MLF-adjusted revenue, dispatch, capacity factor, and estimated SRMC from AEMO 5‑minute dispatch data. Data through 03 Aug 2026, 13:55 AEST.
Energy revenue = cleared MW × (5/60 h) × regional RRP × MLF. FCAS revenue = sum of cleared FCAS MW × (5/60 h) × regional FCAS price × MLF (raise/lower 6s, 60s, 5min, reg). FCAS volume = total FCAS enablement MWh across all services. Capacity factor = dispatched MWh ÷ (nameplate MW × period hours). SRMC from financial assumptions. Not AEMO settlement data.
| Site | DUID | Region | Tech | Energy rev. (× MLF) | FCAS rev. (× MLF) | FCAS MWh | MWh dispatch | MWh available | Capacity factor | Est. SRMC | |
|---|---|---|---|---|---|---|---|---|---|---|---|
| Bayswater | BW02 |
NSW1 | Turbine - Steam Sub Critical | $667.5k | $213 | 146.0 | 11,740.1 | 9,875.4 | 71.4% | $26.23 | View |
| Bayswater | BW04 |
NSW1 | Turbine - Steam Sub Critical | $667.5k | $225 | 166.6 | 11,744.0 | 9,875.4 | 71.4% | $55.48 | View |
| Eraring | ER03 |
NSW1 | Turbine - Steam Sub Critical | $651.2k | $246 | 551.7 | 11,001.4 | 10,091.7 | 63.7% | $49.77 | View |
| Bayswater | BW01 |
NSW1 | Turbine - Steam Sub Critical | $647.6k | $215 | 150.9 | 11,415.1 | 9,515.0 | 72.1% | $53.57 | View |
| Eraring | ER02 |
NSW1 | Turbine - Steam Sub Critical | $637.0k | $254 | 588.4 | 10,578.6 | 10,091.7 | 61.2% | $59.45 | View |
| Eraring | ER01 |
NSW1 | Turbine - Steam Sub Critical | $616.2k | $229 | 503.0 | 10,267.2 | 9,082.5 | 59.4% | $48.29 | View |
| Vales Point B | VP6 |
NSW1 | Turbine - Steam Sub Critical | $515.1k | $1 | 5.5 | 8,749.6 | 9,515.0 | 55.2% | $52.60 | View |
| Vales Point B | VP5 |
NSW1 | Turbine - Steam Sub Critical | $514.2k | $1 | 4.6 | 8,737.8 | 9,515.0 | 55.2% | $52.60 | View |
| Millmerran Power Plant | MPP_2 |
QLD1 | Turbine - Steam Super Critical | $442.9k | $0 | — | 8,580.1 | 6,271.2 | 83.9% | $52.60 | View |
| Millmerran Power Plant | MPP_1 |
QLD1 | Turbine - Steam Super Critical | $442.6k | $0 | — | 8,575.0 | 6,267.1 | 83.9% | $52.60 | View |
| Tarong North | TNPS1 |
QLD1 | Turbine - Steam Super Critical | $441.8k | $0 | — | 8,696.5 | 6,386.6 | 80.5% | $52.60 | View |
| Eraring | ER04 |
NSW1 | Turbine - Steam Sub Critical | $411.4k | $102 | 156.6 | 7,292.2 | 5,045.8 | 42.2% | $55.48 | View |
| Mt Piper | MP1 |
NSW1 | Turbine - Steam Sub Critical | $390.9k | $0 | — | 6,666.0 | 10,524.2 | 38.0% | $49.24 | View |
| Bayswater | BW03 |
NSW1 | Turbine - Steam Sub Critical | $386.0k | $208 | 87.6 | 7,132.9 | 9,875.4 | 43.4% | $28.68 | View |
| Mt Piper | MP2 |
NSW1 | Turbine - Steam Sub Critical | $379.5k | $0 | — | 6,469.9 | 10,091.7 | 40.8% | $52.60 | View |
| Upper Tumut | UPPTUMUT |
NSW1 | Hydro - Dam | $357.0k | $314 | 367.1 | 5,847.9 | 7,179.5 | 39.6% | $1.00 | View |
| Callide C | CPP_4 |
QLD1 | Turbine - Steam Super Critical | $355.6k | $0 | — | 7,295.4 | 6,055.0 | 72.4% | $101.94 | View |
| Tarong | TARONG#2 |
QLD1 | Turbine - Steam Sub Critical | $342.5k | $60 | 13.6 | 6,637.4 | 5,045.8 | 79.0% | $55.48 | View |
| Tarong | TARONG#1 |
QLD1 | Turbine - Steam Sub Critical | $334.0k | $0 | — | 6,457.0 | 4,940.4 | 76.9% | $52.60 | View |
| Tarong | TARONG#4 |
QLD1 | Turbine - Steam Sub Critical | $329.0k | $74 | 16.1 | 6,345.2 | 4,940.4 | 75.5% | $52.58 | View |
| Callide C | CPP_3 |
QLD1 | Turbine - Steam Super Critical | $312.2k | $0 | — | 6,473.2 | 4,901.7 | 63.6% | $44.41 | View |
| Tarong | TARONG#3 |
QLD1 | Turbine - Steam Sub Critical | $249.7k | $0 | — | 4,920.9 | 3,604.2 | 58.6% | $55.48 | View |
| Coopers Gap Wind Farm | COOPGWF1 |
QLD1 | Wind Turbine - Onshore | $242.5k | $0 | — | 4,578.5 | 3,804.1 | 42.1% | $0.68 | View |
| Callide B | CALL_B_1 |
QLD1 | Turbine - Steam Sub Critical | $238.2k | $0 | — | 5,107.3 | 5,045.8 | 60.8% | $32.60 | View |
| Callide B | CALL_B_2 |
QLD1 | Turbine - Steam Sub Critical | $225.7k | $0 | — | 4,784.3 | 4,901.7 | 57.0% | $55.48 | View |
| Rye Park Wind Farm | RYEPARK1 |
NSW1 | Wind Turbine - Onshore | $220.1k | $0 | — | 3,993.4 | 2,263.9 | 42.0% | $0.50 | View |
| Gladstone | GSTONE3 |
QLD1 | Turbine - Steam Sub Critical | $204.6k | $0 | — | 4,141.2 | 4,036.7 | 61.6% | $128.75 | View |
| Gladstone | GSTONE1 |
QLD1 | Turbine - Steam Sub Critical | $202.9k | $0 | — | 4,079.6 | 3,748.3 | 60.7% | $52.99 | View |
| Stanwell | STAN-1 |
QLD1 | Turbine - Steam Sub Critical | $197.1k | $90 | 86.0 | 4,174.3 | 4,332.5 | 47.7% | $52.60 | View |
| Stanwell | STAN-2 |
QLD1 | Turbine - Steam Sub Critical | $195.9k | $76 | 15.5 | 4,150.7 | 5,080.0 | 47.4% | $52.60 | View |
| Stanwell | STAN-4 |
QLD1 | Turbine - Steam Sub Critical | $195.7k | $0 | — | 4,149.2 | 2,955.4 | 47.4% | $52.60 | View |
| Clarke Creek Wind Farm | CLRKCWF1 |
QLD1 | Wind Turbine - Onshore | $193.8k | $0 | — | 3,881.0 | 2,964.6 | 46.7% | $0.00 | View |
| Gladstone | GSTONE6 |
QLD1 | Turbine - Steam Sub Critical | $181.7k | $0 | — | 3,599.8 | 3,460.0 | 53.6% | $54.96 | View |
| MacIntyre Wind Farm | MCINTYR1 |
QLD1 | Wind Turbine - Onshore | $180.1k | $0 | — | 3,406.3 | 2,947.0 | 15.4% | $0.58 | View |
| Gladstone | GSTONE4 |
QLD1 | Turbine - Steam Sub Critical | $175.6k | $0 | — | 3,531.3 | 3,171.7 | 52.5% | $52.60 | View |
| Tumut 3 | TUMUT3 |
NSW1 | Hydro - Dam | $106.9k | $90 | 187.3 | 1,568.6 | 25,429.0 | 4.4% | $1.05 | View |
| Yarwun 1 | YARWUN_1 |
QLD1 | Turbine - CCGT | $106.2k | $0 | — | 2,275.0 | 2,378.7 | 52.7% | $84.30 | View |
| Boco Rock Wind Farm | BOCORWF1 |
NSW1 | Wind Turbine - Onshore | $102.3k | $0 | — | 1,847.8 | 1,222.8 | 68.1% | $0.00 | View |
| Mount Emerald | MEWF1 |
QLD1 | Wind Turbine - Onshore | $100.9k | $0 | — | 2,068.0 | 1,709.6 | 47.7% | $0.50 | View |
| Gullen Range Wind Farm | GULLRWF1 |
NSW1 | Wind Turbine - Onshore | $93.7k | $0 | — | 1,732.7 | 905.3 | 43.6% | $0.53 | View |
| Goyder South Wind Farm 1A | GSWF1A |
SA1 | Wind Turbine - Onshore | $89.5k | $0 | — | 2,761.4 | 1,935.8 | 55.1% | $0.55 | View |
| Goyder South Wind Farm 1B | GSWF1B1 |
SA1 | Wind Turbine - Onshore | $75.9k | $0 | — | 2,104.0 | 1,582.9 | 43.1% | $0.00 | View |
| Bango 973 Wind Farm | BANGOWF1 |
NSW1 | Wind Turbine - Onshore | $74.1k | $0 | — | 1,396.4 | 792.3 | 36.6% | $0.00 | View |
| Gullen Range Wind Farm 2 | GULLRWF2 |
NSW1 | Wind Turbine - Onshore | $73.5k | $0 | — | 1,354.1 | 734.7 | 51.0% | $0.50 | View |
| Dulacca Wind Farm | DULAWF1 |
QLD1 | Wind Turbine - Onshore | $73.4k | $0 | — | 1,429.9 | 1,096.7 | 34.4% | $0.53 | View |
| Kaban Wind Farm | KABANWF1 |
QLD1 | Wind Turbine - Onshore | $73.1k | $0 | — | 1,439.8 | 1,172.5 | 38.3% | $0.00 | View |
| Clarke Creek Wind Farm | CLRKCWF2 |
QLD1 | Wind Turbine - Onshore | $71.0k | $0 | — | 1,462.0 | 1,128.8 | 58.9% | $0.58 | View |
| Collector | COLWF01 |
NSW1 | Wind Turbine - Onshore | $65.9k | $0 | — | 1,278.3 | 697.6 | 23.5% | $0.65 | View |
| Flyers Creek Wind Farm | FLYCRKWF |
NSW1 | Wind Turbine - Onshore | $64.8k | $0 | — | 1,123.3 | 600.5 | 32.2% | $0.58 | View |
| Western Downs Green Power Hub P/L | WDGPH1 |
QLD1 | Solar PV - Single axis tracking | $64.5k | $5 | 1.0 | 1,860.7 | 719.4 | 19.4% | $0.32 | View |
| Eraring Big Battery | ERB01 |
NSW1 | Storage - Battery | $63.3k | $0 | — | 766.3 | 6,631.7 | 13.3% | $1.58 | View |
| Silverton Wind Farm | STWF1 |
NSW1 | Wind Turbine - Onshore | $62.9k | $0 | — | 1,101.4 | 837.6 | 23.1% | $0.50 | View |
| Orana BESS | ORABESS1 |
NSW1 | Storage - Battery | $61.2k | $37 | 58.5 | 559.7 | 5,982.9 | 5.6% | $1.50 | View |
| Crookwell 2 Wind Farm | CROOKWF2 |
NSW1 | Wind Turbine - Onshore | $58.1k | $0 | — | 1,084.9 | 552.2 | 47.1% | $0.69 | View |
| Barker Inlet Power Station | BARKIPS1 |
SA1 | Reciprocating Engine - Spark ignition | $57.0k | $0 | — | 856.6 | 2,752.7 | 17.0% | $9.00 | View |
| Lake Bonney 2 Wind Farm | LKBONNY2 |
SA1 | Wind Turbine - Onshore | $56.8k | $0 | — | 1,685.3 | 1,182.9 | 44.2% | $0.86 | View |
| Capital Wind Farm | CAPTL_WF |
NSW1 | Wind Turbine - Onshore | $56.5k | $0 | — | 1,132.7 | — | 33.5% | $0.00 | View |
| Darlington Point Solar Farm | DARLSF1 |
NSW1 | Solar PV - Single axis tracking | $51.7k | $0 | — | 1,306.0 | 550.4 | 19.8% | $0.33 | View |
