NEM BESS Stats

Battery energy storage systems registered in the NEM — grid-scale and co-located storage. Stats for the selected period. Data through 05 Aug 2026, 02:15 AEST.

Browse by type
Energy revenue (× MLF)
$653.0k
FCAS revenue (× MLF)
$642
FCAS volume
2,755.5 MWh
Dispatched
-4,381.5 MWh
Capacity factor
-2.3%
Generators
53

Energy revenue = cleared MW × (5/60 h) × regional RRP × MLF. FCAS revenue = sum of cleared FCAS MW × (5/60 h) × regional FCAS price × MLF (raise/lower 6s, 60s, 5min, reg). FCAS volume = total FCAS enablement MWh across all services. Capacity factor = dispatched MWh ÷ (nameplate MW × period hours). SRMC from financial assumptions. Not AEMO settlement data.

Site DUID Region Tech Energy rev. (× MLF) FCAS rev. (× MLF) FCAS MWh MWh dispatch MWh available Capacity factor Est. SRMC
Orana BESS ORABESS1 NSW1 Storage - Battery $107.5k $0 -420.3 760.8 -4.2% $1.50 View
Supernode BESS SNB02 QLD1 Storage - Battery $96.8k $0 -197.8 476.7 -3.2% $1.50 View
Eraring Big Battery ERB01 NSW1 Storage - Battery $95.3k $0 -622.0 843.3 -10.8% $1.58 View
Tarong BESS - Stanwell TARBESS1 QLD1 Storage - Battery $59.0k $5 268.1 -65.1 -0.9% $1.50 View
Swanbank BESS SWANBBF1 QLD1 Storage - Battery $53.0k $0 -56.0 -0.9% $1.50 View
Brendale BESS BRNDBES1 QLD1 Storage - Battery $49.8k $68 29.9 -39.8 375.8 -0.8% $1.58 View
Waratah Super Battery WTAHB1 NSW1 Storage - Battery $44.1k $0 -510.2 1,008.3 -2.5% $1.50 View
Supernode BESS SNB01 QLD1 Storage - Battery $43.2k $0 -137.6 476.7 -2.2% $1.50 View
Ulinda Park BESS ULPBESS1 QLD1 Storage - Battery $32.6k $157 51.1 -83.9 284.2 -2.3% $1.50 View
Limondale BESS LIMBESS1 NSW1 Storage - Battery $29.7k $0 -116.3 91.7 -9.7% $1.50 View
Western Downs Battery - Stage 1 And 2 WDBESS1 QLD1 Storage - Battery $27.5k $46 18.0 -221.8 453.3 -3.6% $1.58 View
Wandoan South BESS WANDB1 QLD1 Storage - Battery $14.2k $46 515.2 -16.6 183.3 -0.7% $1.50 View
Greenbank BESS GREENB1 QLD1 Storage - Battery $14.1k $2 140.9 -40.8 116.7 -0.9% $1.54 View
Chinchilla BESS CHBESS1 QLD1 Storage - Battery $13.9k $1 79.7 -45.9 -1.9% $1.75 View
Mornington BESS MRNBESS1 VIC1 Storage - Battery $12.9k $0 157.5 2.7% $1.50 View
Capital Battery CAPBES1 NSW1 Storage - Battery $10.9k $0 -72.3 183.3 -3.0% $1.50 View
Riverina Energy Storage System 2 RIVNB2 NSW1 Storage - Battery $10.7k $0 -18.4 -1.2% $1.50 View
Bouldercombe Battery project BBATTERY1 QLD1 Storage - Battery $6.6k $27 52.1 -24.9 88.0 -2.1% $1.64 View
Koorangie Energy Storage System KESSB1 VIC1 Storage - Battery $5.0k $0 -143.6 339.2 -3.2% $1.50 View
Riverina Energy Storage System 1 RESS1 NSW1 Storage - Battery $4.0k $0 -36.6 82.5 -2.5% $1.50 View
Rangebank BESS RANGEB1 VIC1 Storage - Battery $3.5k $0 -192.9 366.7 -4.0% $1.50 View
Broken Hill BHB1 NSW1 Storage - Battery $3.2k $0 -6.9 -0.6% $1.50 View
