MLF-adjusted revenue, dispatch, capacity factor, and estimated SRMC from AEMO 5‑minute dispatch data. Data through 25 Sep 2026, 03:05 AEST.
Energy revenue = cleared MW × (5/60 h) × regional RRP × MLF. FCAS revenue = sum of cleared FCAS MW × (5/60 h) × regional FCAS price × MLF (raise/lower 6s, 60s, 5min, reg). FCAS volume = total FCAS enablement MWh across all services. Capacity factor = dispatched MWh ÷ (nameplate MW × period hours). SRMC from financial assumptions. Not AEMO settlement data.
| Site | DUID | Region | Tech | Energy rev. (× MLF) | FCAS rev. (× MLF) | FCAS MWh | MWh dispatch | MWh available | Capacity factor | Est. SRMC | |
|---|---|---|---|---|---|---|---|---|---|---|---|
| Eraring | ER04 |
NSW1 | Turbine - Steam Sub Critical | $1.36M | $0 | — | 14,341.6 | 758.3 | 83.0% | $55.48 | View |
| Mt Piper | MP1 |
NSW1 | Turbine - Steam Sub Critical | $1.23M | $0 | — | 11,902.9 | 790.8 | 67.9% | $49.24 | View |
| Eraring | ER02 |
NSW1 | Turbine - Steam Sub Critical | $1.22M | $0 | — | 12,243.7 | 715.0 | 70.9% | $59.45 | View |
| Bayswater | BW04 |
NSW1 | Turbine - Steam Sub Critical | $1.19M | $28 | 22.2 | 11,956.4 | 742.1 | 72.7% | $55.48 | View |
| Bayswater | BW02 |
NSW1 | Turbine - Steam Sub Critical | $1.18M | $0 | — | 11,865.0 | 742.1 | 72.2% | $26.23 | View |
| Bayswater | BW01 |
NSW1 | Turbine - Steam Sub Critical | $1.15M | $28 | 21.3 | 11,584.8 | 715.0 | 73.1% | $53.57 | View |
| Vales Point B | VP6 |
NSW1 | Turbine - Steam Sub Critical | $960.1k | $0 | — | 9,240.7 | 585.0 | 58.3% | $52.60 | View |
| Millmerran Power Plant | MPP_2 |
QLD1 | Turbine - Steam Super Critical | $926.6k | $0 | — | 8,960.3 | 471.2 | 87.6% | $52.60 | View |
| Loy Yang B | LOYYB2 |
VIC1 | Turbine - Steam Sub Critical | $848.8k | $0 | — | 10,711.4 | 624.0 | 76.9% | $47.20 | View |
| Loy Yang B | LOYYB1 |
VIC1 | Turbine - Steam Sub Critical | $843.3k | $0 | — | 10,663.2 | 578.6 | 76.6% | $47.20 | View |
| Loy Yang A Power Station | LYA3 |
VIC1 | Turbine - Steam Sub Critical | $780.7k | $5 | 17.3 | 9,631.7 | 559.2 | 71.7% | $47.20 | View |
| Loy Yang A Power Station | LYA2 |
VIC1 | Turbine - Steam Sub Critical | $776.9k | $2 | 3.8 | 9,549.1 | 574.2 | 75.1% | $47.20 | View |
| Vales Point B | VP5 |
NSW1 | Turbine - Steam Sub Critical | $766.2k | $0 | — | 7,860.4 | 303.3 | 49.6% | $52.60 | View |
| Loy Yang A Power Station | LYA4 |
VIC1 | Turbine - Steam Sub Critical | $755.4k | $2 | 3.8 | 9,393.3 | 561.7 | 69.9% | $47.20 | View |
| MacIntyre Wind Farm | MCINTYR1 |
QLD1 | Wind Turbine - Onshore | $712.3k | $0 | — | 5,690.2 | 504.9 | 25.7% | $0.58 | View |
| Callide C | CPP_3 |
QLD1 | Turbine - Steam Super Critical | $694.6k | $0 | — | 7,230.3 | 459.3 | 71.1% | $44.41 | View |
| Callide C | CPP_4 |
QLD1 | Turbine - Steam Super Critical | $690.1k | $0 | — | 7,199.0 | 455.0 | 71.4% | $101.94 | View |
| Darling Downs | DDPS1 |
QLD1 | Turbine - CCGT | $675.2k | $0 | — | 5,010.5 | 515.7 | 32.4% | $3.31 | View |
| Tarong North | TNPS1 |
QLD1 | Turbine - Steam Super Critical | $663.4k | $0 | — | 5,896.0 | 357.5 | 54.6% | $52.60 | View |
| Callide B | CALL_B_2 |
QLD1 | Turbine - Steam Sub Critical | $578.6k | $13 | 15.0 | 5,881.1 | 357.5 | 70.0% | $55.48 | View |
| Upper Tumut | UPPTUMUT |
NSW1 | Hydro - Dam | $567.2k | $29 | 34.0 | 4,632.9 | 615.3 | 31.3% | $1.00 | View |
| Callide B | CALL_B_1 |
QLD1 | Turbine - Steam Sub Critical | $556.6k | $13 | 15.0 | 5,732.3 | 379.2 | 68.2% | $32.60 | View |
| Stanwell | STAN-3 |
QLD1 | Turbine - Steam Sub Critical | $549.4k | $0 | — | 5,645.3 | 395.4 | 64.4% | $52.60 | View |
| Stanwell | STAN-1 |
QLD1 | Turbine - Steam Sub Critical | $548.7k | $6 | 8.1 | 5,621.5 | 395.4 | 64.2% | $52.60 | View |
| Stanwell | STAN-2 |
QLD1 | Turbine - Steam Sub Critical | $546.6k | $9 | 1.7 | 5,583.3 | 357.5 | 63.7% | $52.60 | View |
| Yallourn W | YWPS4 |
VIC1 | Turbine - Steam Sub Critical | $536.3k | $0 | — | 7,316.3 | 400.8 | 81.3% | $47.20 | View |
| Coopers Gap Wind Farm | COOPGWF1 |
QLD1 | Wind Turbine - Onshore | $533.4k | $0 | — | 5,123.1 | 283.1 | 47.1% | $0.68 | View |
| Gladstone | GSTONE5 |
QLD1 | Turbine - Steam Sub Critical | $507.1k | $0 | — | 4,744.4 | 303.3 | 70.6% | $58.48 | View |
| Gladstone | GSTONE6 |
QLD1 | Turbine - Steam Sub Critical | $495.7k | $0 | — | 4,299.5 | 303.3 | 64.0% | $54.96 | View |
| Yallourn W | YWPS1 |
VIC1 | Turbine - Steam Sub Critical | $476.0k | $0 | — | 6,692.1 | 373.7 | 79.7% | $47.20 | View |
| Tarong | TARONG#4 |
QLD1 | Turbine - Steam Sub Critical | $475.9k | $6 | 1.0 | 4,613.5 | 319.6 | 54.9% | $52.58 | View |
| Tarong | TARONG#2 |
QLD1 | Turbine - Steam Sub Critical | $474.9k | $8 | 1.5 | 4,604.6 | 319.6 | 54.8% | $55.48 | View |
| Tarong | TARONG#1 |
QLD1 | Turbine - Steam Sub Critical | $472.9k | $0 | — | 4,585.0 | 319.6 | 54.6% | $52.60 | View |
| Gladstone | GSTONE3 |
QLD1 | Turbine - Steam Sub Critical | $463.9k | $0 | — | 4,130.5 | 281.7 | 61.5% | $128.75 | View |
| Yallourn W | YWPS2 |
VIC1 | Turbine - Steam Sub Critical | $459.9k | $0 | — | 6,666.2 | 346.7 | 79.4% | $47.20 | View |
| Stanwell | STAN-4 |
QLD1 | Turbine - Steam Sub Critical | $353.5k | $0 | — | 3,756.8 | 222.1 | 42.9% | $52.60 | View |
| Mortlake | MORTLK11 |
VIC1 | Turbine - OCGT | $350.9k | $0 | — | 3,109.5 | 297.9 | 44.4% | $128.50 | View |
| Stockyard Hill Wind Farm | STOCKYD1 |
VIC1 | Wind Turbine - Onshore | $311.1k | $0 | — | 4,667.0 | 320.8 | 36.9% | $0.50 | View |
| Osborne | OSB-AG |
SA1 | Turbine - CCGT | $284.0k | $0 | — | 2,391.2 | 205.8 | 55.4% | $84.30 | View |
| Murray 2 | MURRAY |
VIC1 | Hydro - Dam | $283.9k | $2 | 2.5 | 2,870.7 | 1,120.2 | 19.9% | $1.00 | View |
| Pelican Point | PPCCGT |
SA1 | Turbine - CCGT | $259.7k | $0 | — | 2,503.8 | 46.6 | 19.7% | $84.30 | View |
| Gordon | GORDON |
TAS1 | Hydro - Dam | $246.4k | $265 | 26.2 | 3,032.5 | 312.0 | 29.2% | $1.05 | View |
| Wambo Wind Farm | WAMBOWF1 |
QLD1 | Wind Turbine - Onshore | $239.6k | $0 | — | 2,329.7 | 110.1 | 38.5% | $0.50 | View |
| Barker Inlet Power Station | BARKIPS1 |
SA1 | Reciprocating Engine - Spark ignition | $196.1k | $0 | — | 1,755.4 | 190.7 | 34.8% | $9.00 | View |
| Sapphire Wind Farm | SAPHWF1 |
SA1 | Wind Turbine - Onshore | $187.6k | $0 | — | 1,988.4 | 176.4 | 30.7% | $0.50 | View |
| Swanbank E GT | SWAN_E |
QLD1 | Turbine - CCGT | $180.5k | $0 | — | 2,034.3 | — | 22.0% | $2.00 | View |
| Clarke Creek Wind Farm | CLRKCWF1 |
QLD1 | Wind Turbine - Onshore | $179.2k | $0 | — | 2,457.6 | 226.6 | 29.6% | $0.00 | View |
| Tamar Valley Combined Cycle | TVCC201 |
TAS1 | Turbine - CCGT | $175.6k | $0 | — | 2,595.0 | 225.3 | 52.0% | $84.30 | View |
| Yarwun 1 | YARWUN_1 |
QLD1 | Turbine - CCGT | $174.8k | $0 | — | 1,764.0 | 78.0 | 40.8% | $84.30 | View |
| Clarke Creek Wind Farm | CLRKCWF2 |
QLD1 | Wind Turbine - Onshore | $165.4k | $0 | — | 1,733.4 | 85.7 | 69.8% | $0.58 | View |
| Reece | REECE1 |
TAS1 | Hydro - Dam | $147.6k | $0 | — | 1,539.2 | 127.8 | 55.5% | $1.00 | View |
| Catagunya / Liapootah / Wayatinah | LI_WY_CA |
TAS1 | Hydro - Dam | $146.5k | $0 | — | 1,824.2 | 196.1 | 43.0% | $1.05 | View |
| Wellington North Solar Farm (Lightsource) | WELNSF1 |
NSW1 | Solar PV - Single axis tracking | $135.5k | $0 | — | 2,666.7 | — | 25.4% | $0.25 | View |
| John Butters | JBUTTERS |
TAS1 | Hydro - Dam | $134.8k | $352 | 43.3 | 1,342.8 | 156.0 | 38.9% | $0.00 | View |
| Reece | REECE2 |
TAS1 | Hydro - Dam | $128.6k | $72 | 0.9 | 1,347.2 | 113.7 | 48.6% | $1.00 | View |
| Dulacca Wind Farm | DULAWF1 |
QLD1 | Wind Turbine - Onshore | $126.6k | $0 | — | 1,252.8 | 36.9 | 30.2% | $0.53 | View |
| Oakey Power Station | OAKEY2 |
QLD1 | Turbine - OCGT | $125.5k | $0 | — | 482.7 | 84.5 | 11.6% | $128.50 | View |
| Mortlake | MORTLK12 |
VIC1 | Turbine - OCGT | $118.0k | $0 | — | 1,206.4 | 294.7 | 17.2% | $128.50 | View |
| Moorabool Wind Farm | MOORAWF1 |
VIC1 | Wind Turbine - Onshore | $114.5k | $0 | — | 1,929.4 | 43.9 | 25.8% | $0.50 | View |
| Mackintosh | MACKNTSH |
TAS1 | Hydro - Dam | $108.9k | $0 | — | 1,280.8 | 91.0 | 66.8% | $1.00 | View |
