MLF-adjusted revenue, dispatch, capacity factor, and estimated SRMC from AEMO 5‑minute dispatch data. Data through 22 Sep 2026, 06:05 AEST.
Energy revenue = cleared MW × (5/60 h) × regional RRP × MLF. FCAS revenue = sum of cleared FCAS MW × (5/60 h) × regional FCAS price × MLF (raise/lower 6s, 60s, 5min, reg). FCAS volume = total FCAS enablement MWh across all services. Capacity factor = dispatched MWh ÷ (nameplate MW × period hours). SRMC from financial assumptions. Not AEMO settlement data.
| Site | DUID | Region | Tech | Energy rev. (× MLF) | FCAS rev. (× MLF) | FCAS MWh | MWh dispatch | MWh available | Capacity factor | Est. SRMC | |
|---|---|---|---|---|---|---|---|---|---|---|---|
| Eraring | ER04 |
NSW1 | Turbine - Steam Sub Critical | $1.43M | $60 | 228.4 | 14,311.7 | 14,400.0 | 82.8% | $55.48 | View |
| Eraring | ER02 |
NSW1 | Turbine - Steam Sub Critical | $1.40M | $57 | 207.0 | 13,999.9 | 14,609.2 | 81.0% | $59.45 | View |
| Bayswater | BW04 |
NSW1 | Turbine - Steam Sub Critical | $1.36M | $170 | 155.6 | 13,884.3 | 15,127.1 | 84.5% | $55.48 | View |
| Bayswater | BW01 |
NSW1 | Turbine - Steam Sub Critical | $1.32M | $102 | 100.5 | 13,476.9 | 14,575.0 | 85.1% | $53.57 | View |
| Mt Piper | MP1 |
NSW1 | Turbine - Steam Sub Critical | $1.26M | $0 | — | 12,403.2 | 15,704.2 | 70.8% | $49.24 | View |
| Vales Point B | VP5 |
NSW1 | Turbine - Steam Sub Critical | $1.11M | $3 | 11.7 | 10,511.1 | 14,565.0 | 66.4% | $52.60 | View |
| Vales Point B | VP6 |
NSW1 | Turbine - Steam Sub Critical | $1.05M | $3 | 14.2 | 10,325.8 | 12,650.0 | 65.2% | $52.60 | View |
| Millmerran Power Plant | MPP_2 |
QLD1 | Turbine - Steam Super Critical | $833.6k | $0 | — | 9,761.0 | 9,408.3 | 95.5% | $52.60 | View |
| Callide C | CPP_3 |
QLD1 | Turbine - Steam Super Critical | $683.1k | $0 | — | 8,058.6 | 9,363.3 | 79.2% | $44.41 | View |
| Callide C | CPP_4 |
QLD1 | Turbine - Steam Super Critical | $680.3k | $0 | — | 8,028.1 | 9,275.0 | 79.6% | $101.94 | View |
| Loy Yang B | LOYYB1 |
VIC1 | Turbine - Steam Sub Critical | $673.0k | $183 | 334.6 | 11,246.4 | 12,918.7 | 80.8% | $47.20 | View |
| Loy Yang B | LOYYB2 |
VIC1 | Turbine - Steam Sub Critical | $667.2k | $205 | 275.1 | 11,143.5 | 12,813.0 | 80.1% | $47.20 | View |
| Tumut 3 | TUMUT3 |
NSW1 | Hydro - Dam | $649.8k | $110 | 220.0 | 4,909.7 | 39,408.7 | 13.6% | $1.05 | View |
| Loy Yang A Power Station | LYA3 |
VIC1 | Turbine - Steam Sub Critical | $634.3k | $49 | 200.8 | 10,884.1 | 12,366.7 | 81.0% | $47.20 | View |
| Loy Yang A Power Station | LYA4 |
VIC1 | Turbine - Steam Sub Critical | $634.2k | $44 | 189.1 | 10,895.5 | 12,366.7 | 81.1% | $47.20 | View |
| Callide B | CALL_B_1 |
QLD1 | Turbine - Steam Sub Critical | $558.9k | $0 | 4.8 | 6,764.0 | 7,640.0 | 80.5% | $32.60 | View |
| Stanwell | STAN-1 |
QLD1 | Turbine - Steam Sub Critical | $558.6k | $97 | 47.1 | 6,441.7 | 7,442.9 | 73.5% | $52.60 | View |
| Loy Yang A Power Station | LYA2 |
VIC1 | Turbine - Steam Sub Critical | $551.3k | $51 | 42.1 | 10,059.2 | 10,341.7 | 79.1% | $47.20 | View |
| Callide B | CALL_B_2 |
QLD1 | Turbine - Steam Sub Critical | $549.7k | $1 | 30.0 | 6,766.3 | 7,508.3 | 80.6% | $55.48 | View |
| Tarong | TARONG#1 |
QLD1 | Turbine - Steam Sub Critical | $547.0k | $0 | 2.0 | 5,839.8 | 6,477.1 | 69.5% | $52.60 | View |
| Upper Tumut | UPPTUMUT |
NSW1 | Hydro - Dam | $546.2k | $283 | 317.8 | 4,819.6 | 12,771.0 | 32.6% | $1.00 | View |
| Stanwell | STAN-2 |
QLD1 | Turbine - Steam Sub Critical | $543.0k | $78 | 18.2 | 6,319.7 | 7,317.9 | 72.1% | $52.60 | View |
| Stanwell | STAN-3 |
QLD1 | Turbine - Steam Sub Critical | $538.1k | $0 | — | 6,266.1 | 7,347.9 | 71.5% | $52.60 | View |
| Tarong | TARONG#4 |
QLD1 | Turbine - Steam Sub Critical | $535.8k | $109 | 27.7 | 5,756.4 | 6,354.6 | 68.5% | $52.58 | View |
| Gladstone | GSTONE5 |
QLD1 | Turbine - Steam Sub Critical | $501.4k | $0 | — | 6,054.1 | 6,183.3 | 90.1% | $58.48 | View |
| Gladstone | GSTONE3 |
QLD1 | Turbine - Steam Sub Critical | $465.5k | $0 | — | 5,326.4 | 5,962.5 | 79.3% | $128.75 | View |
| Gladstone | GSTONE6 |
QLD1 | Turbine - Steam Sub Critical | $437.5k | $0 | — | 4,626.0 | 4,367.1 | 68.8% | $54.96 | View |
| Tarong North | TNPS1 |
QLD1 | Turbine - Steam Super Critical | $432.5k | $0 | — | 5,063.4 | 4,968.7 | 46.9% | $52.60 | View |
| Darling Downs | DDPS1 |
QLD1 | Turbine - CCGT | $411.2k | $0 | — | 3,400.6 | 3,419.7 | 22.0% | $3.31 | View |
| Tallawarra | TALWA1 |
NSW1 | Turbine - CCGT | $407.4k | $0 | — | 3,274.4 | 3,963.3 | 34.1% | $84.30 | View |
| Yallourn W | YWPS1 |
VIC1 | Turbine - Steam Sub Critical | $368.2k | $0 | — | 7,754.4 | 7,618.7 | 92.3% | $47.20 | View |
| Yallourn W | YWPS2 |
VIC1 | Turbine - Steam Sub Critical | $353.8k | $0 | — | 7,230.3 | 7,066.7 | 86.1% | $47.20 | View |
| Stanwell | STAN-4 |
QLD1 | Turbine - Steam Sub Critical | $351.8k | $0 | — | 4,399.3 | 4,527.1 | 50.2% | $52.60 | View |
| Rye Park Wind Farm | RYEPARK1 |
NSW1 | Wind Turbine - Onshore | $346.4k | $0 | — | 4,008.3 | 3,544.4 | 42.2% | $0.50 | View |
| Swanbank E GT | SWAN_E |
QLD1 | Turbine - CCGT | $339.6k | $0 | — | 2,669.0 | 2,836.1 | 28.9% | $2.00 | View |
| Tarong | TARONG#2 |
QLD1 | Turbine - Steam Sub Critical | $303.0k | $29 | 6.0 | 3,052.3 | 2,933.3 | 36.3% | $55.48 | View |
| Mortlake | MORTLK11 |
VIC1 | Turbine - OCGT | $260.1k | $0 | — | 2,828.4 | 6,002.2 | 40.4% | $128.50 | View |
| Stockyard Hill Wind Farm | STOCKYD1 |
VIC1 | Wind Turbine - Onshore | $254.1k | $0 | — | 4,998.1 | 4,752.8 | 39.5% | $0.50 | View |
| Clarke Creek Wind Farm | CLRKCWF1 |
QLD1 | Wind Turbine - Onshore | $238.6k | $0 | — | 2,462.6 | 3,212.5 | 29.6% | $0.00 | View |
| Eraring | ER03 |
NSW1 | Turbine - Steam Sub Critical | $237.6k | $38 | 50.2 | 3,658.1 | 4,974.2 | 21.2% | $49.77 | View |
| Tamar Valley Combined Cycle | TVCC201 |
TAS1 | Turbine - CCGT | $217.9k | $3 | 7.0 | 2,840.2 | 2,799.2 | 56.9% | $84.30 | View |
| Western Downs Green Power Hub P/L | WDGPH1 |
QLD1 | Solar PV - Single axis tracking | $213.3k | $0 | — | 3,835.5 | 3,866.0 | 40.0% | $0.32 | View |
| Silverton Wind Farm | STWF1 |
NSW1 | Wind Turbine - Onshore | $205.5k | $0 | — | 2,323.9 | 2,655.1 | 48.7% | $0.50 | View |
| Collector | COLWF01 |
NSW1 | Wind Turbine - Onshore | $196.0k | $0 | — | 2,336.9 | 2,155.2 | 42.9% | $0.65 | View |
| Pelican Point | PPCCGT |
SA1 | Turbine - CCGT | $174.3k | $0 | — | 2,456.8 | 3,042.6 | 19.4% | $84.30 | View |
| MacIntyre Wind Farm | MCINTYR1 |
QLD1 | Wind Turbine - Onshore | $167.2k | $0 | — | 2,007.4 | 1,348.9 | 9.1% | $0.58 | View |
| Orana BESS | ORABESS1 |
NSW1 | Storage - Battery | $162.2k | $13 | 42.0 | 1,418.8 | 4,679.9 | 14.3% | $1.50 | View |
| Culcairn Solar Farm | CUSF1 |
NSW1 | Solar PV - Single axis tracking | $156.0k | $0 | — | 2,285.3 | 3,478.1 | 27.2% | $0.25 | View |
| Catagunya / Liapootah / Wayatinah | LI_WY_CA |
TAS1 | Hydro - Dam | $152.8k | $31 | 77.6 | 2,496.0 | 3,862.1 | 58.9% | $1.05 | View |
| Yallourn W | YWPS4 |
VIC1 | Turbine - Steam Sub Critical | $143.4k | $0 | — | 1,822.8 | 2,150.0 | 20.3% | $47.20 | View |
| Port Augusta Renewable Energy Park - Wind | PAREPW1 |
SA1 | Wind Turbine - Onshore | $141.7k | $0 | — | 2,231.3 | 2,635.6 | 46.3% | $0.50 | View |
| Yarwun 1 | YARWUN_1 |
QLD1 | Turbine - CCGT | $134.6k | $0 | — | 1,711.4 | 1,590.0 | 39.6% | $84.30 | View |
| Murra Warra Wind Farm - stage 2 | MUWAWF2 |
VIC1 | Wind Turbine - Onshore | $133.4k | $0 | — | 1,779.4 | 2,228.2 | 35.5% | $0.50 | View |
| Goyder South Wind Farm 1A | GSWF1A |
SA1 | Wind Turbine - Onshore | $132.7k | $0 | — | 1,869.8 | 1,690.6 | 37.3% | $0.55 | View |
| Gullen Range Wind Farm | GULLRWF1 |
NSW1 | Wind Turbine - Onshore | $126.8k | $0 | — | 1,566.5 | 1,446.4 | 39.4% | $0.53 | View |
| Murra Warra Wind Farm - stage 1 | MUWAWF1 |
VIC1 | Wind Turbine - Onshore | $125.5k | $0 | — | 1,576.8 | 2,179.7 | 29.1% | $0.50 | View |
| Cattle Hill Wind Farm | CTHLWF1 |
TAS1 | Wind Turbine - Onshore | $124.9k | $0 | — | 2,717.7 | 2,607.2 | 78.6% | $0.66 | View |
| Gullen Range Wind Farm 2 | GULLRWF2 |
NSW1 | Wind Turbine - Onshore | $124.4k | $0 | — | 1,442.2 | 1,291.5 | 54.3% | $0.50 | View |
| Bango 973 Wind Farm | BANGOWF1 |