| Culcairn Solar Farm | CUSF1 |
NSW1 | Solar PV - Single axis tracking | $47.5k | $0 | — | 1,026.4 | 898.4 | 12.2% | $0.25 | View |
| SHOAL1 | SHOAL1 |
NSW1 | $46.1k | $0 | — | 800.0 | — | 13.5% | $1.20 | View | |
| Limondale Solar Farm 1 | LIMOSF11 |
NSW1 | Solar PV - Single axis tracking | $44.5k | $0 | — | 1,085.6 | 512.7 | 19.7% | $0.25 | View |
| Taralga Wind Farm | TARALGA1 |
NSW1 | Wind Turbine - Onshore | $43.7k | $0 | — | 781.4 | 350.6 | 30.5% | $0.50 | View |
| Catagunya / Liapootah / Wayatinah | LI_WY_CA |
TAS1 | Hydro - Dam | $43.4k | $68 | 133.8 | 2,399.8 | 2,609.4 | 56.6% | $1.05 | View |
| Loy Yang B | LOYYB2 |
VIC1 | Turbine - Steam Sub Critical | $42.1k | $381 | 584.3 | 9,513.2 | 8,289.6 | 68.3% | $47.20 | View |
| Supernode BESS | SNB02 |
QLD1 | Storage - Battery | $39.3k | $0 | — | 512.6 | 3,748.3 | 8.2% | $1.50 | View |
| Crudine Ridge Wind Farm | CRURWF1 |
NSW1 | Wind Turbine - Onshore | $38.6k | $0 | — | 736.5 | 257.6 | 21.7% | $0.53 | View |
| Avonlie Solar Farm | AVLSF1 |
NSW1 | Solar PV - Single axis tracking | $38.5k | $0 | — | 1,000.9 | 449.2 | 16.4% | $0.00 | View |
| Pelican Point | PPCCGT |
SA1 | Turbine - CCGT | $37.6k | $0 | — | 1,121.5 | 619.9 | 8.8% | $84.30 | View |
| Bango 999 Wind Farm | BANGOWF2 |
NSW1 | Wind Turbine - Onshore | $37.6k | $0 | — | 695.8 | 400.9 | 34.2% | $0.00 | View |
| Sunraysia Solar Farm | SUNRSF1 |
NSW1 | Solar PV - Single axis tracking | $36.6k | $0 | — | 922.7 | 412.8 | 16.8% | $0.25 | View |
| Loy Yang B | LOYYB1 |
VIC1 | Turbine - Steam Sub Critical | $36.0k | $544 | 816.4 | 9,403.6 | 8,343.8 | 67.6% | $47.20 | View |
| Snowtown S2 Wind Farm | SNOWSTH1 |
SA1 | Wind Turbine - Onshore | $35.4k | $0 | — | 1,342.5 | 1,120.5 | 44.4% | $0.74 | View |
| Crookwell 3 Wind Farm | CROOKWF3 |
NSW1 | Wind Turbine - Onshore | $34.6k | $0 | — | 645.4 | 350.1 | 46.7% | $0.76 | View |
| Tamar Valley Combined Cycle | TVCC201 |
TAS1 | Turbine - CCGT | $34.0k | $15 | 24.6 | 2,693.7 | 2,998.7 | 54.0% | $84.30 | View |
| Blyth BESS | BLYTHB1 |
SA1 | Storage - Battery | $33.8k | $452 | 707.5 | -256.6 | 2,882.1 | -5.3% | $4.86 | View |
| Edenvale Solar Park | EDENVSF1 |
QLD1 | Solar PV - Single axis tracking | $33.5k | $0 | — | 847.4 | 320.0 | 19.6% | $0.00 | View |
| Aldoga Solar Farm | ALDGASF1 |
QLD1 | Solar PV - Single axis tracking | $33.5k | $0 | — | 1,310.8 | 919.0 | 14.1% | $0.00 | View |
| Reece | REECE1 |
TAS1 | Hydro - Dam | $32.8k | $99 | 201.7 | 1,977.8 | 1,701.2 | 71.3% | $1.00 | View |
| Woodlawn Wind Farm | WOODLWN1 |
NSW1 | Wind Turbine - Onshore | $31.5k | $0 | — | 618.2 | 387.6 | 53.3% | $0.50 | View |
| Waterloo Wind Farm | WATERLWF |
SA1 | Wind Turbine - Onshore | $31.2k | $0 | — | 1,248.1 | 849.6 | 39.8% | $0.50 | View |
| Glenellen Solar Farm | GESF1 |
NSW1 | Solar PV - Fixed | $30.8k | $0 | — | 663.0 | 353.5 | 10.6% | $0.00 | View |
| Waratah Super Battery | WTAHB1 |
NSW1 | Storage - Battery | $30.5k | $0 | — | -24.4 | 6,345.8 | -0.1% | $1.50 | View |
| Coleambally Solar Farm | COLEASF1 |
NSW1 | Solar PV - Single axis tracking | $30.2k | $0 | — | 754.2 | 308.9 | 20.9% | $0.00 | View |
| Gunning Wind Farm | GUNNING1 |
NSW1 | Wind Turbine - Onshore | $29.7k | $0 | — | 542.9 | 298.6 | 48.7% | $0.50 | View |
| Wellington North Solar Farm (Lightsource) | WELNSF1 |
NSW1 | Solar PV - Single axis tracking | $29.6k | $0 | — | 827.6 | 399.3 | 7.9% | $0.25 | View |
| Reece | REECE2 |
TAS1 | Hydro - Dam | $28.7k | $443 | 371.7 | 1,849.9 | 1,513.7 | 66.7% | $1.00 | View |
| Woolooga Solar Farm | WOOLGSF1 |
QLD1 | Solar PV - Single axis tracking | $28.2k | $0 | — | 676.9 | 233.8 | 12.7% | $0.25 | View |
| Loy Yang A Power Station | LYA2 |
VIC1 | Turbine - Steam Sub Critical | $27.7k | $13 | 11.6 | 7,883.9 | 7,640.8 | 62.0% | $47.20 | View |
| Salt Creek Wind Farm | SALTCRK1 |
SA1 | Wind Turbine - Onshore | $27.6k | $0 | — | 569.7 | 577.9 | 44.0% | $0.50 | View |
| Columboola Solar Farm | COLUMSF1 |
QLD1 | Solar PV - Single axis tracking | $27.0k | $0 | — | 740.7 | 212.8 | 14.2% | $0.32 | View |
| John Butters | JBUTTERS |
TAS1 | Hydro - Dam | $26.8k | $506 | 390.0 | 980.6 | 2,076.0 | 28.4% | $0.00 | View |
| Cathedral Rocks | CATHROCK |
SA1 | Wind Turbine - Onshore | $26.8k | $0 | — | 633.5 | 656.0 | 42.6% | $0.53 | View |
| Moranbah North | MBAHNTH |
QLD1 | Reciprocating Engine - Spark ignition | $26.4k | $0 | — | 528.4 | — | 34.5% | $57.00 | View |
| Lincoln Gap Wind Farm - stage 1 | LGAPWF1 |
SA1 | Wind Turbine - Onshore | $26.2k | $0 | — | 608.8 | 592.7 | 20.1% | $0.50 | View |
| Port Augusta Renewable Energy Park - Wind | PAREPW1 |
SA1 | Wind Turbine - Onshore | $26.0k | $0 | — | 607.7 | 677.4 | 12.6% | $0.50 | View |
| Sapphire Wind Farm | SAPHWF1 |
SA1 | Wind Turbine - Onshore | $25.9k | $0 | — | 766.5 | 710.9 | 11.8% | $0.50 | View |
| Hallett Stage 1 Brown Hill | HALLWF1 |
SA1 | Wind Turbine - Onshore | $25.7k | $0 | — | 712.5 | 613.8 | 31.4% | $0.71 | View |
| Hallett Stage 2 Hallett Hill | HALLWF2 |
SA1 | Wind Turbine - Onshore | $24.1k | $0 | — | 677.8 | 506.1 | 39.6% | $0.00 | View |
| Walla Walla Solar Farm | WLWLSF1 |
NSW1 | Solar PV - Single axis tracking | $24.0k | $0 | — | 496.5 | 264.6 | 13.6% | $0.25 | View |
| Tungatinah | TUNGATIN |
TAS1 | Hydro - Dam | $23.9k | $635 | 438.4 | 1,023.8 | 1,989.5 | 34.1% | $1.00 | View |
| Walla Walla Solar Farm | WLWLSF2 |
NSW1 | Solar PV - Single axis tracking | $23.9k | $0 | — | 497.1 | 268.0 | 13.6% | $0.25 | View |
| Wollar Solar Farm | WOLARSF1 |
NSW1 | Solar PV - Single axis tracking | $23.6k | $0 | — | 717.6 | 383.6 | 10.7% | $0.25 | View |
| Lake Bonney 1 Wind Farm | LKBONNY1 |
SA1 | Wind Turbine - Onshore | $23.3k | $0 | — | 695.7 | 443.1 | 36.0% | $0.79 | View |
| Wandoan South Solar Stage 1 | WANDSF1 |
QLD1 | Solar PV - Single axis tracking | $22.8k | $0 | — | 479.2 | 116.1 | 12.5% | $0.25 | View |
| Golden Plains Wind Farm East | GPWFEST3 |
VIC1 | Wind Turbine - Onshore | $22.7k | $0 | — | 4,025.8 | 3,054.2 | 67.6% | $0.50 | View |
| Snowtown Wind Farm | SNOWTWN1 |
SA1 | Wind Turbine - Onshore | $22.6k | $0 | — | 605.4 | 753.3 | 25.6% | $0.50 | View |
| Loy Yang A Power Station | LYA3 |
VIC1 | Turbine - Steam Sub Critical | $22.5k | $6 | 59.9 | 7,159.4 | 8,073.3 | 53.3% | $47.20 | View |
| Loy Yang A Power Station | LYA4 |
VIC1 | Turbine - Steam Sub Critical | $22.4k | $6 | 59.9 | 7,168.0 | 8,073.3 | 53.3% | $47.20 | View |
| Golden Plains Wind Farm East | GPWFEST2 |
VIC1 | Wind Turbine - Onshore | $21.9k | $0 | — | 3,646.2 | 2,895.9 | 58.3% | $0.50 | View |
| Bastyan | BASTYAN |
TAS1 | Hydro - Dam | $21.6k | $74 | 37.0 | 1,245.1 | 1,110.1 | 64.9% | $0.00 | View |
| Granville Harbour Wind Farm | GRANWF1 |
TAS1 | Wind Turbine - Onshore | $21.6k | $0 | — | 1,535.2 | 1,176.3 | 57.3% | $0.66 | View |
| Hallett 4 North Brown Hill | NBHWF1 |
SA1 | Wind Turbine - Onshore | $21.4k | $0 | — | 581.4 | 569.4 | 18.3% | $0.80 | View |
| Golden Plains Wind Farm East | GPWFEST1 |
VIC1 | Wind Turbine - Onshore | $21.2k | $0 | — | 3,462.2 | 2,722.6 | 58.2% | $0.00 | View |
| Snowtown S2 Wind Farm | SNOWNTH1 |
SA1 | Wind Turbine - Onshore | $21.2k | $0 | — | 988.8 | 847.4 | 28.6% | $0.50 | View |
| Trevallyn | TREVALLN |
TAS1 | Hydro - Dam | $21.0k | $0 | — | 740.3 | 1,405.5 | 33.2% | $1.00 | View |
| Moorabool Wind Farm | MOORAWF1 |
VIC1 | Wind Turbine - Onshore | $20.9k | $0 | — | 4,508.6 | 3,391.5 | 60.2% | $0.50 | View |
| Wattle Point | WPWF |
SA1 | Wind Turbine - Onshore | $20.4k | $0 | — | 524.2 | 522.3 | 24.1% | $0.50 | View |
| Mackintosh | MACKNTSH |
TAS1 | Hydro - Dam | $20.4k | $183 | 151.3 | 1,061.6 | 1,182.2 | 55.4% | $1.00 | View |
| Munna Creek Solar Farm | MUCRKSF1 |
QLD1 | Solar PV - Single axis tracking | $20.0k | $0 | — | 462.3 | 154.7 | 12.5% | $0.25 | View |
| Loy Yang A Power Station | LYA1 |
VIC1 | Turbine - Steam Sub Critical | $19.7k | $5 | 54.2 | 7,245.8 | 8,073.3 | 53.9% | $47.20 | View |
| Swanbank BESS | SWANBBF1 |
QLD1 | Storage - Battery | $19.7k | $0 | — | 175.0 | 1,914.6 | 2.9% | $1.50 | View |
| Hillston Sun Farm | HILLSTN1 |
NSW1 | Solar PV - Single axis tracking | $19.5k | $0 | — | 490.8 | 211.2 | 18.6% | $0.00 | View |
