MLF-adjusted revenue, dispatch, capacity factor, and estimated SRMC from AEMO 5‑minute dispatch data. Data through 02 Aug 2026, 16:00 AEST.
Energy revenue = cleared MW × (5/60 h) × regional RRP × MLF. FCAS revenue = sum of cleared FCAS MW × (5/60 h) × regional FCAS price × MLF (raise/lower 6s, 60s, 5min, reg). FCAS volume = total FCAS enablement MWh across all services. Capacity factor = dispatched MWh ÷ (nameplate MW × period hours). SRMC from financial assumptions. Not AEMO settlement data.
| Site | DUID | Region | Tech | Energy rev. (× MLF) | FCAS rev. (× MLF) | FCAS MWh | MWh dispatch | MWh available | Capacity factor | Est. SRMC | |
|---|---|---|---|---|---|---|---|---|---|---|---|
| Bayswater | BW04 |
NSW1 | Turbine - Steam Sub Critical | $630.0k | $116 | 134.1 | 11,262.7 | 8,277.1 | 68.5% | $55.48 | View |
| Bayswater | BW02 |
NSW1 | Turbine - Steam Sub Critical | $625.9k | $113 | 131.9 | 11,174.7 | 8,277.1 | 68.0% | $26.23 | View |
| Bayswater | BW01 |
NSW1 | Turbine - Steam Sub Critical | $606.5k | $117 | 132.5 | 10,865.0 | 7,975.0 | 68.6% | $53.57 | View |
| Eraring | ER03 |
NSW1 | Turbine - Steam Sub Critical | $576.5k | $139 | 384.2 | 9,825.0 | 8,458.3 | 56.9% | $49.77 | View |
| Eraring | ER02 |
NSW1 | Turbine - Steam Sub Critical | $567.3k | $137 | 395.5 | 9,300.0 | 8,279.2 | 53.8% | $59.45 | View |
| Eraring | ER01 |
NSW1 | Turbine - Steam Sub Critical | $536.6k | $126 | 357.3 | 8,875.1 | 7,612.5 | 51.4% | $48.29 | View |
| Bayswater | BW03 |
NSW1 | Turbine - Steam Sub Critical | $519.5k | $161 | 94.5 | 9,199.3 | 8,277.1 | 56.0% | $28.68 | View |
| Vales Point B | VP5 |
NSW1 | Turbine - Steam Sub Critical | $491.5k | $0 | — | 8,296.6 | 7,975.0 | 52.4% | $52.60 | View |
| Vales Point B | VP6 |
NSW1 | Turbine - Steam Sub Critical | $486.9k | $0 | — | 8,209.7 | 7,975.0 | 51.8% | $52.60 | View |
| Murray 2 | MURRAY |
VIC1 | Hydro - Dam | $383.1k | $162 | 214.4 | 7,439.0 | 13,438.3 | 51.7% | $1.00 | View |
| Mt Piper | MP1 |
NSW1 | Turbine - Steam Sub Critical | $375.8k | $0 | — | 6,281.7 | 8,820.8 | 35.9% | $49.24 | View |
| Eraring | ER04 |
NSW1 | Turbine - Steam Sub Critical | $372.7k | $44 | 75.2 | 6,936.3 | 4,229.2 | 40.1% | $55.48 | View |
| Tarong North | TNPS1 |
QLD1 | Turbine - Steam Super Critical | $364.5k | $0 | — | 8,383.5 | 5,352.9 | 77.6% | $52.60 | View |
| Millmerran Power Plant | MPP_1 |
QLD1 | Turbine - Steam Super Critical | $360.1k | $0 | — | 7,950.0 | 5,256.2 | 77.8% | $52.60 | View |
| Millmerran Power Plant | MPP_2 |
QLD1 | Turbine - Steam Super Critical | $360.1k | $0 | — | 7,957.2 | 5,256.2 | 77.8% | $52.60 | View |
| MacIntyre Wind Farm | MCINTYR1 |
QLD1 | Wind Turbine - Onshore | $352.7k | $0 | — | 7,645.7 | 5,517.9 | 34.5% | $0.58 | View |
| Mt Piper | MP2 |
NSW1 | Turbine - Steam Sub Critical | $335.1k | $0 | — | 5,506.3 | 8,458.3 | 34.8% | $52.60 | View |
| Callide C | CPP_4 |
QLD1 | Turbine - Steam Super Critical | $293.4k | $0 | — | 6,674.9 | 5,075.0 | 66.2% | $101.94 | View |
| Tarong | TARONG#2 |
QLD1 | Turbine - Steam Sub Critical | $269.9k | $25 | 6.1 | 5,969.2 | 4,229.2 | 71.1% | $55.48 | View |
| Tarong | TARONG#4 |
QLD1 | Turbine - Steam Sub Critical | $269.1k | $28 | 6.5 | 5,810.1 | 4,229.2 | 69.2% | $52.58 | View |
| Tarong | TARONG#1 |
QLD1 | Turbine - Steam Sub Critical | $268.9k | $0 | — | 5,801.9 | 4,229.2 | 69.1% | $52.60 | View |
| Loy Yang B | LOYYB2 |
VIC1 | Turbine - Steam Sub Critical | $260.0k | $302 | 306.9 | 9,620.8 | 6,947.9 | 69.1% | $47.20 | View |
| Loy Yang B | LOYYB1 |
VIC1 | Turbine - Steam Sub Critical | $259.9k | $259 | 257.9 | 9,749.9 | 7,008.0 | 70.0% | $47.20 | View |
| Callide C | CPP_3 |
QLD1 | Turbine - Steam Super Critical | $253.1k | $0 | — | 5,954.8 | 4,108.3 | 58.5% | $44.41 | View |
| Loy Yang A Power Station | LYA4 |
VIC1 | Turbine - Steam Sub Critical | $245.9k | $32 | 157.4 | 8,483.8 | 6,766.7 | 63.1% | $47.20 | View |
| Loy Yang A Power Station | LYA3 |
VIC1 | Turbine - Steam Sub Critical | $239.7k | $31 | 147.3 | 8,434.3 | 6,766.7 | 62.8% | $47.20 | View |
| Coopers Gap Wind Farm | COOPGWF1 |
QLD1 | Wind Turbine - Onshore | $239.5k | $0 | — | 5,315.1 | 3,599.1 | 48.9% | $0.68 | View |
| Loy Yang A Power Station | LYA2 |
VIC1 | Turbine - Steam Sub Critical | $237.1k | $39 | 38.4 | 8,652.4 | 6,404.2 | 68.0% | $47.20 | View |
| Loy Yang A Power Station | LYA1 |
VIC1 | Turbine - Steam Sub Critical | $235.7k | $23 | 135.3 | 8,410.7 | 6,766.7 | 62.6% | $47.20 | View |
| Tarong | TARONG#3 |
QLD1 | Turbine - Steam Sub Critical | $232.3k | $0 | — | 5,337.2 | 3,487.5 | 63.5% | $55.48 | View |
| Callide B | CALL_B_1 |
QLD1 | Turbine - Steam Sub Critical | $185.6k | $0 | — | 4,808.0 | 4,229.2 | 57.2% | $32.60 | View |
| Callide B | CALL_B_2 |
QLD1 | Turbine - Steam Sub Critical | $176.4k | $0 | — | 4,419.3 | 4,108.3 | 52.6% | $55.48 | View |
| Upper Tumut | UPPTUMUT |
NSW1 | Hydro - Dam | $168.8k | $135 | 173.0 | 2,397.7 | 6,000.7 | 16.2% | $1.00 | View |
| Stanwell | STAN-2 |
QLD1 | Turbine - Steam Sub Critical | $162.6k | $13 | 2.5 | 3,972.3 | 4,410.4 | 45.3% | $52.60 | View |
| Gladstone | GSTONE6 |
QLD1 | Turbine - Steam Sub Critical | $160.2k | $0 | — | 3,573.4 | 2,900.0 | 53.2% | $54.96 | View |
| Gladstone | GSTONE3 |
QLD1 | Turbine - Steam Sub Critical | $160.1k | $0 | — | 3,603.1 | 3,383.3 | 53.6% | $128.75 | View |
| Stanwell | STAN-1 |
QLD1 | Turbine - Steam Sub Critical | $159.3k | $39 | 104.3 | 3,925.0 | 3,685.4 | 44.8% | $52.60 | View |
| Stanwell | STAN-4 |
QLD1 | Turbine - Steam Sub Critical | $158.5k | $0 | — | 3,992.2 | 2,477.1 | 45.6% | $52.60 | View |
| Gladstone | GSTONE1 |
QLD1 | Turbine - Steam Sub Critical | $153.0k | $0 | — | 3,578.6 | 3,141.2 | 53.3% | $52.99 | View |