NSW1 | Wind Turbine - Onshore | $122.5k | $0 | — | 1,467.9 | 1,303.1 | 38.5% | $0.00 | View |
| Reece | REECE1 |
TAS1 | Hydro - Dam | $121.9k | $1.4k | 477.7 | 1,784.9 | 2,605.8 | 64.3% | $1.00 | View |
| Avonlie Solar Farm | AVLSF1 |
NSW1 | Solar PV - Single axis tracking | $121.3k | $0 | — | 1,759.2 | 1,764.7 | 28.8% | $0.00 | View |
| New England Solar Farm | NEWENSF1 |
NSW1 | Solar PV - Single axis tracking | $117.6k | $0 | — | 1,726.9 | 1,726.9 | 36.0% | $0.25 | View |
| Gordon | GORDON |
TAS1 | Hydro - Dam | $114.4k | $3.2k | 943.5 | 1,538.5 | 6,360.0 | 14.8% | $1.05 | View |
| Goyder South Wind Farm 1B | GSWF1B1 |
SA1 | Wind Turbine - Onshore | $113.2k | $0 | — | 1,661.1 | 1,563.6 | 34.0% | $0.00 | View |
| Uranquinty | URANQ13 |
NSW1 | Turbine - OCGT | $112.0k | $0 | — | 832.0 | 3,464.0 | 20.0% | $128.50 | View |
| Coopers Gap Wind Farm | COOPGWF1 |
QLD1 | Wind Turbine - Onshore | $111.9k | $0 | — | 1,244.5 | 1,055.0 | 11.4% | $0.68 | View |
| Reece | REECE2 |
TAS1 | Hydro - Dam | $107.9k | $442 | 306.3 | 1,715.1 | 2,318.7 | 61.8% | $1.00 | View |
| Capital Wind Farm | CAPTL_WF |
NSW1 | Wind Turbine - Onshore | $106.7k | $0 | — | 1,059.7 | — | 31.4% | $0.00 | View |
| Bulgana Green Power Hub - Wind Farm | BULGANA1 |
VIC1 | Wind Turbine - Onshore | $104.3k | $0 | — | 2,126.2 | 2,033.8 | 43.3% | $0.00 | View |
| New England Solar Farm | NEWENSF2 |
NSW1 | Solar PV - Single axis tracking | $101.5k | $0 | — | 1,488.6 | 1,488.6 | 31.0% | $0.25 | View |
| Glenellen Solar Farm | GESF1 |
NSW1 | Solar PV - Fixed | $100.7k | $0 | — | 1,345.8 | 1,615.3 | 21.6% | $0.00 | View |
| Taralga Wind Farm | TARALGA1 |
NSW1 | Wind Turbine - Onshore | $100.6k | $0 | — | 1,185.5 | 1,149.3 | 46.3% | $0.50 | View |
| Uranquinty | URANQ14 |
NSW1 | Turbine - OCGT | $98.5k | $0 | — | 726.9 | 3,457.0 | 17.5% | $128.50 | View |
| Dulacca Wind Farm | DULAWF1 |
QLD1 | Wind Turbine - Onshore | $97.6k | $0 | — | 1,207.6 | 991.6 | 29.1% | $0.53 | View |
| Barker Inlet Power Station | BARKIPS1 |
SA1 | Reciprocating Engine - Spark ignition | $97.1k | $0 | — | 1,112.1 | 4,017.1 | 22.1% | $9.00 | View |
| Wellington Solar Farm | WELLSF1 |
NSW1 | Solar PV - Single axis tracking | $96.6k | $0 | — | 1,336.0 | 1,336.0 | 25.8% | $0.25 | View |
| Crookwell 2 Wind Farm | CROOKWF2 |
NSW1 | Wind Turbine - Onshore | $96.1k | $0 | — | 1,114.7 | 1,058.2 | 48.4% | $0.69 | View |
| Eraring Big Battery | ERB01 |
NSW1 | Storage - Battery | $95.2k | $0 | — | -611.3 | 8,280.0 | -10.6% | $1.58 | View |
| Braemar 2 Power Station | BRAEMAR6 |
QLD1 | Turbine - OCGT | $94.4k | $0 | — | 663.3 | 3,503.5 | 16.0% | $133.36 | View |
| Clarke Creek Wind Farm | CLRKCWF2 |
QLD1 | Wind Turbine - Onshore | $93.5k | $0 | — | 979.9 | 923.3 | 39.4% | $0.58 | View |
| Columboola Solar Farm | COLUMSF1 |
QLD1 | Solar PV - Single axis tracking | $88.1k | $0 | — | 1,604.0 | 1,603.9 | 30.8% | $0.32 | View |
| Moorabool Wind Farm | MOORAWF1 |
VIC1 | Wind Turbine - Onshore | $87.7k | $0 | — | 1,847.1 | 1,712.4 | 24.7% | $0.50 | View |
| Musselroe Wind Farm | MUSSELR1 |
TAS1 | Wind Turbine - Onshore | $85.7k | $0 | — | 2,326.4 | 2,209.2 | 57.7% | $0.50 | View |
| Crudine Ridge Wind Farm | CRURWF1 |
NSW1 | Wind Turbine - Onshore | $85.4k | $0 | — | 988.4 | 850.6 | 29.1% | $0.53 | View |
| Blowering | BLOWERNG |
NSW1 | Hydro - Dam | $85.4k | $0 | — | 940.5 | 883.3 | 49.0% | $0.00 | View |
| Wambo Wind Farm | WAMBOWF1 |
QLD1 | Wind Turbine - Onshore | $85.2k | $0 | — | 959.0 | 831.1 | 15.9% | $0.50 | View |
| Sapphire Wind Farm | SAPHWF1 |
SA1 | Wind Turbine - Onshore | $78.6k | $0 | — | 1,299.8 | 955.3 | 20.1% | $0.50 | View |
| Supernode BESS | SNB02 |
QLD1 | Storage - Battery | $78.0k | $0 | — | -197.8 | 4,554.0 | -3.2% | $1.50 | View |
| Edenvale Solar Park | EDENVSF1 |
QLD1 | Solar PV - Single axis tracking | $76.8k | $0 | — | 1,435.8 | 1,435.7 | 33.2% | $0.00 | View |
| Bastyan | BASTYAN |
TAS1 | Hydro - Dam | $76.4k | $29 | 2.3 | 929.2 | 1,673.3 | 48.5% | $0.00 | View |
| Flyers Creek Wind Farm | FLYCRKWF |
NSW1 | Wind Turbine - Onshore | $76.2k | $0 | — | 826.1 | 663.7 | 23.7% | $0.58 | View |
| SHOAL1 | SHOAL1 |
NSW1 | $75.1k | $0 | — | 779.6 | — | 13.2% | $1.20 | View | |
| BRDDSF01 | BRDDSF01 |
QLD1 | $75.0k | $0 | — | 1,808.1 | 1,979.0 | 20.5% | $0.27 | View | |
| Waubra | WAUBRAWF |
VIC1 | Wind Turbine - Onshore | $74.8k | $0 | — | 1,552.7 | — | 33.7% | $0.50 | View |
| Tarraleah | TARRALEA |
TAS1 | Hydro - Dam | $74.8k | $0 | — | 1,637.8 | 1,511.7 | 75.8% | $1.00 | View |
| Bodangora Wind Farm | BODWF1 |
NSW1 | Wind Turbine - Onshore | $74.3k | $0 | — | 809.1 | 667.0 | 29.8% | $0.68 | View |
| Hallett 4 North Brown Hill | NBHWF1 |
SA1 | Wind Turbine - Onshore | $74.0k | $0 | — | 1,051.0 | 919.5 | 33.1% | $0.80 | View |
| Metz Solar Farm | METZSF1 |
NSW1 | Solar PV - Single axis tracking | $73.4k | $0 | — | 1,091.9 | 1,146.9 | 33.7% | $0.25 | View |
| Hornsdale Wind Farm Stage 3 | HDWF3 |
SA1 | Wind Turbine - Onshore | $71.7k | $0 | — | 1,018.5 | 898.1 | 37.9% | $0.68 | View |
| Snowtown S2 Wind Farm | SNOWSTH1 |
SA1 | Wind Turbine - Onshore | $70.7k | $0 | — | 1,170.1 | 1,093.3 | 38.7% | $0.74 | View |
| Woolooga Solar Farm | WOOLGSF1 |
QLD1 | Solar PV - Single axis tracking | $70.7k | $0 | — | 1,428.4 | 1,428.3 | 26.7% | $0.25 | View |
| Waterloo Wind Farm | WATERLWF |
SA1 | Wind Turbine - Onshore | $70.2k | $0 | — | 971.3 | 843.2 | 30.9% | $0.50 | View |
| Lincoln Gap Wind Farm - stage 1 | LGAPWF1 |
SA1 | Wind Turbine - Onshore | $68.4k | $0 | — | 1,318.5 | 1,319.5 | 43.6% | $0.50 | View |
| Ararat Wind Farm | ARWF1 |
VIC1 | Wind Turbine - Onshore | $67.6k | $0 | — | 1,752.8 | 1,696.5 | 30.4% | $0.00 | View |
| Bango 999 Wind Farm | BANGOWF2 |
NSW1 | Wind Turbine - Onshore | $67.4k | $0 | — | 787.1 | 689.9 | 38.7% | $0.00 | View |
| Hornsdale Wind Farm Stage 2 | HDWF2 |
SA1 | Wind Turbine - Onshore | $67.2k | $0 | — | 957.4 | 841.4 | 39.0% | $0.69 | View |
| Snowtown Wind Farm | SNOWTWN1 |
SA1 | Wind Turbine - Onshore | $66.5k | $0 | — | 1,115.0 | 1,032.8 | 47.1% | $0.50 | View |
| Mackintosh | MACKNTSH |
TAS1 | Hydro - Dam | $66.4k | $7.5k | 805.1 | 1,286.5 | 1,877.1 | 67.1% | $1.00 | View |
| Crookwell 3 Wind Farm | CROOKWF3 |
NSW1 | Wind Turbine - Onshore | $66.3k | $0 | — | 736.6 | 694.7 | 53.3% | $0.76 | View |
| White Rock Wind Farm - Stage 1 | WRWF1 |
NSW1 | Wind Turbine - Onshore | $65.7k | $0 | — | 857.9 | 722.9 | 20.4% | $0.50 | View |
| Stubbo Solar Farm | STUBSF1 |
NSW1 | Solar PV - Single axis tracking | $65.0k | $0 | — | 860.0 | 1,017.6 | 18.1% | $0.25 | View |
| Boco Rock Wind Farm | BOCORWF1 |
NSW1 | Wind Turbine - Onshore | $64.2k | $0 | — | 676.6 | 676.5 | 24.9% | $0.00 | View |
| Wandoan South Solar Stage 1 | WANDSF1 |
QLD1 | Solar PV - Single axis tracking | $63.6k | $0 | — | 1,188.9 | 1,199.8 | 31.0% | $0.25 | View |
| Torrens Island B | TORRB4 |
SA1 | Turbine - Steam Sub Critical | $62.5k | $306 | 351.9 | 1,379.4 | 2,393.7 | 28.7% | $2.00 | View |
| Hornsdale Wind Farm Stage 1 | HDWF1 |
SA1 | Wind Turbine - Onshore | $61.4k | $0 | — | 878.2 | 777.2 | 35.7% | $0.50 | View |
| Cherry Tree Wind Farm | CHYTWF1 |
VIC1 | Wind Turbine - Onshore | $60.3k | $0 | — | 991.1 | 1,091.8 | 71.7% | $0.53 | View |
| Willogoleche Wind Farm | WGWF1 |
SA1 | Wind Turbine - Onshore | $59.9k | $0 | — | 949.8 | 870.4 | 33.0% | $0.50 | View |
| Woodlawn Wind Farm | WOODLWN1 |
NSW1 | Wind Turbine - Onshore | $59.1k | $0 | — | 656.3 | 612.0 | 56.6% | $0.50 | View |
| Devils Gate | DEVILS_G |
TAS1 | Hydro - Dam | $58.9k | $598 | 117.0 | 1,056.0 | 1,413.3 | 73.3% | $1.00 | View |
| Bluegrass Solar Farm | BLUEGSF1 |
QLD1 | Solar PV - Single axis tracking | $57.7k | $0 | — | 1,036.4 | 1,036.4 | 29.2% | $0.29 | View |
| Hillston Sun Farm | HILLSTN1 |
NSW1 | Solar PV - Single axis tracking | $54.7k | $0 | — | 774.9 | 774.9 | 29.4% | $0.00 | View |
| Gangarri Solar Farm | GANGARR1 |
QLD1 | Solar PV - Single axis tracking | $54.3k | $0 | — | 951.3 | 978.1 | 24.5% | $0.26 | View |
| Swanbank BESS | SWANBBF1 |
QLD1 | Storage - Battery | $53.8k | $0 | — | -9.0 | 3,708.3 | -0.1% | $1.50 | View |
| Wellington North Solar Farm (Lightsource) | WELNSF1 |
NSW1 | Solar PV - Single axis tracking | $53.6k | $0 | — | 741.9 | 742.7 | 7.1% | $0.25 | View |