| Torrens Island BESS | TIB1 |
SA1 | Storage - Battery | $19.4k | $753 | 2,366.8 | -211.7 | 3,604.2 | -3.5% | $1.50 | View |
| Tarong BESS - Stanwell | TARBESS1 |
QLD1 | Storage - Battery | $19.4k | $51 | 2,416.5 | 196.3 | 2,416.7 | 2.7% | $1.50 | View |
| Cattle Hill Wind Farm | CTHLWF1 |
TAS1 | Wind Turbine - Onshore | $19.2k | $0 | — | 1,631.8 | 1,321.4 | 47.2% | $0.66 | View |
| Stubbo Solar Farm | STUBSF2 |
NSW1 | Solar PV - Single axis tracking | $19.2k | $0 | — | 504.8 | 251.2 | 10.4% | $0.25 | View |
| Macarthur Wind Farm | MACARTH1 |
VIC1 | Wind Turbine - Onshore | $19.0k | $0 | — | 2,917.3 | 3,454.1 | 28.9% | $0.50 | View |
| New England Solar Farm | NEWENSF2 |
NSW1 | Solar PV - Single axis tracking | $18.9k | $0 | — | 520.9 | 215.6 | 10.9% | $0.25 | View |
| Bodangora Wind Farm | BODWF1 |
NSW1 | Wind Turbine - Onshore | $18.7k | $0 | — | 334.7 | 122.3 | 12.3% | $0.68 | View |
| Gangarri Solar Farm | GANGARR1 |
QLD1 | Solar PV - Single axis tracking | $18.6k | $0 | — | 410.3 | 116.8 | 10.6% | $0.26 | View |
| Bluegrass Solar Farm | BLUEGSF1 |
QLD1 | Solar PV - Single axis tracking | $18.3k | $0 | — | 463.5 | 152.2 | 13.1% | $0.29 | View |
| Tarraleah | TARRALEA |
TAS1 | Hydro - Dam | $18.3k | $0 | — | 1,508.8 | 1,009.2 | 69.9% | $1.00 | View |
| Barron Gorge | BARRON-1 |
QLD1 | Hydro - Run of River | $18.3k | $0 | — | 385.2 | 475.7 | 45.9% | $0.00 | View |
| Stubbo Solar Farm | STUBSF1 |
NSW1 | Solar PV - Single axis tracking | $18.2k | $0 | — | 435.5 | 191.2 | 9.2% | $0.25 | View |
| New England Solar Farm | NEWENSF1 |
NSW1 | Solar PV - Single axis tracking | $17.9k | $0 | — | 513.0 | 215.7 | 10.7% | $0.25 | View |
| Haughton Solar Farm Stage 1 | HAUGHT11 |
QLD1 | Solar PV - Single axis tracking | $17.5k | $0 | — | 488.7 | 111.6 | 15.4% | $0.00 | View |
| Willogoleche Wind Farm | WGWF1 |
SA1 | Wind Turbine - Onshore | $17.3k | $0 | — | 848.3 | 592.2 | 29.5% | $0.50 | View |
| Devils Gate | DEVILS_G |
TAS1 | Hydro - Dam | $17.1k | $219 | 83.3 | 704.8 | 908.2 | 48.9% | $1.00 | View |
| Cethana | CETHANA |
TAS1 | Hydro - Dam | $16.5k | $88 | 35.5 | 571.1 | 1,412.8 | 28.0% | $1.09 | View |
| Limondale BESS | LIMBESS1 |
NSW1 | Storage - Battery | $16.0k | $0 | — | 114.2 | 720.8 | 9.5% | $1.50 | View |
| Broadwater | BWTR1 |
NSW1 | Turbine - Steam Sub Critical | $16.0k | $0 | — | 288.2 | — | 31.6% | $124.22 | View |
| Clements Gap - BESS | CGBESS01 |
SA1 | Storage - Battery | $16.0k | $0 | — | -92.8 | 865.0 | -6.4% | $1.58 | View |
| Cullerin Range Wind Farm | CULLRGWF |
NSW1 | Wind Turbine - Onshore | $15.9k | $0 | — | 296.3 | — | 41.2% | $0.68 | View |
| Lincoln Gap Wind Farm - Stage 2 | LGAPWF2 |
SA1 | Wind Turbine - Onshore | $15.9k | $0 | — | 373.6 | 408.6 | 18.0% | $0.50 | View |
| Brendale BESS | BRNDBES1 |
QLD1 | Storage - Battery | $15.9k | $3 | 10.3 | 185.1 | 2,955.4 | 3.8% | $1.58 | View |
| Lake Bonney 3 Wind Farm | LKBONNY3 |
SA1 | Wind Turbine - Onshore | $15.8k | $0 | — | 469.3 | 314.8 | 50.1% | $0.53 | View |
| Canunda | CNUNDAWF |
SA1 | Wind Turbine - Onshore | $15.7k | $0 | — | 442.4 | 339.4 | 40.1% | $0.50 | View |
| Greenbank BESS | GREENB1 |
QLD1 | Storage - Battery | $15.5k | $28 | 1,126.5 | 190.4 | 2,881.4 | 4.0% | $1.54 | View |
| Condong | CONDONG1 |
NSW1 | Turbine - Steam Sub Critical | $15.4k | $0 | — | 299.0 | — | 41.5% | $112.12 | View |
| Western Downs Gas Peaking Plant - KCI | WDBESS2 |
QLD1 | Turbine - CCGT | $14.9k | $1.2k | 846.0 | 190.5 | 3,676.2 | 2.0% | $2.00 | View |
| Sun Metals Corporation Solar Farm | SMCSF1 |
QLD1 | Solar PV - Fixed | $14.9k | $0 | — | 413.4 | 207.4 | 12.0% | $0.00 | View |
| Western Downs Battery - Stage 1 And 2 | WDBESS1 |
QLD1 | Storage - Battery | $14.9k | $804 | 438.4 | 137.2 | 3,630.0 | 2.2% | $1.58 | View |
| Moura Solar Farm | MOUSF1 |
QLD1 | Solar PV - Single axis tracking | $14.9k | $0 | — | 379.6 | 53.2 | 16.0% | $0.25 | View |
| Mannum BESS | MANNUMB1 |
SA1 | Storage - Battery | $14.7k | $4 | 0.8 | -42.0 | 1,441.7 | -1.7% | $1.50 | View |
| Hallett 5 The Bluff WF | BLUFF1 |
SA1 | Wind Turbine - Onshore | $14.2k | $0 | — | 377.3 | 308.3 | 29.9% | $0.77 | View |
| Murra Warra Wind Farm - stage 2 | MUWAWF2 |
VIC1 | Wind Turbine - Onshore | $14.0k | $0 | — | 2,412.3 | 2,055.6 | 48.1% | $0.50 | View |
| Nyngan Solar Plant | NYNGAN1 |
NSW1 | Solar PV - Fixed | $13.9k | $0 | — | 291.7 | 179.8 | 11.9% | $0.20 | View |
| Suntop Solar Farm | SUNTPSF1 |
NSW1 | Solar PV - Single axis tracking | $13.9k | $0 | — | 306.9 | 264.3 | 8.5% | $0.25 | View |
| Kareeya | KAREEYA1 |
QLD1 | Hydro - Run of River | $13.8k | $0 | — | 277.9 | 244.5 | 53.6% | $1.00 | View |
| Kennedy Energy Park - Phase 1 - Wind | KEPWF1 |
QLD1 | Wind Turbine - Onshore | $13.7k | $0 | — | 282.7 | 187.5 | 27.3% | $0.68 | View |
| Kareeya | KAREEYA3 |
QLD1 | Hydro - Run of River | $13.7k | $0 | — | 278.4 | 244.5 | 53.7% | $1.05 | View |
| Kareeya | KAREEYA4 |
QLD1 | Hydro - Run of River | $13.7k | $0 | — | 277.3 | 244.5 | 53.5% | $1.66 | View |
| Rangebank BESS | RANGEB1 |
VIC1 | Storage - Battery | $13.7k | $0 | — | -164.0 | 2,008.7 | -3.4% | $1.50 | View |
| Nevertire Solar Farm | NEVERSF1 |
NSW1 | Solar PV - Single axis tracking | $13.7k | $0 | — | 380.3 | 202.5 | 15.1% | $0.25 | View |
| Yarranlea Solar Farm | YARANSF1 |
QLD1 | Solar PV - Single axis tracking | $13.5k | $0 | — | 344.7 | 205.1 | 11.9% | $0.25 | View |
| Mt Millar Wind Farm | MTMILLAR |
SA1 | Wind Turbine - Onshore | $13.5k | $0 | — | 349.6 | 341.6 | 20.2% | $0.50 | View |
| Emerald Solar Park | EMERASF1 |
QLD1 | Solar PV - Single axis tracking | $13.4k | $0 | — | 338.9 | 108.3 | 19.6% | $0.25 | View |
| Wellington Solar Farm | WELLSF1 |
NSW1 | Solar PV - Single axis tracking | $13.3k | $0 | — | 418.5 | 209.1 | 8.1% | $0.25 | View |
| Darling Downs Solar Farm | DDSF1 |
QLD1 | Solar PV - Fixed | $13.3k | $0 | — | 376.8 | 115.0 | 13.0% | $0.28 | View |
| Lilyvale Solar Farm | LILYSF1 |
QLD1 | Solar PV - Single axis tracking | $12.9k | $0 | — | 320.4 | 110.7 | 11.3% | $0.25 | View |
| Metz Solar Farm | METZSF1 |
NSW1 | Solar PV - Single axis tracking | $12.8k | $0 | — | 345.7 | 161.5 | 10.7% | $0.25 | View |
| Ulinda Park BESS | ULPBESS1 |
QLD1 | Storage - Battery | $12.7k | $262 | 82.7 | 94.7 | 2,164.2 | 2.5% | $1.50 | View |
| Finley Solar Farm | FINLYSF1 |
NSW1 | Solar PV - Single axis tracking | $12.7k | $0 | — | 326.0 | 151.2 | 8.4% | $0.25 | View |
| Daydream Solar Farm | DAYDSF1 |
QLD1 | Solar PV - Single axis tracking | $12.6k | $0 | — | 292.3 | 3.4 | 7.3% | $0.00 | View |
| Fisher | FISHER |
TAS1 | Hydro - Dam | $12.6k | $492 | 106.3 | 923.2 | 663.2 | 89.0% | $1.05 | View |
| Hornsdale Wind Farm Stage 1 | HDWF1 |
SA1 | Wind Turbine - Onshore | $12.6k | $0 | — | 573.5 | 432.7 | 23.3% | $0.50 | View |
| Koorangie Energy Storage System | KESSB1 |
VIC1 | Storage - Battery | $12.5k | $0 | — | -153.0 | 1,909.7 | -3.4% | $1.50 | View |
| Starfish Hill | STARHLWF |
SA1 | Wind Turbine - Onshore | $12.5k | $0 | — | 356.1 | 308.4 | 45.0% | $0.50 | View |
| Yallourn W | YWPS1 |
VIC1 | Turbine - Steam Sub Critical | $12.4k | $0 | — | 6,980.3 | 4,757.5 | 83.1% | $47.20 | View |
| Clermont Solar Farm | CLERMSF1 |
QLD1 | Solar PV - Single axis tracking | $12.4k | $0 | — | 337.4 | 110.6 | 15.2% | $0.34 | View |
| Broken Hill Solar Plant | BROKENH1 |
NSW1 | Solar PV - Fixed | $12.1k | $0 | — | 253.1 | 132.5 | 19.9% | $0.28 | View |
| Gunnedah Solar Farm | GNNDHSF1 |
NSW1 | Solar PV - Single axis tracking | $11.9k | $0 | — | 264.6 | 70.3 | 10.0% | $0.33 | View |
| Ryan Corner Wind Farm | RYANCWF1 |
VIC1 | Wind Turbine - Onshore | $11.9k | $0 | — | 3,130.5 | 2,474.2 | 59.7% | $0.50 | View |
| Yallourn W | YWPS2 |
VIC1 | Turbine - Steam Sub Critical | $11.8k | $0 | — | 6,907.1 | 4,613.3 | 82.2% | $47.20 | View |
| Yallourn W | YWPS4 |
VIC1 | Turbine - Steam Sub Critical | $11.1k | $0 | — | 6,473.1 | 5,709.0 | 71.9% | $47.20 | View |
| Yallourn W | YWPS3 |
VIC1 | Turbine - Steam Sub Critical | $11.1k | $0 | — | 6,474.2 | 5,550.4 | 71.9% | $47.20 | View |
| Susan River Solar Farm | SRSF1 |