| White Rock Wind Farm - Stage 1 | WRWF1 |
NSW1 | Wind Turbine - Onshore | $107.2k | $0 | — | 1,152.3 | 114.3 | 27.4% | $0.50 | View |
| Bastyan | BASTYAN |
TAS1 | Hydro - Dam | $106.8k | $0 | — | 1,299.5 | 86.7 | 67.8% | $0.00 | View |
| Murra Warra Wind Farm - stage 2 | MUWAWF2 |
VIC1 | Wind Turbine - Onshore | $105.8k | $0 | — | 1,254.3 | 139.0 | 25.0% | $0.50 | View |
| Braemar | BRAEMAR1 |
QLD1 | Turbine - OCGT | $99.2k | $0 | — | 420.8 | 200.4 | 9.3% | $133.75 | View |
| GPWFWST2 | GPWFWST2 |
VIC1 | $98.4k | $0 | — | 1,351.3 | 29.9 | 10.1% | $0.53 | View | |
| Rye Park Wind Farm | RYEPARK1 |
NSW1 | Wind Turbine - Onshore | $97.8k | $0 | — | 817.3 | 141.9 | 8.6% | $0.50 | View |
| Torrens Island B | TORRB4 |
SA1 | Turbine - Steam Sub Critical | $96.5k | $0 | — | 878.2 | — | 18.3% | $2.00 | View |
| Tarraleah | TARRALEA |
TAS1 | Hydro - Dam | $94.1k | $0 | — | 1,451.5 | 75.8 | 67.2% | $1.00 | View |
| Tribute | TRIBUTE |
TAS1 | Hydro - Dam | $93.7k | $0 | — | 979.2 | 96.4 | 49.3% | $1.00 | View |
| Western Downs Green Power Hub P/L | WDGPH1 |
QLD1 | Solar PV - Single axis tracking | $90.5k | $0 | — | 2,176.7 | — | 22.7% | $0.32 | View |
| Blowering | BLOWERNG |
NSW1 | Hydro - Dam | $88.1k | $0 | — | 985.8 | 53.1 | 51.3% | $0.00 | View |
| Granville Harbour Wind Farm | GRANWF1 |
TAS1 | Wind Turbine - Onshore | $88.0k | $0 | — | 1,308.2 | 13.7 | 48.8% | $0.66 | View |
| SHOAL1 | SHOAL1 |
NSW1 | $87.3k | $0 | — | 913.6 | — | 15.4% | $1.20 | View | |
| Macarthur Wind Farm | MACARTH1 |
VIC1 | Wind Turbine - Onshore | $87.2k | $0 | — | 1,929.7 | 54.8 | 19.1% | $0.50 | View |
| Wollar Solar Farm | WOLARSF1 |
NSW1 | Solar PV - Single axis tracking | $84.5k | $0 | — | 1,654.1 | — | 24.6% | $0.25 | View |
| Murra Warra Wind Farm - stage 1 | MUWAWF1 |
VIC1 | Wind Turbine - Onshore | $82.4k | $0 | — | 969.6 | 84.9 | 17.9% | $0.50 | View |
| Cattle Hill Wind Farm | CTHLWF1 |
TAS1 | Wind Turbine - Onshore | $82.4k | $0 | — | 1,025.6 | 0.2 | 29.7% | $0.66 | View |
| Stubbo Solar Farm | STUBSF1 |
NSW1 | Solar PV - Single axis tracking | $74.3k | $0 | — | 1,473.3 | — | 31.0% | $0.25 | View |
| Flyers Creek Wind Farm | FLYCRKWF |
NSW1 | Wind Turbine - Onshore | $73.2k | $0 | — | 583.4 | 79.1 | 16.7% | $0.58 | View |
| Stubbo Solar Farm | STUBSF2 |
NSW1 | Solar PV - Single axis tracking | $71.3k | $0 | — | 1,429.6 | — | 29.5% | $0.25 | View |
| Dundonnell Wind Farm | DUNDWF1 |
VIC1 | Wind Turbine - Onshore | $69.9k | $0 | — | 1,181.5 | 59.2 | 29.3% | $0.66 | View |
| Bodangora Wind Farm | BODWF1 |
NSW1 | Wind Turbine - Onshore | $68.9k | $0 | — | 563.7 | 101.3 | 20.8% | $0.68 | View |
| Orana BESS | ORABESS1 |
NSW1 | Storage - Battery | $68.8k | $0 | — | -266.3 | — | -2.7% | $1.50 | View |
| Boco Rock Wind Farm | BOCORWF1 |
NSW1 | Wind Turbine - Onshore | $67.4k | $0 | — | 689.6 | 16.5 | 25.4% | $0.00 | View |
| Hume Dam NSW | HUMENSW |
NSW1 | Hydro - Dam | $67.4k | $0 | — | 753.8 | 37.9 | 100.0% | $1.05 | View |
| Waubra | WAUBRAWF |
VIC1 | Wind Turbine - Onshore | $65.8k | $0 | — | 1,224.4 | — | 26.6% | $0.50 | View |
| Port Augusta Renewable Energy Park - Wind | PAREPW1 |
SA1 | Wind Turbine - Onshore | $62.7k | $0 | — | 602.5 | 47.6 | 12.5% | $0.50 | View |
| Avonlie Solar Farm | AVLSF1 |
NSW1 | Solar PV - Single axis tracking | $62.5k | $0 | — | 1,429.3 | — | 23.4% | $0.00 | View |
| Golden Plains Wind Farm East | GPWFEST2 |
VIC1 | Wind Turbine - Onshore | $61.7k | $0 | — | 852.3 | 9.5 | 13.6% | $0.50 | View |
| Goyder South Wind Farm 1A | GSWF1A |
SA1 | Wind Turbine - Onshore | $61.1k | $0 | — | 578.6 | 78.0 | 11.5% | $0.55 | View |
| Woolnorth Studland Bay / Bluff Point | WOOLNTH1 |
TAS1 | Wind Turbine - Onshore | $61.1k | $0 | — | 1,100.0 | — | 33.2% | $0.53 | View |
| Wellington Solar Farm | WELLSF1 |
NSW1 | Solar PV - Single axis tracking | $59.2k | $0 | — | 1,182.4 | — | 22.8% | $0.25 | View |
| Eraring Big Battery | ERB01 |
NSW1 | Storage - Battery | $58.3k | $0 | — | -457.8 | 124.6 | -7.9% | $1.58 | View |
| Portland Wind Farm | PORTWF |
VIC1 | Wind Turbine - Onshore | $58.2k | $0 | — | 1,098.4 | — | 30.2% | $0.50 | View |
| Suntop Solar Farm | SUNTPSF1 |
NSW1 | Solar PV - Single axis tracking | $57.9k | $0 | — | 1,159.1 | — | 32.2% | $0.25 | View |
| Darlington Point Solar Farm | DARLSF1 |
NSW1 | Solar PV - Single axis tracking | $54.8k | $0 | — | 1,150.9 | — | 17.4% | $0.33 | View |
| Goyder South Wind Farm 1B | GSWF1B1 |
SA1 | Wind Turbine - Onshore | $54.2k | $0 | — | 504.0 | 57.4 | 10.3% | $0.00 | View |
| Yendon Wind Farm | YENDWF1 |
VIC1 | Wind Turbine - Onshore | $54.2k | $0 | — | 805.1 | 60.6 | 23.2% | $0.50 | View |
| Fisher | FISHER |
TAS1 | Hydro - Dam | $53.5k | $49 | 37.9 | 800.5 | 49.8 | 77.2% | $1.05 | View |
| Lake Bonney 2 Wind Farm | LKBONNY2 |
SA1 | Wind Turbine - Onshore | $53.3k | $0 | — | 747.3 | 56.7 | 19.6% | $0.86 | View |
| BRDDSF01 | BRDDSF01 |
QLD1 | $52.0k | $0 | — | 1,338.4 | — | 15.2% | $0.27 | View | |
| Glenellen Solar Farm | GESF1 |
NSW1 | Solar PV - Fixed | $52.0k | $0 | — | 1,150.9 | — | 18.4% | $0.00 | View |
| Culcairn Solar Farm | CUSF1 |
NSW1 | Solar PV - Single axis tracking | $49.9k | $0 | — | 900.8 | — | 10.7% | $0.25 | View |
| Dundonnell Wind Farm | DUNDWF3 |
VIC1 | Wind Turbine - Onshore | $49.8k | $0 | — | 857.8 | 52.1 | 29.3% | $0.53 | View |
| Mount Emerald | MEWF1 |
QLD1 | Wind Turbine - Onshore | $49.7k | $0 | — | 496.1 | 75.3 | 11.5% | $0.50 | View |
| Ryan Corner Wind Farm | RYANCWF1 |
VIC1 | Wind Turbine - Onshore | $49.5k | $0 | — | 1,194.6 | 12.3 | 22.8% | $0.50 | View |
| Golden Plains Wind Farm East | GPWFEST3 |
VIC1 | Wind Turbine - Onshore | $49.1k | $0 | — | 1,044.6 | 0.8 | 17.6% | $0.50 | View |
| Moranbah North | MBAHNTH |
QLD1 | Reciprocating Engine - Spark ignition | $47.6k | $0 | — | 445.2 | — | 29.1% | $57.00 | View |
| Bogong / Mackay | MCKAY1 |
VIC1 | Hydro - Dam | $47.3k | $0 | — | 492.5 | — | 6.8% | $1.00 | View |
| Berrybank Wind Farm | BRYB1WF1 |
VIC1 | Wind Turbine - Onshore | $47.1k | $0 | — | 1,140.7 | 8.9 | 26.3% | $0.50 | View |
| Columboola Solar Farm | COLUMSF1 |
QLD1 | Solar PV - Single axis tracking | $46.7k | $0 | — | 1,115.3 | — | 21.4% | $0.32 | View |
| Ladbroke Grove | LADBROK2 |
SA1 | Turbine - OCGT | $46.2k | $0 | — | 395.2 | 45.5 | 41.2% | $145.06 | View |
| GPWFWST1 | GPWFWST1 |
VIC1 | $46.2k | $0 | — | 1,014.3 | 4.3 | 7.6% | $0.53 | View | |
| Coleambally Solar Farm | COLEASF1 |
NSW1 | Solar PV - Single axis tracking | $45.5k | $0 | — | 1,016.7 | — | 28.2% | $0.00 | View |
| Cethana | CETHANA |
TAS1 | Hydro - Dam | $45.4k | $0 | — | 499.1 | 102.9 | 24.5% | $1.09 | View |
| Woolooga Solar Farm | WOOLGSF1 |
QLD1 | Solar PV - Single axis tracking | $44.3k | $0 | — | 1,004.1 | — | 18.8% | $0.25 | View |
| Barron Gorge | BARRON-1 |
QLD1 | Hydro - Run of River | $44.3k | $0 | — | 337.5 | 35.7 | 40.2% | $0.00 | View |
| Ladbroke Grove | LADBROK1 |
SA1 | Turbine - OCGT | $44.0k | $0 | — | 364.7 | 45.5 | 38.0% | $153.02 | View |
| Mt Mercer Wind Farm | MERCER01 |
VIC1 | Wind Turbine - Onshore | $42.5k | $0 | — | 802.3 | 39.6 | 25.5% | $0.50 | View |
| Kaban Wind Farm | KABANWF1 |
QLD1 | Wind Turbine - Onshore | $42.0k | $0 | — | 417.3 | 65.9 | 11.1% | $0.00 | View |
| Bulgana Green Power Hub - Wind Farm | BULGANA1 |
VIC1 | Wind Turbine - Onshore | $40.1k | $0 | — | 776.1 | 61.3 | 15.8% | $0.00 | View |
| Bango 973 Wind Farm | BANGOWF1 |
NSW1 | Wind Turbine - Onshore | $39.4k | $0 | — | 324.0 | 64.0 | 8.5% | $0.00 | View |
| Hawkesdale Wind Farm | HD1WF1 |
VIC1 | Wind Turbine - Onshore | $39.0k | $0 | — | 634.6 | 11.1 | 27.4% | $0.00 | View |
| New England Solar Farm | NEWENSF1 |
NSW1 | Solar PV - Single axis tracking | $38.3k | $0 | — | 798.9 | — | 16.6% | $0.25 | View |
| Somerton | AGLSOM |
VIC1 | Turbine - OCGT | $37.9k | $0 | — | 376.2 | 91.0 | 9.2% | $128.50 | View |
| Edenvale Solar Park | EDENVSF1 |
QLD1 | Solar PV - Single axis tracking | $37.7k | $0 | — | 917.4 | — | 21.2% | $0.00 | View |
| Wandoan South Solar Stage 1 | WANDSF1 |