| Western Downs Battery - Stage 1 And 2 | WDBESS1 |
QLD1 | Storage - Battery | $52.2k | $814 | 322.0 | -46.7 | 4,759.1 | -0.8% | $1.58 | View |
| Hume Dam NSW | HUMENSW |
NSW1 | Hydro - Dam | $51.8k | $0 | — | 556.6 | 532.1 | 80.0% | $1.05 | View |
| Gunnedah Solar Farm | GNNDHSF1 |
NSW1 | Solar PV - Single axis tracking | $51.2k | $0 | — | 744.3 | 1,098.6 | 28.2% | $0.33 | View |
| Somerton | AGLSOM |
VIC1 | Turbine - OCGT | $50.7k | $0 | — | 524.3 | 1,610.0 | 12.9% | $128.50 | View |
| Darlington Point Solar Farm | DARLSF1 |
NSW1 | Solar PV - Single axis tracking | $50.7k | $0 | — | 707.3 | 1,350.2 | 10.7% | $0.33 | View |
| Gunning Wind Farm | GUNNING1 |
NSW1 | Wind Turbine - Onshore | $49.3k | $0 | — | 555.5 | 497.9 | 49.8% | $0.50 | View |
| Barron Gorge | BARRON-1 |
QLD1 | Hydro - Run of River | $49.1k | $0 | — | 483.0 | 478.5 | 57.5% | $0.00 | View |
| Lincoln Gap Wind Farm - Stage 2 | LGAPWF2 |
SA1 | Wind Turbine - Onshore | $48.5k | $0 | — | 980.8 | 976.5 | 47.3% | $0.50 | View |
| Snowtown S2 Wind Farm | SNOWNTH1 |
SA1 | Wind Turbine - Onshore | $48.1k | $0 | — | 898.0 | 867.1 | 26.0% | $0.50 | View |
| Munna Creek Solar Farm | MUCRKSF1 |
QLD1 | Solar PV - Single axis tracking | $47.1k | $0 | — | 943.8 | 943.8 | 25.5% | $0.25 | View |
| Sunraysia Solar Farm | SUNRSF1 |
NSW1 | Solar PV - Single axis tracking | $45.9k | $0 | — | 646.8 | 1,422.8 | 11.8% | $0.25 | View |
| Clements Gap Wind Farm | CLEMGPWF |
SA1 | Wind Turbine - Onshore | $45.2k | $0 | — | 711.1 | 644.3 | 52.3% | $0.80 | View |
| Golden Plains Wind Farm East | GPWFEST1 |
VIC1 | Wind Turbine - Onshore | $45.0k | $0 | — | 684.5 | 1,168.8 | 11.5% | $0.00 | View |
| Gunsynd Solar Farm | GUSF1 |
QLD1 | Solar PV - Fixed | $44.7k | $0 | — | 856.1 | 856.0 | 37.9% | $0.00 | View |
| Yarranlea Solar Farm | YARANSF1 |
QLD1 | Solar PV - Single axis tracking | $44.2k | $0 | — | 805.0 | 804.9 | 27.7% | $0.25 | View |
| Crowlands Wind Farm | CROWLWF1 |
VIC1 | Wind Turbine - Onshore | $41.3k | $0 | — | 917.6 | 849.0 | 47.8% | $0.68 | View |
| Tarong BESS - Stanwell | TARBESS1 |
QLD1 | Storage - Battery | $39.9k | $85 | 4,637.6 | -160.3 | 5,700.0 | -2.2% | $1.50 | View |
| Granville Harbour Wind Farm | GRANWF1 |
TAS1 | Wind Turbine - Onshore | $39.5k | $0 | — | 1,157.2 | 1,154.0 | 43.2% | $0.66 | View |
| Hallett Stage 1 Brown Hill | HALLWF1 |
SA1 | Wind Turbine - Onshore | $39.5k | $0 | — | 613.2 | 559.3 | 27.0% | $0.71 | View |
| Meadowbank | MEADOWBK |
TAS1 | Hydro - Dam | $39.4k | $21 | 8.8 | 610.7 | 949.6 | 63.6% | $1.00 | View |
| Guthega | GUTHEGA |
NSW1 | Hydro - Dam | $39.3k | $0 | — | 286.3 | 1,501.7 | 19.9% | $1.05 | View |
| Cethana | CETHANA |
TAS1 | Hydro - Dam | $39.0k | $420 | 95.7 | 452.8 | 2,097.9 | 22.2% | $1.09 | View |
| Wattle Point | WPWF |
SA1 | Wind Turbine - Onshore | $38.4k | $0 | — | 836.9 | 787.6 | 38.4% | $0.50 | View |
| Supernode BESS | SNB01 |
QLD1 | Storage - Battery | $38.3k | $0 | — | -112.0 | 4,550.0 | -1.8% | $1.50 | View |
| Mount Emerald | MEWF1 |
QLD1 | Wind Turbine - Onshore | $38.3k | $0 | — | 431.4 | 1,255.4 | 10.0% | $0.50 | View |
| Walla Walla Solar Farm | WLWLSF2 |
NSW1 | Solar PV - Single axis tracking | $37.7k | $0 | — | 397.3 | 1,293.1 | 10.9% | $0.25 | View |
| Moura Solar Farm | MOUSF1 |
QLD1 | Solar PV - Single axis tracking | $37.6k | $0 | — | 782.9 | 808.8 | 32.9% | $0.25 | View |
| Walla Walla Solar Farm | WLWLSF1 |
NSW1 | Solar PV - Single axis tracking | $37.4k | $0 | — | 394.9 | 1,290.5 | 10.8% | $0.25 | View |
| Rangebank BESS | RANGEB1 |
VIC1 | Storage - Battery | $36.7k | $0 | — | 184.1 | 3,430.3 | 3.8% | $1.50 | View |
| Dundonnell Wind Farm | DUNDWF1 |
VIC1 | Wind Turbine - Onshore | $36.6k | $0 | — | 977.6 | 949.7 | 24.2% | $0.66 | View |
| Western Downs Gas Peaking Plant - KCI | WDBESS2 |
QLD1 | Turbine - CCGT | $36.3k | $1.8k | 1,456.2 | -186.1 | 4,635.8 | -1.9% | $2.00 | View |
| Limondale Solar Farm 1 | LIMOSF11 |
NSW1 | Solar PV - Single axis tracking | $36.2k | $0 | — | 534.6 | 1,759.3 | 9.7% | $0.25 | View |
| West Wyalong Solar Farm | WSTWYSF1 |
NSW1 | Solar PV - Single axis tracking | $35.8k | $0 | — | 570.9 | 793.4 | 22.6% | $0.25 | View |
| Koorangie Energy Storage System | KESSB1 |
VIC1 | Storage - Battery | $35.1k | $0 | — | 290.8 | 3,049.2 | 6.5% | $1.50 | View |
| Kaban Wind Farm | KABANWF1 |
QLD1 | Wind Turbine - Onshore | $34.9k | $0 | — | 368.0 | 778.7 | 9.8% | $0.00 | View |
| Bomen Solar Farm | BOMENSF1 |
NSW1 | Solar PV - Single axis tracking | $34.8k | $0 | — | 556.5 | 798.1 | 19.2% | $0.25 | View |
| Brendale BESS | BRNDBES1 |
QLD1 | Storage - Battery | $34.7k | $665 | 298.0 | -199.6 | 4,246.0 | -4.1% | $1.58 | View |
| Wollar Solar Farm | WOLARSF1 |
NSW1 | Solar PV - Single axis tracking | $34.7k | $0 | — | 508.2 | 509.2 | 7.6% | $0.25 | View |
| Moranbah North | MBAHNTH |
QLD1 | Reciprocating Engine - Spark ignition | $34.4k | $0 | — | 414.8 | — | 27.1% | $57.00 | View |
| Sebastopol Solar Farm | SEBSF1 |
NSW1 | Solar PV - Single axis tracking | $34.0k | $0 | — | 526.7 | 852.7 | 24.4% | $0.25 | View |
| Broadwater | BWTR1 |
NSW1 | Turbine - Steam Sub Critical | $34.0k | $0 | — | 364.5 | — | 40.0% | $124.22 | View |
| Lemonthyme / Wilmot | LEM_WIL |
TAS1 | Hydro - Dam | $33.7k | $1.2k | 70.3 | 419.8 | 706.7 | 21.4% | $1.00 | View |
| Yendon Wind Farm | YENDWF1 |
VIC1 | Wind Turbine - Onshore | $33.6k | $0 | — | 526.0 | 715.1 | 15.2% | $0.50 | View |
| Lilyvale Solar Farm | LILYSF1 |
QLD1 | Solar PV - Single axis tracking | $33.5k | $0 | — | 683.0 | 684.1 | 24.0% | $0.25 | View |
| Darling Downs Solar Farm | DDSF1 |
QLD1 | Solar PV - Fixed | $33.2k | $0 | — | 698.3 | 750.3 | 24.0% | $0.28 | View |
| Wandoan South Solar Stage 2 | WANDSF2 |
QLD1 | Solar PV - Single axis tracking | $32.3k | $0 | — | 562.4 | 562.4 | 7.3% | $0.25 | View |
| Woolnorth Studland Bay / Bluff Point | WOOLNTH1 |
TAS1 | Wind Turbine - Onshore | $32.1k | $0 | — | 1,056.7 | — | 31.9% | $0.53 | View |
| Clermont Solar Farm | CLERMSF1 |
QLD1 | Solar PV - Single axis tracking | $32.0k | $0 | — | 648.5 | 660.7 | 29.2% | $0.34 | View |
| Moree Solar Farm | MOREESF1 |
NSW1 | Solar PV - Single axis tracking | $31.6k | $0 | — | 465.2 | 483.1 | 34.6% | $0.25 | View |
| Greenbank BESS | GREENB1 |
QLD1 | Storage - Battery | $31.6k | $89 | 1,730.8 | 13.9 | 4,408.0 | 0.3% | $1.54 | View |
| Coleambally Solar Farm | COLEASF1 |
NSW1 | Solar PV - Single axis tracking | $30.8k | $0 | — | 433.0 | 433.0 | 12.0% | $0.00 | View |
| Emerald Solar Park | EMERASF1 |
QLD1 | Solar PV - Single axis tracking | $30.4k | $0 | — | 619.0 | 635.4 | 35.8% | $0.25 | View |
| Jemalong Solar | JEMALNG1 |
NSW1 | Solar PV - Single axis tracking | $29.8k | $0 | — | 412.5 | 412.5 | 31.2% | $0.32 | View |
| Finley Solar Farm | FINLYSF1 |
NSW1 | Solar PV - Single axis tracking | $29.3k | $0 | — | 415.7 | 580.4 | 10.7% | $0.25 | View |
| Bogong / Mackay | MCKAY1 |
VIC1 | Hydro - Dam | $28.7k | $0 | — | 330.0 | 6,625.0 | 4.6% | $1.00 | View |
| West Kiewa | WKIEWA1 |
VIC1 | Hydro - Dam | $28.4k | $0 | — | 435.4 | 1,457.5 | 53.4% | $10.00 | View |
| Templers B BESS | TEMPB1 |
SA1 | Storage - Battery | $28.2k | $0 | — | 304.4 | 310.7 | 11.4% | $1.50 | View |
| Susan River Solar Farm | SRSF1 |
QLD1 | Solar PV - Single axis tracking | $27.3k | $0 | — | 544.1 | 544.1 | 26.6% | $0.25 | View |
| Golden Plains Wind Farm East | GPWFEST3 |
VIC1 | Wind Turbine - Onshore | $26.7k | $0 | — | 857.6 | 853.8 | 14.4% | $0.50 | View |
| Berrybank Wind Farm | BRYB1WF1 |
VIC1 | Wind Turbine - Onshore | $26.4k | $0 | — | 800.5 | 781.3 | 18.5% | $0.50 | View |
| Dundonnell Wind Farm | DUNDWF3 |
VIC1 | Wind Turbine - Onshore | $26.3k | $0 | — | 745.0 | 728.9 | 25.5% | $0.53 | View |
| SHGEN | SHGEN |
NSW1 | $25.7k | $0 | — | 173.3 | 553.3 | 2.9% | $1.20 | View | |
| Bundaberg Solar Farm | BUSF1 |
QLD1 | Solar PV - Single axis tracking | $25.6k | $0 | — | 549.8 | 549.7 | 29.4% | $14.55 | View |
| Oakey 2 Solar Farm | OAKEY2SF |
QLD1 | Solar PV - Single axis tracking | $25.6k | $0 | — | 481.7 | 481.7 | 36.1% | $0.25 | View |
| Liddell BESS | LDBESS1 |
NSW1 | Storage - Battery | $25.3k | $1.3k | 550.7 | -368.8 | 9,632.0 | -3.1% | $1.50 | View |