QLD1 | Solar PV - Single axis tracking | $11.0k | $0 | — | 290.3 | 121.6 | 14.2% | $0.25 | View |
| Clare Solar Farm | CLARESF1 |
QLD1 | Solar PV - Single axis tracking | $11.0k | $0 | — | 287.5 | 170.0 | 10.9% | $0.00 | View |
| Hornsdale Power Reserve Unit 1 | HPR1 |
SA1 | Storage - Battery | $11.0k | $212 | 146.7 | -74.6 | 1,145.7 | -2.1% | $1.50 | View |
| Yendon Wind Farm | YENDWF1 |
VIC1 | Wind Turbine - Onshore | $10.9k | $0 | — | 1,735.0 | 1,526.7 | 50.1% | $0.50 | View |
| Hornsdale Wind Farm Stage 3 | HDWF3 |
SA1 | Wind Turbine - Onshore | $10.4k | $0 | — | 552.1 | 416.6 | 20.5% | $0.68 | View |
| Supernode BESS | SNB01 |
QLD1 | Storage - Battery | $10.3k | $0 | — | 56.2 | 3,748.3 | 0.9% | $1.50 | View |
| Musselroe Wind Farm | MUSSELR1 |
TAS1 | Wind Turbine - Onshore | $10.2k | $0 | — | 960.2 | 357.1 | 23.8% | $0.50 | View |
| Ross River Solar Farm | RRSF1 |
QLD1 | Solar PV - Single axis tracking | $10.2k | $0 | — | 405.2 | 191.8 | 13.2% | $0.25 | View |
| Woolnorth Studland Bay / Bluff Point | WOOLNTH1 |
TAS1 | Wind Turbine - Onshore | $10.1k | $0 | — | 858.0 | — | 25.9% | $0.53 | View |
| German Creek | GERMCRK |
QLD1 | Reciprocating Engine - Spark ignition | $10.0k | $0 | — | 214.3 | — | 19.8% | $122.81 | View |
| Sebastopol Solar Farm | SEBSF1 |
NSW1 | Solar PV - Single axis tracking | $9.9k | $0 | — | 300.3 | 186.3 | 13.9% | $0.25 | View |
| Hawkesdale Wind Farm | HD1WF1 |
VIC1 | Wind Turbine - Onshore | $9.9k | $0 | — | 1,541.0 | 1,240.2 | 66.5% | $0.00 | View |
| Childers Solar Farm | CHILDSF1 |
QLD1 | Solar PV - Single axis tracking | $9.7k | $0 | — | 246.6 | 104.0 | 16.0% | $0.34 | View |
| White Rock Wind Farm - Stage 1 | WRWF1 |
NSW1 | Wind Turbine - Onshore | $9.6k | $0 | — | 200.9 | 187.0 | 4.8% | $0.50 | View |
| Hornsdale Wind Farm Stage 2 | HDWF2 |
SA1 | Wind Turbine - Onshore | $9.6k | $0 | — | 476.6 | 372.8 | 19.4% | $0.69 | View |
| Quarantine | QPS5 |
SA1 | Turbine - OCGT | $9.5k | $0 | — | 373.3 | 1,729.3 | 12.2% | $209.05 | View |
| Waubra | WAUBRAWF |
VIC1 | Wind Turbine - Onshore | $9.4k | $0 | — | 1,287.3 | — | 27.9% | $0.50 | View |
| Lemonthyme / Wilmot | LEM_WIL |
TAS1 | Hydro - Dam | $9.4k | $257 | 125.3 | 655.4 | 475.7 | 33.5% | $1.00 | View |
| West Wyalong Solar Farm | WSTWYSF1 |
NSW1 | Solar PV - Single axis tracking | $9.3k | $0 | — | 279.2 | 175.0 | 11.1% | $0.25 | View |
| Dundonnell Wind Farm | DUNDWF1 |
VIC1 | Wind Turbine - Onshore | $9.3k | $0 | — | 1,610.7 | 1,993.7 | 39.9% | $0.66 | View |
| Meadowbank | MEADOWBK |
TAS1 | Hydro - Dam | $9.2k | $12 | 15.6 | 411.3 | 634.3 | 42.8% | $1.00 | View |
| Portland Wind Farm | PORTWF |
VIC1 | Wind Turbine - Onshore | $9.1k | $0 | — | 1,571.4 | — | 43.2% | $0.50 | View |
| Tully Sugar Mill | TULLYSM1 |
QLD1 | Turbine - Steam Super Critical | $9.0k | $0 | — | 177.4 | — | 23.1% | $117.00 | View |
| Rugby Run Solar Farm | RUGBYR1 |
QLD1 | Solar PV - Single axis tracking | $9.0k | $0 | — | 261.5 | 133.6 | 16.8% | $0.25 | View |
| Mt Gellibrand Wind Farm | MTGELWF1 |
VIC1 | Wind Turbine - Onshore | $9.0k | $0 | — | 1,939.1 | 1,346.1 | 58.3% | $0.50 | View |
| Oakey 2 Solar Farm | OAKEY2SF |
QLD1 | Solar PV - Single axis tracking | $8.9k | $0 | — | 213.6 | 82.3 | 16.0% | $0.25 | View |
| Goonumbla Solar Farm | GOONSF1 |
NSW1 | Solar PV - Single axis tracking | $8.4k | $0 | — | 223.7 | 140.7 | 13.4% | $0.25 | View |
| Bomen Solar Farm | BOMENSF1 |
NSW1 | Solar PV - Single axis tracking | $8.3k | $0 | — | 265.4 | 158.8 | 9.1% | $0.25 | View |
| Mortlake South Wind Farm | MRTLSWF1 |
VIC1 | Wind Turbine - Onshore | $8.3k | $0 | — | 2,343.8 | 1,634.0 | 62.0% | $0.50 | View |
| Kingaroy Solar Farm | KINGASF1 |
QLD1 | Solar PV - Single axis tracking | $8.0k | $0 | — | 185.5 | 60.4 | 19.3% | $0.25 | View |
| Berrybank Wind Farm | BRYB2WF2 |
VIC1 | Wind Turbine - Onshore | $7.8k | $0 | — | 1,786.8 | 1,234.8 | 68.2% | $0.65 | View |
| LaTrobe Valley BESS | LVES1 |
VIC1 | Storage - Battery | $7.7k | $51 | 3,429.0 | -94.9 | 1,441.7 | -4.0% | $1.54 | View |
| Stockyard Hill Wind Farm | STOCKYD1 |
VIC1 | Wind Turbine - Onshore | $7.6k | $0 | — | 8,471.2 | 6,078.7 | 66.9% | $0.50 | View |
| BRDDBES1 | BRDDBES1 |
QLD1 | $7.4k | $0 | — | 96.3 | 2,595.0 | 1.1% | $0.27 | View | |
| Torrens Island B | TORRB2 |
SA1 | Turbine - Steam Sub Critical | $7.4k | $0 | — | 237.7 | — | 5.0% | $5.47 | View |
| Kidston Solar Project Phase One 50MW | KSP1 |
QLD1 | Solar PV - Fixed | $7.4k | $0 | — | 220.3 | 139.1 | 18.4% | $0.20 | View |
| Gladstone | GSTONE2 |
QLD1 | Turbine - Steam Sub Critical | $7.2k | $0 | — | 145.6 | — | 2.2% | $49.17 | View |
| Jemalong Solar | JEMALNG1 |
NSW1 | Solar PV - Single axis tracking | $6.6k | $0 | — | 174.4 | 100.1 | 13.2% | $0.32 | View |
| Elaine Wind Farm | ELAINWF1 |
VIC1 | Wind Turbine - Onshore | $6.5k | $0 | — | 1,122.4 | 892.5 | 55.9% | $0.53 | View |
| Wyalong Solar Farm | WYASF1 |
NSW1 | Solar PV - Single axis tracking | $6.5k | $0 | — | 189.1 | 128.6 | 12.6% | $0.25 | View |
| Limondale Solar Farm 2 | LIMOSF21 |
NSW1 | Solar PV - Single axis tracking | $6.5k | $0 | — | 154.8 | 74.1 | 22.3% | $0.25 | View |
| Gordon | GORDON |
TAS1 | Hydro - Dam | $6.5k | $1.5k | 719.9 | 516.8 | 4,152.0 | 5.0% | $1.05 | View |
| Beryl Solar Farm | BERYLSF1 |
NSW1 | Solar PV - Single axis tracking | $6.3k | $0 | — | 174.6 | 74.9 | 7.4% | $0.25 | View |
| Parkes Solar Farm | PARSF1 |
NSW1 | Solar PV - Single axis tracking | $6.3k | $0 | — | 182.6 | 110.0 | 15.4% | $0.25 | View |
| Repulse | REPULSE |
TAS1 | Hydro - Dam | $6.2k | $0 | — | 330.9 | — | 49.2% | $1.00 | View |
| Victorian Big Battery | VBB1 |
VIC1 | Storage - Battery | $6.2k | $272 | 156.5 | -40.1 | 3,445.6 | -0.6% | $1.50 | View |
| Barron Gorge | BARRON-2 |
QLD1 | Hydro - Run of River | $6.2k | $0 | — | 93.2 | 231.0 | 11.1% | $0.00 | View |
| Guthega | GUTHEGA |
NSW1 | Hydro - Dam | $6.1k | $0 | — | 89.9 | 980.3 | 6.2% | $1.05 | View |
| Mt Mercer Wind Farm | MERCER01 |
VIC1 | Wind Turbine - Onshore | $6.0k | $0 | — | 984.8 | 1,231.5 | 31.3% | $0.50 | View |
| Moree Solar Farm | MOREESF1 |
NSW1 | Solar PV - Single axis tracking | $5.9k | $0 | — | 157.5 | 61.4 | 11.7% | $0.25 | View |
| Chinchilla BESS | CHBESS1 |
QLD1 | Storage - Battery | $5.8k | $16 | 566.2 | 62.4 | 1,441.7 | 2.6% | $1.75 | View |
| Whitsunday Solar Farm | WHITSF1 |
QLD1 | Solar PV - Single axis tracking | $5.8k | $0 | — | 143.1 | 57.2 | 10.4% | $0.25 | View |
| Bungala Two Solar Farm | BNGSF2 |
SA1 | Solar PV - Single axis tracking | $5.8k | $0 | — | 350.4 | 273.7 | 10.8% | $0.33 | View |
| Griffith Solar Farm | GRIFSF1 |
NSW1 | Solar PV - Single axis tracking | $5.7k | $0 | — | 131.6 | — | 20.2% | $0.35 | View |
| Hamilton Solar Farm | HAMISF1 |
QLD1 | Solar PV - Single axis tracking | $5.7k | $0 | — | 140.5 | 50.1 | 10.2% | $18.64 | View |
| Crowlands Wind Farm | CROWLWF1 |
VIC1 | Wind Turbine - Onshore | $5.7k | $0 | — | 894.7 | 880.6 | 46.6% | $0.68 | View |
| Clements Gap Wind Farm | CLEMGPWF |
SA1 | Wind Turbine - Onshore | $5.5k | $0 | — | 264.4 | 233.9 | 19.4% | $0.80 | View |
| Oaklands Hill Wind Farm | OAKLAND1 |
VIC1 | Wind Turbine - Onshore | $5.4k | $0 | — | 891.4 | 693.9 | 55.3% | $0.50 | View |
| Corowa Solar Farm | CRWASF1 |
NSW1 | Solar PV - Single axis tracking | $5.1k | $0 | — | 131.4 | 63.5 | 15.2% | $0.33 | View |
| Riverina Energy Storage System 2 | RIVNB2 |
NSW1 | Storage - Battery | $5.1k | $0 | — | 30.5 | 362.8 | 2.0% | $1.50 | View |
| Berrybank Wind Farm | BRYB1WF1 |
VIC1 | Wind Turbine - Onshore | $5.0k | $0 | — | 3,251.9 | 2,159.3 | 75.0% | $0.50 | View |
| Smithfield BESS | SMTHBES1 |
NSW1 | Storage - Battery | $5.0k | $398 | 2,006.3 | 29.1 | 937.1 | 1.4% | $1.50 | View |
| SHGEN | SHGEN |
NSW1 | $4.9k | $0 | — | 73.5 | 600.0 | 1.2% | $1.20 | View | |
| Wandoan South Solar Stage 2 | WANDSF2 |
QLD1 | Solar PV - Single axis tracking | $4.7k | $0 | — | 92.9 | 4.8 | 1.2% | $0.25 | View |
| Cherry Tree Wind Farm | CHYTWF1 |
VIC1 | Wind Turbine - Onshore | $4.6k | $0 | — | 538.1 | 545.6 | 38.9% | $0.53 | View |
| Wandoan South BESS | WANDB1 |