| Yallourn W | YWPS4 |
VIC1 | Turbine - Steam Sub Critical | $152.3k | $0 | — | 6,720.5 | 4,785.0 | 74.7% | $47.20 | View |
| Gladstone | GSTONE4 |
QLD1 | Turbine - Steam Sub Critical | $148.5k | $0 | — | 3,384.3 | 2,670.0 | 50.4% | $52.60 | View |
| Yallourn W | YWPS3 |
VIC1 | Turbine - Steam Sub Critical | $148.1k | $0 | — | 6,653.5 | 4,652.1 | 73.9% | $47.20 | View |
| Clarke Creek Wind Farm | CLRKCWF1 |
QLD1 | Wind Turbine - Onshore | $142.5k | $0 | — | 3,445.9 | 2,201.4 | 41.4% | $0.00 | View |
| Sapphire Wind Farm | SAPHWF1 |
SA1 | Wind Turbine - Onshore | $132.6k | $0 | — | 3,297.3 | 2,441.9 | 50.9% | $0.50 | View |
| Yallourn W | YWPS1 |
VIC1 | Turbine - Steam Sub Critical | $130.1k | $0 | — | 6,806.1 | 3,987.5 | 81.0% | $47.20 | View |
| Yallourn W | YWPS2 |
VIC1 | Turbine - Steam Sub Critical | $126.0k | $0 | — | 6,613.5 | 3,866.7 | 78.7% | $47.20 | View |
| Pelican Point | PPCCGT |
SA1 | Turbine - CCGT | $123.4k | $0 | — | 1,735.2 | 1,963.4 | 13.7% | $84.30 | View |
| Osborne | OSB-AG |
SA1 | Turbine - CCGT | $112.1k | $0 | — | 1,051.1 | 1,098.4 | 24.3% | $84.30 | View |
| Orana BESS | ORABESS1 |
NSW1 | Storage - Battery | $110.0k | $0 | — | 323.9 | 5,014.6 | 3.3% | $1.50 | View |
| Barker Inlet Power Station | BARKIPS1 |
SA1 | Reciprocating Engine - Spark ignition | $104.6k | $0 | — | 959.8 | 2,155.0 | 19.0% | $9.00 | View |
| Mount Emerald | MEWF1 |
QLD1 | Wind Turbine - Onshore | $102.3k | $0 | — | 2,653.7 | 1,580.9 | 61.3% | $0.50 | View |
| Yarwun 1 | YARWUN_1 |
QLD1 | Turbine - CCGT | $99.1k | $0 | — | 2,427.9 | 1,993.7 | 56.2% | $84.30 | View |
| Torrens Island B | TORRB2 |
SA1 | Turbine - Steam Sub Critical | $98.0k | $146 | 166.8 | 901.0 | 1,516.7 | 18.8% | $5.47 | View |
| Stockyard Hill Wind Farm | STOCKYD1 |
VIC1 | Wind Turbine - Onshore | $95.5k | $0 | — | 7,556.3 | 4,244.6 | 59.7% | $0.50 | View |
| Dulacca Wind Farm | DULAWF1 |
QLD1 | Wind Turbine - Onshore | $89.3k | $0 | — | 1,949.7 | 1,432.6 | 47.0% | $0.53 | View |
| Catagunya / Liapootah / Wayatinah | LI_WY_CA |
TAS1 | Hydro - Dam | $85.7k | $7 | 17.9 | 2,681.3 | 2,199.2 | 63.2% | $1.05 | View |
| Boco Rock Wind Farm | BOCORWF1 |
NSW1 | Wind Turbine - Onshore | $77.4k | $0 | — | 1,498.2 | 877.9 | 55.2% | $0.00 | View |
| Bogong / Mackay | MCKAY1 |
VIC1 | Hydro - Dam | $74.9k | $0 | — | 1,100.1 | 3,625.0 | 15.3% | $1.00 | View |
| Rye Park Wind Farm | RYEPARK1 |
NSW1 | Wind Turbine - Onshore | $70.1k | $0 | — | 1,453.2 | 878.6 | 15.3% | $0.50 | View |
| White Rock Wind Farm - Stage 1 | WRWF1 |
NSW1 | Wind Turbine - Onshore | $69.2k | $0 | — | 1,357.5 | 1,010.2 | 32.3% | $0.50 | View |
| Bodangora Wind Farm | BODWF1 |
NSW1 | Wind Turbine - Onshore | $66.3k | $0 | — | 1,151.4 | 863.4 | 42.4% | $0.68 | View |
| Flyers Creek Wind Farm | FLYCRKWF |
NSW1 | Wind Turbine - Onshore | $64.1k | $0 | — | 1,122.7 | 770.4 | 32.1% | $0.58 | View |
| John Butters | JBUTTERS |
TAS1 | Hydro - Dam | $63.6k | $565 | 314.8 | 1,305.1 | 1,740.0 | 37.8% | $0.00 | View |
| Tungatinah | TUNGATIN |
TAS1 | Hydro - Dam | $60.6k | $367 | 206.0 | 1,412.3 | 1,665.2 | 47.1% | $1.00 | View |
| Eraring Big Battery | ERB01 |
NSW1 | Storage - Battery | $59.9k | $0 | — | 19.1 | 5,558.3 | 0.3% | $1.58 | View |
| Kaban Wind Farm | KABANWF1 |
QLD1 | Wind Turbine - Onshore | $58.7k | $0 | — | 1,637.6 | 902.7 | 43.5% | $0.00 | View |
| Clarke Creek Wind Farm | CLRKCWF2 |
QLD1 | Wind Turbine - Onshore | $57.0k | $0 | — | 1,410.9 | 870.6 | 56.8% | $0.58 | View |
| Tamar Valley Combined Cycle | TVCC201 |
TAS1 | Turbine - CCGT | $56.0k | $0 | 0.8 | 2,579.5 | 2,513.3 | 51.7% | $84.30 | View |
| Tumut 3 | TUMUT3 |
NSW1 | Hydro - Dam | $55.8k | $38 | 150.4 | 749.7 | 21,260.0 | 2.1% | $1.05 | View |
| Reece | REECE1 |
TAS1 | Hydro - Dam | $55.3k | $21 | 13.6 | 1,951.0 | 1,425.8 | 70.3% | $1.00 | View |
| Reece | REECE2 |
TAS1 | Hydro - Dam | $47.2k | $193 | 12.6 | 1,924.5 | 1,268.7 | 69.4% | $1.00 | View |
| Supernode BESS | SNB02 |
QLD1 | Storage - Battery | $43.7k | $0 | — | 79.8 | 3,141.7 | 1.3% | $1.50 | View |
| Silverton Wind Farm | STWF1 |
NSW1 | Wind Turbine - Onshore | $43.1k | $0 | — | 941.7 | 448.7 | 19.7% | $0.50 | View |
| Waratah Super Battery | WTAHB1 |
NSW1 | Storage - Battery | $42.8k | $0 | — | -298.6 | 5,160.0 | -1.5% | $1.50 | View |
| SHOAL1 | SHOAL1 |
NSW1 | $41.0k | $0 | — | 783.0 | — | 13.2% | $1.20 | View | |
| Tarong BESS - Stanwell | TARBESS1 |
QLD1 | Storage - Battery | $39.4k | $83 | 3,125.3 | 132.6 | 2,050.0 | 1.8% | $1.50 | View |
| Blyth BESS | BLYTHB1 |
SA1 | Storage - Battery | $38.6k | $387 | 839.5 | 19.6 | 2,416.7 | 0.4% | $4.86 | View |
| Cethana | CETHANA |
TAS1 | Hydro - Dam | $37.8k | $195 | 58.1 | 616.2 | 1,190.8 | 30.2% | $1.09 | View |
| Rangebank BESS | RANGEB1 |
VIC1 | Storage - Battery | $37.3k | $0 | — | 46.1 | 911.4 | 1.0% | $1.50 | View |
| Waubra | WAUBRAWF |
VIC1 | Wind Turbine - Onshore | $37.0k | $0 | — | 1,654.2 | — | 35.9% | $0.50 | View |
| Bastyan | BASTYAN |
TAS1 | Hydro - Dam | $36.9k | $63 | 25.8 | 1,113.4 | 930.4 | 58.1% | $0.00 | View |
| Mackintosh | MACKNTSH |
TAS1 | Hydro - Dam | $36.5k | $426 | 361.9 | 1,076.0 | 990.8 | 56.1% | $1.00 | View |
| Trevallyn | TREVALLN |
TAS1 | Hydro - Dam | $35.8k | $0 | — | 786.3 | 1,160.0 | 35.2% | $1.00 | View |
| Koorangie Energy Storage System | KESSB1 |
VIC1 | Storage - Battery | $35.2k | $0 | — | 62.3 | 821.2 | 1.4% | $1.50 | View |
| Gullen Range Wind Farm 2 | GULLRWF2 |
NSW1 | Wind Turbine - Onshore | $34.2k | $0 | — | 679.0 | 440.3 | 25.6% | $0.50 | View |
| Murra Warra Wind Farm - stage 2 | MUWAWF2 |
VIC1 | Wind Turbine - Onshore | $31.9k | $0 | — | 1,504.8 | 1,136.5 | 30.0% | $0.50 | View |