| Repulse | REPULSE |
TAS1 | Hydro - Dam | $25.2k | $0 | — | 354.9 | — | 52.8% | $1.00 | View |
| Ulinda Park BESS | ULPBESS1 |
QLD1 | Storage - Battery | $25.1k | $445 | 180.3 | -130.8 | 3,265.2 | -3.5% | $1.50 | View |
| Elaine Wind Farm | ELAINWF1 |
VIC1 | Wind Turbine - Onshore | $24.2k | $0 | — | 352.8 | 428.1 | 17.6% | $0.53 | View |
| Ladbroke Grove | LADBROK2 |
SA1 | Turbine - OCGT | $24.1k | $0 | — | 269.3 | 925.0 | 28.0% | $145.06 | View |
| Victorian Big Battery | VBB1 |
VIC1 | Storage - Battery | $24.0k | $393 | 156.2 | 148.7 | 2,216.7 | 2.1% | $1.50 | View |
| Golden Plains Wind Farm East | GPWFEST2 |
VIC1 | Wind Turbine - Onshore | $23.8k | $0 | — | 378.3 | 786.4 | 6.1% | $0.50 | View |
| Ladbroke Grove | LADBROK1 |
SA1 | Turbine - OCGT | $23.2k | $0 | — | 258.8 | 927.5 | 27.0% | $153.02 | View |
| Torrens Island BESS | TIB1 |
SA1 | Storage - Battery | $23.0k | $686 | 3,319.0 | 15.6 | 2,163.7 | 0.3% | $1.50 | View |
| Cathedral Rocks | CATHROCK |
SA1 | Wind Turbine - Onshore | $22.5k | $0 | — | 382.4 | 351.4 | 25.7% | $0.53 | View |
| Cullerin Range Wind Farm | CULLRGWF |
NSW1 | Wind Turbine - Onshore | $22.3k | $0 | — | 256.1 | — | 35.6% | $0.68 | View |
| Limondale BESS | LIMBESS1 |
NSW1 | Storage - Battery | $22.2k | $204 | 52.5 | -55.2 | 1,104.2 | -4.6% | $1.50 | View |
| Wyalong Solar Farm | WYASF1 |
NSW1 | Solar PV - Single axis tracking | $21.4k | $0 | — | 323.4 | 532.9 | 21.6% | $0.25 | View |
| Oakey Power Station | OAKEY2 |
QLD1 | Turbine - OCGT | $21.1k | $0 | — | 137.9 | 1,502.3 | 3.3% | $128.50 | View |
| Kennedy Energy Park - Phase 1 - Wind | KEPWF1 |
QLD1 | Wind Turbine - Onshore | $20.1k | $0 | — | 206.2 | 591.6 | 19.9% | $0.68 | View |
| Corowa Solar Farm | CRWASF1 |
NSW1 | Solar PV - Single axis tracking | $19.9k | $0 | — | 280.2 | 281.8 | 32.4% | $0.33 | View |
| Childers Solar Farm | CHILDSF1 |
QLD1 | Solar PV - Single axis tracking | $19.6k | $0 | — | 384.7 | 384.7 | 24.9% | $0.34 | View |
| Berrybank Wind Farm | BRYB2WF2 |
VIC1 | Wind Turbine - Onshore | $19.4k | $0 | — | 526.2 | 514.0 | 20.1% | $0.65 | View |
| Broken Hill Solar Plant | BROKENH1 |
NSW1 | Solar PV - Fixed | $19.4k | $0 | — | 263.1 | 356.0 | 20.7% | $0.28 | View |
| Starfish Hill | STARHLWF |
SA1 | Wind Turbine - Onshore | $18.7k | $0 | — | 294.1 | 258.6 | 37.1% | $0.50 | View |
| Macarthur Wind Farm | MACARTH1 |
VIC1 | Wind Turbine - Onshore | $18.6k | $0 | — | 1,098.5 | 1,095.5 | 10.9% | $0.50 | View |
| Suntop Solar Farm | SUNTPSF1 |
NSW1 | Solar PV - Single axis tracking | $18.5k | $0 | — | 254.7 | 254.7 | 7.1% | $0.25 | View |
| KIATAWF1 | KIATAWF1 |
VIC1 | $18.5k | $0 | — | 223.7 | 326.4 | 30.0% | $0.68 | View | |
| German Creek | GERMCRK |
QLD1 | Reciprocating Engine - Spark ignition | $17.8k | $0 | — | 232.5 | — | 21.5% | $122.81 | View |
| Rocky Point Sugar Mill Cogeneration Plant | RPCG |
QLD1 | Other - Other | $17.8k | $0 | — | 207.7 | — | 28.8% | $117.00 | View |
| Mulwala Solar Farm | MULWASF1 |
NSW1 | Solar PV - Single axis tracking | $17.5k | $0 | — | 238.9 | 238.9 | 32.1% | $0.25 | View |
| LaTrobe Valley BESS | LVES1 |
VIC1 | Storage - Battery | $17.4k | $125 | 5,824.5 | 103.4 | 2,208.3 | 4.3% | $1.54 | View |
| Oaklands Hill Wind Farm | OAKLAND1 |
VIC1 | Wind Turbine - Onshore | $16.8k | $0 | — | 362.6 | 351.0 | 22.5% | $0.50 | View |
| Mt Gellibrand Wind Farm | MTGELWF1 |
VIC1 | Wind Turbine - Onshore | $16.7k | $0 | — | 457.6 | 455.1 | 13.8% | $0.50 | View |
| Wagga North Solar Farm | WAGGNSF1 |
NSW1 | Solar PV - Single axis tracking | $16.5k | $0 | — | 267.0 | 422.0 | 20.0% | $0.25 | View |
| Kingaroy Solar Farm | KINGASF1 |
QLD1 | Solar PV - Single axis tracking | $16.4k | $0 | — | 336.2 | 388.5 | 35.0% | $0.25 | View |
| Mt Millar Wind Farm | MTMILLAR |
SA1 | Wind Turbine - Onshore | $16.3k | $0 | — | 354.7 | 345.1 | 20.4% | $0.50 | View |
| Quarantine | QPS1 |
SA1 | Turbine - OCGT | $16.1k | $0 | — | 178.6 | 640.4 | 25.7% | $128.50 | View |
| Paloona | PALOONA |
TAS1 | Hydro - Dam | $15.6k | $0 | — | 326.3 | — | 48.6% | $1.00 | View |
| Terang BESS | TRGBESS1 |
VIC1 | Storage - Battery | $15.5k | $1.3k | 588.0 | -90.2 | 2,200.7 | -3.8% | $1.50 | View |
| Williamsdale BESS | WILLBES1 |
NSW1 | Storage - Battery | $15.4k | $0 | — | 181.6 | 833.3 | 3.0% | $1.50 | View |
| Chinchilla BESS | CHBESS1 |
QLD1 | Storage - Battery | $15.4k | $9 | 413.9 | -1.6 | 1,744.9 | -0.1% | $1.75 | View |
| Ryan Corner Wind Farm | RYANCWF1 |
VIC1 | Wind Turbine - Onshore | $15.2k | $0 | — | 1,000.2 | 1,000.2 | 19.1% | $0.50 | View |
| Challicum Hills | CHALLHWF |
VIC1 | Wind Turbine - Onshore | $14.9k | $0 | — | 274.9 | — | 21.8% | $0.53 | View |
| Quarantine | QPS3 |
SA1 | Turbine - OCGT | $14.9k | $0 | — | 164.1 | 640.4 | 23.6% | $128.50 | View |
| Cluny | CLUNY |
TAS1 | Hydro - Dam | $14.6k | $0 | — | 216.5 | — | 47.5% | $1.00 | View |
| Mortlake South Wind Farm | MRTLSWF1 |
VIC1 | Wind Turbine - Onshore | $14.3k | $0 | — | 815.9 | 809.5 | 21.6% | $0.50 | View |
| Warwick Solar Farm | WARWSF1 |
QLD1 | Solar PV - Single axis tracking | $13.2k | $0 | — | 246.1 | 246.1 | 31.9% | $0.25 | View |
| Hallett 5 The Bluff WF | BLUFF1 |
SA1 | Wind Turbine - Onshore | $13.1k | $0 | — | 261.8 | 240.0 | 20.8% | $0.77 | View |
| Griffith Solar Farm | GRIFSF1 |
NSW1 | Solar PV - Single axis tracking | $12.7k | $0 | — | 179.5 | — | 27.5% | $0.35 | View |
| Daydream Solar Farm | DAYDSF1 |
QLD1 | Solar PV - Single axis tracking | $12.4k | $0 | — | 177.6 | 727.3 | 4.4% | $0.00 | View |
| John Butters | JBUTTERS |
TAS1 | Hydro - Dam | $12.3k | $857 | 244.7 | 140.6 | 3,180.0 | 4.1% | $0.00 | View |
| Bald Hills Wind Farm | BALDHWF1 |
VIC1 | Wind Turbine - Onshore | $12.1k | $0 | — | 741.9 | 740.5 | 29.0% | $0.00 | View |
| Smithfield Energy Facility | SITHE01 |
NSW1 | Turbine - OCGT | $12.0k | $0 | — | 74.6 | 74.6 | 2.5% | $128.50 | View |
| Nevertire Solar Farm | NEVERSF1 |
NSW1 | Solar PV - Single axis tracking | $12.0k | $0 | — | 169.4 | 170.8 | 6.7% | $0.25 | View |
| Oakey Solar Farm | OAKEY1SF |
QLD1 | Solar PV - Fixed | $11.7k | $0 | — | 216.9 | 216.8 | 36.1% | $0.20 | View |
| Maryrorough Solar Farm | MARYRSF1 |
QLD1 | Solar PV - Single axis tracking | $11.5k | $0 | — | 224.3 | 225.8 | 27.1% | $0.25 | View |
| Dundonnell Wind Farm | DUNDWF2 |
VIC1 | Wind Turbine - Onshore | $11.4k | $0 | — | 307.2 | 296.3 | 27.7% | $0.66 | View |
| Junee Solar Farm | JUNEESF1 |
NSW1 | Solar PV - Single axis tracking | $11.4k | $0 | — | 175.5 | 280.4 | 20.3% | $0.00 | View |
| Hawkesdale Wind Farm | HD1WF1 |
VIC1 | Wind Turbine - Onshore | $11.4k | $0 | — | 376.5 | 445.3 | 16.2% | $0.00 | View |
| Clare Solar Farm | CLARESF1 |
QLD1 | Solar PV - Single axis tracking | $11.0k | $0 | — | 211.0 | 933.6 | 8.0% | $0.00 | View |
| Capital Battery | CAPBES1 |
NSW1 | Storage - Battery | $11.0k | $0 | — | -12.9 | 1,916.7 | -0.5% | $1.50 | View |
| Hornsdale Power Reserve Unit 1 | HPR1 |
SA1 | Storage - Battery | $10.8k | $177 | 151.0 | 42.1 | 1,656.2 | 1.2% | $1.50 | View |
| Sun Metals Corporation Solar Farm | SMCSF1 |
QLD1 | Solar PV - Fixed | $10.3k | $0 | — | 131.9 | 819.8 | 3.8% | $0.00 | View |
| Warwick Solar Farm | WARWSF2 |
QLD1 | Solar PV - Single axis tracking | $9.9k | $0 | — | 185.5 | 185.5 | 24.1% | $0.25 | View |
| Salt Creek Wind Farm | SALTCRK1 |
SA1 | Wind Turbine - Onshore | $9.8k | $0 | — | 160.3 | 274.0 | 12.4% | $0.50 | View |
| Beryl Solar Farm | BERYLSF1 |
NSW1 | Solar PV - Single axis tracking | $9.6k | $0 | — | 135.3 | 135.8 | 5.7% | $0.25 | View |
| Eildon | EILDON2 |
VIC1 | Hydro - Dam | $9.3k | $0 | — | 104.0 | 987.3 | 6.4% | $1.00 | View |
| Nyngan Solar Plant | NYNGAN1 |
NSW1 | Solar PV - Fixed | $9.3k | $0 | — | 127.4 | 135.2 | 5.2% | $0.20 | View |
| Quorn Park Solar Hybrid | QPSFB1 |
NSW1 | Solar PV - Single axis tracking | $9.1k | $0 | — | 119.2 | 139.2 | 5.1% | $0.26 | View |
| Rugby Run Solar Farm | RUGBYR1 |
QLD1 | Solar PV - Single axis tracking | $9.1k | $0 | — | 173.8 | 581.8 | 11.1% | $0.25 | View |
| White Rock Solar Farm | WRSF1 |
NSW1 | Solar PV - Fixed | $9.0k | $0 | — | 153.7 | 153.7 | 32.0% | $0.20 | View |
| BRDDBES1 | BRDDBES1 |
QLD1 | $8.6k | $148 | 163.9 | -107.4 | 3,912.2 | -1.2% | $0.27 | View | |