QLD1 | Storage - Battery | $4.6k | $583 | 2,807.4 | 52.1 | 777.1 | 2.2% | $1.50 | View |
| Bungala One Solar Farm | BNGSF1 |
SA1 | Solar PV - Single axis tracking | $4.6k | $0 | — | 293.5 | 37.2 | 9.1% | $0.34 | View |
| Wagga North Solar Farm | WAGGNSF1 |
NSW1 | Solar PV - Single axis tracking | $4.6k | $0 | — | 146.8 | 90.0 | 11.0% | $0.25 | View |
| Paloona | PALOONA |
TAS1 | Hydro - Dam | $4.5k | $0 | — | 299.5 | — | 44.6% | $1.00 | View |
| Hayman Solar Farm | HAYMSF1 |
QLD1 | Solar PV - Single axis tracking | $4.4k | $0 | — | 102.0 | 3.7 | 7.4% | $0.34 | View |
| Manildra Solar Farm | MANSLR1 |
NSW1 | Solar PV - Single axis tracking | $4.3k | $0 | — | 96.4 | 61.0 | 8.0% | $0.25 | View |
| Collinsville PV | CSPVPS1 |
QLD1 | Solar PV - Fixed | $4.1k | $0 | — | 112.9 | 37.3 | 11.1% | $0.28 | View |
| Middlemount Solar Farm | MIDDLSF1 |
QLD1 | Solar PV - Single axis tracking | $4.1k | $0 | — | 101.3 | 43.0 | 16.2% | $0.25 | View |
| Oakey Solar Farm | OAKEY1SF |
QLD1 | Solar PV - Fixed | $4.0k | $0 | — | 99.7 | 41.2 | 16.6% | $0.20 | View |
| Cluny | CLUNY |
TAS1 | Hydro - Dam | $3.8k | $0 | — | 200.9 | — | 44.0% | $1.00 | View |
| Maryrorough Solar Farm | MARYRSF1 |
QLD1 | Solar PV - Single axis tracking | $3.6k | $0 | — | 94.3 | 54.5 | 11.4% | $0.25 | View |
| Wallgrove Grid Battery project | WALGRV1 |
NSW1 | Storage - Battery | $3.6k | $95 | 1,913.6 | 28.5 | 617.6 | 2.4% | $1.50 | View |
| Molong Solar Farm | MOLNGSF1 |
NSW1 | Solar PV - Single axis tracking | $3.5k | $0 | — | 85.2 | 46.2 | 9.8% | $0.25 | View |
| Junee Solar Farm | JUNEESF1 |
NSW1 | Solar PV - Single axis tracking | $3.2k | $0 | — | 98.3 | 63.6 | 11.4% | $0.00 | View |
| Capital Battery | CAPBES1 |
NSW1 | Storage - Battery | $3.2k | $0 | — | -3.8 | 1,441.7 | -0.2% | $1.50 | View |
| Port Augusta Renewable Energy Park - Solar | PAREPS1 |
SA1 | Solar PV - Fixed | $3.1k | $0 | — | 269.0 | 204.2 | 11.3% | $0.20 | View |
| Barcaldine Remote Community Solar Farm | BARCSF1 |
QLD1 | Solar PV - Single axis tracking | $3.1k | $0 | — | 75.8 | — | 15.8% | $0.00 | View |
| Tailem Bend Battery Project | TB2B1 |
SA1 | Storage - Battery | $3.0k | $328 | 446.6 | -24.4 | 584.6 | -2.5% | $1.50 | View |
| Hazelwood Battery Energy Storage System (HBESS) | HBESS1 |
VIC1 | Storage - Battery | $2.9k | $165 | 142.7 | -84.4 | 2,160.5 | -1.8% | $1.87 | View |
| West Kiewa | WKIEWA1 |
VIC1 | Hydro - Dam | $2.8k | $0 | — | 373.0 | 477.5 | 45.7% | $10.00 | View |
| Warwick Solar Farm | WARWSF1 |
QLD1 | Solar PV - Single axis tracking | $2.8k | $0 | — | 60.6 | 15.9 | 7.9% | $0.25 | View |
| Challicum Hills | CHALLHWF |
VIC1 | Wind Turbine - Onshore | $2.7k | $0 | — | 408.0 | — | 32.4% | $0.53 | View |
| Hughenden Sun Farm | HUGSF1 |
QLD1 | Solar PV - Single axis tracking | $2.6k | $0 | — | 71.6 | — | 14.2% | $0.00 | View |
| Tailem Bend - Solar | TBSF1 |
SA1 | Solar PV - Fixed | $2.6k | $0 | — | 301.5 | 237.6 | 11.6% | $0.20 | View |
| KIATAWF1 | KIATAWF1 |
VIC1 | $2.5k | $0 | — | 433.0 | 361.1 | 58.1% | $0.68 | View | |
| Warwick Solar Farm | WARWSF2 |
QLD1 | Solar PV - Single axis tracking | $2.5k | $0 | — | 56.9 | 24.4 | 7.4% | $0.25 | View |
| Gunsynd Solar Farm | GUSF1 |
QLD1 | Solar PV - Fixed | $2.2k | $0 | — | 131.0 | 176.8 | 5.8% | $0.00 | View |
| Riverina Energy Storage System 1 | RESS1 |
NSW1 | Storage - Battery | $2.1k | $0 | — | -65.5 | 606.8 | -4.5% | $1.50 | View |
| Longreach Solar Farm | LRSF1 |
QLD1 | Solar PV - Fixed | $2.0k | $0 | — | 52.7 | — | 14.6% | $0.20 | View |
| Rowallan | ROWALLAN |
TAS1 | Hydro - Dam | $1.8k | $0 | — | 137.0 | — | 54.4% | $1.00 | View |
| Darlington Point Energy Storage System | DPNTB1 |
NSW1 | Storage - Battery | $1.7k | $0 | — | 7.8 | 139.1 | 1.3% | $0.00 | View |
| Butlers Gorge | BUTLERSG |
TAS1 | Hydro - Dam | $1.7k | $0 | — | 142.0 | — | 48.5% | $1.00 | View |
| Bouldercombe Battery project | BBATTERY1 |
QLD1 | Storage - Battery | $1.5k | $368 | 345.6 | 2.7 | 691.8 | 0.2% | $1.64 | View |
| Eildon | EILDON1 |
VIC1 | Hydro - Dam | $1.5k | $0 | — | 66.1 | 648.7 | 4.1% | $1.05 | View |
| Eildon | EILDON2 |
VIC1 | Hydro - Dam | $1.5k | $0 | — | 64.6 | 634.3 | 4.0% | $1.00 | View |
| Yaloak South Wind Farm | YSWF1 |
VIC1 | Wind Turbine - Onshore | $1.5k | $0 | — | 261.2 | — | 37.9% | $0.50 | View |
| Gullen Range Solar Farm | GULLRSF1 |
NSW1 | Solar PV - Fixed | $1.5k | $0 | — | 35.4 | 16.4 | 14.7% | $0.27 | View |
| Kennedy Energy Park - Phase 1 - Solar | KEPSF1 |
QLD1 | Solar PV - Single axis tracking | $1.4k | $0 | — | 33.6 | 20.4 | 9.3% | $0.34 | View |
| Yambuk | YAMBUKWF |
VIC1 | Wind Turbine - Onshore | $1.4k | $0 | — | 260.3 | — | 36.2% | $0.50 | View |
| White Rock Solar Farm | WRSF1 |
NSW1 | Solar PV - Fixed | $1.4k | $0 | — | 41.2 | 15.0 | 8.6% | $0.20 | View |
| Royalla Solar Farm | ROYALLA1 |
NSW1 | Solar PV - Fixed | $1.3k | $0 | — | 33.9 | — | 7.1% | $0.20 | View |
| Lake Echo | LK_ECHO |
TAS1 | Hydro - Dam | $1.2k | $0 | — | 96.8 | — | 12.5% | $1.17 | View |
| Lake Bonney Battery Energy Storage | LBB1 |
SA1 | Storage - Battery | $1.0k | $19 | 778.1 | -6.3 | 346.0 | -1.0% | $1.98 | View |
| Dundonnell Wind Farm | DUNDWF2 |
VIC1 | Wind Turbine - Onshore | $968 | $0 | — | 517.5 | 532.9 | 46.7% | $0.66 | View |
| Gannawarra Energy Storage System | GANNB1 |
VIC1 | Storage - Battery | $687 | $0 | — | -6.4 | 169.0 | -1.0% | $1.98 | View |
| Bulgana Green Power Hub - BESS | BULBES1 |
VIC1 | Storage - Battery | $539 | $188 | 401.9 | -8.6 | 240.0 | -1.8% | $1.98 | View |
| Mannum Solar Farm 2 | MANNSF2 |
SA1 | Solar PV - Single axis tracking | $488 | $0 | — | 82.3 | 57.9 | 11.4% | $0.25 | View |
| Happy Valley Reservoir | HVWWBA1 |
SA1 | Storage - Battery | $472 | $3 | 118.5 | -2.2 | 57.7 | -1.6% | $1.58 | View |
| Bald Hills Wind Farm | BALDHWF1 |
VIC1 | Wind Turbine - Onshore | $446 | $0 | — | 930.4 | 423.4 | 36.4% | $0.00 | View |
| Ballarat Energy Storage System | BALB1 |
VIC1 | Storage - Battery | $389 | $0 | — | -8.9 | 389.2 | -1.2% | $0.00 | View |
| Broken Hill | BHB1 |
NSW1 | Storage - Battery | $297 | $0 | — | -8.0 | 314.9 | -0.7% | $1.50 | View |
| Mulwala Solar Farm | MULWASF1 |
NSW1 | Solar PV - Single axis tracking | $265 | $0 | — | 4.3 | 45.6 | 0.6% | $0.25 | View |
| Bolivar Waste Water Treatment | BOWWBA1 |
SA1 | Storage - Battery | $257 | $0 | — | -1.5 | 28.8 | -2.0% | $1.58 | View |
| Mortons Lane Wind Farm | MLWF1 |
VIC1 | Wind Turbine - Onshore | $249 | $0 | — | 277.1 | — | 59.2% | $0.50 | View |
| Christies Beach Wastewater Treatment Plant | CBWWBA1 |
SA1 | Storage - Battery | $235 | $0 | 0.1 | -1.0 | 28.5 | -1.8% | $1.50 | View |
| Murray Bridge - Onkaparinga Pipeline Pump 2 | MBPS2PV1 |
SA1 | Solar PV - Single axis tracking | $228 | $0 | — | 20.5 | 10.5 | 6.2% | $0.25 | View |
| Mt Stuart | MSTUART1 |
QLD1 | Turbine - OCGT | $225 | $0 | — | 4.5 | 1,989.5 | 0.1% | $2.00 | View |
| Diapur Wind Farm | DIAPURWF1 |
VIC1 | Wind Turbine - Onshore | $212 | $0 | — | 112.9 | — | 58.8% | $0.00 | View |
| Dalrymple BESS | DALNTH1 |
SA1 | Storage - Battery | $209 | $0 | — | -5.1 | 196.4 | -0.7% | $2.03 | View |
| Morgan To Whyalla Pipeline No 1 PS And Water Filtration Plant | MWPS1PV1 |
SA1 | Solar PV - Single axis tracking | $128 | $0 | — | 9.8 | 4.9 | 7.4% | $0.25 | View |
| Philip Island BESS | PIBESS1 |
VIC1 | Storage - Battery | $128 | $49 | 13.0 | -4.1 | 52.6 | -3.4% | $1.50 | View |
| Braemar 2 Power Station | BRAEMAR7 |
QLD1 | Turbine - OCGT | $107 | $0 | — | 2.1 | 2,389.8 | 0.1% | $132.25 | View |
| Mt Stuart | MSTUART2 |
QLD1 | Turbine - OCGT | $90 | $0 | — | 1.8 | — | 0.1% | $148.45 | View |
| Braemar 2 Power Station | BRAEMAR5 |
QLD1 | Turbine - OCGT | $85 | $0 | — | 1.7 | 2,413.7 | 0.0% | $3.14 | View |
| Swanbank E GT | SWAN_E |
QLD1 | Turbine - CCGT | $82 | $0 | — | 1.6 | — | 0.0% | $2.00 | View |
| Morgan To Whyalla Pipeline No 4 PS | MWPS4PV1 |
SA1 | Solar PV - Single axis tracking | $82 | $0 | — | 9.4 | 2.4 | 7.1% | $0.25 | View |
| Mannum Adelaide Pumping Station No 2 - MAPL2 (Palmer) | MAPS2PV1 |
SA1 | Solar PV - Single axis tracking | $56 | $0 | — | 23.7 | 12.0 | 6.0% | $0.26 | View |
| Morgan To Whyalla Pipeline No 2 PS | MWPS2PV1 |