| Gullen Range Wind Farm | GULLRWF1 |
NSW1 | Wind Turbine - Onshore | $31.4k | $0 | — | 691.3 | 386.0 | 17.4% | $0.53 | View |
| Tribute | TRIBUTE |
TAS1 | Hydro - Dam | $31.0k | $74 | 41.6 | 547.5 | 1,051.2 | 27.5% | $1.00 | View |
| Torrens Island BESS | TIB1 |
SA1 | Storage - Battery | $30.3k | $250 | 2,183.7 | 1.8 | 962.7 | 0.0% | $1.50 | View |
| Victorian Big Battery | VBB1 |
VIC1 | Storage - Battery | $30.2k | $62 | 48.0 | 8.4 | 1,240.9 | 0.1% | $1.50 | View |
| Tarraleah | TARRALEA |
TAS1 | Hydro - Dam | $30.1k | $0 | — | 1,448.4 | 845.8 | 67.1% | $1.00 | View |
| Wellington North Solar Farm (Lightsource) | WELNSF1 |
NSW1 | Solar PV - Single axis tracking | $30.0k | $0 | — | 1,324.8 | 106.3 | 12.6% | $0.25 | View |
| Swanbank BESS | SWANBBF1 |
QLD1 | Storage - Battery | $29.9k | $0 | — | 44.8 | 3,020.8 | 0.7% | $1.50 | View |
| Crookwell 2 Wind Farm | CROOKWF2 |
NSW1 | Wind Turbine - Onshore | $29.8k | $0 | — | 596.3 | 360.4 | 25.9% | $0.69 | View |
| Brendale BESS | BRNDBES1 |
QLD1 | Storage - Battery | $29.6k | $39 | 37.3 | 60.1 | 2,350.3 | 1.2% | $1.58 | View |
| Moorabool Wind Farm | MOORAWF1 |
VIC1 | Wind Turbine - Onshore | $29.3k | $0 | — | 2,904.6 | 1,608.2 | 38.8% | $0.50 | View |
| Western Downs Battery - Stage 1 And 2 | WDBESS1 |
QLD1 | Storage - Battery | $29.3k | $475 | 208.2 | 22.3 | 3,043.1 | 0.4% | $1.58 | View |
| Macarthur Wind Farm | MACARTH1 |
VIC1 | Wind Turbine - Onshore | $29.2k | $0 | — | 2,062.9 | 1,010.2 | 20.5% | $0.50 | View |
| Crudine Ridge Wind Farm | CRURWF1 |
NSW1 | Wind Turbine - Onshore | $28.6k | $0 | — | 544.8 | 408.5 | 16.0% | $0.53 | View |
| Devils Gate | DEVILS_G |
TAS1 | Hydro - Dam | $28.3k | $34 | 9.9 | 545.9 | 764.6 | 37.9% | $1.00 | View |
| Mannum BESS | MANNUMB1 |
SA1 | Storage - Battery | $26.9k | $0 | — | 27.2 | 906.7 | 1.1% | $1.50 | View |
| Supernode BESS | SNB01 |
QLD1 | Storage - Battery | $26.7k | $0 | — | 14.2 | 3,141.7 | 0.2% | $1.50 | View |
| Western Downs Gas Peaking Plant - KCI | WDBESS2 |
QLD1 | Turbine - CCGT | $26.1k | $1.1k | 582.3 | -56.4 | 3,081.2 | -0.6% | $2.00 | View |
| Yendon Wind Farm | YENDWF1 |
VIC1 | Wind Turbine - Onshore | $25.2k | $0 | — | 1,370.6 | 933.2 | 39.5% | $0.50 | View |
| Darlington Point Solar Farm | DARLSF1 |
NSW1 | Solar PV - Single axis tracking | $25.0k | $0 | — | 1,152.6 | 99.3 | 17.5% | $0.33 | View |
| Culcairn Solar Farm | CUSF1 |
NSW1 | Solar PV - Single axis tracking | $24.5k | $0 | — | 1,038.8 | 181.5 | 12.4% | $0.25 | View |
| Cattle Hill Wind Farm | CTHLWF1 |
TAS1 | Wind Turbine - Onshore | $24.3k | $0 | — | 1,839.7 | 881.5 | 53.2% | $0.66 | View |
| Granville Harbour Wind Farm | GRANWF1 |
TAS1 | Wind Turbine - Onshore | $24.3k | $0 | — | 1,513.5 | 855.1 | 56.5% | $0.66 | View |
| Lincoln Gap Wind Farm - stage 1 | LGAPWF1 |
SA1 | Wind Turbine - Onshore | $24.1k | $0 | — | 648.4 | 406.5 | 21.4% | $0.50 | View |
| Limondale Solar Farm 1 | LIMOSF11 |
NSW1 | Solar PV - Single axis tracking | $23.9k | $0 | — | 1,022.1 | 125.8 | 18.5% | $0.25 | View |
| West Kiewa | WKIEWA1 |
VIC1 | Hydro - Dam | $23.6k | $0 | — | 616.2 | 749.2 | 75.5% | $10.00 | View |
| Mt Millar Wind Farm | MTMILLAR |
SA1 | Wind Turbine - Onshore | $23.3k | $0 | — | 708.4 | 502.2 | 40.8% | $0.50 | View |
| Collector | COLWF01 |
NSW1 | Wind Turbine - Onshore | $22.9k | $0 | — | 524.1 | 296.0 | 9.6% | $0.65 | View |
| Port Augusta Renewable Energy Park - Wind | PAREPW1 |
SA1 | Wind Turbine - Onshore | $22.3k | $0 | — | 749.2 | 433.5 | 15.5% | $0.50 | View |
| Wollar Solar Farm | WOLARSF1 |
NSW1 | Solar PV - Single axis tracking | $21.6k | $0 | — | 1,127.2 | 47.4 | 16.8% | $0.25 | View |
| Dundonnell Wind Farm | DUNDWF1 |
VIC1 | Wind Turbine - Onshore | $21.5k | $0 | — | 1,090.6 | 685.0 | 27.0% | $0.66 | View |
| Clements Gap - BESS | CGBESS01 |
SA1 | Storage - Battery | $21.3k | $0 | — | 21.3 | 477.1 | 1.5% | $1.58 | View |
| Goyder South Wind Farm 1B | GSWF1B1 |
SA1 | Wind Turbine - Onshore | $21.3k | $0 | — | 1,210.1 | 705.8 | 24.8% | $0.00 | View |
| Fisher | FISHER |
TAS1 | Hydro - Dam | $21.0k | $2 | 4.3 | 862.5 | 555.8 | 83.2% | $1.05 | View |
| Ulinda Park BESS | ULPBESS1 |
QLD1 | Storage - Battery | $20.7k | $72 | 53.8 | 22.4 | 1,822.0 | 0.6% | $1.50 | View |
| Sunraysia Solar Farm | SUNRSF1 |
NSW1 | Solar PV - Single axis tracking | $20.5k | $0 | — | 863.9 | 118.9 | 15.7% | $0.25 | View |
| Meadowbank | MEADOWBK |
TAS1 | Hydro - Dam | $20.4k | $1 | 1.7 | 647.9 | 522.7 | 67.5% | $1.00 | View |
| Bulgana Green Power Hub - Wind Farm | BULGANA1 |
VIC1 | Wind Turbine - Onshore | $20.3k | $0 | — | 2,330.2 | 1,249.0 | 47.5% | $0.00 | View |
| Golden Plains Wind Farm East | GPWFEST2 |
VIC1 | Wind Turbine - Onshore | $19.8k | $0 | — | 640.5 | 402.7 | 10.2% | $0.50 | View |
| Avonlie Solar Farm | AVLSF1 |
NSW1 | Solar PV - Single axis tracking | $19.6k | $0 | — | 906.7 | 91.0 | 14.9% | $0.00 | View |
| LaTrobe Valley BESS | LVES1 |
VIC1 | Storage - Battery | $19.2k | $50 | 2,807.9 | 17.4 | 874.1 | 0.7% | $1.54 | View |
| Goyder South Wind Farm 1A | GSWF1A |
SA1 | Wind Turbine - Onshore | $19.0k | $0 | — | 2,064.4 | 820.2 | 41.2% | $0.55 | View |
| Moranbah North | MBAHNTH |
QLD1 | Reciprocating Engine - Spark ignition | $18.7k | $0 | — | 506.6 | — | 33.1% | $57.00 | View |
| Bango 973 Wind Farm | BANGOWF1 |
NSW1 | Wind Turbine - Onshore | $18.4k | $0 | — | 396.5 | 229.2 | 10.4% | $0.00 | View |
| Crowlands Wind Farm | CROWLWF1 |
VIC1 | Wind Turbine - Onshore | $17.7k | $0 | — | 834.2 | 602.6 | 43.5% | $0.68 | View |
| Taralga Wind Farm | TARALGA1 |
NSW1 | Wind Turbine - Onshore | $17.6k | $0 | — | 377.6 | 203.7 | 14.7% | $0.50 | View |