QLD1 | Solar PV - Single axis tracking | $37.5k | $0 | — | 896.6 | — | 23.3% | $0.25 | View |
| Tumut 3 | TUMUT3 |
NSW1 | Hydro - Dam | $37.1k | $0 | 10.8 | 269.7 | 1,950.0 | 0.7% | $1.05 | View |
| Nevertire Solar Farm | NEVERSF1 |
NSW1 | Solar PV - Single axis tracking | $36.5k | $0 | — | 740.3 | — | 29.5% | $0.25 | View |
| Hornsdale Wind Farm Stage 1 | HDWF1 |
SA1 | Wind Turbine - Onshore | $36.1k | $0 | — | 341.6 | 41.9 | 13.9% | $0.50 | View |
| Lincoln Gap Wind Farm - stage 1 | LGAPWF1 |
SA1 | Wind Turbine - Onshore | $36.0k | $0 | — | 373.2 | 30.8 | 12.3% | $0.50 | View |
| Hallett 4 North Brown Hill | NBHWF1 |
SA1 | Wind Turbine - Onshore | $35.9k | $0 | — | 382.4 | 51.5 | 12.0% | $0.80 | View |
| Liddell BESS | LDBESS1 |
NSW1 | Storage - Battery | $35.5k | $6 | 4.4 | -155.4 | — | -1.3% | $1.50 | View |
| Golden Plains Wind Farm East | GPWFEST1 |
VIC1 | Wind Turbine - Onshore | $33.9k | $0 | — | 481.7 | 4.7 | 8.1% | $0.00 | View |
| Hallett Stage 1 Brown Hill | HALLWF1 |
SA1 | Wind Turbine - Onshore | $33.5k | $0 | — | 304.5 | 54.5 | 13.4% | $0.71 | View |
| New England Solar Farm | NEWENSF2 |
NSW1 | Solar PV - Single axis tracking | $33.4k | $0 | — | 691.4 | — | 14.4% | $0.25 | View |
| Devils Gate | DEVILS_G |
TAS1 | Hydro - Dam | $32.8k | $0 | — | 261.4 | 69.3 | 18.1% | $1.00 | View |
| Uranquinty | URANQ13 |
NSW1 | Turbine - OCGT | $32.7k | $0 | — | 224.3 | 162.5 | 5.4% | $128.50 | View |
| Hornsdale Wind Farm Stage 2 | HDWF2 |
SA1 | Wind Turbine - Onshore | $32.0k | $0 | — | 310.5 | 28.2 | 12.6% | $0.69 | View |
| Mortlake South Wind Farm | MRTLSWF1 |
VIC1 | Wind Turbine - Onshore | $31.6k | $0 | — | 778.8 | 20.8 | 20.6% | $0.50 | View |
| Nyngan Solar Plant | NYNGAN1 |
NSW1 | Solar PV - Fixed | $31.5k | $0 | — | 629.3 | — | 25.7% | $0.20 | View |
| Elaine Wind Farm | ELAINWF1 |
VIC1 | Wind Turbine - Onshore | $31.3k | $0 | — | 466.8 | 9.7 | 23.3% | $0.53 | View |
| West Kiewa | WKIEWA1 |
VIC1 | Hydro - Dam | $31.1k | $0 | — | 315.2 | 71.5 | 38.6% | $10.00 | View |
| Hornsdale Wind Farm Stage 3 | HDWF3 |
SA1 | Wind Turbine - Onshore | $31.1k | $0 | — | 298.4 | 29.9 | 11.1% | $0.68 | View |
| Victorian Big Battery | VBB1 |
VIC1 | Storage - Battery | $31.0k | $5 | 5.0 | -26.4 | 137.3 | -0.4% | $1.50 | View |
| Gangarri Solar Farm | GANGARR1 |
QLD1 | Solar PV - Single axis tracking | $30.6k | $0 | — | 717.5 | — | 18.5% | $0.26 | View |
| Gunnedah Solar Farm | GNNDHSF1 |
NSW1 | Solar PV - Single axis tracking | $30.4k | $0 | — | 626.2 | — | 23.7% | $0.33 | View |
| Mt Millar Wind Farm | MTMILLAR |
SA1 | Wind Turbine - Onshore | $30.3k | $0 | — | 324.5 | 19.0 | 18.7% | $0.50 | View |
| Ararat Wind Farm | ARWF1 |
VIC1 | Wind Turbine - Onshore | $30.1k | $0 | — | 694.6 | 42.2 | 12.1% | $0.00 | View |
| Supernode BESS | SNB02 |
QLD1 | Storage - Battery | $30.0k | $0 | — | -281.5 | — | -4.5% | $1.50 | View |
| Salt Creek Wind Farm | SALTCRK1 |
SA1 | Wind Turbine - Onshore | $29.7k | $0 | — | 343.5 | 32.9 | 26.5% | $0.50 | View |
| Wattle Point | WPWF |
SA1 | Wind Turbine - Onshore | $29.4k | $0 | — | 287.1 | 56.8 | 13.2% | $0.50 | View |
| Hillston Sun Farm | HILLSTN1 |
NSW1 | Solar PV - Single axis tracking | $28.4k | $0 | — | 604.9 | — | 22.9% | $0.00 | View |
| Berrybank Wind Farm | BRYB2WF2 |
VIC1 | Wind Turbine - Onshore | $28.4k | $0 | — | 667.4 | 7.8 | 25.5% | $0.65 | View |
| Kennedy Energy Park - Phase 1 - Wind | KEPWF1 |
QLD1 | Wind Turbine - Onshore | $27.7k | $0 | — | 273.3 | 44.5 | 26.4% | $0.68 | View |
| Willogoleche Wind Farm | WGWF1 |
SA1 | Wind Turbine - Onshore | $27.5k | $0 | — | 321.5 | 31.3 | 11.2% | $0.50 | View |
| German Creek | GERMCRK |
QLD1 | Reciprocating Engine - Spark ignition | $27.3k | $0 | — | 281.1 | — | 26.0% | $122.81 | View |
| Lake Bonney 1 Wind Farm | LKBONNY1 |
SA1 | Wind Turbine - Onshore | $26.9k | $0 | — | 371.9 | 33.1 | 19.2% | $0.79 | View |
| Rocky Point Sugar Mill Cogeneration Plant | RPCG |
QLD1 | Other - Other | $26.8k | $0 | — | 250.3 | — | 34.8% | $117.00 | View |
| Meadowbank | MEADOWBK |
TAS1 | Hydro - Dam | $26.4k | $0 | — | 321.0 | 47.7 | 33.4% | $1.00 | View |
| Metz Solar Farm | METZSF1 |
NSW1 | Solar PV - Single axis tracking | $26.0k | $0 | — | 599.0 | — | 18.5% | $0.25 | View |
| Gunsynd Solar Farm | GUSF1 |
QLD1 | Solar PV - Fixed | $25.7k | $0 | — | 588.7 | — | 26.1% | $0.00 | View |
| Munna Creek Solar Farm | MUCRKSF1 |
QLD1 | Solar PV - Single axis tracking | $25.6k | $0 | — | 588.2 | 0.0 | 15.9% | $0.25 | View |
| Port Augusta Renewable Energy Park - Solar | PAREPS1 |
SA1 | Solar PV - Fixed | $25.4k | $0 | — | 438.6 | — | 18.5% | $0.20 | View |
| West Wyalong Solar Farm | WSTWYSF1 |
NSW1 | Solar PV - Single axis tracking | $25.4k | $0 | — | 513.9 | — | 20.3% | $0.25 | View |
| Crowlands Wind Farm | CROWLWF1 |
VIC1 | Wind Turbine - Onshore | $25.3k | $0 | — | 455.8 | 35.9 | 23.8% | $0.68 | View |
| Bomen Solar Farm | BOMENSF1 |
NSW1 | Solar PV - Single axis tracking | $25.2k | $0 | — | 518.2 | — | 17.8% | $0.25 | View |
| Goorambat East Solar Farm (ENGIE) | GOESF1 |
VIC1 | Solar PV - Single axis tracking | $25.0k | $0 | — | 1,874.2 | — | 31.2% | $0.25 | View |
| Waterloo Wind Farm | WATERLWF |
SA1 | Wind Turbine - Onshore | $24.7k | $0 | — | 244.3 | 20.3 | 7.8% | $0.50 | View |
| Snowtown S2 Wind Farm | SNOWNTH1 |
SA1 | Wind Turbine - Onshore | $24.6k | $0 | — | 231.5 | 46.3 | 6.7% | $0.50 | View |
| Lincoln Gap Wind Farm - Stage 2 | LGAPWF2 |
SA1 | Wind Turbine - Onshore | $23.9k | $0 | — | 251.7 | 20.8 | 12.1% | $0.50 | View |
| BRDDBES1 | BRDDBES1 |
QLD1 | $23.8k | $0 | 0.3 | -37.9 | 172.2 | -0.4% | $0.27 | View | |
| Snowtown Wind Farm | SNOWTWN1 |
SA1 | Wind Turbine - Onshore | $23.8k | $0 | — | 225.0 | 60.6 | 9.5% | $0.50 | View |
| Bango 999 Wind Farm | BANGOWF2 |
NSW1 | Wind Turbine - Onshore | $23.7k | $0 | — | 191.6 | 37.8 | 9.4% | $0.00 | View |
| Swanbank BESS | SWANBBF1 |
QLD1 | Storage - Battery | $23.7k | $0 | — | -140.8 | — | -2.3% | $1.50 | View |
| Sebastopol Solar Farm | SEBSF1 |
NSW1 | Solar PV - Single axis tracking | $23.5k | $0 | — | 466.8 | — | 21.6% | $0.25 | View |
| Repulse | REPULSE |
TAS1 | Hydro - Dam | $23.2k | $0 | — | 258.3 | — | 38.4% | $1.00 | View |
| Crudine Ridge Wind Farm | CRURWF1 |
NSW1 | Wind Turbine - Onshore | $22.5k | $0 | — | 211.3 | 34.4 | 6.2% | $0.53 | View |
| Finley Solar Farm | FINLYSF1 |
NSW1 | Solar PV - Single axis tracking | $22.2k | $0 | — | 472.9 | — | 12.1% | $0.25 | View |
| Oaklands Hill Wind Farm | OAKLAND1 |
VIC1 | Wind Turbine - Onshore | $22.0k | $0 | — | 276.3 | 24.2 | 17.1% | $0.50 | View |
| Bluegrass Solar Farm | BLUEGSF1 |
QLD1 | Solar PV - Single axis tracking | $22.0k | $0 | — | 575.6 | — | 16.2% | $0.29 | View |
| Tully Sugar Mill | TULLYSM1 |
QLD1 | Turbine - Steam Super Critical | $22.0k | $0 | — | 207.8 | — | 27.1% | $117.00 | View |
| Uranquinty | URANQ14 |
NSW1 | Turbine - OCGT | $21.6k | $0 | — | 192.8 | 162.5 | 4.6% | $128.50 | View |
| Guthega | GUTHEGA |
NSW1 | Hydro - Dam | $21.4k | $0 | — | 210.5 | 73.7 | 14.6% | $1.05 | View |
| Western Downs Gas Peaking Plant - KCI | WDBESS2 |
QLD1 | Turbine - CCGT | $20.8k | $28 | 28.1 | -151.9 | 31.8 | -1.6% | $2.00 | View |
| Snowtown S2 Wind Farm | SNOWSTH1 |
SA1 | Wind Turbine - Onshore | $20.1k | $0 | — | 219.0 | 28.4 | 7.2% | $0.74 | View |
| Cathedral Rocks | CATHROCK |
SA1 | Wind Turbine - Onshore | $19.9k | $0 | — | 290.0 | 31.5 | 19.5% | $0.53 | View |
| Western Downs Battery - Stage 1 And 2 | WDBESS1 |
QLD1 | Storage - Battery | $19.0k | $0 | — | -48.2 | 270.2 | -0.8% | $1.58 | View |
| Broadwater | BWTR1 |
NSW1 | Turbine - Steam Sub Critical | $19.0k | $0 | — | 174.5 | — | 19.1% | $124.22 | View |
| Mornington BESS | MRNBESS1 |
VIC1 | Storage - Battery | $18.2k | $0 | — | 119.7 | — | 2.1% | $1.50 | View |
| Moura Solar Farm | MOUSF1 |
QLD1 | Solar PV - Single axis tracking | $18.2k | $0 | — | 490.6 | — | 20.6% | $0.25 | View |
| Bungala Two Solar Farm | BNGSF2 |
SA1 | Solar PV - Single axis tracking | $18.0k | $0 | — | 301.1 | — | 9.3% | $0.33 | View |
