWYGJP | SNOWYGJP |
$0 | $0 | 9,103.1 | — | — | — | — | View | ||
| DRXNDJ01 | DRXNDJ01 |
$0 | $0 | — | — | 0.9 | — | — | View | ||
| DRXNDW01 | DRXNDW01 |
$0 | $0 | — | — | 2.0 | — | — | View | ||
| DRXNFF01 | DRXNFF01 |
$0 | $0 | — | 2.2 | 2.2 | — | — | View | ||
| DRXNFS01 | DRXNFS01 |
$0 | $0 | — | — | — | — | — | View | ||
| DRXNQX01 | DRXNQX01 |
$0 | $0 | — | — | — | — | — | View | ||
| DRXNDA04 | DRXNDA04 |
$0 | $0 | — | — | — | — | — | View | ||
| DRXNDA03 | DRXNDA03 |
$0 | $0 | — | — | — | — | — | View | ||
| DRVIOT01 | DRVIOT01 |
$0 | $0 | 8,138.7 | — | — | — | — | View | ||
| DRVIOT02 | DRVIOT02 |
$0 | $0 | 1,568.1 | — | — | — | — | View | ||
| DRVIOT03 | DRVIOT03 |
$0 | $0 | 2,707.9 | — | — | — | — | View | ||
| DRVIOT04 | DRVIOT04 |
$0 | $0 | 75,720.4 | — | — | — | — | View | ||
| DRVIOT05 | DRVIOT05 |
$0 | $0 | 19,798.7 | — | — | — | — | View | ||
| DRVIOT06 | DRVIOT06 |
$0 | $0 | — | — | — | — | — | View | ||
| DRVIOT07 | DRVIOT07 |
$0 | $0 | — | — | — | — | — | View | ||
| DRXNAD01 | DRXNAD01 |
$0 | $0 | — | 17.5 | 25.6 | — | — | View | ||
| DRXNAE01 | DRXNAE01 |
$0 | $0 | — | — | — | — | — | View | ||
| DRXNDA01 | DRXNDA01 |
$0 | $0 | — | — | — | — | — | View | ||
| DRXNDA02 | DRXNDA02 |
$0 | $0 | — | — | — | — | — | View | ||
| DRXNSS01 | DRXNSS01 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_VIC11 | RT_VIC11 |
$0 | $0 | — | — | — | — | — | View | ||
| DRXVDX01 | DRXVDX01 |
$0 | $0 | — | — | — | — | — | View | ||
| DRXVQP01 | DRXVQP01 |
$0 | $0 | — | — | — | — | — | View | ||
| DRXVQX01 | DRXVQX01 |
$0 | $0 | — | — | — | — | — | View | ||
| DRXVQX02 | DRXVQX02 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_VIC9 | RT_VIC9 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_VIC8 | RT_VIC8 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_VIC7 | RT_VIC7 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_VIC6 | RT_VIC6 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_VIC5 | RT_VIC5 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_VIC4 | RT_VIC4 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_VIC3 | RT_VIC3 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_VIC2 | RT_VIC2 |
$0 | $0 | — | — | — | — | — | View | ||
| DRXVDP01 | DRXVDP01 |
$0 | $0 | — | — | — | — | — | View | ||
| DRXQDA01 | DRXQDA01 |
$0 | $0 | — | — | — | — | — | View | ||
| DRXVDJ01 | DRXVDJ01 |
$0 | $0 | — | — | 175.0 | — | — | View | ||
| DRXVAE01 | DRXVAE01 |
$0 | $0 | — | — | — | — | — | View | ||
| DRXSQS01 | DRXSQS01 |
$0 | $0 | — | — | — | — | — | View | ||
| DRXQQE01 | DRXQQE01 |
$0 | $0 | — | — | 353.1 | — | — | View | ||
| DRXNTM02 | DRXNTM02 |
$0 | $0 | — | — | — | — | — | View | ||
| SHPUMP | SHPUMP |
$0 | $0 | — | 5,019.2 | 5,135.7 | — | — | View | ||
| DRXNVS01 | DRXNVS01 |
$0 | $0 | — | 20.2 | 21.3 | — | — | View | ||
| Paloona | PALOONA |
TAS1 | Hydro - Dam | $-1 | $0 | — | 0.1 | — | 0.0% | $1.00 | View |
| Rowallan | ROWALLAN |
TAS1 | Hydro - Dam | $-189 | $0 | — | -3.0 | — | 0.0% | $1.00 | View |
| Jeeralang A | JLA03 |
VIC1 | Turbine - OCGT | $-438 | $0 | — | 18.4 | 29,870.3 | 0.0% | $141.46 | View |
| Jeeralang A | JLA01 |
VIC1 | Turbine - OCGT | $-439 | $0 | — | 18.4 | 29,870.3 | 0.0% | $135.55 | View |
| Wooreen Energy Storage System | WOORB1 |
VIC1 | Storage - Battery | $-1.4k | $0 | — | -21.6 | 133.1 | 0.0% | $1.50 | View |
| Queanbeyan BESS | QBYNB1 |
NSW1 | Storage - Battery | $-2.6k | $0 | — | -16.0 | 89.7 | -0.2% | $1.50 | View |