| Western Downs Green Power Hub P/L | WDGPH1 |
QLD1 | Solar PV - Single axis tracking | $17.2k | $0 | — | 1,885.6 | 186.5 | 19.6% | $0.32 | View |
| Stubbo Solar Farm | STUBSF2 |
NSW1 | Solar PV - Single axis tracking | $17.2k | $0 | — | 786.2 | 83.6 | 16.2% | $0.25 | View |
| New England Solar Farm | NEWENSF1 |
NSW1 | Solar PV - Single axis tracking | $17.0k | $0 | — | 743.2 | 50.1 | 15.5% | $0.25 | View |
| Aldoga Solar Farm | ALDGASF1 |
QLD1 | Solar PV - Single axis tracking | $16.9k | $0 | — | 1,794.1 | 145.4 | 19.3% | $0.00 | View |
| New England Solar Farm | NEWENSF2 |
NSW1 | Solar PV - Single axis tracking | $16.8k | $0 | — | 706.6 | 48.0 | 14.7% | $0.25 | View |
| Oaklands Hill Wind Farm | OAKLAND1 |
VIC1 | Wind Turbine - Onshore | $16.7k | $0 | — | 601.2 | 467.5 | 37.3% | $0.50 | View |
| Lincoln Gap Wind Farm - Stage 2 | LGAPWF2 |
SA1 | Wind Turbine - Onshore | $16.4k | $0 | — | 520.6 | 300.0 | 25.1% | $0.50 | View |
| Hallett 4 North Brown Hill | NBHWF1 |
SA1 | Wind Turbine - Onshore | $16.0k | $0 | — | 829.5 | 502.5 | 26.1% | $0.80 | View |
| Hornsdale Power Reserve Unit 1 | HPR1 |
SA1 | Storage - Battery | $15.9k | $79 | 86.8 | -3.6 | 635.5 | -0.1% | $1.50 | View |
| Salt Creek Wind Farm | SALTCRK1 |
SA1 | Wind Turbine - Onshore | $15.9k | $0 | — | 332.8 | 295.2 | 25.7% | $0.50 | View |
| Stubbo Solar Farm | STUBSF1 |
NSW1 | Solar PV - Single axis tracking | $15.4k | $0 | — | 694.1 | 77.2 | 14.6% | $0.25 | View |
| Lemonthyme / Wilmot | LEM_WIL |
TAS1 | Hydro - Dam | $15.4k | $1 | 3.2 | 615.3 | 398.7 | 31.4% | $1.00 | View |
| Coleambally Solar Farm | COLEASF1 |
NSW1 | Solar PV - Single axis tracking | $15.2k | $0 | — | 673.1 | 67.0 | 18.7% | $0.00 | View |
| Crookwell 3 Wind Farm | CROOKWF3 |
NSW1 | Wind Turbine - Onshore | $15.1k | $0 | — | 294.5 | 170.9 | 21.3% | $0.76 | View |
| Kareeya | KAREEYA1 |
QLD1 | Hydro - Run of River | $14.7k | $0 | — | 369.5 | 217.5 | 71.3% | $1.00 | View |
| Kareeya | KAREEYA4 |
QLD1 | Hydro - Run of River | $14.7k | $0 | — | 368.8 | 217.5 | 71.1% | $1.66 | View |
| Kareeya | KAREEYA3 |
QLD1 | Hydro - Run of River | $14.7k | $0 | — | 368.7 | 217.5 | 71.1% | $1.05 | View |
| Golden Plains Wind Farm East | GPWFEST1 |
VIC1 | Wind Turbine - Onshore | $14.7k | $0 | — | 455.6 | 288.4 | 7.7% | $0.00 | View |
| Barron Gorge | BARRON-1 |
QLD1 | Hydro - Run of River | $14.6k | $0 | — | 370.7 | 398.7 | 44.1% | $0.00 | View |
| Ararat Wind Farm | ARWF1 |
VIC1 | Wind Turbine - Onshore | $14.3k | $0 | — | 2,223.6 | 1,091.2 | 38.6% | $0.00 | View |
| Gunning Wind Farm | GUNNING1 |
NSW1 | Wind Turbine - Onshore | $14.2k | $0 | — | 263.7 | 192.0 | 23.6% | $0.50 | View |
| Golden Plains Wind Farm East | GPWFEST3 |
VIC1 | Wind Turbine - Onshore | $13.9k | $0 | — | 789.6 | 330.9 | 13.3% | $0.50 | View |
| Ladbroke Grove | LADBROK2 |
SA1 | Turbine - OCGT | $13.7k | $0 | — | 125.8 | 507.5 | 13.1% | $145.06 | View |
| Greenbank BESS | GREENB1 |
QLD1 | Storage - Battery | $13.6k | $11 | 928.5 | -111.6 | 2,408.7 | -2.3% | $1.54 | View |
| Condong | CONDONG1 |
NSW1 | Turbine - Steam Sub Critical | $13.5k | $0 | — | 275.4 | — | 38.3% | $112.12 | View |
| Mortlake South Wind Farm | MRTLSWF1 |
VIC1 | Wind Turbine - Onshore | $13.1k | $0 | — | 1,348.3 | 556.8 | 35.7% | $0.50 | View |
| Wattle Point | WPWF |
SA1 | Wind Turbine - Onshore | $12.9k | $0 | — | 696.7 | 433.0 | 32.0% | $0.50 | View |
| Metz Solar Farm | METZSF1 |
NSW1 | Solar PV - Single axis tracking | $12.9k | $0 | — | 483.5 | 36.4 | 14.9% | $0.25 | View |
| Limondale BESS | LIMBESS1 |
NSW1 | Storage - Battery | $12.7k | $0 | — | -165.4 | 604.2 | -13.8% | $1.50 | View |
| Hornsdale Wind Farm Stage 1 | HDWF1 |
SA1 | Wind Turbine - Onshore | $12.7k | $0 | — | 828.4 | 404.1 | 33.7% | $0.50 | View |
| Cherry Tree Wind Farm | CHYTWF1 |
VIC1 | Wind Turbine - Onshore | $12.5k | $0 | — | 555.3 | 392.0 | 40.2% | $0.53 | View |
| Hazelwood Battery Energy Storage System (HBESS) | HBESS1 |
VIC1 | Storage - Battery | $12.2k | $400 | 297.7 | -37.1 | 983.7 | -0.8% | $1.87 | View |
| Hawkesdale Wind Farm | HD1WF1 |
VIC1 | Wind Turbine - Onshore | $11.8k | $0 | — | 699.2 | 462.8 | 30.2% | $0.00 | View |
| Suntop Solar Farm | SUNTPSF1 |
NSW1 | Solar PV - Single axis tracking | $11.8k | $0 | — | 365.5 | 57.9 | 10.2% | $0.25 | View |
| Kennedy Energy Park - Phase 1 - Wind | KEPWF1 |
QLD1 | Wind Turbine - Onshore | $11.6k | $0 | — | 295.4 | 176.9 | 28.5% | $0.68 | View |
| Cathedral Rocks | CATHROCK |
SA1 | Wind Turbine - Onshore | $11.3k | $0 | — | 556.2 | 359.2 | 37.4% | $0.53 | View |
| Bango 999 Wind Farm | BANGOWF2 |
NSW1 | Wind Turbine - Onshore | $11.3k | $0 | — | 231.9 | 137.9 | 11.4% | $0.00 | View |
| KIATAWF1 | KIATAWF1 |
VIC1 | $11.2k | $0 | — | 406.6 | 305.3 | 54.6% | $0.68 | View | |
| Gordon | GORDON |
TAS1 | Hydro - Dam | $11.0k | $1.0k | 322.6 | 504.0 | 3,480.0 | 4.9% | $1.05 | View |
| Gunnedah Solar Farm | GNNDHSF1 |
NSW1 | Solar PV - Single axis tracking | $10.9k | $0 | — | 404.6 | 40.8 | 15.3% | $0.33 | View |
| Repulse | REPULSE |
TAS1 | Hydro - Dam | $10.6k | $0 | — | 375.2 | — | 55.8% | $1.00 | View |
| Glenellen Solar Farm | GESF1 |
NSW1 | Solar PV - Fixed | $10.5k | $0 | — | 331.7 | 52.3 | 5.3% | $0.00 | View |
| Mt Mercer Wind Farm | MERCER01 |
VIC1 | Wind Turbine - Onshore | $10.5k | $0 | — | 689.4 | 460.5 | 21.9% | $0.50 | View |
| Lake Bonney 2 Wind Farm | LKBONNY2 |
SA1 | Wind Turbine - Onshore | $10.1k | $0 | — | 684.6 | 335.7 | 17.9% | $0.86 | View |
| Hallett Stage 1 Brown Hill | HALLWF1 |
SA1 | Wind Turbine - Onshore | $10.0k | $0 | — | 628.8 | 309.9 | 27.7% | $0.71 | View |
| Elaine Wind Farm | ELAINWF1 |