| Wandoan South Solar Stage 2 | WANDSF2 |
QLD1 | Solar PV - Single axis tracking | $18.0k | $0 | — | 426.1 | — | 5.5% | $0.25 | View |
| Yarranlea Solar Farm | YARANSF1 |
QLD1 | Solar PV - Single axis tracking | $17.9k | $0 | — | 394.3 | — | 13.6% | $0.25 | View |
| Bungala One Solar Farm | BNGSF1 |
SA1 | Solar PV - Single axis tracking | $17.1k | $0 | — | 287.4 | — | 8.9% | $0.34 | View |
| Gullen Range Wind Farm 2 | GULLRWF2 |
NSW1 | Wind Turbine - Onshore | $17.1k | $0 | — | 167.1 | 22.5 | 6.3% | $0.50 | View |
| Terang BESS | TRGBESS1 |
VIC1 | Storage - Battery | $17.0k | $12 | 24.8 | -45.0 | 40.1 | -1.9% | $1.50 | View |
| SHGEN | SHGEN |
NSW1 | $16.9k | $0 | — | 159.6 | — | 2.7% | $1.20 | View | |
| Jemalong Solar | JEMALNG1 |
NSW1 | Solar PV - Single axis tracking | $16.8k | $0 | — | 344.0 | — | 26.1% | $0.32 | View |
| Dundonnell Wind Farm | DUNDWF2 |
VIC1 | Wind Turbine - Onshore | $16.7k | $0 | — | 300.5 | 16.3 | 27.1% | $0.66 | View |
| Darling Downs Solar Farm | DDSF1 |
QLD1 | Solar PV - Fixed | $16.5k | $0 | — | 392.4 | — | 13.5% | $0.28 | View |
| Gullen Range Wind Farm | GULLRWF1 |
NSW1 | Wind Turbine - Onshore | $16.3k | $0 | — | 189.9 | 9.9 | 4.8% | $0.53 | View |
| KIATAWF1 | KIATAWF1 |
VIC1 | $16.2k | $0 | — | 187.1 | 29.8 | 25.1% | $0.68 | View | |
| Tailem Bend - Solar | TBSF1 |
SA1 | Solar PV - Fixed | $16.1k | $0 | — | 281.5 | — | 10.9% | $0.20 | View |
| Emerald Solar Park | EMERASF1 |
QLD1 | Solar PV - Single axis tracking | $15.7k | $0 | — | 430.9 | — | 24.9% | $0.25 | View |
| Quarantine | QPS1 |
SA1 | Turbine - OCGT | $15.6k | $0 | — | 140.5 | 31.4 | 20.2% | $128.50 | View |
| Canunda | CNUNDAWF |
SA1 | Wind Turbine - Onshore | $15.5k | $0 | — | 228.9 | 15.5 | 20.7% | $0.50 | View |
| Supernode BESS | SNB01 |
QLD1 | Storage - Battery | $15.3k | $0 | — | -137.6 | — | -2.2% | $1.50 | View |
| Moree Solar Farm | MOREESF1 |
NSW1 | Solar PV - Single axis tracking | $15.1k | $0 | — | 329.1 | — | 24.5% | $0.25 | View |
| Quarantine | QPS3 |
SA1 | Turbine - OCGT | $15.0k | $0 | — | 136.0 | 31.4 | 19.5% | $128.50 | View |
| Clermont Solar Farm | CLERMSF1 |
QLD1 | Solar PV - Single axis tracking | $14.8k | $0 | — | 375.6 | — | 16.9% | $0.34 | View |
| Susan River Solar Farm | SRSF1 |
QLD1 | Solar PV - Single axis tracking | $14.5k | $0 | — | 346.7 | — | 16.9% | $0.25 | View |
| Trevallyn | TREVALLN |
TAS1 | Hydro - Dam | $14.4k | $0 | — | 156.7 | 106.2 | 7.0% | $1.00 | View |
| Wyalong Solar Farm | WYASF1 |
NSW1 | Solar PV - Single axis tracking | $14.3k | $0 | — | 278.6 | — | 18.6% | $0.25 | View |
| Cluny | CLUNY |
TAS1 | Hydro - Dam | $14.2k | $0 | — | 162.3 | — | 35.6% | $1.00 | View |
| Mt Gellibrand Wind Farm | MTGELWF1 |
VIC1 | Wind Turbine - Onshore | $13.9k | $0 | — | 386.3 | 14.5 | 11.6% | $0.50 | View |
| Tarong BESS - Stanwell | TARBESS1 |
QLD1 | Storage - Battery | $13.6k | $2 | 162.3 | 11.0 | — | 0.2% | $1.50 | View |
| Limondale BESS | LIMBESS1 |
NSW1 | Storage - Battery | $13.2k | $1 | 0.3 | -176.4 | 54.2 | -14.7% | $1.50 | View |
| Paloona | PALOONA |
TAS1 | Hydro - Dam | $13.0k | $0 | — | 197.8 | — | 29.4% | $1.00 | View |
| Lake Bonney 3 Wind Farm | LKBONNY3 |
SA1 | Wind Turbine - Onshore | $12.8k | $0 | — | 185.5 | 11.0 | 19.8% | $0.53 | View |
| Williamsdale BESS | WILLBES1 |
NSW1 | Storage - Battery | $12.6k | $0 | — | -70.1 | — | -1.2% | $1.50 | View |
| Brendale BESS | BRNDBES1 |
QLD1 | Storage - Battery | $12.1k | $92 | 29.7 | -123.6 | 188.7 | -2.5% | $1.58 | View |
| Butlers Gorge | BUTLERSG |
TAS1 | Hydro - Dam | $12.0k | $0 | — | 187.2 | — | 63.9% | $1.00 | View |
| LaTrobe Valley BESS | LVES1 |
VIC1 | Storage - Battery | $12.0k | $6 | 252.9 | -95.5 | 35.0 | -4.0% | $1.54 | View |
| Numurkah Solar Farm | NUMURSF1 |
VIC1 | Solar PV - Single axis tracking | $11.9k | $0 | — | 696.1 | — | 28.7% | $0.25 | View |
| Wagga North Solar Farm | WAGGNSF1 |
NSW1 | Solar PV - Single axis tracking | $11.9k | $0 | — | 246.1 | — | 18.4% | $0.25 | View |
| Collector | COLWF01 |
NSW1 | Wind Turbine - Onshore | $11.6k | $0 | — | 100.0 | 16.6 | 1.8% | $0.65 | View |
| Clements Gap Wind Farm | CLEMGPWF |
SA1 | Wind Turbine - Onshore | $11.6k | $0 | — | 90.5 | 21.4 | 6.6% | $0.80 | View |
| Taralga Wind Farm | TARALGA1 |
NSW1 | Wind Turbine - Onshore | $11.4k | $0 | — | 123.6 | 0.1 | 4.8% | $0.50 | View |
| Bundaberg Solar Farm | BUSF1 |
QLD1 | Solar PV - Single axis tracking | $11.3k | $0 | — | 313.5 | — | 16.7% | $14.55 | View |
| Oakey 2 Solar Farm | OAKEY2SF |
QLD1 | Solar PV - Single axis tracking | $11.3k | $0 | — | 246.3 | — | 18.4% | $0.25 | View |
| Bald Hills Wind Farm | BALDHWF1 |
VIC1 | Wind Turbine - Onshore | $10.9k | $0 | — | 122.5 | 8.1 | 4.8% | $0.00 | View |
| Daydream Solar Farm | DAYDSF1 |
QLD1 | Solar PV - Single axis tracking | $10.7k | $0 | — | 304.5 | — | 7.6% | $0.00 | View |
| Karadoc Solar Farm | KARSF1 |
VIC1 | Solar PV - Single axis tracking | $10.5k | $0 | — | 568.2 | — | 22.7% | $0.00 | View |
| Challicum Hills | CHALLHWF |
VIC1 | Wind Turbine - Onshore | $10.4k | $0 | — | 216.2 | — | 17.2% | $0.53 | View |
| Hazelwood Battery Energy Storage System (HBESS) | HBESS1 |
VIC1 | Storage - Battery | $10.3k | $0 | — | -64.1 | 37.3 | -1.3% | $1.87 | View |
| Crookwell 2 Wind Farm | CROOKWF2 |
NSW1 | Wind Turbine - Onshore | $10.3k | $0 | — | 132.5 | 0.3 | 5.7% | $0.69 | View |
| Starfish Hill | STARHLWF |
SA1 | Wind Turbine - Onshore | $10.2k | $0 | — | 106.3 | 9.5 | 13.4% | $0.50 | View |
| Glenrowan Solar Farm | GLENSF1 |
VIC1 | Solar PV - Single axis tracking | $10.1k | $0 | — | 760.4 | — | 25.1% | $0.25 | View |
| Lilyvale Solar Farm | LILYSF1 |
QLD1 | Solar PV - Single axis tracking | $9.9k | $0 | — | 263.6 | — | 9.3% | $0.25 | View |
| Eildon | EILDON2 |
VIC1 | Hydro - Dam | $9.8k | $0 | — | 104.7 | 54.2 | 6.5% | $1.00 | View |
| Griffith Solar Farm | GRIFSF1 |
NSW1 | Solar PV - Single axis tracking | $9.7k | $0 | — | 205.9 | — | 31.5% | $0.35 | View |
| Glenrowan West Solar Farm | GLRWNSF1 |
VIC1 | Solar PV - Single axis tracking | $9.6k | $0 | — | 651.6 | — | 20.6% | $0.32 | View |
| Sun Metals Corporation Solar Farm | SMCSF1 |
QLD1 | Solar PV - Fixed | $9.5k | $0 | — | 238.1 | — | 6.9% | $0.00 | View |
| Clover | CLOVER |
VIC1 | Hydro - Dam | $9.4k | $0 | — | 99.1 | — | 14.2% | $1.17 | View |
| Limondale Solar Farm 2 | LIMOSF21 |
NSW1 | Solar PV - Single axis tracking | $9.4k | $0 | — | 210.4 | — | 30.3% | $0.25 | View |
| Corowa Solar Farm | CRWASF1 |
NSW1 | Solar PV - Single axis tracking | $9.0k | $0 | — | 187.4 | — | 21.7% | $0.33 | View |
| Girgarre Solar Farm | GIRGSF |
VIC1 | Solar PV - Single axis tracking | $8.9k | $0 | — | 420.2 | — | 18.7% | $0.00 | View |
| Goonumbla Solar Farm | GOONSF1 |
NSW1 | Solar PV - Single axis tracking | $8.8k | $0 | — | 152.2 | — | 9.1% | $0.25 | View |
| Wunghnu Solar Farm | WUNUSF1 |
VIC1 | Solar PV - Single axis tracking | $8.6k | $0 | — | 431.9 | — | 19.2% | $0.25 | View |
| Quorn Park Solar Hybrid | QPSFB1 |
NSW1 | Solar PV - Single axis tracking | $8.6k | $0 | — | 137.5 | — | 5.9% | $0.26 | View |
| Cherry Tree Wind Farm | CHYTWF1 |
VIC1 | Wind Turbine - Onshore | $8.4k | $0 | — | 128.5 | 3.2 | 9.3% | $0.53 | View |
| Gunning Wind Farm | GUNNING1 |
NSW1 | Wind Turbine - Onshore | $8.3k | $0 | — | 76.6 | 9.7 | 6.9% | $0.50 | View |
| Rowallan | ROWALLAN |
TAS1 | Hydro - Dam | $8.3k | $0 | — | 124.5 | — | 49.4% | $1.00 | View |
| Hallett 5 The Bluff WF | BLUFF1 |
SA1 | Wind Turbine - Onshore | $8.2k | $0 | — | 111.7 | 10.2 | 8.9% | $0.77 | View |
| Walla Walla Solar Farm | WLWLSF1 |
NSW1 | Solar PV - Single axis tracking | $8.0k | $0 | — | 113.7 | — | 3.1% | $0.25 | View |
| Kingaroy Solar Farm | KINGASF1 |
QLD1 | Solar PV - Single axis tracking | $7.9k | $0 | — | 184.9 | — | 19.3% | $0.25 | View |
| Kiamal Solar Farm - Stage 1 | KIAMSF1 |
VIC1 | Solar PV - Single axis tracking | $7.9k | $0 | — | 1,088.5 | — | 22.7% | $0.00 | View |
| Junee Solar Farm | JUNEESF1 |
NSW1 | Solar PV - Single axis tracking | $7.8k | $0 | — | 157.8 | — | 18.3% | $0.00 | View |