| Mt Mercer Wind Farm | MERCER01 |
VIC1 | Wind Turbine - Onshore | $8.4k | $0 | — | 308.2 | 309.0 | 9.8% | $0.50 | View |
| Tully Sugar Mill | TULLYSM1 |
QLD1 | Turbine - Steam Super Critical | $8.2k | $0 | — | 102.3 | — | 13.3% | $117.00 | View |
| Limondale Solar Farm 2 | LIMOSF21 |
NSW1 | Solar PV - Single axis tracking | $7.8k | $0 | — | 110.1 | 270.0 | 15.8% | $0.25 | View |
| Lake Bonney 2 Wind Farm | LKBONNY2 |
SA1 | Wind Turbine - Onshore | $7.8k | $0 | — | 398.9 | 442.4 | 10.5% | $0.86 | View |
| Clements Gap - BESS | CGBESS01 |
SA1 | Storage - Battery | $7.1k | $0 | — | -16.1 | 1,225.0 | -1.1% | $1.58 | View |
| Butlers Gorge | BUTLERSG |
TAS1 | Hydro - Dam | $7.1k | $0 | — | 156.4 | — | 53.4% | $1.00 | View |
| NESBESS1 | NESBESS1 |
NSW1 | $6.9k | $0 | — | -29.9 | 350.0 | -0.6% | $1.50 | View | |
| Portland Wind Farm | PORTWF |
VIC1 | Wind Turbine - Onshore | $6.9k | $0 | — | 372.9 | — | 10.2% | $0.50 | View |
| Goonumbla Solar Farm | GOONSF1 |
NSW1 | Solar PV - Single axis tracking | $6.9k | $0 | — | 92.7 | 103.7 | 5.5% | $0.25 | View |
| Blyth BESS | BLYTHB1 |
SA1 | Storage - Battery | $6.7k | $1.6k | 955.2 | -179.2 | 4,414.9 | -3.7% | $4.86 | View |
| Middlemount Solar Farm | MIDDLSF1 |
QLD1 | Solar PV - Single axis tracking | $6.5k | $0 | — | 173.5 | 243.6 | 27.8% | $0.25 | View |
| Mannum BESS | MANNUMB1 |
SA1 | Storage - Battery | $6.4k | $7 | 1.5 | -15.4 | 2,208.3 | -0.6% | $1.50 | View |
| Hamilton Solar Farm | HAMISF1 |
QLD1 | Solar PV - Single axis tracking | $6.1k | $0 | — | 117.8 | 375.5 | 8.5% | $18.64 | View |
| Clover | CLOVER |
VIC1 | Hydro - Dam | $6.1k | $0 | — | 110.3 | — | 15.9% | $1.17 | View |
| Whitsunday Solar Farm | WHITSF1 |
QLD1 | Solar PV - Single axis tracking | $6.0k | $0 | — | 116.2 | 419.6 | 8.4% | $0.25 | View |
| Yaloak South Wind Farm | YSWF1 |
VIC1 | Wind Turbine - Onshore | $5.7k | $0 | — | 117.9 | — | 17.1% | $0.50 | View |
| Gullen Range Solar Farm | GULLRSF1 |
NSW1 | Solar PV - Fixed | $5.6k | $0 | — | 79.2 | 79.2 | 33.0% | $0.27 | View |
| Parkes Solar Farm | PARSF1 |
NSW1 | Solar PV - Single axis tracking | $5.6k | $0 | — | 73.7 | 86.8 | 6.2% | $0.25 | View |
| Barcaldine Remote Community Solar Farm | BARCSF1 |
QLD1 | Solar PV - Single axis tracking | $5.4k | $0 | — | 97.5 | — | 20.3% | $0.00 | View |
| Longreach Solar Farm | LRSF1 |
QLD1 | Solar PV - Fixed | $5.1k | $0 | — | 94.7 | — | 26.3% | $0.20 | View |
| Murray 2 | MURRAY |
VIC1 | Hydro - Dam | $5.0k | $0 | — | 62.3 | 22,387.0 | 0.4% | $1.00 | View |
| Wandoan South BESS | WANDB1 |
QLD1 | Storage - Battery | $4.7k | $1.0k | 4,601.0 | -58.4 | 1,830.8 | -2.4% | $1.50 | View |
| Lake Bonney 1 Wind Farm | LKBONNY1 |
SA1 | Wind Turbine - Onshore | $4.5k | $0 | — | 157.4 | 219.1 | 8.1% | $0.79 | View |
| Rubicon Mountain Streams | RUBICON |
VIC1 | Hydro - Dam | $4.4k | $0 | — | 90.2 | — | 27.8% | $1.00 | View |
| Diapur Wind Farm | DIAPURWF1 |
VIC1 | Wind Turbine - Onshore | $4.4k | $0 | — | 78.1 | — | 40.7% | $0.00 | View |
| Royalla Solar Farm | ROYALLA1 |
NSW1 | Solar PV - Fixed | $4.3k | $0 | — | 59.2 | — | 12.3% | $0.20 | View |
| Hayman Solar Farm | HAYMSF1 |
QLD1 | Solar PV - Single axis tracking | $4.2k | $0 | — | 59.7 | 443.2 | 4.3% | $0.34 | View |
| Riverina Energy Storage System 2 | RIVNB2 |
NSW1 | Storage - Battery | $4.0k | $0 | — | -7.6 | 475.6 | -0.5% | $1.50 | View |
| Girgarre Solar Farm | GIRGSF |
VIC1 | Solar PV - Single axis tracking | $3.5k | $0 | — | 259.6 | 657.4 | 11.6% | $0.00 | View |
| Bungala Two Solar Farm | BNGSF2 |
SA1 | Solar PV - Single axis tracking | $3.3k | $0 | — | 941.5 | 941.5 | 29.1% | $0.33 | View |
| Molong Solar Farm | MOLNGSF1 |
NSW1 | Solar PV - Single axis tracking | $3.1k | $0 | — | 40.5 | 40.5 | 4.7% | $0.25 | View |
| Manildra Solar Farm | MANSLR1 |
NSW1 | Solar PV - Single axis tracking | $3.1k | $0 | — | 34.1 | 59.1 | 2.8% | $0.25 | View |
| Hazelwood Battery Energy Storage System (HBESS) | HBESS1 |
VIC1 | Storage - Battery | $3.0k | $595 | 292.9 | -118.3 | 3,312.5 | -2.5% | $1.87 | View |
| Broken Hill | BHB1 |
NSW1 | Storage - Battery | $3.0k | $0 | — | -9.6 | 409.3 | -0.8% | $1.50 | View |
| Fisher | FISHER |
TAS1 | Hydro - Dam | $2.9k | $435 | 91.3 | 118.8 | 118.8 | 11.5% | $1.05 | View |
| Hughenden Sun Farm | HUGSF1 |
QLD1 | Solar PV - Single axis tracking | $2.8k | $0 | — | 54.8 | — | 10.9% | $0.00 | View |
| GPWFWST2 | GPWFWST2 |
VIC1 | $2.8k | $0 | — | 141.7 | 159.5 | 1.1% | $0.53 | View | |
| Bungala One Solar Farm | BNGSF1 |
SA1 | Solar PV - Single axis tracking | $2.7k | $0 | — | 747.1 | 747.1 | 23.1% | $0.34 | View |
| GPWFWST1 | GPWFWST1 |
VIC1 | $2.6k | $0 | — | 152.9 | 152.9 | 1.1% | $0.53 | View | |
| Mortons Lane Wind Farm | MLWF1 |
VIC1 | Wind Turbine - Onshore | $2.6k | $0 | — | 78.9 | — | 16.8% | $0.50 | View |
| Tailem Bend Stage 2 Solar Project | TB2SF1 |
SA1 | Solar PV - Single axis tracking | $2.4k | $0 | — | 323.4 | 397.6 | 12.8% | $0.25 | View |
| Stubbo Solar Farm | STUBSF2 |
NSW1 | Solar PV - Single axis tracking | $2.4k | $0 | — | 38.4 | 125.9 | 0.8% | $0.25 | View |
| Tailem Bend Battery Project | TB2B1 |
SA1 | Storage - Battery | $2.4k | $341 | 346.0 | -13.0 | 452.8 | -1.3% | $1.50 | View |
| Lake Bonney Battery Energy Storage | LBB1 |
SA1 | Storage - Battery | $2.3k | $44 | 1,295.2 | -6.6 | 398.0 | -1.1% | $1.98 | View |
| Port Augusta Renewable Energy Park - Solar | PAREPS1 |
SA1 | Solar PV - Fixed | $2.2k | $0 | — | 202.7 | 583.2 | 8.5% | $0.20 | View |
| Canunda | CNUNDAWF |
SA1 | Wind Turbine - Onshore | $2.2k | $0 | — | 135.0 | 135.0 | 12.2% | $0.50 | View |
| Smithfield BESS | SMTHBES1 |
NSW1 | Storage - Battery | $2.1k | $504 | 3,522.8 | -30.1 | 1,109.3 | -1.5% | $1.50 | View |
| Lake Bonney 3 Wind Farm | LKBONNY3 |
SA1 | Wind Turbine - Onshore | $2.1k | $0 | — | 68.1 | 94.6 | 7.3% | $0.53 | View |
| Numurkah Solar Farm | NUMURSF1 |
VIC1 | Solar PV - Single axis tracking | $2.1k | $0 | — | 843.5 | 870.8 | 34.8% | $0.25 | View |
| Yambuk | YAMBUKWF |
VIC1 | Wind Turbine - Onshore | $2.1k | $0 | — | 120.5 | — | 16.7% | $0.50 | View |
| Wemen Solar Farm | WEMENSF1 |
VIC1 | Solar PV - Single axis tracking | $2.1k | $0 | — | 459.0 | 724.3 | 19.6% | $0.25 | View |
| Darlington Point Energy Storage System | DPNTB1 |
NSW1 | Storage - Battery | $1.8k | $0 | — | 0.5 | 85.5 | 0.1% | $0.00 | View |
| Karadoc Solar Farm | KARSF1 |
VIC1 | Solar PV - Single axis tracking | $1.7k | $0 | — | 417.9 | 663.0 | 16.7% | $0.00 | View |
| Riverina Energy Storage System 1 | RESS1 |
NSW1 | Storage - Battery | $1.6k | $0 | — | -49.6 | 736.6 | -3.4% | $1.50 | View |
| Ross River Solar Farm | RRSF1 |
QLD1 | Solar PV - Single axis tracking | $1.5k | $0 | — | 40.4 | 269.3 | 1.3% | $0.25 | View |
| Ballarat Energy Storage System | BALB1 |
VIC1 | Storage - Battery | $1.5k | $0 | — | -4.8 | 217.5 | -0.7% | $0.00 | View |
| Goorambat East Solar Farm (ENGIE) | GOESF1 |
VIC1 | Solar PV - Single axis tracking | $1.4k | $0 | — | 2,400.1 | 2,400.1 | 40.0% | $0.25 | View |
| Glenrowan West Solar Farm | GLRWNSF1 |
VIC1 | Solar PV - Single axis tracking | $1.4k | $0 | — | 849.3 | 1,059.4 | 26.8% | $0.32 | View |
| Tailem Bend - Solar | TBSF1 |
SA1 | Solar PV - Fixed | $1.3k | $0 | — | 391.8 | 391.8 | 15.1% | $0.20 | View |
| Hallett GT | AGLHAL |
SA1 | Turbine - OCGT | $1.3k | $0 | — | 40.8 | 3,756.2 | 0.6% | $100.22 | View |
| Bannerton Solar Park | BANN1 |
VIC1 | Solar PV - Single axis tracking | $1.3k | $0 | — | 456.8 | 679.4 | 19.0% | $0.34 | View |
| Gannawarra Energy Storage System | GANNB1 |
VIC1 | Storage - Battery | $1.2k | $0 | — | 11.7 | 124.4 | 1.9% | $1.98 | View |
| Kidston Solar Project Phase One 50MW | KSP1 |
QLD1 | Solar PV - Fixed | $952 | $0 | — | 14.0 | 468.0 | 1.2% | $0.20 | View |
| Kerang Hybrid | KERNGSP1 |
VIC1 | Solar PV - Single axis tracking | $888 | $0 | — | 49.6 | 234.3 | 1.3% | $0.26 | View |
| Wallgrove Grid Battery project | WALGRV1 |
NSW1 | Storage - Battery | $802 | $55 | 2,627.6 | -13.6 | 737.9 | -1.1% | $1.50 | View |
| Cohuna Solar Farm | COHUNSF1 |
VIC1 | Solar PV - Single axis tracking | $698 | $0 | — | 112.5 | 114.9 | 15.0% | $0.33 | View |
| Glenrowan Solar Farm | GLENSF1 |
