NEM Gas Baseload Stats

CCGT and steam-cycle gas thermal plant across the NEM — baseload and mid-merit units, not open-cycle peakers. Stats for the selected period. Data through 22 Jun 2026, 10:15 AEST.

Browse by type
Energy revenue (× MLF)
$15.32M
FCAS revenue (× MLF)
$233
FCAS volume
106.7 MWh
Dispatched
20,663.1 MWh
Capacity factor
28.3%
Generators
12

Energy revenue = cleared MW × (5/60 h) × regional RRP × MLF. FCAS revenue = sum of cleared FCAS MW × (5/60 h) × regional FCAS price × MLF (raise/lower 6s, 60s, 5min, reg). FCAS volume = total FCAS enablement MWh across all services. Capacity factor = dispatched MWh ÷ (nameplate MW × period hours). SRMC from financial assumptions. Not AEMO settlement data.

Site DUID Region Tech Energy rev. (× MLF) FCAS rev. (× MLF) FCAS MWh MWh dispatch MWh available Capacity factor Est. SRMC
Pelican Point PPCCGT SA1 Turbine - CCGT $8.00M $0 6,945.8 6,892.5 54.7% $84.30 View
Osborne OSB-AG SA1 Turbine - CCGT $3.39M $0 3,790.2 3,430.7 87.7% $84.30 View
Torrens Island B TORRB2 SA1 Turbine - Steam Sub Critical $3.16M $233 106.7 2,827.8 3,566.7 58.9% $5.47 View
Tallawarra TALWA1 NSW1 Turbine - CCGT $423.2k $0 3,805.3 5,167.5 39.6% $84.30 View
Yarwun 1 YARWUN_1 QLD1 Turbine - CCGT $188.5k $0 2,378.4 2,942.5 55.1% $84.30 View
Newport NPS VIC1 Turbine - Steam Sub Critical $105.8k $0 444.9 3.7% $2.00 View
Townsville Power Station YABULU QLD1 Turbine - CCGT $46.4k $0 470.6 470.6 12.3% $84.30 View
Tamar Valley Combined Cycle TVCC201 TAS1 Turbine - CCGT $0 $0 0.0% $84.30 View
Torrens Island B TORRB4 SA1 Turbine - Steam Sub Critical $0 $0 0.0% $2.00 View
Torrens Island B TORRB3 SA1 Turbine - Steam Sub Critical $0 $0 0.0% $2.00 View
Torrens Island B TORRB1 SA1 Turbine - Steam Sub Critical $0 $0 0.0% $2.00 View
Townsville Power Station YABULU2 QLD1 Turbine - CCGT $0 $0 0.0% $84.30 View