VIC1 | Wind Turbine - Onshore | $9.8k | $0 | — | 663.3 | 438.5 | 33.1% | $0.53 | View |
| Hornsdale Wind Farm Stage 2 | HDWF2 |
SA1 | Wind Turbine - Onshore | $9.7k | $0 | — | 764.5 | 327.6 | 31.1% | $0.69 | View |
| Wellington Solar Farm | WELLSF1 |
NSW1 | Solar PV - Single axis tracking | $9.7k | $0 | — | 561.5 | 44.3 | 10.8% | $0.25 | View |
| Hillston Sun Farm | HILLSTN1 |
NSW1 | Solar PV - Single axis tracking | $9.6k | $0 | — | 438.3 | 41.1 | 16.6% | $0.00 | View |
| Portland Wind Farm | PORTWF |
VIC1 | Wind Turbine - Onshore | $9.5k | $0 | — | 695.6 | — | 19.1% | $0.50 | View |
| Sebastopol Solar Farm | SEBSF1 |
NSW1 | Solar PV - Single axis tracking | $9.2k | $0 | — | 415.3 | 32.8 | 19.2% | $0.25 | View |
| SHGEN | SHGEN |
NSW1 | $9.0k | $0 | — | 116.7 | 920.0 | 2.0% | $1.20 | View | |
| Chinchilla BESS | CHBESS1 |
QLD1 | Storage - Battery | $8.7k | $5 | 443.5 | 9.2 | 1,208.3 | 0.4% | $1.75 | View |
| Guthega | GUTHEGA |
NSW1 | Hydro - Dam | $8.7k | $0 | — | 120.9 | 821.7 | 8.4% | $1.05 | View |
| Paloona | PALOONA |
TAS1 | Hydro - Dam | $8.6k | $0 | — | 285.1 | — | 42.4% | $1.00 | View |
| Eildon | EILDON2 |
VIC1 | Hydro - Dam | $8.5k | $0 | — | 110.0 | 531.7 | 6.8% | $1.00 | View |
| Hornsdale Wind Farm Stage 3 | HDWF3 |
SA1 | Wind Turbine - Onshore | $8.5k | $0 | — | 799.4 | 330.5 | 29.7% | $0.68 | View |
| Nevertire Solar Farm | NEVERSF1 |
NSW1 | Solar PV - Single axis tracking | $8.3k | $0 | — | 423.7 | 33.7 | 16.9% | $0.25 | View |
| Broadwater | BWTR1 |
NSW1 | Turbine - Steam Sub Critical | $8.1k | $0 | — | 196.9 | — | 21.6% | $124.22 | View |
| Nyngan Solar Plant | NYNGAN1 |
NSW1 | Solar PV - Fixed | $8.0k | $0 | — | 282.3 | 31.0 | 11.5% | $0.20 | View |
| West Wyalong Solar Farm | WSTWYSF1 |
NSW1 | Solar PV - Single axis tracking | $7.9k | $0 | — | 372.2 | 33.3 | 14.7% | $0.25 | View |
| Goonumbla Solar Farm | GOONSF1 |
NSW1 | Solar PV - Single axis tracking | $7.9k | $0 | — | 312.0 | 32.6 | 18.6% | $0.25 | View |
| Musselroe Wind Farm | MUSSELR1 |
TAS1 | Wind Turbine - Onshore | $7.9k | $0 | — | 347.2 | 216.5 | 8.6% | $0.50 | View |
| German Creek | GERMCRK |
QLD1 | Reciprocating Engine - Spark ignition | $7.4k | $0 | — | 204.8 | — | 19.0% | $122.81 | View |
| Riverina Energy Storage System 1 | RESS1 |
NSW1 | Storage - Battery | $7.3k | $0 | — | 16.2 | 496.8 | 1.1% | $1.50 | View |
| Capital Wind Farm | CAPTL_WF |
NSW1 | Wind Turbine - Onshore | $7.1k | $0 | — | 291.3 | — | 8.6% | $0.00 | View |
| Eildon | EILDON1 |
VIC1 | Hydro - Dam | $7.1k | $0 | — | 90.0 | 543.7 | 5.6% | $1.05 | View |
| Riverina Energy Storage System 2 | RIVNB2 |
NSW1 | Storage - Battery | $7.0k | $0 | — | 5.3 | 206.9 | 0.3% | $1.50 | View |
| Bomen Solar Farm | BOMENSF1 |
NSW1 | Solar PV - Single axis tracking | $6.9k | $0 | — | 353.1 | 20.5 | 12.2% | $0.25 | View |
| Walla Walla Solar Farm | WLWLSF1 |
NSW1 | Solar PV - Single axis tracking | $6.8k | $0 | — | 207.4 | 35.1 | 5.7% | $0.25 | View |
| Tully Sugar Mill | TULLYSM1 |
QLD1 | Turbine - Steam Super Critical | $6.7k | $0 | — | 176.0 | — | 22.9% | $117.00 | View |
| Berrybank Wind Farm | BRYB2WF2 |
VIC1 | Wind Turbine - Onshore | $6.7k | $0 | — | 616.9 | 225.0 | 23.5% | $0.65 | View |
| Finley Solar Farm | FINLYSF1 |
NSW1 | Solar PV - Single axis tracking | $6.6k | $0 | — | 301.6 | 30.3 | 7.7% | $0.25 | View |
| Walla Walla Solar Farm | WLWLSF2 |
NSW1 | Solar PV - Single axis tracking | $6.6k | $0 | — | 203.2 | 35.0 | 5.6% | $0.25 | View |
| Wandoan South BESS | WANDB1 |
QLD1 | Storage - Battery | $6.5k | $432 | 2,871.4 | -11.5 | 616.5 | -0.5% | $1.50 | View |
| Starfish Hill | STARHLWF |
SA1 | Wind Turbine - Onshore | $6.4k | $0 | — | 251.7 | 126.9 | 31.8% | $0.50 | View |
| Wyalong Solar Farm | WYASF1 |
NSW1 | Solar PV - Single axis tracking | $6.4k | $0 | — | 266.8 | 27.5 | 17.8% | $0.25 | View |
| Woodlawn Wind Farm | WOODLWN1 |
NSW1 | Wind Turbine - Onshore | $6.4k | $0 | — | 185.2 | 78.4 | 16.0% | $0.50 | View |
| Barron Gorge | BARRON-2 |
QLD1 | Hydro - Run of River | $6.4k | $0 | — | 94.2 | 200.7 | 11.2% | $0.00 | View |
| Cluny | CLUNY |
TAS1 | Hydro - Dam | $6.2k | $0 | — | 223.9 | — | 49.1% | $1.00 | View |
| Edenvale Solar Park | EDENVSF1 |
QLD1 | Solar PV - Single axis tracking | $6.1k | $0 | — | 748.7 | 48.5 | 17.3% | $0.00 | View |
| Parkes Solar Farm | PARSF1 |
NSW1 | Solar PV - Single axis tracking | $6.1k | $0 | — | 245.2 | 25.5 | 20.6% | $0.25 | View |
| Hallett 5 The Bluff WF | BLUFF1 |
SA1 | Wind Turbine - Onshore | $5.9k | $0 | — | 304.5 | 202.8 | 24.2% | $0.77 | View |
| Dundonnell Wind Farm | DUNDWF3 |
VIC1 | Wind Turbine - Onshore | $5.7k | $0 | — | 1,113.5 | 461.2 | 38.1% | $0.53 | View |
| Daydream Solar Farm | DAYDSF1 |
QLD1 | Solar PV - Single axis tracking | $5.7k | $0 | — | 93.6 | 81.7 | 2.3% | $0.00 | View |
| Willogoleche Wind Farm | WGWF1 |
SA1 | Wind Turbine - Onshore | $5.6k | $0 | — | 937.9 | 429.2 | 32.6% | $0.50 | View |
| Hallett Stage 2 Hallett Hill | HALLWF2 |
SA1 | Wind Turbine - Onshore | $5.3k | $0 | — | 475.0 | 229.5 | 27.7% | $0.00 | View |
| Beryl Solar Farm | BERYLSF1 |
NSW1 | Solar PV - Single axis tracking | $5.3k | $0 | — | 280.8 | 22.3 | 11.9% | $0.25 | View |
| Broken Hill Solar Plant | BROKENH1 |
NSW1 | Solar PV - Fixed | $5.3k | $0 | — | 170.0 | 30.6 | 13.4% | $0.28 | View |
| Bluegrass Solar Farm | BLUEGSF1 |
QLD1 | Solar PV - Single axis tracking | $5.2k | $0 | — | 492.2 | 51.4 | 13.9% | $0.29 | View |
| Lake Bonney 1 Wind Farm | LKBONNY1 |
SA1 | Wind Turbine - Onshore | $5.1k | $0 | — | 280.1 | 162.8 | 14.5% | $0.79 | View |
| Jemalong Solar | JEMALNG1 |
NSW1 | Solar PV - Single axis tracking | $5.1k | $0 | — | 196.0 | 18.7 | 14.8% | $0.32 | View |