| NESBESS1 | NESBESS1 |
NSW1 | $7.8k | $0 | — | -36.5 | — | -0.8% | $1.50 | View | |
| Walla Walla Solar Farm | WLWLSF2 |
NSW1 | Solar PV - Single axis tracking | $7.7k | $0 | — | 109.5 | — | 3.0% | $0.25 | View |
| Mortons Lane Wind Farm | MLWF1 |
VIC1 | Wind Turbine - Onshore | $7.5k | $0 | — | 117.1 | — | 25.0% | $0.50 | View |
| Bannerton Solar Park | BANN1 |
VIC1 | Solar PV - Single axis tracking | $7.3k | $0 | — | 454.2 | — | 18.9% | $0.34 | View |
| Warwick Solar Farm | WARWSF1 |
QLD1 | Solar PV - Single axis tracking | $7.3k | $0 | — | 159.1 | — | 20.6% | $0.25 | View |
| Parkes Solar Farm | PARSF1 |
NSW1 | Solar PV - Single axis tracking | $6.8k | $0 | — | 115.2 | — | 9.7% | $0.25 | View |
| Clare Solar Farm | CLARESF1 |
QLD1 | Solar PV - Single axis tracking | $6.7k | $0 | — | 192.4 | — | 7.3% | $0.00 | View |
| Lemonthyme / Wilmot | LEM_WIL |
TAS1 | Hydro - Dam | $6.6k | $0 | — | 71.7 | 33.6 | 3.7% | $1.00 | View |
| Blyth BESS | BLYTHB1 |
SA1 | Storage - Battery | $6.6k | $28 | 33.8 | -101.7 | 168.7 | -2.1% | $4.86 | View |
| Winton Solar Farm | WINTSF1 |
VIC1 | Solar PV - Single axis tracking | $6.3k | $0 | — | 507.5 | — | 24.9% | $0.25 | View |
| Mulwala Solar Farm | MULWASF1 |
NSW1 | Solar PV - Single axis tracking | $5.9k | $0 | — | 128.2 | — | 17.2% | $0.25 | View |
| Ross River Solar Farm | RRSF1 |
QLD1 | Solar PV - Single axis tracking | $5.8k | $0 | — | 155.9 | — | 5.1% | $0.25 | View |
| Warwick Solar Farm | WARWSF2 |
QLD1 | Solar PV - Single axis tracking | $5.8k | $0 | — | 127.2 | — | 16.5% | $0.25 | View |
| Beryl Solar Farm | BERYLSF1 |
NSW1 | Solar PV - Single axis tracking | $5.7k | $0 | — | 113.1 | — | 4.8% | $0.25 | View |
| Gladstone | GSTONE4 |
QLD1 | Turbine - Steam Sub Critical | $5.7k | $0 | — | 68.2 | — | 1.0% | $52.60 | View |
| Crookwell 3 Wind Farm | CROOKWF3 |
NSW1 | Wind Turbine - Onshore | $5.6k | $0 | — | 66.6 | 0.8 | 4.8% | $0.76 | View |
| Capital Battery | CAPBES1 |
NSW1 | Storage - Battery | $5.5k | $0 | — | -37.3 | 43.9 | -1.6% | $1.50 | View |
| Yatpool Solar Farm | YATSF1 |
VIC1 | Solar PV - Single axis tracking | $5.5k | $0 | — | 310.5 | — | 13.8% | $0.25 | View |
| Rugby Run Solar Farm | RUGBYR1 |
QLD1 | Solar PV - Single axis tracking | $5.4k | $0 | — | 143.8 | — | 9.2% | $0.25 | View |
| Bell Bay Three | BBTHREE1 |
TAS1 | Turbine - OCGT | $5.4k | $0 | — | 60.8 | — | 6.3% | $182.63 | View |
| Yambuk | YAMBUKWF |
VIC1 | Wind Turbine - Onshore | $5.4k | $0 | — | 125.5 | — | 17.4% | $0.50 | View |
| Wemen Solar Farm | WEMENSF1 |
VIC1 | Solar PV - Single axis tracking | $5.3k | $0 | — | 502.4 | — | 21.5% | $0.25 | View |
| Hallett GT | AGLHAL |
SA1 | Turbine - OCGT | $5.3k | $0 | — | 63.5 | 198.2 | 1.0% | $100.22 | View |
| Oakey Solar Farm | OAKEY1SF |
QLD1 | Solar PV - Fixed | $5.2k | $0 | — | 112.4 | — | 18.7% | $0.20 | View |
| Barcaldine Remote Community Solar Farm | BARCSF1 |
QLD1 | Solar PV - Single axis tracking | $5.2k | $0 | — | 118.6 | — | 24.7% | $0.00 | View |
| Longreach Solar Farm | LRSF1 |
QLD1 | Solar PV - Fixed | $4.6k | $0 | — | 111.8 | — | 31.1% | $0.20 | View |
| Maryrorough Solar Farm | MARYRSF1 |
QLD1 | Solar PV - Single axis tracking | $4.6k | $0 | — | 104.3 | — | 12.6% | $0.25 | View |
| Diapur Wind Farm | DIAPURWF1 |
VIC1 | Wind Turbine - Onshore | $4.3k | $0 | — | 58.2 | — | 30.3% | $0.00 | View |
| Musselroe Wind Farm | MUSSELR1 |
TAS1 | Wind Turbine - Onshore | $4.2k | $0 | — | 62.4 | — | 1.5% | $0.50 | View |
| Whitsunday Solar Farm | WHITSF1 |
QLD1 | Solar PV - Single axis tracking | $4.2k | $0 | — | 116.0 | — | 8.4% | $0.25 | View |
| Hamilton Solar Farm | HAMISF1 |
QLD1 | Solar PV - Single axis tracking | $4.2k | $0 | — | 118.4 | — | 8.6% | $18.64 | View |
| Smithfield Energy Facility | SITHE01 |
NSW1 | Turbine - OCGT | $4.1k | $0 | — | 39.0 | — | 1.3% | $128.50 | View |
| Mannum Solar Farm 2 | MANNSF2 |
SA1 | Solar PV - Single axis tracking | $4.1k | $0 | — | 76.3 | — | 10.6% | $0.25 | View |
| Yaloak South Wind Farm | YSWF1 |
VIC1 | Wind Turbine - Onshore | $4.0k | $0 | — | 78.8 | — | 11.4% | $0.50 | View |
| Cullerin Range Wind Farm | CULLRGWF |
NSW1 | Wind Turbine - Onshore | $3.9k | $0 | — | 32.3 | — | 4.5% | $0.68 | View |
| Gannawarra Solar Farm | GANNSF1 |
VIC1 | Solar PV - Single axis tracking | $3.9k | $0 | — | 326.2 | — | 24.7% | $0.34 | View |
| Mokoan Solar Farm (LightsourceBP) | MOKOSF1 |
VIC1 | Solar PV - Single axis tracking | $3.8k | $0 | — | 254.2 | — | 23.0% | $0.25 | View |
| Bouldercombe Battery project | BBATTERY1 |
QLD1 | Storage - Battery | $3.8k | $3 | 74.1 | -20.4 | 34.1 | -1.7% | $1.64 | View |
| Adelaide Desalination Plant | ADPPV1 |
SA1 | Solar PV - Fixed | $3.7k | $0 | — | 58.1 | — | 22.0% | $0.00 | View |
| Hayman Solar Farm | HAYMSF1 |
QLD1 | Solar PV - Single axis tracking | $3.5k | $0 | — | 98.8 | — | 7.1% | $0.34 | View |
| Riverina Energy Storage System 2 | RIVNB2 |
NSW1 | Storage - Battery | $3.4k | $0 | — | -41.5 | — | -2.7% | $1.50 | View |
| White Rock Solar Farm | WRSF1 |
NSW1 | Solar PV - Fixed | $3.4k | $0 | — | 78.7 | — | 16.4% | $0.20 | View |
| Greenbank BESS | GREENB1 |
QLD1 | Storage - Battery | $3.4k | $0 | 15.9 | -117.8 | 29.5 | -2.5% | $1.54 | View |
| Royalla Solar Farm | ROYALLA1 |
NSW1 | Solar PV - Fixed | $3.2k | $0 | — | 62.9 | — | 13.1% | $0.20 | View |
| Lancaster Solar Farm | LANCSF1 |
VIC1 | Solar PV - Single axis tracking | $3.1k | $0 | — | 205.2 | — | 8.1% | $0.25 | View |
| Gullen Range Solar Farm | GULLRSF1 |
NSW1 | Solar PV - Fixed | $3.0k | $0 | — | 61.4 | — | 25.6% | $0.27 | View |
| Kidston Solar Project Phase One 50MW | KSP1 |
QLD1 | Solar PV - Fixed | $3.0k | $0 | — | 86.6 | — | 7.2% | $0.20 | View |
| Middlemount Solar Farm | MIDDLSF1 |
QLD1 | Solar PV - Single axis tracking | $2.9k | $0 | — | 78.9 | — | 12.6% | $0.25 | View |
| Mt Stuart | MSTUART3 |
QLD1 | Turbine - OCGT | $2.8k | $0 | — | 27.8 | 39.3 | 0.9% | $2.00 | View |
| Kerang Hybrid | KERNGSP1 |
VIC1 | Solar PV - Single axis tracking | $2.7k | $0 | — | 113.4 | — | 2.9% | $0.26 | View |
| Tamar Valley Peaking | TVPP104 |
TAS1 | Turbine - OCGT | $2.5k | $0 | — | 34.3 | 32.5 | 2.5% | $128.50 | View |
| Templers B BESS | TEMPB1 |
SA1 | Storage - Battery | $2.4k | $0 | — | -21.6 | — | -0.8% | $1.50 | View |
| Gannawarra Energy Storage System | GANNB1 |
VIC1 | Storage - Battery | $2.3k | $0 | — | -7.9 | — | -1.3% | $1.98 | View |
| Smithfield BESS | SMTHBES1 |
NSW1 | Storage - Battery | $2.2k | $28 | 233.6 | -22.7 | 47.7 | -1.1% | $1.50 | View |
| Hughenden Sun Farm | HUGSF1 |
QLD1 | Solar PV - Single axis tracking | $2.1k | $0 | — | 54.7 | — | 10.9% | $0.00 | View |
| Bell Bay Three | BBTHREE2 |
TAS1 | Turbine - OCGT | $2.0k | $0 | — | 21.9 | 27.1 | 2.3% | $137.22 | View |
| Happy Valley Reservoir | HVWWPV1 |
SA1 | Solar PV - Single axis tracking | $1.9k | $0 | — | 31.2 | — | 11.8% | $0.00 | View |
| Mannum Adelaide Pumping Station No 3 - MAPL3 (Tungkillo) | MAPS3PV1 |
SA1 | Solar PV - Single axis tracking | $1.8k | $0 | — | 34.0 | — | 8.6% | $0.25 | View |
| Bulgana Green Power Hub - BESS | BULBES1 |
VIC1 | Storage - Battery | $1.6k | $9 | 56.2 | -1.7 | 19.7 | -0.4% | $1.98 | View |
| Bolivar Waste Water Treatment | BOWWPV1 |
SA1 | Solar PV - Fixed | $1.6k | $0 | — | 25.7 | — | 13.0% | $0.23 | View |
| Hallett Stage 2 Hallett Hill | HALLWF2 |
SA1 | Wind Turbine - Onshore | $1.5k | $0 | — | 14.6 | — | 0.9% | $0.00 | View |
| Darlington Point Energy Storage System | DPNTB1 |
NSW1 | Storage - Battery | $1.5k | $0 | — | -12.4 | — | -2.1% | $0.00 | View |
| Manildra Solar Farm | MANSLR1 |
NSW1 | Solar PV - Single axis tracking | $1.4k | $0 | — | 18.2 | — | 1.5% | $0.25 | View |
| Valley Power | VPGS4 |
VIC1 | Turbine - OCGT | $1.4k | $0 | — | 22.4 | — | 1.9% | $128.50 | View |
| Quorn Park Solar Hybrid | QPSFB2 |
NSW1 | Storage - Battery | $1.3k | $0 | — | -4.5 | — | -0.7% | $1.58 | View |
| Murray Bridge - Onkaparinga Pipeline Pump 2 | MBPS2PV1 |
SA1 | Solar PV - Single axis tracking | $1.2k | $0 | — | 20.1 | — | 6.1% | $0.25 | View |