SA1 | Solar PV - Single axis tracking | $46 | $0 | — | 4.6 | 2.8 | 3.5% | $0.25 | View |
| Rubicon Mountain Streams | RUBICON |
VIC1 | Hydro - Dam | $34 | $0 | — | 17.6 | — | 5.4% | $1.00 | View |
| Bolivar Waste Water Treatment | BOWWPV1 |
SA1 | Solar PV - Fixed | $33 | $0 | — | 17.4 | 10.7 | 8.8% | $0.23 | View |
| Mannum Adelaide Pumping Station No 3 - MAPL3 (Tungkillo) | MAPS3PV1 |
SA1 | Solar PV - Single axis tracking | $26 | $0 | — | 35.0 | 21.7 | 8.8% | $0.25 | View |
| Mintaro GT | MINTARO |
SA1 | Turbine - OCGT | $19 | $0 | — | 0.6 | 1,275.3 | 0.0% | $128.50 | View |
| Happy Valley Reservoir | HVWWPV1 |
SA1 | Solar PV - Single axis tracking | $13 | $0 | — | 18.0 | 7.9 | 6.8% | $0.00 | View |
| Jeeralang B | JLB01 |
VIC1 | Turbine - OCGT | $12 | $0 | — | 2.9 | 1,124.5 | 0.2% | $128.50 | View |
| Tailem Bend Stage 2 Solar Project | TB2SF1 |
SA1 | Solar PV - Single axis tracking | $9 | $0 | — | 0.7 | — | 0.0% | $0.25 | View |
| Ladbroke Grove | LADBROK1 |
SA1 | Turbine - OCGT | $2 | $0 | — | 0.1 | 605.5 | 0.0% | $153.02 | View |
| Ladbroke Grove | LADBROK2 |
SA1 | Turbine - OCGT | $2 | $0 | — | 0.1 | 603.1 | 0.0% | $145.06 | View |
| BRDDSF01 | BRDDSF01 |
QLD1 | $2 | $0 | — | 0.1 | — | 0.0% | $0.27 | View | |
| Bogong / Mackay | MCKAY1 |
VIC1 | Hydro - Dam | $1 | $0 | — | 0.1 | 4,325.0 | 0.0% | $1.00 | View |
| Bairnsdale | BDL01 |
VIC1 | Turbine - OCGT | $0 | $0 | — | 0.0 | 624.8 | 0.0% | $142.10 | View |
| Bolivar Power Station | BOLIVPS1 |
SA1 | Turbine - OCGT | $0 | $0 | — | 0.0 | — | 0.0% | $151.37 | View |
| RT_TAS1 | RT_TAS1 |
$0 | $0 | — | — | — | — | — | View | ||
| Townsville Power Station | YABULU2 |
QLD1 | Turbine - CCGT | $0 | $0 | — | — | — | 0.0% | $84.30 | View |
| VSSSH1S1 | VSSSH1S1 |
$0 | $0 | — | — | — | — | — | View | ||
| Port Stanvac 1 | PTSTAN1 |
SA1 | Reciprocating Engine - Compression ignition | $0 | $0 | — | — | 807.3 | 0.0% | $308.00 | View |
| VSSSE1V1 | VSSSE1V1 |
$0 | $0 | — | — | — | — | — | View | ||
| Townsville Power Station | YABULU |
QLD1 | Turbine - CCGT | $0 | $0 | — | — | — | 0.0% | $84.30 | View |
| Port Lincoln GT | POR03 |
SA1 | Turbine - OCGT | $0 | $0 | — | — | — | 0.0% | $2.00 | View |
| Roma | ROMA_7 |
QLD1 | Turbine - OCGT | $0 | $0 | — | — | 513.2 | 0.0% | $128.50 | View |
| VSSAE1V1 | VSSAE1V1 |
$0 | $0 | — | — | — | — | — | View | ||
| VSNEL2S1 | VSNEL2S1 |
$0 | $0 | — | — | — | — | — | View | ||
| Tallawarra B | TALWB1 |
NSW1 | Turbine - OCGT | $0 | $0 | — | — | 4,541.2 | 0.0% | $128.50 | View |
| VSQHT1V1 | VSQHT1V1 |
$0 | $0 | — | — | — | — | — | View | ||
| QPSFB1 | QPSFB1 |
$0 | $0 | — | 230.0 | 163.0 | — | — | View | ||
| VSVEL2S1 | VSVEL2S1 |
$0 | $0 | — | — | — | — | — | View | ||
| PUMP1 | PUMP1 |
$0 | $0 | — | — | — | — | — | View | ||
| Quarantine | QPS4 |
SA1 | Turbine - OCGT | $0 | $0 | — | — | 317.2 | 0.0% | $128.50 | View |
| Quarantine | QPS3 |
SA1 | Turbine - OCGT | $0 | $0 | — | — | 418.1 | 0.0% | $128.50 | View |
| QPSFB2 | QPSFB2 |
$0 | $0 | — | 31.4 | 273.9 | — | — | View | ||
| WAMBOWF2 | WAMBOWF2 |
$0 | $0 | — | 85.0 | 67.1 | — | — | View | ||
| Quarantine | QPS2 |
SA1 | Turbine - OCGT | $0 | $0 | — | — | 342.1 | 0.0% | $128.50 | View |
| Wambo Wind Farm | WAMBOWF1 |
QLD1 | Wind Turbine - Onshore | $0 | $0 | — | — | — | 0.0% | $0.50 | View |
| Quarantine | QPS1 |
SA1 | Turbine - OCGT | $0 | $0 | — | — | 418.1 | 0.0% | $128.50 | View |
| Wivenhoe | W/HOE#2 |
Storage - Pumped hydro | $0 | $0 | 12.3 | 759.4 | 3,035.2 | — | — | View | |
| PUMP2 | PUMP2 |
$0 | $0 | — | 1,453.4 | 584.8 | — | — | View | ||
| Wivenhoe | W/HOE#1 |
Storage - Pumped hydro | $0 | $0 | — | — | — | — | — | View | |
| WNSF1 | WNSF1 |
$0 | $0 | — | 68.4 | — | — | — | View | ||
| WOOLES1 | WOOLES1 |
$0 | $0 | — | -2.1 | — | — | — | View | ||
| Valley Power | VPGS6 |
VIC1 | Turbine - OCGT | $0 | $0 | — | — | 782.7 | 0.0% | $128.50 | View |
| RT_VIC2 | RT_VIC2 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_SA2 | RT_SA2 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_SA1 | RT_SA1 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_QLD1 | RT_QLD1 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_VIC8 | RT_VIC8 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_NSW6 | RT_NSW6 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_VIC9 | RT_VIC9 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_NSW5 | RT_NSW5 |
$0 | $0 | — | — | — | — | — | View | ||
| DRGBND02 | DRGBND02 |
$0 | $0 | 1.2 | — | — | — | — | View | ||
| SHPUMP | SHPUMP |
$0 | $0 | — | 72.9 | — | — | — | View | ||
| Smithfield Energy Facility | SITHE01 |
NSW1 | Turbine - OCGT | $0 | $0 | — | — | — | 0.0% | $128.50 | View |
| RT_SA3 | RT_SA3 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_SA4 | RT_SA4 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_SA5 | RT_SA5 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_VIC12 | RT_VIC12 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_VIC3 | RT_VIC3 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_VIC11 | RT_VIC11 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_VIC10 | RT_VIC10 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_VIC1 | RT_VIC1 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_VIC4 | RT_VIC4 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_VIC5 | RT_VIC5 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_VIC6 | RT_VIC6 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_SA6 | RT_SA6 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_VIC7 | RT_VIC7 |
$0 | $0 | — | — | — | — | — | View | ||
| Snapper Point Power Station | SNAPPER1 |
SA1 | Turbine - OCGT | $0 | $0 | — | — | 2,162.5 | 0.0% | $128.50 | View |
| RT_NSW4 | RT_NSW4 |
$0 | $0 | — | — | — | — | — | View | ||
| Uranquinty | URANQ12 |
NSW1 | Turbine - OCGT | $0 | $0 | — | — | 1,771.2 | 0.0% | $128.50 | View |
| Uranquinty | URANQ13 |
NSW1 | Turbine - OCGT | $0 | $0 | — | — | 1,769.7 | 0.0% | $128.50 | View |
| Uranquinty | URANQ14 |
NSW1 | Turbine - OCGT | $0 | $0 | — | — | 1,764.2 | 0.0% | $128.50 | View |
| VENUS1 | VENUS1 |
$0 | $0 | — | — | — | — | — | View | ||
| Valley Power | VPGS1 |
VIC1 | Turbine - OCGT | $0 | $0 | — | — | 822.2 | 0.0% | $128.50 | View |
| RT_NSW1 | RT_NSW1 |
$0 | $0 | — | — | — | — | — | View | ||
| Valley Power | VPGS2 |
VIC1 | Turbine - OCGT | $0 | $0 | — | — | 822.2 | 0.0% | $128.50 | View |
| Valley Power | VPGS3 |
VIC1 | Turbine - OCGT | $0 | $0 | — | — | 822.2 | 0.0% | $128.50 | View |
| Valley Power | VPGS4 |
VIC1 | Turbine - OCGT | $0 | $0 | — | — | 782.7 | 0.0% | $128.50 | View |
| Valley Power | VPGS5 |
VIC1 | Turbine - OCGT | $0 | $0 | — | — | 782.7 | 0.0% | $128.50 | View |
| Uranquinty | URANQ11 |
NSW1 | Turbine - OCGT | $0 | $0 | — | — | 1,749.4 | 0.0% | $128.50 | View |
| Tamar Valley Peaking | TVPP104 |
TAS1 | Turbine - OCGT | $0 | $0 | — | — | 432.5 | 0.0% | $128.50 | View |
| Tribute | TRIBUTE |
TAS1 | Hydro - Dam | $0 | $0 | — | — | 348.0 | 0.0% | $1.00 | View |
| RT_NSW3 | RT_NSW3 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_NSW2 | RT_NSW2 |
$0 | $0 | — | — | — | — | — | View | ||
| SNOWYGJP | SNOWYGJP |
$0 | $0 | 1,332.2 | — | — | — | — | View | ||
| SNOWYP | SNOWYP |
$0 | $0 | — | 373.7 | 373.7 | — | — | View | ||
| Snuggery | SNUG1 |
SA1 | Turbine - OCGT | $0 | $0 | — | — | — | 0.0% | $2.00 | View |
| STABESS1 | STABESS1 |
$0 | $0 | — | -1.3 | — | — | — | View | ||
| Stanwell | STAN-3 |
QLD1 | Turbine - Steam Sub Critical | $0 | $0 | — | — | — | 0.0% | $52.60 | View |
| Tallawarra | TALWA1 |
NSW1 | Turbine - CCGT | $0 | $0 | — | — | — | 0.0% | $84.30 | View |
| Torrens Island B | TORRB3 |
SA1 | Turbine - Steam Sub Critical | $0 | $0 | — | — | — | 0.0% | $2.00 | View |
| Torrens Island B | TORRB4 |
SA1 | Turbine - Steam Sub Critical | $0 | $0 | — | — | — | 0.0% | $2.00 | View |
| Roma | ROMA_8 |
QLD1 | Turbine - OCGT | $0 | $0 | — | — | 508.7 | 0.0% | $128.50 | View |
| Port Lincoln GT | POR01 |
SA1 | Turbine - OCGT | $0 | $0 | — | — | — | 0.0% | $2.00 | View |
| Condamine A | CPSA |
QLD1 | Turbine - CCGT | $0 | $0 | — | — | — | 0.0% | $95.40 | View |