| Tailem Bend Battery Project | TB2B1 |
SA1 | Storage - Battery | $5.1k | $115 | 381.4 | 3.1 | 206.2 | 0.3% | $1.50 | View |
| Mt Gellibrand Wind Farm | MTGELWF1 |
VIC1 | Wind Turbine - Onshore | $5.1k | $0 | — | 378.3 | 143.6 | 11.4% | $0.50 | View |
| Bungala Two Solar Farm | BNGSF2 |
SA1 | Solar PV - Single axis tracking | $5.0k | $0 | — | 212.2 | 102.8 | 6.5% | $0.33 | View |
| Lake Bonney Battery Energy Storage | LBB1 |
SA1 | Storage - Battery | $5.0k | $13 | 575.0 | 3.1 | 157.5 | 0.5% | $1.98 | View |
| Cullerin Range Wind Farm | CULLRGWF |
NSW1 | Wind Turbine - Onshore | $4.9k | $0 | — | 116.2 | — | 16.1% | $0.68 | View |
| Challicum Hills | CHALLHWF |
VIC1 | Wind Turbine - Onshore | $4.8k | $0 | — | 291.5 | — | 23.1% | $0.53 | View |
| Ryan Corner Wind Farm | RYANCWF1 |
VIC1 | Wind Turbine - Onshore | $4.8k | $0 | — | 1,384.6 | 549.4 | 26.4% | $0.50 | View |
| Bald Hills Wind Farm | BALDHWF1 |
VIC1 | Wind Turbine - Onshore | $4.7k | $0 | — | 320.4 | 177.3 | 12.5% | $0.00 | View |
| Hallett GT | AGLHAL |
SA1 | Turbine - OCGT | $4.4k | $0 | — | 39.0 | 1,715.8 | 0.6% | $100.22 | View |
| Moree Solar Farm | MOREESF1 |
NSW1 | Solar PV - Single axis tracking | $4.1k | $0 | — | 206.6 | 23.2 | 15.4% | $0.25 | View |
| Bungala One Solar Farm | BNGSF1 |
SA1 | Solar PV - Single axis tracking | $4.1k | $0 | — | 157.1 | 81.7 | 4.8% | $0.34 | View |
| Wagga North Solar Farm | WAGGNSF1 |
NSW1 | Solar PV - Single axis tracking | $4.0k | $0 | — | 202.8 | 10.7 | 15.2% | $0.25 | View |
| Snowtown Wind Farm | SNOWTWN1 |
SA1 | Wind Turbine - Onshore | $3.8k | $0 | — | 596.4 | 277.8 | 25.2% | $0.50 | View |
| Columboola Solar Farm | COLUMSF1 |
QLD1 | Solar PV - Single axis tracking | $3.8k | $0 | — | 691.8 | 39.4 | 13.3% | $0.32 | View |
| Woolooga Solar Farm | WOOLGSF1 |
QLD1 | Solar PV - Single axis tracking | $3.8k | $0 | — | 538.2 | 16.8 | 10.1% | $0.25 | View |
| Kidston Solar Project Phase One 50MW | KSP1 |
QLD1 | Solar PV - Fixed | $3.7k | $0 | — | 233.0 | 41.7 | 19.4% | $0.20 | View |
| Bouldercombe Battery project | BBATTERY1 |
QLD1 | Storage - Battery | $3.7k | $350 | 249.3 | -9.9 | 579.8 | -0.8% | $1.64 | View |
| Limondale Solar Farm 2 | LIMOSF21 |
NSW1 | Solar PV - Single axis tracking | $3.7k | $0 | — | 149.9 | 19.7 | 21.5% | $0.25 | View |
| Rugby Run Solar Farm | RUGBYR1 |
QLD1 | Solar PV - Single axis tracking | $3.6k | $0 | — | 329.2 | 42.1 | 21.1% | $0.25 | View |
| Manildra Solar Farm | MANSLR1 |
NSW1 | Solar PV - Single axis tracking | $3.4k | $0 | — | 125.2 | 13.2 | 10.4% | $0.25 | View |
| Wandoan South Solar Stage 1 | WANDSF1 |
QLD1 | Solar PV - Single axis tracking | $3.3k | $0 | — | 158.3 | 28.5 | 4.1% | $0.25 | View |
| Molong Solar Farm | MOLNGSF1 |
NSW1 | Solar PV - Single axis tracking | $3.3k | $0 | — | 131.6 | 10.0 | 15.2% | $0.25 | View |
| Goorambat East Solar Farm (ENGIE) | GOESF1 |
VIC1 | Solar PV - Single axis tracking | $3.3k | $0 | — | 135.2 | 96.2 | 2.3% | $0.25 | View |
| Clare Solar Farm | CLARESF1 |
QLD1 | Solar PV - Single axis tracking | $3.3k | $0 | — | 308.9 | 38.0 | 11.7% | $0.00 | View |
| Canunda | CNUNDAWF |
SA1 | Wind Turbine - Onshore | $3.2k | $0 | — | 170.1 | 95.8 | 15.4% | $0.50 | View |
| Gangarri Solar Farm | GANGARR1 |
QLD1 | Solar PV - Single axis tracking | $3.2k | $0 | — | 371.1 | 26.8 | 9.5% | $0.26 | View |
| Port Augusta Renewable Energy Park - Solar | PAREPS1 |
SA1 | Solar PV - Fixed | $3.1k | $0 | — | 62.1 | 56.7 | 2.6% | $0.20 | View |
| Griffith Solar Farm | GRIFSF1 |
NSW1 | Solar PV - Single axis tracking | $3.1k | $0 | — | 133.4 | — | 20.4% | $0.35 | View |
| Junee Solar Farm | JUNEESF1 |
NSW1 | Solar PV - Single axis tracking | $3.0k | $0 | — | 133.9 | 11.2 | 15.5% | $0.00 | View |
| Corowa Solar Farm | CRWASF1 |
NSW1 | Solar PV - Single axis tracking | $3.0k | $0 | — | 134.6 | 10.0 | 15.6% | $0.33 | View |
| Woolnorth Studland Bay / Bluff Point | WOOLNTH1 |
TAS1 | Wind Turbine - Onshore | $2.9k | $0 | — | 443.3 | — | 13.4% | $0.53 | View |
| Lake Bonney 3 Wind Farm | LKBONNY3 |
SA1 | Wind Turbine - Onshore | $2.8k | $0 | — | 131.3 | 74.2 | 14.0% | $0.53 | View |
| Darlington Point Energy Storage System | DPNTB1 |
NSW1 | Storage - Battery | $2.7k | $0 | — | 2.8 | 79.8 | 0.5% | $0.00 | View |
| Gannawarra Energy Storage System | GANNB1 |
VIC1 | Storage - Battery | $2.7k | $0 | — | 2.1 | 106.2 | 0.4% | $1.98 | View |
| Broken Hill | BHB1 |
NSW1 | Storage - Battery | $2.7k | $0 | — | 2.8 | 213.1 | 0.2% | $1.50 | View |
| Rowallan | ROWALLAN |
TAS1 | Hydro - Dam | $2.7k | $0 | — | 131.4 | — | 52.1% | $1.00 | View |
| Yarranlea Solar Farm | YARANSF1 |
QLD1 | Solar PV - Single axis tracking | $2.6k | $0 | — | 298.8 | 7.5 | 10.3% | $0.25 | View |
| Gunsynd Solar Farm | GUSF1 |
QLD1 | Solar PV - Fixed | $2.6k | $0 | — | 446.9 | 21.9 | 19.8% | $0.00 | View |
| Munna Creek Solar Farm | MUCRKSF1 |
QLD1 | Solar PV - Single axis tracking | $2.6k | $0 | — | 334.0 | 13.7 | 9.0% | $0.25 | View |
| Dundonnell Wind Farm | DUNDWF2 |
VIC1 | Wind Turbine - Onshore | $2.5k | $0 | — | 386.0 | 174.5 | 34.8% | $0.66 | View |
| Wallgrove Grid Battery project | WALGRV1 |
NSW1 | Storage - Battery | $2.4k | $47 | 1,761.3 | -11.3 | 535.9 | -0.9% | $1.50 | View |
| Butlers Gorge | BUTLERSG |
TAS1 | Hydro - Dam | $2.3k | $0 | — | 135.2 | — | 46.2% | $1.00 | View |
| Yambuk | YAMBUKWF |
VIC1 | Wind Turbine - Onshore | $2.2k | $0 | — | 95.8 | — | 13.3% | $0.50 | View |
| Bulgana Green Power Hub - BESS | BULBES1 |
VIC1 | Storage - Battery | $2.2k | $125 | 447.8 | 0.6 | 134.2 | 0.1% | $1.98 | View |
| Tailem Bend - Solar | TBSF1 |
SA1 | Solar PV - Fixed | $1.9k | $0 | — | 168.1 | 55.6 | 6.5% | $0.20 | View |