| Molong Solar Farm | MOLNGSF1 |
NSW1 | Solar PV - Single axis tracking | $1.2k | $0 | — | 16.7 | — | 1.9% | $0.25 | View |
| Broken Hill | BHB1 |
NSW1 | Storage - Battery | $1.1k | $0 | — | -11.7 | — | -1.0% | $1.50 | View |
| Cohuna Solar Farm | COHUNSF1 |
VIC1 | Solar PV - Single axis tracking | $1.1k | $0 | — | 105.4 | — | 14.1% | $0.33 | View |
| Yallourn W | YWPS3 |
VIC1 | Turbine - Steam Sub Critical | $1.1k | $0 | — | 16.7 | — | 0.2% | $47.20 | View |
| Tarong | TARONG#3 |
QLD1 | Turbine - Steam Sub Critical | $1.1k | $0 | — | 11.8 | — | 0.1% | $55.48 | View |
| Ballarat Energy Storage System | BALB1 |
VIC1 | Storage - Battery | $1.0k | $0 | — | -9.5 | — | -1.3% | $0.00 | View |
| Mt Stuart | MSTUART1 |
QLD1 | Turbine - OCGT | $966 | $0 | — | 10.5 | 23.0 | 0.3% | $2.00 | View |
| Chinchilla BESS | CHBESS1 |
QLD1 | Storage - Battery | $966 | $161 | 65.8 | -45.3 | 59.5 | -1.9% | $1.75 | View |
| Mannum Adelaide Pumping Station No 2 - MAPL2 (Palmer) | MAPS2PV1 |
SA1 | Solar PV - Single axis tracking | $894 | $0 | — | 17.7 | — | 4.5% | $0.26 | View |
| Clements Gap - BESS | CGBESS01 |
SA1 | Storage - Battery | $852 | $0 | — | -76.2 | 0.6 | -5.3% | $1.58 | View |
| Morgan To Whyalla Pipeline No 4 PS | MWPS4PV1 |
SA1 | Solar PV - Single axis tracking | $810 | $0 | — | 15.6 | — | 11.8% | $0.25 | View |
| Childers Solar Farm | CHILDSF1 |
QLD1 | Solar PV - Single axis tracking | $790 | $0 | — | 8.2 | — | 0.5% | $0.34 | View |
| Woodlawn Wind Farm | WOODLWN1 |
NSW1 | Wind Turbine - Onshore | $630 | $0 | — | 7.1 | — | 0.6% | $0.50 | View |
| Morgan To Whyalla Pipeline No 1 PS And Water Filtration Plant | MWPS1PV1 |
SA1 | Solar PV - Single axis tracking | $622 | $0 | — | 16.1 | — | 12.2% | $0.25 | View |
| Mt Stuart | MSTUART2 |
QLD1 | Turbine - OCGT | $608 | $0 | — | 8.3 | — | 0.2% | $148.45 | View |
| Morgan To Whyalla Pipeline No 3 PS | MWPS3PV1 |
SA1 | Solar PV - Single axis tracking | $385 | $0 | — | 11.2 | — | 6.2% | $0.25 | View |
| Philip Island BESS | PIBESS1 |
VIC1 | Storage - Battery | $381 | $3 | 0.8 | -6.1 | 4.2 | -5.1% | $1.50 | View |
| Morgan To Whyalla Pipeline No 2 PS | MWPS2PV1 |
SA1 | Solar PV - Single axis tracking | $335 | $0 | — | 8.2 | — | 6.2% | $0.25 | View |
| Braemar 2 Power Station | BRAEMAR5 |
QLD1 | Turbine - OCGT | $278 | $0 | — | 3.0 | — | 0.1% | $3.14 | View |
| Kennedy Energy Park - Phase 1 - Storage | KEPBG1 |
QLD1 | Storage - Battery | $238 | $0 | — | 2.4 | — | 5.0% | $2.03 | View |
| Mintaro GT | MINTARO |
SA1 | Turbine - OCGT | $148 | $0 | — | 1.7 | 94.8 | 0.1% | $128.50 | View |
| Kennedy Energy Park - Phase 1 - Solar | KEPSF1 |
QLD1 | Solar PV - Single axis tracking | $40 | $0 | — | 0.4 | — | 0.1% | $0.34 | View |
| Bolivar Power Station | BOLIVPS1 |
SA1 | Turbine - OCGT | $0 | $0 | — | 0.0 | — | 0.0% | $151.37 | View |
| RT_VIC1 | RT_VIC1 |
$0 | $0 | — | — | — | — | — | View | ||
| Condamine A | CPSA |
QLD1 | Turbine - CCGT | $0 | $0 | — | — | — | 0.0% | $95.40 | View |
| Braemar 2 Power Station | BRAEMAR7 |
QLD1 | Turbine - OCGT | $0 | $0 | — | — | 174.9 | 0.0% | $132.25 | View |
| RT_TAS1 | RT_TAS1 |
$0 | $0 | — | — | — | — | — | View | ||
| Braemar 2 Power Station | BRAEMAR6 |
QLD1 | Turbine - OCGT | $0 | $0 | — | — | 178.7 | 0.0% | $133.36 | View |
| RT_SA6 | RT_SA6 |
$0 | $0 | — | — | — | — | — | View | ||
| Snapper Point Power Station | SNAPPER1 |
SA1 | Turbine - OCGT | $0 | $0 | — | — | 159.2 | 0.0% | $128.50 | View |
| RT_SA4 | RT_SA4 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_SA3 | RT_SA3 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_SA5 | RT_SA5 |
$0 | $0 | — | — | — | — | — | View | ||
| Broken Hill Solar Plant | BROKENH1 |
NSW1 | Solar PV - Fixed | $0 | $0 | — | — | — | 0.0% | $0.28 | View |
| RT_VIC11 | RT_VIC11 |
$0 | $0 | — | — | — | — | — | View | ||
| BUNGAMB1 | BUNGAMB1 |
$0 | $0 | 525.1 | -273.5 | 162.5 | — | — | View | ||
| Rubicon Mountain Streams | RUBICON |
VIC1 | Hydro - Dam | $0 | $0 | — | — | — | 0.0% | $1.00 | View |
| Snuggery | SNUG1 |
SA1 | Turbine - OCGT | $0 | $0 | — | — | — | 0.0% | $2.00 | View |
| Capital Wind Farm | CAPTL_WF |
NSW1 | Wind Turbine - Onshore | $0 | $0 | — | — | — | 0.0% | $0.00 | View |
| Colongra | CG3 |
NSW1 | Turbine - OCGT | $0 | $0 | — | — | — | 0.0% | $144.24 | View |
| SHPUMP | SHPUMP |
$0 | $0 | — | 229.1 | — | — | — | View | ||
| SNOWYP | SNOWYP |
$0 | $0 | — | — | — | — | — | View | ||
| SNOWYGJP | SNOWYGJP |
$0 | $0 | — | — | — | — | — | View | ||
| Colongra | CG4 |
NSW1 | Turbine - OCGT | $0 | $0 | — | — | 191.7 | 0.0% | $194.33 | View |
| Colongra | CG1 |
NSW1 | Turbine - OCGT | $0 | $0 | — | — | 191.7 | 0.0% | $197.00 | View |
| RT_VIC9 | RT_VIC9 |
$0 | $0 | — | — | — | — | — | View | ||
| STABESS1 | STABESS1 |
$0 | $0 | — | -82.4 | — | — | — | View | ||
| RT_VIC12 | RT_VIC12 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_VIC2 | RT_VIC2 |
$0 | $0 | — | — | — | — | — | View | ||
| Bayswater | BW03 |
NSW1 | Turbine - Steam Sub Critical | $0 | $0 | — | — | — | 0.0% | $28.68 | View |
| RT_VIC3 | RT_VIC3 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_VIC4 | RT_VIC4 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_VIC5 | RT_VIC5 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_VIC6 | RT_VIC6 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_VIC7 | RT_VIC7 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_VIC8 | RT_VIC8 |
$0 | $0 | — | — | — | — | — | View | ||
| Colongra | CG2 |
NSW1 | Turbine - OCGT | $0 | $0 | — | — | 191.7 | 0.0% | $135.55 | View |
| Aldoga Solar Farm | ALDGASF1 |
QLD1 | Solar PV - Single axis tracking | $0 | $0 | — | — | — | 0.0% | $0.00 | View |
| ASPSTV01 | ASPSTV01 |
$0 | $0 | — | — | — | — | — | View | ||
| ASQEEV1 | ASQEEV1 |
$0 | $0 | 3.0 | — | — | — | — | View | ||
| ASACLE01 | ASACLE01 |
$0 | $0 | — | — | — | — | — | View | ||
| ASQENC1 | ASQENC1 |
$0 | $0 | 8.8 | — | — | — | — | View | ||
| ASRMGE01 | ASRMGE01 |
$0 | $0 | — | — | — | — | — | View | ||
| ASRMGE02 | ASRMGE02 |
$0 | $0 | — | — | — | — | — | View | ||
| ASRMGE03 | ASRMGE03 |
$0 | $0 | — | — | — | — | — | View | ||
| ASRMGE04 | ASRMGE04 |
$0 | $0 | 17.7 | — | — | — | — | View | ||
| RT_VIC10 | RT_VIC10 |
$0 | $0 | — | — | — | — | — | View | ||
| WAMBOWF2 | WAMBOWF2 |
$0 | $0 | — | 746.6 | 14.9 | — | — | View | ||
| ASRMGE05 | ASRMGE05 |
$0 | $0 | 13.0 | — | — | — | — | View | ||
| ASSDE1 | ASSDE1 |
$0 | $0 | — | — | — | — | — | View | ||
| Wivenhoe | W/HOE#2 |
Storage - Pumped hydro | $0 | $0 | — | 49.5 | 240.5 | — | — | View | |
| Wivenhoe | W/HOE#1 |
Storage - Pumped hydro | $0 | $0 | — | — | — | — | — | View | |
| ASPBSC01 | ASPBSC01 |
$0 | $0 | — | — | — | — | — | View | ||
| ASPAPM01 | ASPAPM01 |
$0 | $0 | — | — | — | — | — | View | ||
| Townsville Power Station | YABULU2 |
QLD1 | Turbine - CCGT | $0 | $0 | — | — | — | 0.0% | $84.30 | View |
| Townsville Power Station | YABULU |
QLD1 | Turbine - CCGT | $0 | $0 | — | — | — | 0.0% | $84.30 | View |
| APD01 | APD01 |
$0 | $0 | 127.8 | — | — | — | — | View | ||
| ASDEVI01 | ASDEVI01 |
$0 | $0 | 39.0 | — | — | — | — | View | ||
| ASDLBY01 | ASDLBY01 |
$0 | $0 | — | — | — | — | — | View | ||
| Wooreen Energy Storage System | WOORB1 |
VIC1 | Storage - Battery | $0 | $0 | — | — | — | 0.0% | $1.50 | View |
| ASENGV01 | ASENGV01 |
$0 | $0 | — | — | — | — | — | View | ||
| ASENGY01 | ASENGY01 |
$0 | $0 | — | — | — | — | — | View | ||
| WOOLES1 | WOOLES1 |
$0 | $0 | — | -14.3 | — | — | — | View | ||
| ASGENE01 | ASGENE01 |
$0 | $0 | — | — | — | — | — | View | ||
| WNSF1 | WNSF1 |
$0 | $0 | — | 155.9 | — | — | — | View | ||
| ASNAES1 | ASNAES1 |
$0 | $0 | — | — | — | — | — | View | ||
| ASNBRL1 | ASNBRL1 |
$0 | $0 | 34.7 | — | — | — | — | View | ||
| ASNENC1 | ASNENC1 |
$0 | $0 | 26.9 | — | — | — | — | View | ||
| VSVEL2S1 | VSVEL2S1 |
$0 | $0 | — | — | — | — | — | View | ||
| VSSSH1S1 | VSSSH1S1 |
$0 | $0 | — | — | — | — | — | View | ||
| VSSSE1V1 | VSSSE1V1 |
$0 | $0 | — | — | — | — | — | View | ||
| Tungatinah | TUNGATIN |
