NEM BESS Stats

Battery energy storage systems registered in the NEM — grid-scale and co-located storage. Stats for the selected period. Data through 20 Sep 2026, 15:40 AEST.

Browse by type
Energy revenue (× MLF)
$1.32M
FCAS revenue (× MLF)
$4.7k
FCAS volume
18,143.6 MWh
Dispatched
2,414.5 MWh
Capacity factor
1.2%
Generators
56

Energy revenue = cleared MW × (5/60 h) × regional RRP × MLF. FCAS revenue = sum of cleared FCAS MW × (5/60 h) × regional FCAS price × MLF (raise/lower 6s, 60s, 5min, reg). FCAS volume = total FCAS enablement MWh across all services. Capacity factor = dispatched MWh ÷ (nameplate MW × period hours). SRMC from financial assumptions. Not AEMO settlement data.

Site DUID Region Tech Energy rev. (× MLF) FCAS rev. (× MLF) FCAS MWh MWh dispatch MWh available Capacity factor Est. SRMC
Eraring Big Battery ERB01 NSW1 Storage - Battery $147.7k $0 312.0 2,861.7 5.4% $1.58 View
Orana BESS ORABESS1 NSW1 Storage - Battery $141.2k $299 65.6 371.0 3,744.2 3.7% $1.50 View
Waratah Super Battery WTAHB1 NSW1 Storage - Battery $116.5k $0 318.4 5,983.1 1.6% $1.50 View
Supernode BESS SNB02 QLD1 Storage - Battery $80.1k $0 225.7 1,518.0 3.6% $1.50 View
Liddell BESS LDBESS1 NSW1 Storage - Battery $72.7k $406 230.0 418.6 3,794.0 3.5% $1.50 View
Tarong BESS - Stanwell TARBESS1 QLD1 Storage - Battery $49.1k $114 2,982.3 105.3 2,050.0 1.5% $1.50 View
Swanbank BESS SWANBBF1 QLD1 Storage - Battery $46.8k $0 113.2 1,562.5 1.9% $1.50 View
Blyth BESS BLYTHB1 SA1 Storage - Battery $46.4k $605 457.7 -16.8 2,254.1 -0.3% $4.86 View
Victorian Big Battery VBB1 VIC1 Storage - Battery $45.6k $312 220.0 48.3 1,977.7 0.7% $1.50 View
Rangebank BESS RANGEB1 VIC1 Storage - Battery $44.5k $0 29.2 882.9 0.6% $1.50 View
Koorangie Energy Storage System KESSB1 VIC1 Storage - Battery $39.6k $0 52.3 732.4 1.2% $1.50 View
Limondale BESS LIMBESS1 NSW1 Storage - Battery $39.0k $63 16.6 82.3 620.8 6.9% $1.50 View
Supernode BESS SNB01 QLD1 Storage - Battery $38.6k $0 72.1 1,416.7 1.2% $1.50 View
Templers B BESS TEMPB1 SA1 Storage - Battery $35.3k $0 68.0 311.0 2.6% $1.50 View
Brendale BESS BRNDBES1 QLD1 Storage - Battery $33.6k $26 7.5 96.1 1,773.6 2.0% $1.58 View
Western Downs Battery - Stage 1 And 2 WDBESS1 QLD1 Storage - Battery $32.9k $732 279.0 5.2 2,021.3 0.1% $1.58 View
Greenbank BESS GREENB1 QLD1 Storage - Battery $29.6k $27 477.8 66.6 930.1 1.4% $1.54 View
Torrens Island BESS TIB1 SA1 Storage - Battery $26.1k $307 2,139.4 -6.3 1,384.1 -0.1% $1.50 View
Ulinda Park BESS ULPBESS1 QLD1 Storage - Battery $24.6k $78 15.9 41.4 1,827.2 1.1% $1.50 View
Mannum BESS MANNUMB1 SA1 Storage - Battery $23.0k $0 40.2 902.2 1.7% $1.50 View
LaTrobe Valley BESS LVES1 VIC1 Storage - Battery $22.5k $78 2,662.6 36.5 697.8 1.5% $1.54 View
Terang BESS TRGBESS1 VIC1 Storage - Battery $21.8k $598 265.4 -14.9 538.9 -0.6% $1.50 View
Hazelwood Battery Energy Storage System (HBESS) HBESS1 VIC1 Storage - Battery $17.9k $52 23.5 5.8 808.5 0.1% $1.87 View