VIC1 | Solar PV - Single axis tracking | $662 | $0 | — | 985.2 | 985.2 | 32.6% | $0.25 | View |
| Yatpool Solar Farm | YATSF1 |
VIC1 | Solar PV - Single axis tracking | $562 | $0 | — | 152.4 | 152.6 | 6.8% | $0.25 | View |
| Condamine A | CPSA |
QLD1 | Turbine - CCGT | $517 | $0 | — | 3.4 | 252.8 | 0.2% | $95.40 | View |
| Quorn Park Solar Hybrid | QPSFB2 |
NSW1 | Storage - Battery | $492 | $0 | — | 1.5 | 46.9 | 0.2% | $1.58 | View |
| Adelaide Desalination Plant | ADPPV1 |
SA1 | Solar PV - Fixed | $433 | $0 | — | 72.6 | 100.3 | 27.5% | $0.00 | View |
| Bulgana Green Power Hub - BESS | BULBES1 |
VIC1 | Storage - Battery | $405 | $341 | 933.9 | -26.7 | 440.0 | -5.6% | $1.98 | View |
| Mannum Solar Farm 2 | MANNSF2 |
SA1 | Solar PV - Single axis tracking | $356 | $0 | — | 84.4 | 84.4 | 11.7% | $0.25 | View |
| Winton Solar Farm | WINTSF1 |
VIC1 | Solar PV - Single axis tracking | $307 | $0 | — | 636.7 | 713.2 | 31.2% | $0.25 | View |
| Philip Island BESS | PIBESS1 |
VIC1 | Storage - Battery | $239 | $123 | 44.6 | -11.6 | 101.5 | -9.6% | $1.50 | View |
| Mokoan Solar Farm (LightsourceBP) | MOKOSF1 |
VIC1 | Solar PV - Single axis tracking | $224 | $0 | — | 350.1 | 418.6 | 31.7% | $0.25 | View |
| Kennedy Energy Park - Phase 1 - Solar | KEPSF1 |
QLD1 | Solar PV - Single axis tracking | $138 | $0 | — | 3.6 | 51.9 | 1.0% | $0.34 | View |
| Adelaide Desalination Plant | ADPBA1 |
SA1 | Storage - Battery | $135 | $12 | 228.3 | -2.5 | 132.5 | -1.3% | $0.00 | View |
| Happy Valley Reservoir | HVWWPV1 |
SA1 | Solar PV - Single axis tracking | $89 | $0 | — | 37.1 | 46.7 | 14.0% | $0.00 | View |
| Happy Valley Reservoir | HVWWBA1 |
SA1 | Storage - Battery | $89 | $5 | 98.3 | -1.5 | 87.2 | -1.1% | $1.58 | View |
| Morgan To Whyalla Pipeline No 4 PS | MWPS4PV1 |
SA1 | Solar PV - Single axis tracking | $85 | $0 | — | 11.6 | 16.3 | 8.8% | $0.25 | View |
| Bolivar Waste Water Treatment | BOWWPV1 |
SA1 | Solar PV - Fixed | $83 | $0 | — | 33.9 | 37.1 | 17.1% | $0.23 | View |
| Yallourn W | YWPS3 |
VIC1 | Turbine - Steam Sub Critical | $72 | $0 | — | 0.9 | — | 0.0% | $47.20 | View |
| Murray Bridge - Onkaparinga Pipeline Pump 2 | MBPS2PV1 |
SA1 | Solar PV - Single axis tracking | $70 | $0 | — | 21.4 | 30.3 | 6.5% | $0.25 | View |
| Tarong | TARONG#3 |
QLD1 | Turbine - Steam Sub Critical | $66 | $0 | — | 0.8 | — | 0.0% | $55.48 | View |
| Morgan To Whyalla Pipeline No 1 PS And Water Filtration Plant | MWPS1PV1 |
SA1 | Solar PV - Single axis tracking | $59 | $0 | — | 17.0 | 25.6 | 12.9% | $0.25 | View |
| Mt Stuart | MSTUART1 |
QLD1 | Turbine - OCGT | $58 | $0 | — | 0.8 | 3,047.5 | 0.0% | $2.00 | View |
| Bolivar Waste Water Treatment | BOWWBA1 |
SA1 | Storage - Battery | $52 | $4 | 0.5 | -0.8 | 44.2 | -1.1% | $1.58 | View |
| Mt Stuart | MSTUART2 |
QLD1 | Turbine - OCGT | $46 | $0 | — | 0.6 | 3,047.5 | 0.0% | $148.45 | View |
| Christies Beach Wastewater Treatment Plant | CBWWBA1 |
SA1 | Storage - Battery | $44 | $3 | 0.5 | -0.8 | 44.2 | -1.6% | $1.50 | View |
| Dalrymple BESS | DALNTH1 |
SA1 | Storage - Battery | $31 | $0 | — | -3.5 | 257.5 | -0.5% | $2.03 | View |
| Morgan To Whyalla Pipeline No 3 PS | MWPS3PV1 |
SA1 | Solar PV - Single axis tracking | $17 | $0 | — | 12.0 | 17.0 | 6.7% | $0.25 | View |
| Braemar 2 Power Station | BRAEMAR5 |
QLD1 | Turbine - OCGT | $17 | $0 | — | 0.2 | 1,662.7 | 0.0% | $3.14 | View |
| Mintaro GT | MINTARO |
SA1 | Turbine - OCGT | $9 | $0 | — | 0.1 | 1,941.9 | 0.0% | $128.50 | View |
| Mannum Adelaide Pumping Station No 3 - MAPL3 (Tungkillo) | MAPS3PV1 |
SA1 | Solar PV - Single axis tracking | $4 | $0 | — | 55.3 | 57.3 | 14.0% | $0.25 | View |
| Morgan To Whyalla Pipeline No 2 PS | MWPS2PV1 |
SA1 | Solar PV - Single axis tracking | $0 | $0 | — | 7.3 | 11.0 | 5.5% | $0.25 | View |
| Bolivar Power Station | BOLIVPS1 |
SA1 | Turbine - OCGT | $0 | $0 | — | 0.0 | — | 0.0% | $151.37 | View |
| DG_QLD1 | DG_QLD1 |
$0 | $0 | — | — | — | — | — | View | ||
| DG_NSW1 | DG_NSW1 |
$0 | $0 | — | — | — | — | — | View | ||
| Dartmouth | DARTM1 |
VIC1 | Hydro - Dam | $0 | $0 | — | — | 3,489.2 | 0.0% | $0.00 | View |
| CRWARP1 | CRWARP1 |
$0 | $0 | — | 0.0 | — | — | — | View | ||
| BUNGAMB1 | BUNGAMB1 |
$0 | $0 | 9,261.4 | -15.9 | 3,120.2 | — | — | View | ||
| Torrens Island B | TORRB3 |
SA1 | Turbine - Steam Sub Critical | $0 | $0 | — | — | — | 0.0% | $2.00 | View |
| Tamar Valley Peaking | TVPP104 |
TAS1 | Turbine - OCGT | $0 | $0 | — | — | 662.5 | 0.0% | $128.50 | View |
| Tungatinah | TUNGATIN |
TAS1 | Hydro - Dam | $0 | $0 | — | — | — | 0.0% | $1.00 | View |
| Collinsville PV | CSPVPS1 |
QLD1 | Solar PV - Fixed | $0 | $0 | — | — | — | 0.0% | $0.28 | View |
| Bayswater | BW02 |
NSW1 | Turbine - Steam Sub Critical | $0 | $0 | — | — | — | 0.0% | $26.23 | View |
| Bayswater | BW03 |
NSW1 | Turbine - Steam Sub Critical | $0 | $0 | — | — | — | 0.0% | $28.68 | View |
| Colongra | CG3 |
NSW1 | Turbine - OCGT | $0 | $0 | — | — | 14.6 | 0.0% | $144.24 | View |
| TB3B1 | TB3B1 |
$0 | $0 | — | — | — | — | — | View | ||
| Colongra | CG2 |
NSW1 | Turbine - OCGT | $0 | $0 | — | — | 3,862.2 | 0.0% | $135.55 | View |
| Torrens Island B | TORRB2 |
SA1 | Turbine - Steam Sub Critical | $0 | $0 | — | — | — | 0.0% | $5.47 | View |
| Colongra | CG1 |
NSW1 | Turbine - OCGT | $0 | $0 | — | — | 3,862.2 | 0.0% | $197.00 | View |
| Trevallyn | TREVALLN |
TAS1 | Hydro - Dam | $0 | $0 | — | — | 2,131.0 | 0.0% | $1.00 | View |
| DRSHVS01 | DRSHVS01 |
$0 | $0 | 29.0 | — | — | — | — | View | ||
| Tribute | TRIBUTE |
TAS1 | Hydro - Dam | $0 | $0 | — | — | — | 0.0% | $1.00 | View |
| Colongra | CG4 |
NSW1 | Turbine - OCGT | $0 | $0 | — | — | 3,862.2 | 0.0% | $194.33 | View |
| DG_SA1 | DG_SA1 |
$0 | $0 | — | — | — | — | — | View | ||
| SNOWYP | SNOWYP |
$0 | $0 | — | — | — | — | — | View | ||
| SNOWYGJP | SNOWYGJP |
$0 | $0 | 283.0 | — | — | — | — | View | ||
| DROZVP01 | DROZVP01 |
$0 | $0 | — | — | — | — | — | View | ||
| DROZVP02 | DROZVP02 |
$0 | $0 | — | — | — | — | — | View | ||
| DROZVP03 | DROZVP03 |
$0 | $0 | 2.3 | — | — | — | — | View | ||
| DRPSTQ01 | DRPSTQ01 |
$0 | $0 | 199.4 | — | — | — | — | View | ||
| DRPSTV01 | DRPSTV01 |
$0 | $0 | 38.3 | — | — | — | — | View | ||
| Snapper Point Power Station | SNAPPER1 |
SA1 | Turbine - OCGT | $0 | $0 | — | — | 3,135.0 | 0.0% | $128.50 | View |
| DRSHVN01 | DRSHVN01 |
$0 | $0 | — | — | — | — | — | View | ||
| DRSHVN02 | DRSHVN02 |
$0 | $0 | 768.5 | — | — | — | — | View | ||
| DRSHVQ01 | DRSHVQ01 |
$0 | $0 | 56.3 | — | — | — | — | View | ||
| SHPUMP | SHPUMP |
$0 | $0 | — | 245.3 | 249.3 | — | — | View | ||
| DRSHVS02 | DRSHVS02 |
$0 | $0 | 485.2 | — | — | — | — | View | ||
| DRVIOT01 | DRVIOT01 |
$0 | $0 | 226.0 | — | — | — | — | View | ||
| DRVIOT02 | DRVIOT02 |
$0 | $0 | 55.8 | — | — | — | — | View | ||
| Snuggery | SNUG1 |
SA1 | Turbine - OCGT | $0 | $0 | — | — | — | 0.0% | $2.00 | View |
| DRHTVP03 | DRHTVP03 |
$0 | $0 | — | — | — | — | — | View | ||
| STABESS1 | STABESS1 |
$0 | $0 | — | -0.6 | — | — | — | View | ||
| Tallawarra B | TALWB1 |
NSW1 | Turbine - OCGT | $0 | $0 | — | — | 6,956.2 | 0.0% | $128.50 | View |
| DG_TAS1 | DG_TAS1 |
$0 | $0 | — | — | — | — | — | View | ||
| DG_VIC1 | DG_VIC1 |
$0 | $0 | — | — | — | — | — | View | ||
| DRACAN1 | DRACAN1 |
$0 | $0 | 16.0 | — | — | — | — | View | ||
| DRACAV1 | DRACAV1 |
$0 | $0 | — | — | — | — | — | View | ||
| DRAESN3 | DRAESN3 |
$0 | $0 | — | — | — | — | — | View | ||
| DRAESS1 | DRAESS1 |
$0 | $0 | — | — | — | — | — | View | ||
| DRBRLV01 | DRBRLV01 |
$0 | $0 | 276.1 | — | — | — | — | View | ||
| DRFIIN01 | DRFIIN01 |
$0 | $0 | — | — | — | — | — | View | ||
| DRFIIN02 | DRFIIN02 |
$0 | $0 | — | — | — | — | — | View | ||
| DRGBND01 | DRGBND01 |
$0 | $0 | 141.2 | — | — | — | — | View | ||
| DRGBND02 | DRGBND02 |
$0 | $0 | 23.1 | — | — | — | — | View | ||
| DRGBND03 | DRGBND03 |
$0 | $0 | 570.0 | — | — | — | — | View | ||
| DRGBND04 | DRGBND04 |
$0 | $0 | 505.2 | — | — | — | — | View | ||
| DRHTVP01 | DRHTVP01 |
$0 | $0 | — | — | — | — | — | View | ||
| DRVIOT03 | DRVIOT03 |
$0 | $0 | 13.5 | — | — | — | — | View | ||
| RT_VIC10 | RT_VIC10 |
$0 | $0 | — | — | — | — | — | View | ||
| ASPAPM01 | ASPAPM01 |
$0 | $0 | — | — | — | — | — | View | ||
| ASPBSC01 | ASPBSC01 |