TAS1 | Hydro - Dam | $0 | $0 | — | — | — | 0.0% | $1.00 | View |
| Barron Gorge | BARRON-2 |
QLD1 | Hydro - Run of River | $0 | $0 | — | — | — | 0.0% | $0.00 | View |
| Bell Bay Three | BBTHREE3 |
TAS1 | Turbine - OCGT | $0 | $0 | — | — | 24.9 | 0.0% | $141.97 | View |
| Torrens Island B | TORRB3 |
SA1 | Turbine - Steam Sub Critical | $0 | $0 | — | — | — | 0.0% | $2.00 | View |
| Torrens Island B | TORRB2 |
SA1 | Turbine - Steam Sub Critical | $0 | $0 | — | — | — | 0.0% | $5.47 | View |
| Bairnsdale | BDL01 |
VIC1 | Turbine - OCGT | $0 | $0 | — | — | 46.6 | 0.0% | $142.10 | View |
| Bairnsdale | BDL02 |
VIC1 | Turbine - OCGT | $0 | $0 | — | — | — | 0.0% | $158.38 | View |
| TB3B1 | TB3B1 |
$0 | $0 | — | — | — | — | — | View | ||
| Tailem Bend Stage 2 Solar Project | TB2SF1 |
SA1 | Solar PV - Single axis tracking | $0 | $0 | — | — | — | 0.0% | $0.25 | View |
| Tallawarra B | TALWB1 |
NSW1 | Turbine - OCGT | $0 | $0 | — | — | 341.2 | 0.0% | $128.50 | View |
| Tallawarra | TALWA1 |
NSW1 | Turbine - CCGT | $0 | $0 | — | — | — | 0.0% | $84.30 | View |
| Braemar | BRAEMAR2 |
QLD1 | Turbine - OCGT | $0 | $0 | — | — | 200.4 | 0.0% | $130.94 | View |
| Braemar | BRAEMAR3 |
QLD1 | Turbine - OCGT | $0 | $0 | — | — | 195.5 | 0.0% | $128.50 | View |
| Sunraysia Solar Farm | SUNRSF1 |
NSW1 | Solar PV - Single axis tracking | $0 | $0 | — | — | — | 0.0% | $0.25 | View |
| DRGBND02 | DRGBND02 |
$0 | $0 | 11.3 | — | — | — | — | View | ||
| Barcaldine Power Station | BARCALDN |
QLD1 | Turbine - OCGT | $0 | $0 | — | — | — | 0.0% | $141.78 | View |
| VSSAE1V1 | VSSAE1V1 |
$0 | $0 | — | — | — | — | — | View | ||
| VSQHT1V1 | VSQHT1V1 |
$0 | $0 | — | — | — | — | — | View | ||
| VSNEL2S1 | VSNEL2S1 |
$0 | $0 | — | — | — | — | — | View | ||
| Valley Power | VPGS6 |
VIC1 | Turbine - OCGT | $0 | $0 | — | — | 60.7 | 0.0% | $128.50 | View |
| Valley Power | VPGS5 |
VIC1 | Turbine - OCGT | $0 | $0 | — | — | 60.7 | 0.0% | $128.50 | View |
| Valley Power | VPGS3 |
VIC1 | Turbine - OCGT | $0 | $0 | — | — | 62.8 | 0.0% | $128.50 | View |
| Valley Power | VPGS2 |
VIC1 | Turbine - OCGT | $0 | $0 | — | — | 62.8 | 0.0% | $128.50 | View |
| Valley Power | VPGS1 |
VIC1 | Turbine - OCGT | $0 | $0 | — | — | 62.8 | 0.0% | $128.50 | View |
| ASSENC1 | ASSENC1 |
$0 | $0 | 3.3 | — | — | — | — | View | ||
| ASSERDV1 | ASSERDV1 |
$0 | $0 | — | — | — | — | — | View | ||
| VENUS1 | VENUS1 |
$0 | $0 | 5.4 | — | — | — | — | View | ||
| ASTHYD1 | ASTHYD1 |
$0 | $0 | — | — | — | — | — | View | ||
| Uranquinty | URANQ12 |
NSW1 | Turbine - OCGT | $0 | $0 | — | — | 162.5 | 0.0% | $128.50 | View |
| Uranquinty | URANQ11 |
NSW1 | Turbine - OCGT | $0 | $0 | — | — | 162.5 | 0.0% | $128.50 | View |
| Silverton Wind Farm | STWF1 |
NSW1 | Wind Turbine - Onshore | $0 | $0 | — | — | — | 0.0% | $0.50 | View |
| RT_SA2 | RT_SA2 |
$0 | $0 | — | — | — | — | — | View | ||
| DRSHVS02 | DRSHVS02 |
$0 | $0 | 35.0 | — | — | — | — | View | ||
| DRXNDE01 | DRXNDE01 |
$0 | $0 | — | — | — | — | — | View | ||
| DRXNDJ01 | DRXNDJ01 |
$0 | $0 | — | — | — | — | — | View | ||
| DRXNDW01 | DRXNDW01 |
$0 | $0 | — | — | — | — | — | View | ||
| Lake Echo | LK_ECHO |
TAS1 | Hydro - Dam | $0 | $0 | — | — | 29.2 | 0.0% | $1.17 | View |
| Limondale Solar Farm 1 | LIMOSF11 |
NSW1 | Solar PV - Single axis tracking | $0 | $0 | — | — | — | 0.0% | $0.25 | View |
| DRXNFF01 | DRXNFF01 |
$0 | $0 | — | — | — | — | — | View | ||
| DRXNFS01 | DRXNFS01 |
$0 | $0 | — | — | — | — | — | View | ||
| DRXNQX01 | DRXNQX01 |
$0 | $0 | — | — | — | — | — | View | ||
| DRXNSS01 | DRXNSS01 |
$0 | $0 | — | — | — | — | — | View | ||
| LINCOLN GAP BESSBDU | LGAPBS1 |
SA1 | Storage - Battery | $0 | $0 | — | — | — | 0.0% | $1.50 | View |
| DRXNTM02 | DRXNTM02 |
$0 | $0 | — | — | — | — | — | View | ||
| DRXNVS01 | DRXNVS01 |
$0 | $0 | — | — | — | — | — | View | ||
| DRXQDA01 | DRXQDA01 |
$0 | $0 | — | — | — | — | — | View | ||
| Kogan Creek | KPP_1 |
QLD1 | Turbine - Steam Super Critical | $0 | $0 | — | — | — | 0.0% | $52.60 | View |
| DRXQQE01 | DRXQQE01 |
$0 | $0 | — | — | — | — | — | View | ||
| KIDSPHL1 | KIDSPHL1 |
$0 | $0 | — | — | — | — | — | View | ||
| Laverton North | LNGS1 |
VIC1 | Turbine - OCGT | $0 | $0 | — | — | 185.2 | 0.0% | $128.50 | View |
| Laverton North | LNGS2 |
VIC1 | Turbine - OCGT | $0 | $0 | — | — | 185.2 | 0.0% | $128.50 | View |
| DRVIOT01 | DRVIOT01 |
$0 | $0 | 18.4 | — | — | — | — | View | ||
| DRVIOT02 | DRVIOT02 |
$0 | $0 | 4.8 | — | — | — | — | View | ||
| DRVIOT03 | DRVIOT03 |
$0 | $0 | 15.5 | — | — | — | — | View | ||
| DRVIOT04 | DRVIOT04 |
$0 | $0 | 186.0 | — | — | — | — | View | ||
| DRVIOT05 | DRVIOT05 |
$0 | $0 | — | — | — | — | — | View | ||
| DRVIOT06 | DRVIOT06 |
$0 | $0 | — | — | — | — | — | View | ||
| DRVIOT07 | DRVIOT07 |
$0 | $0 | — | — | — | — | — | View | ||
| DRXNAD01 | DRXNAD01 |
$0 | $0 | — | — | — | — | — | View | ||
| DRXNAE01 | DRXNAE01 |
$0 | $0 | — | — | — | — | — | View | ||
| DRXNDA01 | DRXNDA01 |
$0 | $0 | — | — | — | — | — | View | ||
| DRXNDA02 | DRXNDA02 |
$0 | $0 | — | — | — | — | — | View | ||
| Loy Yang A Power Station | LYA1 |
VIC1 | Turbine - Steam Sub Critical | $0 | $0 | — | — | — | 0.0% | $47.20 | View |
| DRXNDA03 | DRXNDA03 |
$0 | $0 | — | — | — | — | — | View | ||
| DRXNDA04 | DRXNDA04 |
$0 | $0 | — | — | — | — | — | View | ||
| DRXNDB04 | DRXNDB04 |
$0 | $0 | — | — | — | — | — | View | ||
| Lonsdale | LONSDALE |
SA1 | Reciprocating Engine - Compression ignition | $0 | $0 | — | — | 10.8 | 0.0% | $308.00 | View |
| KIDSPHG2 | KIDSPHG2 |
$0 | $0 | — | — | — | — | — | View | ||
| KIDSPHG1 | KIDSPHG1 |
$0 | $0 | — | — | — | — | — | View | ||
| DRXSQS01 | DRXSQS01 |
$0 | $0 | — | — | — | — | — | View | ||
| Hunter Power Station | HUNTER1 |
NSW1 | Turbine - OCGT | $0 | $0 | — | — | — | 0.0% | $142.99 | View |
| Hume Dam VIC | HUMEV |
VIC1 | Hydro - Dam | $0 | $0 | — | — | — | 0.0% | $1.54 | View |
| DRXVQX01 | DRXVQX01 |
$0 | $0 | — | — | — | — | — | View | ||
| DRXVQX02 | DRXVQX02 |
$0 | $0 | — | — | — | — | — | View | ||
| Hunter EconomicZone | HEZ1 |
NSW1 | Reciprocating Engine - Compression ignition | $0 | $0 | — | — | 20.6 | 0.0% | $308.00 | View |
| Dry Creek GT | DRYCGT1 |
SA1 | Turbine - OCGT | $0 | $0 | — | — | 48.7 | 0.0% | $141.50 | View |
| Dry Creek GT | DRYCGT2 |
SA1 | Turbine - OCGT | $0 | $0 | — | — | 37.9 | 0.0% | $135.55 | View |
| Dry Creek GT | DRYCGT3 |
SA1 | Turbine - OCGT | $0 | $0 | — | — | — | 0.0% | $210.15 | View |
| Eildon | EILDON1 |
VIC1 | Hydro - Dam | $0 | $0 | — | — | 55.2 | 0.0% | $1.05 | View |
| Haughton Solar Farm Stage 1 | HAUGHT11 |
QLD1 | Solar PV - Single axis tracking | $0 | $0 | — | — | — | 0.0% | $0.00 | View |
| Eraring | ER01 |
NSW1 | Turbine - Steam Sub Critical | $0 | $0 | — | — | — | 0.0% | $48.29 | View |
| Eraring | ER03 |
NSW1 | Turbine - Steam Sub Critical | $0 | $0 | — | — | — | 0.0% | $49.77 | View |
| ERB02 | ERB02 |
$0 | $0 | — | -18.9 | 6.5 | — | — | View | ||
| Eraring GT | ERGT01 |
NSW1 | Turbine - OCGT | $0 | $0 | — | — | — | 0.0% | $96.96 | View |
| Broken Hill GT | GB01 |
NSW1 | Turbine - OCGT | $0 | $0 | — | — | — | 0.0% | $2.11 | View |
| Gladstone | GSTONE2 |
QLD1 | Turbine - Steam Sub Critical | $0 | $0 | — | — | — | 0.0% | $49.17 | View |
| Hunter Power Station | HUNTER2 |
NSW1 | Turbine - OCGT | $0 | $0 | — | — | — | 0.0% | $152.46 | View |
| DRXVQP01 | DRXVQP01 |
$0 | $0 | — | — | — | — | — | View | ||
| DRXVAE01 | DRXVAE01 |
$0 | $0 | — | — | — | — | — | View | ||
| KEPBL1 | KEPBL1 |
$0 | $0 | — | — | — | — | — | View | ||
| DRXVDJ01 | DRXVDJ01 |
$0 | $0 | — | — | — | — | — | View | ||
| Kareeya | KAREEYA4 |
QLD1 | Hydro - Run of River | $0 | $0 | — | — | — | 0.0% | $1.66 | View |
| Kareeya | KAREEYA3 |
QLD1 | Hydro - Run of River | $0 | $0 | — | — | — | 0.0% | $1.05 | View |
| Kareeya | KAREEYA2 |
QLD1 | Hydro - Run of River | $0 | $0 | — | — | — | 0.0% | $1.00 | View |
| Kareeya | KAREEYA1 |
QLD1 | Hydro - Run of River | $0 | $0 | — | — | — | 0.0% | $1.00 | View |
| DRXVDP01 | DRXVDP01 |
$0 | $0 | — | — | — | — | — | View | ||