Capital Battery CAPBES1 NSW1 Storage - Battery $16.1k $0 26.6 942.1 1.1% $1.50 View
NESBESS1 NESBESS1 NSW1 $14.5k $0 37.1 291.7 0.8% $1.50 View
Clements Gap - BESS CGBESS01 SA1 Storage - Battery $14.3k $0 45.4 408.8 3.2% $1.58 View
Hornsdale Power Reserve Unit 1 HPR1 SA1 Storage - Battery $12.4k $80 87.7 -4.2 497.9 -0.1% $1.50 View
Chinchilla BESS CHBESS1 QLD1 Storage - Battery $11.6k $15 273.0 15.4 488.7 0.6% $1.75 View
Mornington BESS MRNBESS1 VIC1 Storage - Battery $9.8k $0 -189.9 -3.3% $1.50 View
Wandoan South BESS WANDB1 QLD1 Storage - Battery $9.0k $564 3,135.3 -4.8 845.3 -0.2% $1.50 View
Riverina Energy Storage System 2 RIVNB2 NSW1 Storage - Battery $8.9k $0 18.5 388.8 1.2% $1.50 View
Riverina Energy Storage System 1 RESS1 NSW1 Storage - Battery $7.9k $0 20.5 389.5 1.4% $1.50 View
Smithfield BESS SMTHBES1 NSW1 Storage - Battery $7.5k $34 1,635.2 15.0 300.6 0.7% $1.50 View
Bouldercombe Battery project BBATTERY1 QLD1 Storage - Battery $6.0k $139 743.9 1.7 476.2 0.1% $1.64 View
Wallgrove Grid Battery project WALGRV1 NSW1 Storage - Battery $4.6k $25 962.5 4.5 278.5 0.4% $1.50 View
Tailem Bend Battery Project TB2B1 SA1 Storage - Battery $3.3k $39 209.2 0.2 156.8 0.0% $1.50 View
Darlington Point Energy Storage System DPNTB1 NSW1 Storage - Battery $3.3k $0 6.2 134.7 1.0% $0.00 View
Gannawarra Energy Storage System GANNB1 VIC1 Storage - Battery $3.2k $0 4.1 42.8 0.7% $1.98 View
Lake Bonney Battery Energy Storage LBB1 SA1 Storage - Battery $2.9k $22 542.3 15.5 109.8 2.6% $1.98 View
Quorn Park Solar Hybrid QPSFB2 NSW1 Storage - Battery $2.6k $0 3.6 90.8 0.5% $1.58 View
Bulgana Green Power Hub - BESS BULBES1 VIC1 Storage - Battery $2.3k $42 498.9 -8.8 180.0 -1.8% $1.98 View
Ballarat Energy Storage System BALB1 VIC1 Storage - Battery $1.8k $0 1.6 64.7 0.2% $0.00 View
Adelaide Desalination Plant ADPBA1 SA1 Storage - Battery $1.1k $17 116.8 2.7 46.8 1.4% $0.00 View
Philip Island BESS PIBESS1 VIC1 Storage - Battery $792 $51 21.7 -5.7 30.7 -4.7% $1.50 View
Happy Valley Reservoir HVWWBA1 SA1 Storage - Battery $786 $19 72.7 1.3 33.2 1.0% $1.58 View
Dalrymple BESS DALNTH1 SA1 Storage - Battery $538 $0 -6.7 105.2 -0.9% $2.03 View
Bolivar Waste Water Treatment BOWWBA1 SA1 Storage - Battery $450 $9 1.2 0.4 16.3 0.6% $1.58 View
Christies Beach Wastewater Treatment Plant CBWWBA1 SA1 Storage - Battery $397 $0 0.8 16.2 1.6% $1.50 View
SMFBESS1 SMFBESS1 SA1 $282 $0 -6.7 -0.1% $1.50 View
SMFBESS2 SMFBESS2 SA1 $281 $0 -6.6 -0.1% $1.50 View
Broken Hill BHB1 NSW1 Storage - Battery $5 $0 -35.6 -3.0% $1.50 View
Kennedy Energy Park - Phase 1 - Storage KEPBG1 QLD1 Storage - Battery $0 $0 0.0% $2.03 View
LINCOLN GAP BESSBDU LGAPBS1 SA1 Storage - Battery $0 $0 0.0% $1.50 View
Queanbeyan BESS QBYNB1 NSW1 Storage - Battery $-6 $0 -0.5 -0.2% $1.50 View
NESBESS2 NESBESS2 NSW1 $-28 $0 -2.3 0.0% $1.50 View
Williamsdale BESS WILLBES1 NSW1 Storage - Battery $-93 $0 -4.8 -0.1% $1.50 View