| Numurkah Solar Farm | NUMURSF1 |
VIC1 | Solar PV - Single axis tracking | $1.8k | $0 | — | 76.2 | 51.9 | 3.1% | $0.25 | View |
| Sun Metals Corporation Solar Farm | SMCSF1 |
QLD1 | Solar PV - Fixed | $1.8k | $0 | — | 482.0 | 6.5 | 14.0% | $0.00 | View |
| Whitsunday Solar Farm | WHITSF1 |
QLD1 | Solar PV - Single axis tracking | $1.7k | $0 | — | 152.1 | 17.5 | 11.0% | $0.25 | View |
| Haughton Solar Farm Stage 1 | HAUGHT11 |
QLD1 | Solar PV - Single axis tracking | $1.6k | $0 | — | 402.6 | 11.5 | 12.7% | $0.00 | View |
| Emerald Solar Park | EMERASF1 |
QLD1 | Solar PV - Single axis tracking | $1.6k | $0 | — | 262.6 | 4.4 | 15.2% | $0.25 | View |
| Girgarre Solar Farm | GIRGSF |
VIC1 | Solar PV - Single axis tracking | $1.6k | $0 | — | 61.8 | 43.8 | 2.8% | $0.00 | View |
| Diapur Wind Farm | DIAPURWF1 |
VIC1 | Wind Turbine - Onshore | $1.5k | $0 | — | 102.2 | — | 53.2% | $0.00 | View |
| Darling Downs Solar Farm | DDSF1 |
QLD1 | Solar PV - Fixed | $1.5k | $0 | — | 409.4 | 16.9 | 14.1% | $0.28 | View |
| Childers Solar Farm | CHILDSF1 |
QLD1 | Solar PV - Single axis tracking | $1.5k | $0 | — | 227.2 | 7.5 | 14.7% | $0.34 | View |
| Berrybank Wind Farm | BRYB1WF1 |
VIC1 | Wind Turbine - Onshore | $1.5k | $0 | — | 1,407.2 | 451.0 | 32.5% | $0.50 | View |
| Barcaldine Remote Community Solar Farm | BARCSF1 |
QLD1 | Solar PV - Single axis tracking | $1.4k | $0 | — | 84.1 | — | 17.5% | $0.00 | View |
| Susan River Solar Farm | SRSF1 |
QLD1 | Solar PV - Single axis tracking | $1.4k | $0 | — | 264.2 | 5.4 | 12.9% | $0.25 | View |
| Smithfield BESS | SMTHBES1 |
NSW1 | Storage - Battery | $1.4k | $155 | 1,939.4 | -60.8 | 785.4 | -2.9% | $1.50 | View |
| Hayman Solar Farm | HAYMSF1 |
QLD1 | Solar PV - Single axis tracking | $1.4k | $0 | — | 23.9 | 20.5 | 1.7% | $0.34 | View |
| BRDDBES1 | BRDDBES1 |
QLD1 | $1.4k | $0 | — | -149.9 | 2,175.0 | -1.7% | $0.27 | View | |
| Ballarat Energy Storage System | BALB1 |
VIC1 | Storage - Battery | $1.3k | $0 | — | 1.9 | 146.8 | 0.3% | $0.00 | View |
| Hamilton Solar Farm | HAMISF1 |
QLD1 | Solar PV - Single axis tracking | $1.3k | $0 | — | 140.3 | 11.9 | 10.2% | $18.64 | View |
| Oakey 2 Solar Farm | OAKEY2SF |
QLD1 | Solar PV - Single axis tracking | $1.3k | $0 | — | 159.5 | 3.8 | 11.9% | $0.25 | View |
| Lilyvale Solar Farm | LILYSF1 |
QLD1 | Solar PV - Single axis tracking | $1.3k | $0 | — | 207.2 | 4.2 | 7.3% | $0.25 | View |
| White Rock Solar Farm | WRSF1 |
NSW1 | Solar PV - Fixed | $1.2k | $0 | — | 62.9 | 3.1 | 13.1% | $0.20 | View |
| Wunghnu Solar Farm | WUNUSF1 |
VIC1 | Solar PV - Single axis tracking | $1.1k | $0 | — | 38.2 | 31.4 | 1.7% | $0.25 | View |
| Longreach Solar Farm | LRSF1 |
QLD1 | Solar PV - Fixed | $1.1k | $0 | — | 71.8 | — | 19.9% | $0.20 | View |
| Yaloak South Wind Farm | YSWF1 |
VIC1 | Wind Turbine - Onshore | $968 | $0 | — | 89.0 | — | 12.9% | $0.50 | View |
| Ross River Solar Farm | RRSF1 |
QLD1 | Solar PV - Single axis tracking | $943 | $0 | — | 490.4 | 10.4 | 16.0% | $0.25 | View |
| Gullen Range Solar Farm | GULLRSF1 |
NSW1 | Solar PV - Fixed | $934 | $0 | — | 43.5 | 1.8 | 18.1% | $0.27 | View |
| Happy Valley Reservoir | HVWWBA1 |
SA1 | Storage - Battery | $914 | $2 | 86.6 | 0.4 | 33.2 | 0.3% | $1.58 | View |
| Hughenden Sun Farm | HUGSF1 |
QLD1 | Solar PV - Single axis tracking | $858 | $0 | — | 74.2 | — | 14.7% | $0.00 | View |
| Clermont Solar Farm | CLERMSF1 |
QLD1 | Solar PV - Single axis tracking | $813 | $0 | — | 269.5 | 6.4 | 12.1% | $0.34 | View |
| Lancaster Solar Farm | LANCSF1 |
VIC1 | Solar PV - Single axis tracking | $781 | $0 | — | 25.7 | 19.7 | 1.0% | $0.25 | View |
| Dalrymple BESS | DALNTH1 |
SA1 | Storage - Battery | $778 | $0 | — | -2.9 | 66.0 | -0.4% | $2.03 | View |
| Warwick Solar Farm | WARWSF2 |
QLD1 | Solar PV - Single axis tracking | $772 | $0 | — | 44.0 | 7.3 | 5.7% | $0.25 | View |
| Warwick Solar Farm | WARWSF1 |
QLD1 | Solar PV - Single axis tracking | $767 | $0 | — | 44.1 | 7.6 | 5.7% | $0.25 | View |
| Collinsville PV | CSPVPS1 |
QLD1 | Solar PV - Fixed | $718 | $0 | — | 132.0 | 8.0 | 12.9% | $0.28 | View |
| Royalla Solar Farm | ROYALLA1 |
NSW1 | Solar PV - Fixed | $675 | $0 | — | 44.9 | — | 9.4% | $0.20 | View |
| Maryrorough Solar Farm | MARYRSF1 |
QLD1 | Solar PV - Single axis tracking | $652 | $0 | — | 87.6 | 2.1 | 10.6% | $0.25 | View |
| Glenrowan West Solar Farm | GLRWNSF1 |
VIC1 | Solar PV - Single axis tracking | $648 | $0 | — | 144.2 | 38.6 | 4.6% | $0.32 | View |
| Kingaroy Solar Farm | KINGASF1 |
QLD1 | Solar PV - Single axis tracking | $627 | $0 | — | 87.3 | 4.6 | 9.1% | $0.25 | View |
| Oakey Solar Farm | OAKEY1SF |
QLD1 | Solar PV - Fixed | $560 | $0 | — | 87.5 | 1.0 | 14.6% | $0.20 | View |
| Kennedy Energy Park - Phase 1 - Solar | KEPSF1 |
QLD1 | Solar PV - Single axis tracking | $555 | $0 | — | 14.9 | 4.0 | 4.2% | $0.34 | View |
| Middlemount Solar Farm | MIDDLSF1 |
QLD1 | Solar PV - Single axis tracking | $522 | $0 | — | 69.9 | 1.8 | 11.2% | $0.25 | View |
| Philip Island BESS | PIBESS1 |
VIC1 | Storage - Battery | $495 | $8 | 5.8 | -0.8 | 11.7 | -0.7% | $1.50 | View |
| Bolivar Waste Water Treatment | BOWWBA1 |
SA1 | Storage - Battery | $495 | $1 | 0.2 | 0.1 | 24.2 | 0.1% | $1.58 | View |
| Mulwala Solar Farm | MULWASF1 |
NSW1 | Solar PV - Single axis tracking | $470 | $0 | — | 8.6 | 10.3 | 1.2% | $0.25 | View |
| Christies Beach Wastewater Treatment Plant | CBWWBA1 |
SA1 | Storage - Battery | $465 | $1 | 0.1 | 0.0 | 13.7 | 0.0% | $1.50 | View |
| Mokoan Solar Farm (LightsourceBP) | MOKOSF1 |
VIC1 | Solar PV - Single axis tracking | $360 | $0 | — | 23.9 | 13.0 | 2.2% | $0.25 | View |
| Moura Solar Farm | MOUSF1 |