$0 | $0 | — | — | — | — | — | View | ||
| WNSF1 | WNSF1 |
$0 | $0 | — | 155.0 | — | — | — | View | ||
| ASPSTV01 | ASPSTV01 |
$0 | $0 | 12.4 | — | — | — | — | View | ||
| ASQEEV1 | ASQEEV1 |
$0 | $0 | 70.1 | — | — | — | — | View | ||
| ASQENC1 | ASQENC1 |
$0 | $0 | 21.0 | — | — | — | — | View | ||
| ASENGY01 | ASENGY01 |
$0 | $0 | — | — | — | — | — | View | ||
| ASRMGE01 | ASRMGE01 |
$0 | $0 | — | — | — | — | — | View | ||
| ASRMGE02 | ASRMGE02 |
$0 | $0 | 0.1 | — | — | — | — | View | ||
| ASRMGE03 | ASRMGE03 |
$0 | $0 | — | — | — | — | — | View | ||
| ASRMGE04 | ASRMGE04 |
$0 | $0 | 385.6 | — | — | — | — | View | ||
| ASRMGE05 | ASRMGE05 |
$0 | $0 | 159.4 | — | — | — | — | View | ||
| ASSDE1 | ASSDE1 |
$0 | $0 | — | — | — | — | — | View | ||
| WOOLES1 | WOOLES1 |
$0 | $0 | — | -0.5 | — | — | — | View | ||
| ASNENC1 | ASNENC1 |
$0 | $0 | 102.2 | — | — | — | — | View | ||
| Aldoga Solar Farm | ALDGASF1 |
QLD1 | Solar PV - Single axis tracking | $0 | $0 | — | — | — | 0.0% | $0.00 | View |
| APD01 | APD01 |
$0 | $0 | 2,247.5 | — | — | — | — | View | ||
| ASACLE01 | ASACLE01 |
$0 | $0 | 109.1 | — | — | — | — | View | ||
| ASDEVI01 | ASDEVI01 |
$0 | $0 | 216.0 | — | — | — | — | View | ||
| Townsville Power Station | YABULU2 |
QLD1 | Turbine - CCGT | $0 | $0 | — | — | — | 0.0% | $84.30 | View |
| Townsville Power Station | YABULU |
QLD1 | Turbine - CCGT | $0 | $0 | — | — | — | 0.0% | $84.30 | View |
| ASDLBY01 | ASDLBY01 |
$0 | $0 | — | — | — | — | — | View | ||
| Wunghnu Solar Farm | WUNUSF1 |
VIC1 | Solar PV - Single axis tracking | $0 | $0 | — | — | — | 0.0% | $0.25 | View |
| ASENGV01 | ASENGV01 |
$0 | $0 | — | — | — | — | — | View | ||
| ASGENE01 | ASGENE01 |
$0 | $0 | — | — | — | — | — | View | ||
| ASNAES1 | ASNAES1 |
$0 | $0 | 2.8 | — | — | — | — | View | ||
| Wooreen Energy Storage System | WOORB1 |
VIC1 | Storage - Battery | $0 | $0 | — | — | — | 0.0% | $1.50 | View |
| ASNBRL1 | ASNBRL1 |
$0 | $0 | 489.6 | — | — | — | — | View | ||
| ASSENC1 | ASSENC1 |
$0 | $0 | 15.1 | — | — | — | — | View | ||
| ASSERDV1 | ASSERDV1 |
$0 | $0 | — | — | — | — | — | View | ||
| ASTHYD1 | ASTHYD1 |
$0 | $0 | 33.5 | — | — | — | — | View | ||
| VSNEL2S1 | VSNEL2S1 |
$0 | $0 | — | — | — | — | — | View | ||
| Valley Power | VPGS6 |
VIC1 | Turbine - OCGT | $0 | $0 | — | — | 1,212.7 | 0.0% | $128.50 | View |
| Valley Power | VPGS5 |
VIC1 | Turbine - OCGT | $0 | $0 | — | — | 1,212.7 | 0.0% | $128.50 | View |
| Valley Power | VPGS4 |
VIC1 | Turbine - OCGT | $0 | $0 | — | — | — | 0.0% | $128.50 | View |
| Valley Power | VPGS3 |
VIC1 | Turbine - OCGT | $0 | $0 | — | — | 1,262.1 | 0.0% | $128.50 | View |
| Valley Power | VPGS2 |
VIC1 | Turbine - OCGT | $0 | $0 | — | — | 1,262.1 | 0.0% | $128.50 | View |
| Valley Power | VPGS1 |
VIC1 | Turbine - OCGT | $0 | $0 | — | — | 1,262.1 | 0.0% | $128.50 | View |
| Braemar | BRAEMAR1 |
QLD1 | Turbine - OCGT | $0 | $0 | — | — | 4,004.9 | 0.0% | $133.75 | View |
| VENUS1 | VENUS1 |
$0 | $0 | 22.2 | — | — | — | — | View | ||
| Braemar | BRAEMAR2 |
QLD1 | Turbine - OCGT | $0 | $0 | — | — | 4,004.9 | 0.0% | $130.94 | View |
| Braemar | BRAEMAR3 |
QLD1 | Turbine - OCGT | $0 | $0 | — | — | 3,907.6 | 0.0% | $128.50 | View |
| Uranquinty | URANQ12 |
NSW1 | Turbine - OCGT | $0 | $0 | — | — | 3,471.0 | 0.0% | $128.50 | View |
| Uranquinty | URANQ11 |
NSW1 | Turbine - OCGT | $0 | $0 | — | — | 3,427.0 | 0.0% | $128.50 | View |
| VSQHT1V1 | VSQHT1V1 |
$0 | $0 | — | — | — | — | — | View | ||
| VSSAE1V1 | VSSAE1V1 |
$0 | $0 | — | — | — | — | — | View | ||
| Barcaldine Power Station | BARCALDN |
QLD1 | Turbine - OCGT | $0 | $0 | — | — | — | 0.0% | $141.78 | View |
| Barron Gorge | BARRON-2 |
QLD1 | Hydro - Run of River | $0 | $0 | — | — | — | 0.0% | $0.00 | View |
| Bell Bay Three | BBTHREE1 |
TAS1 | Turbine - OCGT | $0 | $0 | — | — | — | 0.0% | $182.63 | View |
| Bell Bay Three | BBTHREE2 |
TAS1 | Turbine - OCGT | $0 | $0 | — | — | 58.3 | 0.0% | $137.22 | View |
| Bell Bay Three | BBTHREE3 |
TAS1 | Turbine - OCGT | $0 | $0 | — | — | 162.9 | 0.0% | $141.97 | View |
| Bairnsdale | BDL01 |
VIC1 | Turbine - OCGT | $0 | $0 | — | — | 978.7 | 0.0% | $142.10 | View |
| WAMBOWF2 | WAMBOWF2 |
$0 | $0 | — | 352.7 | 310.8 | — | — | View | ||
| Bairnsdale | BDL02 |
VIC1 | Turbine - OCGT | $0 | $0 | — | — | — | 0.0% | $158.38 | View |
| Wivenhoe | W/HOE#2 |
Storage - Pumped hydro | $0 | $0 | 261.5 | 1,444.5 | 3,789.9 | — | — | View | |
| Wivenhoe | W/HOE#1 |
Storage - Pumped hydro | $0 | $0 | — | — | — | — | — | View | |
| VSVEL2S1 | VSVEL2S1 |
$0 | $0 | — | — | — | — | — | View | ||
| VSSSH1S1 | VSSSH1S1 |
$0 | $0 | — | — | — | — | — | View | ||
| VSSSE1V1 | VSSSE1V1 |
$0 | $0 | — | — | — | — | — | View | ||
| Braemar 2 Power Station | BRAEMAR7 |
QLD1 | Turbine - OCGT | $0 | $0 | — | — | 3,429.2 | 0.0% | $132.25 | View |
| DRXQQE01 | DRXQQE01 |
$0 | $0 | — | — | 9.9 | — | — | View | ||
| ERB02 | ERB02 |
$0 | $0 | — | -24.2 | 21.4 | — | — | View | ||
| Eraring GT | ERGT01 |
NSW1 | Turbine - OCGT | $0 | $0 | — | — | — | 0.0% | $96.96 | View |
| Broken Hill GT | GB01 |
NSW1 | Turbine - OCGT | $0 | $0 | — | — | — | 0.0% | $2.11 | View |
| Gladstone | GSTONE1 |
QLD1 | Turbine - Steam Sub Critical | $0 | $0 | — | — | — | 0.0% | $52.99 | View |
| KIDSPHL2 | KIDSPHL2 |
$0 | $0 | — | — | — | — | — | View | ||
| Gladstone | GSTONE2 |
QLD1 | Turbine - Steam Sub Critical | $0 | $0 | — | — | — | 0.0% | $49.17 | View |
| Gladstone | GSTONE4 |
QLD1 | Turbine - Steam Sub Critical | $0 | $0 | — | — | — | 0.0% | $52.60 | View |
| Mt Stuart | MSTUART3 |
QLD1 | Turbine - OCGT | $0 | $0 | — | — | 2,562.5 | 0.0% | $2.00 | View |
| Hallett Stage 2 Hallett Hill | HALLWF2 |
SA1 | Wind Turbine - Onshore | $0 | $0 | — | — | — | 0.0% | $0.00 | View |
| Mornington BESS | MRNBESS1 |
VIC1 | Storage - Battery | $0 | $0 | — | — | — | 0.0% | $1.50 | View |
| MREHA3 | MREHA3 |
$0 | $0 | 2,307.2 | 512.5 | 4,414.3 | — | — | View | ||
| MREHA2 | MREHA2 |
$0 | $0 | 1,141.1 | 16.7 | 4,391.9 | — | — | View | ||
| MREHA1 | MREHA1 |
$0 | $0 | 1,044.7 | 26.9 | 4,416.7 | — | — | View | ||
| Haughton Solar Farm Stage 1 | HAUGHT11 |
QLD1 | Solar PV - Single axis tracking | $0 | $0 | — | — | 9.1 | 0.0% | $0.00 | View |
| Eraring | ER01 |
NSW1 | Turbine - Steam Sub Critical | $0 | $0 | — | — | — | 0.0% | $48.29 | View |
| Eildon | EILDON1 |
VIC1 | Hydro - Dam | $0 | $0 | — | — | 1,126.2 | 0.0% | $1.05 | View |
| DRXSQS01 | DRXSQS01 |
$0 | $0 | — | — | — | — | — | View | ||
| Osborne | OSB-AG |
SA1 | Turbine - CCGT | $0 | $0 | — | — | — | 0.0% | $84.30 | View |
| DRXVAE01 | DRXVAE01 |
$0 | $0 | — | — | — | — | — | View | ||
| DRXVDJ01 | DRXVDJ01 |
$0 | $0 | — | — | 22.9 | — | — | View | ||
| DRXVDP01 | DRXVDP01 |
$0 | $0 | — | — | — | — | — | View | ||
| DRXVDX01 | DRXVDX01 |
$0 | $0 | — | — | 4.7 | — | — | View | ||
| DRXVQP01 | DRXVQP01 |
$0 | $0 | — | — | — | — | — | View | ||
| Oakey Power Station | OAKEY1 |
QLD1 | Turbine - OCGT | $0 | $0 | — | — | — | 0.0% | $128.50 | View |
| DRXVQX01 | DRXVQX01 |
$0 | $0 | — | — | — | — | — | View | ||
| DRXVQX02 | DRXVQX02 |
$0 | $0 | — | — | — | — | — | View | ||
| Newport | NPS |
VIC1 | Turbine - Steam Sub Critical | $0 | $0 | — | — | — | 0.0% | $2.00 | View |
| Dry Creek GT | DRYCGT1 |
SA1 | Turbine - OCGT | $0 | $0 | — | — | 1,038.9 | 0.0% | $141.50 | View |
| Dry Creek GT | DRYCGT2 |
SA1 | Turbine - OCGT | $0 | $0 | — | — | 772.9 | 0.0% | $135.55 | View |
| Dry Creek GT | DRYCGT3 |
SA1 | Turbine - OCGT | $0 | $0 | — | — | 1,072.6 | 0.0% | $210.15 | View |
| Millmerran Power Plant | MPP_1 |
QLD1 | Turbine - Steam Super Critical | $0 | $0 | — | — | — | 0.0% | $52.60 | View |
| Mt Piper | MP2 |
NSW1 | Turbine - Steam Sub Critical | $0 | $0 | — | — | — | 0.0% | $52.60 | View |
| Hunter EconomicZone | HEZ1 |
NSW1 | Reciprocating Engine - Compression ignition | $0 | $0 | — | — | 432.5 | 0.0% | $308.00 | View |
| Kareeya | KAREEYA3 |
QLD1 | Hydro - Run of River | $0 | $0 | — | — | — | 0.0% | $1.05 | View |
| Kareeya | KAREEYA4 |
QLD1 | Hydro - Run of River | $0 | $0 | — | — | — | 0.0% | $1.66 | View |
| Kennedy Energy Park - Phase 1 - Storage | KEPBG1 |
QLD1 | Storage - Battery | $0 | $0 | — | — | — | 0.0% | $2.03 | View |