| Jeeralang B | JLB03 |
VIC1 | Turbine - OCGT | $0 | $0 | — | — | 84.5 | 0.0% | $137.85 | View |
| Jeeralang B | JLB02 |
VIC1 | Turbine - OCGT | $0 | $0 | — | — | 81.2 | 0.0% | $137.71 | View |
| Jeeralang B | JLB01 |
VIC1 | Turbine - OCGT | $0 | $0 | — | — | — | 0.0% | $128.50 | View |
| Jeeralang A | JLA04 |
VIC1 | Turbine - OCGT | $0 | $0 | — | — | 58.5 | 0.0% | $177.20 | View |
| Jeeralang A | JLA03 |
VIC1 | Turbine - OCGT | $0 | $0 | — | — | 58.5 | 0.0% | $141.46 | View |
| Jeeralang A | JLA02 |
VIC1 | Turbine - OCGT | $0 | $0 | — | — | 58.5 | 0.0% | $128.50 | View |
| Jeeralang A | JLA01 |
VIC1 | Turbine - OCGT | $0 | $0 | — | — | 58.5 | 0.0% | $135.55 | View |
| DRXVDX01 | DRXVDX01 |
$0 | $0 | — | — | — | — | — | View | ||
| Gladstone | GSTONE1 |
QLD1 | Turbine - Steam Sub Critical | $0 | $0 | — | — | — | 0.0% | $52.99 | View |
| MLB01 | MLB01 |
$0 | $0 | — | -98.4 | — | — | — | View | ||
| RT_SA1 | RT_SA1 |
$0 | $0 | — | — | — | — | — | View | ||
| PUMP1 | PUMP1 |
$0 | $0 | — | — | — | — | — | View | ||
| Port Stanvac 1 | PTSTAN1 |
SA1 | Reciprocating Engine - Compression ignition | $0 | $0 | — | — | 60.7 | 0.0% | $308.00 | View |
| Dartmouth | DARTM1 |
VIC1 | Hydro - Dam | $0 | $0 | — | — | 171.2 | 0.0% | $0.00 | View |
| DG_NSW1 | DG_NSW1 |
$0 | $0 | — | — | — | — | — | View | ||
| Port Lincoln GT | POR03 |
SA1 | Turbine - OCGT | $0 | $0 | — | — | — | 0.0% | $2.00 | View |
| Port Lincoln GT | POR01 |
SA1 | Turbine - OCGT | $0 | $0 | — | — | — | 0.0% | $2.00 | View |
| Poatina | POAT220 |
TAS1 | Hydro - Dam | $0 | $0 | — | — | — | 0.0% | $1.00 | View |
| Poatina | POAT110 |
TAS1 | Hydro - Dam | $0 | $0 | — | — | — | 0.0% | $1.00 | View |
| PLBESS1 | PLBESS1 |
$0 | $0 | — | -4.0 | — | — | — | View | ||
| PIONEER | PIONEER |
$0 | $0 | — | 630.7 | — | — | — | View | ||
| DG_QLD1 | DG_QLD1 |
$0 | $0 | — | — | — | — | — | View | ||
| DG_SA1 | DG_SA1 |
$0 | $0 | — | — | — | — | — | View | ||
| DG_TAS1 | DG_TAS1 |
$0 | $0 | — | — | — | — | — | View | ||
| DG_VIC1 | DG_VIC1 |
$0 | $0 | — | — | — | — | — | View | ||
| DRACAV1 | DRACAV1 |
$0 | $0 | — | — | — | — | — | View | ||
| PUMP2 | PUMP2 |
$0 | $0 | — | 422.6 | — | — | — | View | ||
| DRACAN1 | DRACAN1 |
$0 | $0 | 2.2 | — | — | — | — | View | ||
| RT_QLD1 | RT_QLD1 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_NSW6 | RT_NSW6 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_NSW5 | RT_NSW5 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_NSW4 | RT_NSW4 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_NSW3 | RT_NSW3 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_NSW2 | RT_NSW2 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_NSW1 | RT_NSW1 |
$0 | $0 | — | — | — | — | — | View | ||
| Roma | ROMA_8 |
QLD1 | Turbine - OCGT | $0 | $0 | — | — | 37.9 | 0.0% | $128.50 | View |
| Roma | ROMA_7 |
QLD1 | Turbine - OCGT | $0 | $0 | — | — | 38.9 | 0.0% | $128.50 | View |
| CRWARP1 | CRWARP1 |
$0 | $0 | — | 990.4 | — | — | — | View | ||
| Collinsville PV | CSPVPS1 |
QLD1 | Solar PV - Fixed | $0 | $0 | — | — | — | 0.0% | $0.28 | View |
| Quarantine | QPS5 |
SA1 | Turbine - OCGT | $0 | $0 | — | — | — | 0.0% | $209.05 | View |
| Quarantine | QPS4 |
SA1 | Turbine - OCGT | $0 | $0 | — | — | — | 0.0% | $128.50 | View |
| KIDSPHL2 | KIDSPHL2 |
$0 | $0 | — | — | — | — | — | View | ||
| Quarantine | QPS2 |
SA1 | Turbine - OCGT | $0 | $0 | — | — | 24.9 | 0.0% | $128.50 | View |
| Oakey Power Station | OAKEY1 |
QLD1 | Turbine - OCGT | $0 | $0 | — | — | — | 0.0% | $128.50 | View |
| MLSP1 | MLSP1 |
$0 | $0 | — | 67.6 | — | — | — | View | ||
| DRHTVP03 | DRHTVP03 |
$0 | $0 | — | — | — | — | — | View | ||
| DROZVP01 | DROZVP01 |
$0 | $0 | — | — | — | — | — | View | ||
| DROZVP02 | DROZVP02 |
$0 | $0 | — | — | — | — | — | View | ||
| MREHA3 | MREHA3 |
$0 | $0 | 328.9 | -90.4 | 142.4 | — | — | View | ||
| Millmerran Power Plant | MPP_1 |
QLD1 | Turbine - Steam Super Critical | $0 | $0 | — | — | — | 0.0% | $52.60 | View |
| MREHA2 | MREHA2 |
$0 | $0 | 146.8 | -156.5 | 12.7 | — | — | View | ||
| MREHA1 | MREHA1 |
$0 | $0 | 142.8 | -163.3 | 17.9 | — | — | View | ||
| DROZVP03 | DROZVP03 |
$0 | $0 | — | — | — | — | — | View | ||
| Mt Piper | MP2 |
NSW1 | Turbine - Steam Sub Critical | $0 | $0 | — | — | — | 0.0% | $52.60 | View |
| DRPSTQ01 | DRPSTQ01 |
$0 | $0 | — | — | — | — | — | View | ||
| DRSHVN01 | DRSHVN01 |
$0 | $0 | — | — | — | — | — | View | ||
| DRPSTV01 | DRPSTV01 |
$0 | $0 | 3.3 | — | — | — | — | View | ||
| DRSHVN02 | DRSHVN02 |
$0 | $0 | 69.8 | — | — | — | — | View | ||
| DRSHVQ01 | DRSHVQ01 |
$0 | $0 | 5.5 | — | — | — | — | View | ||
| DRSHVS01 | DRSHVS01 |
$0 | $0 | 2.2 | — | — | — | — | View | ||
| DRHTVP01 | DRHTVP01 |
$0 | $0 | — | — | — | — | — | View | ||
| DRGBND04 | DRGBND04 |
$0 | $0 | 34.1 | — | — | — | — | View | ||
| DRGBND03 | DRGBND03 |
$0 | $0 | 49.4 | — | — | — | — | View | ||
| DRGBND01 | DRGBND01 |
$0 | $0 | 9.5 | — | — | — | — | View | ||
| DRAESN3 | DRAESN3 |
$0 | $0 | — | — | — | — | — | View | ||
| DRAESS1 | DRAESS1 |
$0 | $0 | — | — | — | — | — | View | ||
| Newport | NPS |
VIC1 | Turbine - Steam Sub Critical | $0 | $0 | — | — | — | 0.0% | $2.00 | View |
| DRBRLV01 | DRBRLV01 |
$0 | $0 | 14.1 | — | — | — | — | View | ||
| DRFIIN01 | DRFIIN01 |
$0 | $0 | — | — | — | — | — | View | ||
| DRFIIN02 | DRFIIN02 |
$0 | $0 | — | — | — | — | — | View | ||
| Koorangie Energy Storage System | KESSB1 |
VIC1 | Storage - Battery | $-36 | $0 | — | -107.2 | — | -2.4% | $1.50 | View |
| Angaston | ANGAST1 |
SA1 | Reciprocating Engine - Compression ignition | $-108 | $0 | — | -1.1 | 49.8 | -0.1% | $0.00 | View |
| Hornsdale Power Reserve Unit 1 | HPR1 |
SA1 | Storage - Battery | $-109 | $5 | 9.3 | -39.6 | 21.8 | -1.1% | $1.50 | View |
| Wallgrove Grid Battery project | WALGRV1 |
NSW1 | Storage - Battery | $-114 | $2 | 101.6 | -29.8 | 9.7 | -2.5% | $1.50 | View |
| Bolivar Waste Water Treatment | BOWWBA1 |
SA1 | Storage - Battery | $-129 | $0 | — | -1.9 | 2.2 | -2.6% | $1.58 | View |
| SMFBESS2 | SMFBESS2 |
SA1 | $-168 | $0 | — | -1.7 | — | 0.0% | $1.50 | View | |
| Christies Beach Wastewater Treatment Plant | CBWWBA1 |
SA1 | Storage - Battery | $-170 | $0 | — | -1.9 | 2.2 | -3.7% | $1.50 | View |
| Happy Valley Reservoir | HVWWBA1 |
SA1 | Storage - Battery | $-202 | $0 | 9.0 | -2.8 | 4.3 | -2.1% | $1.58 | View |
| Tailem Bend Battery Project | TB2B1 |
SA1 | Storage - Battery | $-216 | $0 | — | -2.5 | — | -0.2% | $1.50 | View |
| Lake Bonney Battery Energy Storage | LBB1 |
SA1 | Storage - Battery | $-297 | $1 | 62.5 | -15.7 | 9.1 | -2.6% | $1.98 | View |
| NESBESS2 | NESBESS2 |
NSW1 | $-377 | $0 | — | -4.4 | — | -0.1% | $1.50 | View | |
| Queanbeyan BESS | QBYNB1 |
NSW1 | Storage - Battery | $-387 | $0 | — | -7.6 | — | -3.2% | $1.50 | View |
| Dalrymple BESS | DALNTH1 |
SA1 | Storage - Battery | $-452 | $0 | — | -5.5 | — | -0.8% | $2.03 | View |
| Adelaide Desalination Plant | ADPBA1 |
SA1 | Storage - Battery | $-528 | $2 | 16.6 | -6.0 | 6.5 | -3.2% | $0.00 | View |
| Riverina Energy Storage System 1 | RESS1 |
NSW1 | Storage - Battery | $-671 | $0 | — | -22.5 | 14.9 | -1.6% | $1.50 | View |
| Torrens Island BESS | TIB1 |
SA1 | Storage - Battery | $-1.0k | $20 | 163.4 | -94.1 | — | -1.6% | $1.50 | View |
| SMFBESS1 | SMFBESS1 |
SA1 | $-1.7k | $0 | — | -17.4 | — | -0.3% | $1.50 | View | |
| Condong | CONDONG1 |
NSW1 | Turbine - Steam Sub Critical | $-2.5k | $0 | — | -29.7 | — | -4.1% | $112.12 | View |
| Rangebank BESS | RANGEB1 |
VIC1 | Storage - Battery | $-2.6k | $0 | — | -112.3 | — | -2.3% | $1.50 | View |
| Mannum BESS | MANNUMB1 |
SA1 | Storage - Battery | $-3.3k | $0 | — | -71.2 | 83.4 | -3.0% | $1.50 | View |
| Waratah Super Battery | WTAHB1 |
NSW1 | Storage - Battery | $-5.0k | $0 | — | -660.3 | 292.0 | -3.2% | $1.50 | View |
| Ulinda Park BESS | ULPBESS1 |
QLD1 | Storage - Battery | $-6.5k | $89 | 26.9 | -101.0 | 164.7 | -2.7% | $1.50 | View |
| Wandoan South BESS | WANDB1 |
QLD1 | Storage - Battery | $-7.0k | $74 | 181.1 | 25.9 | 108.3 | 1.1% | $1.50 | View |