Darlington Point Energy Storage System DPNTB1 NSW1 Storage - Battery $3.0k $0 -9.7 -1.6% $0.00 View
LaTrobe Valley BESS LVES1 VIC1 Storage - Battery $2.7k $38 444.0 -84.0 183.3 -3.5% $1.54 View
Wallgrove Grid Battery project WALGRV1 NSW1 Storage - Battery $1.5k $0 -37.9 -3.2% $1.50 View
Smithfield BESS SMTHBES1 NSW1 Storage - Battery $908 $4 201.3 -94.7 1.2 -4.6% $1.50 View
SMFBESS1 SMFBESS1 SA1 $521 $0 4.6 0.1% $1.50 View
Hazelwood Battery Energy Storage System (HBESS) HBESS1 VIC1 Storage - Battery $501 $18 63.8 -91.2 275.0 -1.9% $1.87 View
Kennedy Energy Park - Phase 1 - Storage KEPBG1 QLD1 Storage - Battery $324 $0 2.8 5.9% $2.03 View
Williamsdale BESS WILLBES1 NSW1 Storage - Battery $142 $0 1.1 0.0% $1.50 View
Gannawarra Energy Storage System GANNB1 VIC1 Storage - Battery $93 $0 -15.2 45.8 -2.5% $1.98 View
LINCOLN GAP BESSBDU LGAPBS1 SA1 Storage - Battery $0 $0 0.0% $1.50 View
Bolivar Waste Water Treatment BOWWBA1 SA1 Storage - Battery $-46 $0 0.1 3.7 0.1% $1.58 View
Happy Valley Reservoir HVWWBA1 SA1 Storage - Battery $-69 $2 15.0 0.4 7.3 0.3% $1.58 View
Christies Beach Wastewater Treatment Plant CBWWBA1 SA1 Storage - Battery $-110 $1 0.2 -0.6 3.7 -1.1% $1.50 View
Adelaide Desalination Plant ADPBA1 SA1 Storage - Battery $-318 $4 30.4 -1.4 11.0 -0.8% $0.00 View
Philip Island BESS PIBESS1 VIC1 Storage - Battery $-320 $3 0.5 -6.0 7.3 -5.0% $1.50 View
Queanbeyan BESS QBYNB1 NSW1 Storage - Battery $-324 $0 -2.9 -1.2% $1.50 View
Terang BESS TRGBESS1 VIC1 Storage - Battery $-522 $0 -6.3 -0.3% $1.50 View
Dalrymple BESS DALNTH1 SA1 Storage - Battery $-719 $0 -7.2 27.5 -1.0% $2.03 View
Templers B BESS TEMPB1 SA1 Storage - Battery $-1.0k $0 -9.2 -0.3% $1.50 View
Ballarat Energy Storage System BALB1 VIC1 Storage - Battery $-1.2k $0 -13.8 15.1 -1.9% $0.00 View
Bulgana Green Power Hub - BESS BULBES1 VIC1 Storage - Battery $-1.8k $7 68.6 -26.3 35.2 -5.5% $1.98 View
Lake Bonney Battery Energy Storage LBB1 SA1 Storage - Battery $-1.9k $3 139.8 -13.5 44.0 -2.2% $1.98 View
Victorian Big Battery VBB1 VIC1 Storage - Battery $-3.0k $4 3.7 -218.5 245.7 -3.0% $1.50 View
Tailem Bend Battery Project TB2B1 SA1 Storage - Battery $-3.3k $18 64.7 -19.0 73.3 -1.9% $1.50 View
SMFBESS2 SMFBESS2 SA1 $-3.4k $0 -29.1 -0.5% $1.50 View
Torrens Island BESS TIB1 SA1 Storage - Battery $-3.7k $29 390.2 -66.5 458.3 -1.1% $1.50 View
Liddell BESS LDBESS1 NSW1 Storage - Battery $-4.1k $0 -235.4 913.0 -2.0% $1.50 View
Hornsdale Power Reserve Unit 1 HPR1 SA1 Storage - Battery $-5.2k $34 7.8 -33.5 146.7 -0.9% $1.50 View
Clements Gap - BESS CGBESS01 SA1 Storage - Battery $-7.2k $0 -52.2 110.0 -3.6% $1.58 View
Mannum BESS MANNUMB1 SA1 Storage - Battery $-9.5k $0 -68.8 183.3 -2.9% $1.50 View
Blyth BESS BLYTHB1 SA1 Storage - Battery $-46.1k $123 170.7 -335.5 364.0 -7.0% $4.86 View