| KEPBL1 | KEPBL1 |
$0 | $0 | — | — | — | — | — | View | ||
| Kiamal Solar Farm - Stage 1 | KIAMSF1 |
VIC1 | Solar PV - Single axis tracking | $0 | $0 | — | — | — | 0.0% | $0.00 | View |
| KIDSPHG1 | KIDSPHG1 |
$0 | $0 | — | — | — | — | — | View | ||
| KIDSPHG2 | KIDSPHG2 |
$0 | $0 | — | — | — | — | — | View | ||
| Loy Yang A Power Station | LYA1 |
VIC1 | Turbine - Steam Sub Critical | $0 | $0 | — | — | — | 0.0% | $47.20 | View |
| KIDSPHL1 | KIDSPHL1 |
$0 | $0 | — | — | — | — | — | View | ||
| Kogan Creek | KPP_1 |
QLD1 | Turbine - Steam Super Critical | $0 | $0 | — | — | — | 0.0% | $52.60 | View |
| Lancaster Solar Farm | LANCSF1 |
VIC1 | Solar PV - Single axis tracking | $0 | $0 | — | — | — | 0.0% | $0.25 | View |
| Lonsdale | LONSDALE |
SA1 | Reciprocating Engine - Compression ignition | $0 | $0 | — | — | 239.6 | 0.0% | $308.00 | View |
| Laverton North | LNGS2 |
VIC1 | Turbine - OCGT | $0 | $0 | — | — | 3,776.2 | 0.0% | $128.50 | View |
| Laverton North | LNGS1 |
VIC1 | Turbine - OCGT | $0 | $0 | — | — | 3,776.2 | 0.0% | $128.50 | View |
| Kareeya | KAREEYA2 |
QLD1 | Hydro - Run of River | $0 | $0 | — | — | — | 0.0% | $1.00 | View |
| Kareeya | KAREEYA1 |
QLD1 | Hydro - Run of River | $0 | $0 | — | — | — | 0.0% | $1.00 | View |
| Hume Dam VIC | HUMEV |
VIC1 | Hydro - Dam | $0 | $0 | — | — | — | 0.0% | $1.54 | View |
| Mortlake | MORTLK12 |
VIC1 | Turbine - OCGT | $0 | $0 | — | — | 5,968.2 | 0.0% | $128.50 | View |
| Hunter Power Station | HUNTER1 |
NSW1 | Turbine - OCGT | $0 | $0 | — | — | — | 0.0% | $142.99 | View |
| Hunter Power Station | HUNTER2 |
NSW1 | Turbine - OCGT | $0 | $0 | — | — | — | 0.0% | $152.46 | View |
| Lake Echo | LK_ECHO |
TAS1 | Hydro - Dam | $0 | $0 | — | — | — | 0.0% | $1.17 | View |
| Jeeralang A | JLA01 |
VIC1 | Turbine - OCGT | $0 | $0 | — | — | 1,192.5 | 0.0% | $135.55 | View |
| MLSP1 | MLSP1 |
$0 | $0 | — | 66.9 | — | — | — | View | ||
| MLB01 | MLB01 |
$0 | $0 | — | 0.0 | 1.0 | — | — | View | ||
| Jeeralang A | JLA02 |
VIC1 | Turbine - OCGT | $0 | $0 | — | — | 1,192.5 | 0.0% | $128.50 | View |
| Jeeralang A | JLA03 |
VIC1 | Turbine - OCGT | $0 | $0 | — | — | 1,192.5 | 0.0% | $141.46 | View |
| Jeeralang A | JLA04 |
VIC1 | Turbine - OCGT | $0 | $0 | — | — | 1,192.5 | 0.0% | $177.20 | View |
| Jeeralang B | JLB01 |
VIC1 | Turbine - OCGT | $0 | $0 | — | — | — | 0.0% | $128.50 | View |
| Jeeralang B | JLB02 |
VIC1 | Turbine - OCGT | $0 | $0 | — | — | 1,656.2 | 0.0% | $137.71 | View |
| Jeeralang B | JLB03 |
VIC1 | Turbine - OCGT | $0 | $0 | — | — | 1,722.5 | 0.0% | $137.85 | View |
| LINCOLN GAP BESSBDU | LGAPBS1 |
SA1 | Storage - Battery | $0 | $0 | — | — | — | 0.0% | $1.50 | View |
| DRVIOT05 | DRVIOT05 |
$0 | $0 | 515.5 | — | — | — | — | View | ||
| RT_SA5 | RT_SA5 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_SA4 | RT_SA4 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_SA3 | RT_SA3 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_SA2 | RT_SA2 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_SA1 | RT_SA1 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_QLD1 | RT_QLD1 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_NSW6 | RT_NSW6 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_NSW5 | RT_NSW5 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_NSW4 | RT_NSW4 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_NSW3 | RT_NSW3 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_NSW2 | RT_NSW2 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_NSW1 | RT_NSW1 |
$0 | $0 | — | — | — | — | — | View | ||
| DRXNAE01 | DRXNAE01 |
$0 | $0 | — | — | — | — | — | View | ||
| DRXNDA01 | DRXNDA01 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_SA6 | RT_SA6 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_TAS1 | RT_TAS1 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_VIC1 | RT_VIC1 |
$0 | $0 | — | — | — | — | — | View | ||
| DRVIOT06 | DRVIOT06 |
$0 | $0 | — | — | — | — | — | View | ||
| DRVIOT07 | DRVIOT07 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_VIC9 | RT_VIC9 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_VIC8 | RT_VIC8 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_VIC7 | RT_VIC7 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_VIC6 | RT_VIC6 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_VIC5 | RT_VIC5 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_VIC4 | RT_VIC4 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_VIC3 | RT_VIC3 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_VIC2 | RT_VIC2 |
$0 | $0 | — | — | — | — | — | View | ||
| DRVIOT04 | DRVIOT04 |
$0 | $0 | 2,271.4 | — | — | — | — | View | ||
| RT_VIC12 | RT_VIC12 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_VIC11 | RT_VIC11 |
$0 | $0 | — | — | — | — | — | View | ||
| DRXNAD01 | DRXNAD01 |
$0 | $0 | — | — | — | — | — | View | ||
| DRXNDA02 | DRXNDA02 |
$0 | $0 | — | — | — | — | — | View | ||
| Gannawarra Solar Farm | GANNSF1 |
VIC1 | Solar PV - Single axis tracking | $0 | $0 | — | — | — | 0.0% | $0.34 | View |
| DRXNFS01 | DRXNFS01 |
$0 | $0 | — | — | — | — | — | View | ||
| Quarantine | QPS2 |
SA1 | Turbine - OCGT | $0 | $0 | — | — | 362.2 | 0.0% | $128.50 | View |
| PLBESS1 | PLBESS1 |
$0 | $0 | — | 39.7 | 40.5 | — | — | View | ||
| DRXNQX01 | DRXNQX01 |
$0 | $0 | — | — | — | — | — | View | ||
| Poatina | POAT110 |
TAS1 | Hydro - Dam | $0 | $0 | — | — | — | 0.0% | $1.00 | View |
| PUMP2 | PUMP2 |
$0 | $0 | — | 1,507.7 | 1,622.8 | — | — | View | ||
| PUMP1 | PUMP1 |
$0 | $0 | — | — | — | — | — | View | ||
| Port Stanvac 1 | PTSTAN1 |
SA1 | Reciprocating Engine - Compression ignition | $0 | $0 | — | — | 1,236.7 | 0.0% | $308.00 | View |
| Poatina | POAT220 |
TAS1 | Hydro - Dam | $0 | $0 | — | — | — | 0.0% | $1.00 | View |
| DRXNSS01 | DRXNSS01 |
$0 | $0 | — | — | — | — | — | View | ||
| DRXNTM02 | DRXNTM02 |
$0 | $0 | — | — | — | — | — | View | ||
| Port Lincoln GT | POR03 |
SA1 | Turbine - OCGT | $0 | $0 | — | — | — | 0.0% | $2.00 | View |
| PIONEER | PIONEER |
$0 | $0 | — | 581.5 | — | — | — | View | ||
| Quarantine | QPS4 |
SA1 | Turbine - OCGT | $0 | $0 | — | — | — | 0.0% | $128.50 | View |
| Roma | ROMA_8 |
QLD1 | Turbine - OCGT | $0 | $0 | — | — | 715.0 | 0.0% | $128.50 | View |
| Roma | ROMA_7 |
QLD1 | Turbine - OCGT | $0 | $0 | — | — | 733.5 | 0.0% | $128.50 | View |
| DRXQDA01 | DRXQDA01 |
$0 | $0 | — | — | 0.9 | — | — | View | ||
| DRXNDA03 | DRXNDA03 |
$0 | $0 | — | — | — | — | — | View | ||
| DRXNDA04 | DRXNDA04 |
$0 | $0 | — | — | — | — | — | View | ||
| DRXNDB04 | DRXNDB04 |
$0 | $0 | — | — | — | — | — | View | ||
| DRXNDE01 | DRXNDE01 |
$0 | $0 | — | — | — | — | — | View | ||
| DRXNDJ01 | DRXNDJ01 |
$0 | $0 | — | — | — | — | — | View | ||
| DRXNDW01 | DRXNDW01 |
$0 | $0 | — | — | 0.2 | — | — | View | ||
| DRXNFF01 | DRXNFF01 |
$0 | $0 | — | — | — | — | — | View | ||
| Quarantine | QPS5 |
SA1 | Turbine - OCGT | $0 | $0 | — | — | — | 0.0% | $209.05 | View |
| DRXNVS01 | DRXNVS01 |
$0 | $0 | — | — | — | — | — | View | ||
| Port Lincoln GT | POR01 |
SA1 | Turbine - OCGT | $0 | $0 | — | — | — | 0.0% | $2.00 | View |
| Rowallan | ROWALLAN |
TAS1 | Hydro - Dam | $-4 | $0 | — | -0.1 | — | 0.0% | $1.00 | View |
| Queanbeyan BESS | QBYNB1 |
NSW1 | Storage - Battery | $-7 | $0 | — | -0.1 | — | 0.0% | $1.50 | View |
| Mannum Adelaide Pumping Station No 2 - MAPL2 (Palmer) | MAPS2PV1 |
SA1 | Solar PV - Single axis tracking | $-9 | $0 | — | 34.9 | 35.5 | 8.8% | $0.26 | View |
| Angaston | ANGAST1 |
SA1 | Reciprocating Engine - Compression ignition | $-18 | $0 | — | -0.2 | 1,015.8 | 0.0% | $0.00 | View |
| NESBESS2 | NESBESS2 |
NSW1 | $-29 | $0 | — | -0.4 | — | 0.0% | $1.50 | View | |
| SMFBESS2 | SMFBESS2 |
SA1 | $-88 | $0 | — | -1.1 | — | 0.0% | $1.50 | View | |
| SMFBESS1 | SMFBESS1 |
SA1 | $-90 | $0 | — | -1.1 | — | 0.0% | $1.50 | View | |
| Condong | CONDONG1 |
NSW1 | Turbine - Steam Sub Critical | $-1.3k | $0 | — | -15.6 | — | -2.2% | $112.12 | View |
| Bouldercombe Battery project | BBATTERY1 |
QLD1 | Storage - Battery | $-1.4k | $169 | 934.1 | -31.1 | 774.0 | -2.6% | $1.64 | View |
| Waratah Super Battery | WTAHB1 |
NSW1 | Storage - Battery | $-2.0k | $0 | — | -743.8 | 9,889.7 | -3.6% | $1.50 | View |