| DRAESS1 | DRAESS1 |
$0 | $0 | — | — | — | — | — | View | ||
| DRBRLV01 | DRBRLV01 |
$0 | $0 | 278.0 | — | — | — | — | View | ||
| DRFIIN01 | DRFIIN01 |
$0 | $0 | — | — | — | — | — | View | ||
| DRFIIN02 | DRFIIN02 |
$0 | $0 | — | — | — | — | — | View | ||
| DRGBND01 | DRGBND01 |
$0 | $0 | 17.4 | — | — | — | — | View | ||
| DRGBND03 | DRGBND03 |
$0 | $0 | — | — | — | — | — | View | ||
| DRGBND04 | DRGBND04 |
$0 | $0 | 287.0 | — | — | — | — | View | ||
| DRHTVP01 | DRHTVP01 |
$0 | $0 | — | — | — | — | — | View | ||
| DRHTVP03 | DRHTVP03 |
$0 | $0 | — | — | — | — | — | View | ||
| DRAESN3 | DRAESN3 |
$0 | $0 | — | — | — | — | — | View | ||
| DRACAV1 | DRACAV1 |
$0 | $0 | — | — | — | — | — | View | ||
| CRWARP1 | CRWARP1 |
$0 | $0 | — | 766.1 | 364.6 | — | — | View | ||
| Dartmouth | DARTM1 |
VIC1 | Hydro - Dam | $0 | $0 | — | — | 2,133.7 | 0.0% | $0.00 | View |
| Darling Downs | DDPS1 |
QLD1 | Turbine - CCGT | $0 | $0 | — | — | — | 0.0% | $3.31 | View |
| DG_NSW1 | DG_NSW1 |
$0 | $0 | — | — | — | — | — | View | ||
| DG_QLD1 | DG_QLD1 |
$0 | $0 | — | — | — | — | — | View | ||
| DG_SA1 | DG_SA1 |
$0 | $0 | — | — | — | — | — | View | ||
| DG_TAS1 | DG_TAS1 |
$0 | $0 | — | — | — | — | — | View | ||
| DG_VIC1 | DG_VIC1 |
$0 | $0 | — | — | — | — | — | View | ||
| DRACAN1 | DRACAN1 |
$0 | $0 | 11.0 | — | — | — | — | View | ||
| DROZVP01 | DROZVP01 |
$0 | $0 | — | — | — | — | — | View | ||
| DROZVP02 | DROZVP02 |
$0 | $0 | — | — | — | — | — | View | ||
| DRVIOT05 | DRVIOT05 |
$0 | $0 | 118.4 | — | — | — | — | View | ||
| DRVIOT06 | DRVIOT06 |
$0 | $0 | — | — | — | — | — | View | ||
| DRVIOT07 | DRVIOT07 |
$0 | $0 | — | — | — | — | — | View | ||
| DRXNAD01 | DRXNAD01 |
$0 | $0 | — | — | — | — | — | View | ||
| DRXNAE01 | DRXNAE01 |
$0 | $0 | — | — | — | — | — | View | ||
| DRXNDA01 | DRXNDA01 |
$0 | $0 | — | — | — | — | — | View | ||
| DRXNDA02 | DRXNDA02 |
$0 | $0 | — | — | — | — | — | View | ||
| DRXNDA03 | DRXNDA03 |
$0 | $0 | — | — | — | — | — | View | ||
| DRXNDA04 | DRXNDA04 |
$0 | $0 | — | — | — | — | — | View | ||
| DRVIOT04 | DRVIOT04 |
$0 | $0 | 382.6 | — | — | — | — | View | ||
| DRVIOT03 | DRVIOT03 |
$0 | $0 | 1.8 | — | — | — | — | View | ||
| DROZVP03 | DROZVP03 |
$0 | $0 | — | — | — | — | — | View | ||
| DRPSTQ01 | DRPSTQ01 |
$0 | $0 | — | — | — | — | — | View | ||
| DRPSTV01 | DRPSTV01 |
$0 | $0 | 26.4 | — | — | — | — | View | ||
| DRSHVN01 | DRSHVN01 |
$0 | $0 | — | — | — | — | — | View | ||
| DRSHVN02 | DRSHVN02 |
$0 | $0 | 484.9 | — | — | — | — | View | ||
| DRSHVS01 | DRSHVS01 |
$0 | $0 | 22.7 | — | — | — | — | View | ||
| DRSHVS02 | DRSHVS02 |
$0 | $0 | 240.3 | — | — | — | — | View | ||
| DRVIOT01 | DRVIOT01 |
$0 | $0 | 9.8 | — | — | — | — | View | ||
| DRVIOT02 | DRVIOT02 |
$0 | $0 | — | — | — | — | — | View | ||
| DRXNDB04 | DRXNDB04 |
$0 | $0 | — | — | — | — | — | View | ||
| Adelaide Desalination Plant | ADPPV1 |
SA1 | Solar PV - Fixed | $0 | $0 | — | — | — | 0.0% | $0.00 | View |
| ASNENC1 | ASNENC1 |
$0 | $0 | — | — | — | — | — | View | ||
| ASPAPM01 | ASPAPM01 |
$0 | $0 | — | — | — | — | — | View | ||
| ASPBSC01 | ASPBSC01 |
$0 | $0 | 16.8 | — | — | — | — | View | ||
| ASPSTV01 | ASPSTV01 |
$0 | $0 | 3.6 | — | — | — | — | View | ||
| ASQEEV1 | ASQEEV1 |
$0 | $0 | 59.9 | — | — | — | — | View | ||
| ASQENC1 | ASQENC1 |
$0 | $0 | — | — | — | — | — | View | ||
| ASRMGE01 | ASRMGE01 |
$0 | $0 | 58.3 | — | — | — | — | View | ||
| ASRMGE02 | ASRMGE02 |
$0 | $0 | 56.7 | — | — | — | — | View | ||
| ASRMGE03 | ASRMGE03 |
$0 | $0 | 57.4 | — | — | — | — | View | ||
| ASNBRL1 | ASNBRL1 |
$0 | $0 | 226.3 | — | — | — | — | View | ||
| ASNAES1 | ASNAES1 |
$0 | $0 | 6.3 | — | — | — | — | View | ||
| Hallett GT | AGLHAL |
SA1 | Turbine - OCGT | $0 | $0 | — | — | 2,047.2 | 0.0% | $100.22 | View |
| Somerton | AGLSOM |
VIC1 | Turbine - OCGT | $0 | $0 | — | — | 1,816.5 | 0.0% | $128.50 | View |
| APD01 | APD01 |
$0 | $0 | 1,421.8 | — | — | — | — | View | ||
| ASACLE01 | ASACLE01 |
$0 | $0 | 56.2 | — | — | — | — | View | ||
| ASDEVI01 | ASDEVI01 |
$0 | $0 | 65.9 | — | — | — | — | View | ||
| ASDLBY01 | ASDLBY01 |
$0 | $0 | 0.1 | — | — | — | — | View | ||
| ASENGV01 | ASENGV01 |
$0 | $0 | — | — | — | — | — | View | ||
| ASENGY01 | ASENGY01 |
$0 | $0 | — | — | — | — | — | View | ||
| ASGENE01 | ASGENE01 |
$0 | $0 | — | — | — | — | — | View | ||
| ASRMGE04 | ASRMGE04 |
$0 | $0 | 229.3 | — | — | — | — | View | ||
| ASRMGE05 | ASRMGE05 |
$0 | $0 | 245.5 | — | — | — | — | View | ||
| Braemar | BRAEMAR2 |
QLD1 | Turbine - OCGT | $0 | $0 | — | — | 2,634.2 | 0.0% | $130.94 | View |
| Braemar | BRAEMAR3 |
QLD1 | Turbine - OCGT | $0 | $0 | — | — | 2,621.8 | 0.0% | $128.50 | View |
| Braemar 2 Power Station | BRAEMAR6 |
QLD1 | Turbine - OCGT | $0 | $0 | — | — | 2,413.7 | 0.0% | $133.36 | View |
| BUNGAMB1 | BUNGAMB1 |
$0 | $0 | 6,033.8 | -147.2 | 2,162.5 | — | — | View | ||
| BUSF1 | BUSF1 |
$0 | $0 | — | 312.5 | 80.9 | — | — | View | ||
| Colongra | CG1 |
NSW1 | Turbine - OCGT | $0 | $0 | — | — | 2,562.9 | 0.0% | $197.00 | View |
| Colongra | CG2 |
NSW1 | Turbine - OCGT | $0 | $0 | — | — | 2,562.9 | 0.0% | $135.55 | View |
| Colongra | CG3 |
NSW1 | Turbine - OCGT | $0 | $0 | — | — | 2,562.9 | 0.0% | $144.24 | View |
| Colongra | CG4 |
NSW1 | Turbine - OCGT | $0 | $0 | — | — | 2,562.9 | 0.0% | $194.33 | View |
| Braemar | BRAEMAR1 |
QLD1 | Turbine - OCGT | $0 | $0 | — | — | 2,634.2 | 0.0% | $133.75 | View |
| Blowering | BLOWERNG |
NSW1 | Hydro - Dam | $0 | $0 | — | — | — | 0.0% | $0.00 | View |
| ASSDE1 | ASSDE1 |
$0 | $0 | — | — | — | — | — | View | ||
| ASSENC1 | ASSENC1 |
$0 | $0 | — | — | — | — | — | View | ||
| ASSERDV1 | ASSERDV1 |
$0 | $0 | — | — | — | — | — | View | ||
| ASTHYD1 | ASTHYD1 |
$0 | $0 | 99.3 | — | — | — | — | View | ||
| Barcaldine Power Station | BARCALDN |
QLD1 | Turbine - OCGT | $0 | $0 | — | — | — | 0.0% | $141.78 | View |
| Bell Bay Three | BBTHREE1 |
TAS1 | Turbine - OCGT | $0 | $0 | — | — | 360.4 | 0.0% | $182.63 | View |
| Bell Bay Three | BBTHREE2 |
TAS1 | Turbine - OCGT | $0 | $0 | — | — | — | 0.0% | $137.22 | View |
| Bell Bay Three | BBTHREE3 |
TAS1 | Turbine - OCGT | $0 | $0 | — | — | 331.6 | 0.0% | $141.97 | View |
| Bairnsdale | BDL02 |
VIC1 | Turbine - OCGT | $0 | $0 | — | — | — | 0.0% | $158.38 | View |
| Clover | CLOVER |
VIC1 | Hydro - Dam | $0 | $0 | — | — | — | 0.0% | $1.17 | View |
| DRXNDE01 | DRXNDE01 |
$0 | $0 | — | — | — | — | — | View | ||
| Poatina | POAT220 |
TAS1 | Hydro - Dam | $0 | $0 | — | — | — | 0.0% | $1.00 | View |
| KIDSPHL1 | KIDSPHL1 |
$0 | $0 | — | — | — | — | — | View | ||
| KIDSPHL2 | KIDSPHL2 |
$0 | $0 | — | — | — | — | — | View | ||
| Kogan Creek | KPP_1 |
QLD1 | Turbine - Steam Super Critical | $0 | $0 | — | — | — | 0.0% | $52.60 | View |
| LINCOLN GAP BESSBDU | LGAPBS1 |
SA1 | Storage - Battery | $0 | $0 | — | — | — | 0.0% | $1.50 | View |
| Laverton North | LNGS1 |
VIC1 | Turbine - OCGT | $0 | $0 | — | — | 2,451.3 | 0.0% | $128.50 | View |
| Laverton North | LNGS2 |
VIC1 | Turbine - OCGT | $0 | $0 | — | — | 2,451.3 | 0.0% | $128.50 | View |
| Lonsdale | LONSDALE |
SA1 | Reciprocating Engine - Compression ignition | $0 | $0 | — | — | 288.3 | 0.0% | $308.00 | View |
| MLB01 | MLB01 |
$0 | $0 | — | -157.5 | — | — | — | View | ||
| KIDSPHG2 | KIDSPHG2 |
$0 | $0 | — | — | — | — | — | View | ||
| KIDSPHG1 | KIDSPHG1 |
$0 | $0 | — | — | — | — | — | View | ||
| Jeeralang A | JLA02 |
VIC1 | Turbine - OCGT | $0 | $0 | — | — | 778.5 | 0.0% | $128.50 | View |
| Jeeralang A | JLA03 |
VIC1 | Turbine - OCGT | $0 | $0 | — | — | 778.5 | 0.0% | $141.46 | View |
| Jeeralang B | JLB02 |
VIC1 | Turbine - OCGT | $0 | $0 | — | — | 1,081.2 | 0.0% | $137.71 | View |
| Jeeralang B | JLB03 |
VIC1 | Turbine - OCGT | $0 | $0 | — | — | 1,124.5 | 0.0% | $137.85 | View |
| Kareeya | KAREEYA2 |
QLD1 | Hydro - Run of River | $0 | $0 | — | — | — | 0.0% | $1.00 | View |
| Kennedy Energy Park - Phase 1 - Storage | KEPBG1 |
QLD1 | Storage - Battery | $0 | $0 | — | — | — | 0.0% | $2.03 | View |
| KEPBL1 | KEPBL1 |
$0 | $0 | — | — | — | — | — | View | ||
| KERNGSP1 | KERNGSP1 |
$0 | $0 | — | 10.4 | 62.5 | — | — | View | ||
| MLSP1 | MLSP1 |
$0 | $0 | — | 37.6 | — | — | — | View | ||
| Jeeralang A | JLA04 |
VIC1 | Turbine - OCGT | $0 | $0 | — | — | 778.5 | 0.0% | $177.20 | View |
| NESBESS2 | NESBESS2 |
$0 | $0 | — | 68.7 | 100.0 | — | — | View | ||
| Newport | NPS |
VIC1 | Turbine - Steam Sub Critical | $0 | $0 | — | — | — | 0.0% | $2.00 | View |
| Oakey Power Station | OAKEY1 |
QLD1 | Turbine - OCGT | $0 | $0 | — | — | 845.0 | 0.0% | $128.50 | View |
| Oakey Power Station | OAKEY2 |
QLD1 | Turbine - OCGT | $0 | $0 | — | — | 845.0 | 0.0% | $128.50 | View |
| Osborne | OSB-AG |
SA1 | Turbine - CCGT | $0 | $0 | — | — | — | 0.0% | $84.30 | View |
| PIONEER | PIONEER |
$0 | $0 | — | 674.3 | — | — | — | View | ||
| PLBESS1 | PLBESS1 |
$0 | $0 | — | — | — | — | — | View | ||
| Poatina | POAT110 |
TAS1 | Hydro - Dam | $0 | $0 | — | — | — | 0.0% | $1.00 | View |
| NESBESS1 | NESBESS1 |
$0 | $0 | — | 119.4 | 166.7 | — | — | View | ||
| Morgan To Whyalla Pipeline No 3 PS | MWPS3PV1 |
SA1 | Solar PV - Single axis tracking | $0 | $0 | — | — | — | 0.0% | $0.25 | View |
| Mortlake | MORTLK11 |
VIC1 | Turbine - OCGT | $0 | $0 | — | — | 2,880.7 | 0.0% | $128.50 | View |
| Mortlake | MORTLK12 |
VIC1 | Turbine - OCGT | $0 | $0 | — | — | 2,880.2 | 0.0% | $128.50 | View |
| MREHA1 | MREHA1 |
$0 | $0 | 890.5 | -243.6 | 2,867.2 | — | — | View | ||
| MREHA2 | MREHA2 |
$0 | $0 | 963.9 | -262.4 | 2,882.6 | — | — | View | ||
| MREHA3 | MREHA3 |
$0 | $0 | 717.5 | -53.3 | 2,880.4 | — | — | View | ||
| Mt Stuart | MSTUART3 |
QLD1 | Turbine - OCGT | $0 | $0 | — | — | 1,699.0 | 0.0% | $2.00 | View |
| Murray 2 | MURRAY |
VIC1 | Hydro - Dam | $0 | $0 | — | — | 16,516.7 | 0.0% | $1.00 | View |
| Murra Warra Wind Farm - stage 1 | MUWAWF1 |
VIC1 | Wind Turbine - Onshore | $0 | $0 | — | — | — | 0.0% | $0.50 | View |
| Jeeralang A | JLA01 |
VIC1 | Turbine - OCGT | $0 | $0 | — | — | — | 0.0% | $135.55 | View |
| Hunter Power Station | HUNTER2 |
NSW1 | Turbine - OCGT | $0 | $0 | — | — | — | 0.0% | $152.46 | View |
| DRXNDJ01 | DRXNDJ01 |
$0 | $0 | — | — | — | — | — | View | ||
| DRXVDP01 | DRXVDP01 |
$0 | $0 | — | — | — | — | — | View | ||
| DRXVDX01 | DRXVDX01 |
$0 | $0 | — | — | — | — | — | View | ||
| DRXVQP01 | DRXVQP01 |
$0 | $0 | — | — | — | — | — | View | ||
| DRXVQX01 | DRXVQX01 |
$0 | $0 | — | — | — | — | — | View | ||
| DRXVQX02 | DRXVQX02 |
$0 | $0 | — | — | — | — | — | View | ||
| Dry Creek GT | DRYCGT1 |
SA1 | Turbine - OCGT | $0 | $0 | — | — | 680.2 | 0.0% | $141.50 | View |
| DRXNQX01 | DRXNQX01 |
$0 | $0 | — | — | — | — | — | View | ||
| Dry Creek GT | DRYCGT2 |
SA1 | Turbine - OCGT | $0 | $0 | — | — | 504.6 | 0.0% | $135.55 | View |
| DRXVDJ01 | DRXVDJ01 |
$0 | $0 | — | — | — | — | — | View | ||
| DRXVAE01 | DRXVAE01 |
$0 | $0 | — | — | — | — | — | View | ||
| DRXSQS01 | DRXSQS01 |
$0 | $0 | — | — | — | — | — | View | ||
| DRXNDW01 | DRXNDW01 |
$0 | $0 | — | — | — | — | — | View | ||
| DRXNFF01 | DRXNFF01 |
$0 | $0 | — | — | — | — | — | View | ||
| DRXNFS01 | DRXNFS01 |
$0 | $0 | — | — | — | — | — | View | ||
| DRXNSS01 | DRXNSS01 |
$0 | $0 | — | — | — | — | — | View | ||
| DRXNTM02 | DRXNTM02 |
$0 | $0 | — | — | — | — | — | View | ||
| DRXNVS01 | DRXNVS01 |
$0 | $0 | — | — | — | — | — | View | ||
| DRXQDA01 | DRXQDA01 |
$0 | $0 | — | — | — | — | — | View | ||
| DRXQQE01 | DRXQQE01 |
$0 | $0 | — | — | 2.2 | — | — | View | ||
| Dry Creek GT | DRYCGT3 |
SA1 | Turbine - OCGT | $0 | $0 | — | — | 703.0 | 0.0% | $210.15 | View |
| Hunter Power Station | HUNTER1 |
NSW1 | Turbine - OCGT | $0 | $0 | — | — | — | 0.0% | $142.99 | View |
| GPWFWST2 | GPWFWST2 |
$0 | $0 | — | 2,032.3 | 1,800.8 | — | — | View | ||
| Gladstone | GSTONE5 |
QLD1 | Turbine - Steam Sub Critical | $0 | $0 | — | — | — | 0.0% | $58.48 | View |
| Broken Hill GT | GB01 |
NSW1 | Turbine - OCGT | $0 | $0 | — | — | — | 0.0% | $2.11 | View |
| Hunter EconomicZone | HEZ1 |
NSW1 | Reciprocating Engine - Compression ignition | $0 | $0 | — | — | 288.3 | 0.0% | $308.00 | View |
| Eraring GT | ERGT01 |
NSW1 | Turbine - OCGT | $0 | $0 | — | — | — | 0.0% | $96.96 | View |
| GPWFWST1 | GPWFWST1 |
$0 | $0 | — | 3,545.3 | 3,400.9 | — | — | View | ||
| Hume Dam VIC | HUMEV |
VIC1 | Hydro - Dam | $0 | $0 | — | — | — | 0.0% | $1.54 | View |
| Adelaide Desalination Plant | ADPBA1 |
SA1 | Storage - Battery | $-5 | $0 | — | -0.2 | — | -0.1% | $0.00 | View |
| Hume Dam NSW | HUMENSW |
NSW1 | Hydro - Dam | $-7 | $0 | — | -0.1 | — | 0.0% | $1.05 | View |
| Terang BESS | TRGBESS1 |
VIC1 | Storage - Battery | $-12 | $0 | — | -2.9 | — | -0.1% | $1.50 | View |
| Lancaster Solar Farm | LANCSF1 |
VIC1 | Solar PV - Single axis tracking | $-23 | $0 | — | 104.8 | 79.5 | 4.1% | $0.25 | View |
| Dundonnell Wind Farm | DUNDWF3 |
VIC1 | Wind Turbine - Onshore | $-25 | $0 | — | 1,420.6 | 1,371.6 | 48.6% | $0.53 | View |
| Angaston | ANGAST1 |
SA1 | Reciprocating Engine - Compression ignition | $-32 | $0 | — | -1.1 | 663.2 | -0.1% | $0.00 | View |
| Cohuna Solar Farm | COHUNSF1 |
VIC1 | Solar PV - Single axis tracking | $-43 | $0 | — | 56.7 | 17.7 | 7.6% | $0.33 | View |
| Mornington BESS | MRNBESS1 |
VIC1 | Storage - Battery | $-50 | $0 | — | 39.4 | — | 0.7% | $1.50 | View |
| Girgarre Solar Farm | GIRGSF |
VIC1 | Solar PV - Single axis tracking | $-72 | $0 | — | 221.0 | 169.8 | 9.9% | $0.00 | View |
| Williamsdale BESS | WILLBES1 |
NSW1 | Storage - Battery | $-73 | $0 | — | -1.2 | — | 0.0% | $1.50 | View |
| SMFBESS2 | SMFBESS2 |
SA1 | $-74 | $0 | — | -2.3 | — | 0.0% | $1.50 | View | |
| Wunghnu Solar Farm | WUNUSF1 |
VIC1 | Solar PV - Single axis tracking | $-81 | $0 | — | 196.3 | 159.7 | 8.7% | $0.25 | View |
| Mokoan Solar Farm (LightsourceBP) | MOKOSF1 |
VIC1 | Solar PV - Single axis tracking | $-86 | $0 | — | 115.2 | 90.9 | 10.4% | $0.25 | View |
| Templers B BESS | TEMPB1 |
SA1 | Storage - Battery | $-92 | $0 | — | -3.7 | — | -0.1% | $1.50 | View |
| Numurkah Solar Farm | NUMURSF1 |
VIC1 | Solar PV - Single axis tracking | $-154 | $0 | — | 287.8 | 221.0 | 11.9% | $0.25 | View |
| SMFBESS1 | SMFBESS1 |
SA1 | $-169 | $0 | — | -5.3 | — | -0.1% | $1.50 | View | |
| Glenrowan West Solar Farm | GLRWNSF1 |
VIC1 | Solar PV - Single axis tracking | $-239 | $0 | — | 290.6 | 233.9 | 9.2% | $0.32 | View |
| Queanbeyan BESS | QBYNB1 |
NSW1 | Storage - Battery | $-269 | $101 | 218.4 | -6.3 | 115.3 | -2.6% | $1.50 | View |
| Rocky Point Sugar Mill Cogeneration Plant | RPCG |
QLD1 | Other - Other | $-273 | $0 | — | -5.3 | — | -0.7% | $117.00 | View |
| Goorambat East Solar Farm (ENGIE) | GOESF1 |
VIC1 | Solar PV - Single axis tracking | $-503 | $0 | — | 673.5 | 535.1 | 11.2% | $0.25 | View |
| Bulgana Green Power Hub - Wind Farm | BULGANA1 |
VIC1 | Wind Turbine - Onshore | $-728 | $0 | — | 2,214.1 | 1,941.7 | 45.1% | $0.00 | View |
| Yatpool Solar Farm | YATSF1 |
VIC1 | Solar PV - Single axis tracking | $-858 | $0 | — | 231.4 | 109.2 | 10.3% | $0.25 | View |
| Gannawarra Solar Farm | GANNSF1 |
VIC1 | Solar PV - Single axis tracking | $-2.6k | $0 | — | 234.6 | 105.9 | 17.8% | $0.34 | View |
| Winton Solar Farm | WINTSF1 |
VIC1 | Solar PV - Single axis tracking | $-2.7k | $0 | — | 329.6 | 155.7 | 16.2% | $0.25 | View |
| Karadoc Solar Farm | KARSF1 |
VIC1 | Solar PV - Single axis tracking | $-3.0k | $0 | — | 412.8 | 204.6 | 16.5% | $0.00 | View |
| Bannerton Solar Park | BANN1 |
VIC1 | Solar PV - Single axis tracking | $-4.1k | $0 | — | 375.6 | 178.8 | 15.6% | $0.34 | View |
| Wemen Solar Farm | WEMENSF1 |
VIC1 | Solar PV - Single axis tracking | $-4.8k | $0 | — | 435.6 | 217.9 | 18.6% | $0.25 | View |
| Ararat Wind Farm | ARWF1 |
VIC1 | Wind Turbine - Onshore | $-4.8k | $0 | — | 1,751.0 | 1,572.9 | 30.4% | $0.00 | View |
| Glenrowan Solar Farm | GLENSF1 |
VIC1 | Solar PV - Single axis tracking | $-5.3k | $0 | — | 459.1 | 221.3 | 15.2% | $0.25 | View |
| Kiamal Solar Farm - Stage 1 | KIAMSF1 |
VIC1 | Solar PV - Single axis tracking | $-7.0k | $0 | — | 897.6 | 473.6 | 18.7% | $0.00 | View |
| Liddell BESS | LDBESS1 |
NSW1 | Storage - Battery | $-35.1k | $0 | — | -390.1 | 2,978.2 | -3.3% | $1.50 | View |