QLD1 | Solar PV - Single axis tracking | $358 | $0 | — | 273.8 | — | 11.5% | $0.25 | View |
| Mannum Solar Farm 2 | MANNSF2 |
SA1 | Solar PV - Single axis tracking | $350 | $0 | — | 68.1 | 16.1 | 9.5% | $0.25 | View |
| Rubicon Mountain Streams | RUBICON |
VIC1 | Hydro - Dam | $279 | $0 | — | 17.6 | — | 5.4% | $1.00 | View |
| Queanbeyan BESS | QBYNB1 |
NSW1 | Storage - Battery | $263 | $94 | 194.8 | -4.3 | 94.5 | -1.8% | $1.50 | View |
| Wandoan South Solar Stage 2 | WANDSF2 |
QLD1 | Solar PV - Single axis tracking | $239 | $0 | — | 12.0 | 2.9 | 0.2% | $0.25 | View |
| Cohuna Solar Farm | COHUNSF1 |
VIC1 | Solar PV - Single axis tracking | $224 | $0 | — | 8.4 | 5.7 | 1.1% | $0.33 | View |
| Murray Bridge - Onkaparinga Pipeline Pump 2 | MBPS2PV1 |
SA1 | Solar PV - Single axis tracking | $163 | $0 | — | 4.0 | 3.2 | 1.2% | $0.25 | View |
| Morgan To Whyalla Pipeline No 4 PS | MWPS4PV1 |
SA1 | Solar PV - Single axis tracking | $118 | $0 | — | 2.5 | 2.2 | 1.9% | $0.25 | View |
| Morgan To Whyalla Pipeline No 1 PS And Water Filtration Plant | MWPS1PV1 |
SA1 | Solar PV - Single axis tracking | $85 | $0 | — | 1.9 | 1.6 | 1.4% | $0.25 | View |
| SMFBESS1 | SMFBESS1 |
SA1 | $83 | $0 | — | -6.2 | — | -0.1% | $1.50 | View | |
| Mt Stuart | MSTUART1 |
QLD1 | Turbine - OCGT | $77 | $0 | — | 5.4 | 1,667.5 | 0.2% | $2.00 | View |
| Morgan To Whyalla Pipeline No 2 PS | MWPS2PV1 |
SA1 | Solar PV - Single axis tracking | $60 | $0 | — | 1.2 | 1.1 | 0.9% | $0.25 | View |
| Templers B BESS | TEMPB1 |
SA1 | Storage - Battery | $46 | $0 | — | -3.4 | — | -0.1% | $1.50 | View |
| Terang BESS | TRGBESS1 |
VIC1 | Storage - Battery | $45 | $0 | — | -3.4 | — | -0.1% | $1.50 | View |
| Bolivar Waste Water Treatment | BOWWPV1 |
SA1 | Solar PV - Fixed | $42 | $0 | — | 16.4 | 4.2 | 8.3% | $0.23 | View |
| Braemar 2 Power Station | BRAEMAR7 |
QLD1 | Turbine - OCGT | $36 | $0 | — | 2.5 | 2,020.7 | 0.1% | $132.25 | View |
| SMFBESS2 | SMFBESS2 |
SA1 | $35 | $0 | — | -2.8 | — | 0.0% | $1.50 | View | |
| Mt Stuart | MSTUART2 |
QLD1 | Turbine - OCGT | $31 | $0 | — | 2.2 | — | 0.1% | $148.45 | View |
| Braemar 2 Power Station | BRAEMAR5 |
QLD1 | Turbine - OCGT | $29 | $0 | — | 2.0 | 2,041.8 | 0.0% | $3.14 | View |
| Swanbank E GT | SWAN_E |
QLD1 | Turbine - CCGT | $28 | $0 | — | 1.9 | — | 0.0% | $2.00 | View |
| Angaston | ANGAST1 |
SA1 | Reciprocating Engine - Compression ignition | $16 | $0 | — | -1.3 | 555.8 | -0.1% | $0.00 | View |
| Adelaide Desalination Plant | ADPBA1 |
SA1 | Storage - Battery | $3 | $0 | — | -0.2 | — | -0.1% | $0.00 | View |
| Bairnsdale | BDL01 |
VIC1 | Turbine - OCGT | $0 | $0 | — | 0.0 | 525.7 | 0.0% | $142.10 | View |
| BUNGAMB1 | BUNGAMB1 |
$0 | $0 | 4,138.4 | 32.4 | 1,638.4 | — | — | View | ||
| DG_TAS1 | DG_TAS1 |
$0 | $0 | — | — | — | — | — | View | ||
| DG_VIC1 | DG_VIC1 |
$0 | $0 | — | — | — | — | — | View | ||
| DRACAN1 | DRACAN1 |
$0 | $0 | 11.0 | — | — | — | — | View | ||
| DRACAV1 | DRACAV1 |
$0 | $0 | — | — | — | — | — | View | ||
| DRAESN3 | DRAESN3 |
$0 | $0 | — | — | — | — | — | View | ||
| Tallawarra B | TALWB1 |
NSW1 | Turbine - OCGT | $0 | $0 | — | — | 3,806.2 | 0.0% | $128.50 | View |
| Tallawarra | TALWA1 |
NSW1 | Turbine - CCGT | $0 | $0 | — | — | — | 0.0% | $84.30 | View |
| DRAESS1 | DRAESS1 |
$0 | $0 | — | — | — | — | — | View | ||
| DRBRLV01 | DRBRLV01 |
$0 | $0 | 156.7 | — | — | — | — | View | ||
| DRFIIN01 | DRFIIN01 |
$0 | $0 | — | — | — | — | — | View | ||
| DRFIIN02 | DRFIIN02 |
$0 | $0 | — | — | — | — | — | View | ||
| DRGBND01 | DRGBND01 |
$0 | $0 | 2.8 | — | — | — | — | View | ||
| DG_SA1 | DG_SA1 |
$0 | $0 | — | — | — | — | — | View | ||
| DG_QLD1 | DG_QLD1 |
$0 | $0 | — | — | — | — | — | View | ||
| DG_NSW1 | DG_NSW1 |
$0 | $0 | — | — | — | — | — | View | ||
| BUSF1 | BUSF1 |
$0 | $0 | — | 264.6 | 8.8 | — | — | View | ||
| Tamar Valley Peaking | TVPP104 |
TAS1 | Turbine - OCGT | $0 | $0 | — | — | 362.5 | 0.0% | $128.50 | View |
| KIDSPHL2 | KIDSPHL2 |
$0 | $0 | — | — | — | — | — | View | ||
| Colongra | CG1 |
NSW1 | Turbine - OCGT | $0 | $0 | — | — | 2,150.8 | 0.0% | $197.00 | View |
| Colongra | CG2 |
NSW1 | Turbine - OCGT | $0 | $0 | — | — | 2,150.8 | 0.0% | $135.55 | View |
| Colongra | CG3 |
NSW1 | Turbine - OCGT | $0 | $0 | — | — | 2,150.8 | 0.0% | $144.24 | View |
| Colongra | CG4 |
NSW1 | Turbine - OCGT | $0 | $0 | — | — | 2,150.8 | 0.0% | $194.33 | View |
| Torrens Island B | TORRB4 |
SA1 | Turbine - Steam Sub Critical | $0 | $0 | — | — | — | 0.0% | $2.00 | View |
| Clover | CLOVER |
VIC1 | Hydro - Dam | $0 | $0 | — | — | — | 0.0% | $1.17 | View |
| Condamine A | CPSA |
QLD1 | Turbine - CCGT | $0 | $0 | — | — | — | 0.0% | $95.40 | View |
| CRWARP1 | CRWARP1 |
$0 | $0 | — | 718.8 | 104.8 | — | — | View | ||
| Dartmouth | DARTM1 |
VIC1 | Hydro - Dam | $0 | $0 | — | — | 1,788.3 | 0.0% | $0.00 | View |
| Darling Downs | DDPS1 |
QLD1 | Turbine - CCGT | $0 | $0 | — | — | — | 0.0% | $3.31 | View |
| DRGBND02 | DRGBND02 |
$0 | $0 | 0.1 | — | — | — | — | View | ||
| DRGBND03 | DRGBND03 |
$0 | $0 | — | — | — | — | — | View | ||
| DRGBND04 | DRGBND04 |
$0 | $0 | 452.3 | — | — | — | — | View | ||
| DRSHVS02 | DRSHVS02 |
$0 | $0 | 257.6 | — | — | — | — | View | ||
| DRVIOT01 | DRVIOT01 |
$0 | $0 | 46.1 | — | — | — | — | View | ||
| Smithfield Energy Facility | SITHE01 |
NSW1 | Turbine - OCGT | $0 | $0 | — | — | — | 0.0% | $128.50 | View |
| SHPUMP | SHPUMP |
$0 | $0 | — | 18.3 | 18.3 | — | — | View | ||
| DRVIOT02 | DRVIOT02 |
$0 | $0 | 37.1 | — | — | — | — | View | ||
| DRVIOT03 | DRVIOT03 |
$0 | $0 | 35.4 | — | — | — | — | View | ||
| DRVIOT04 | DRVIOT04 |
$0 | $0 | 1,198.0 | — | — | — | — | View | ||
| DRVIOT05 | DRVIOT05 |
$0 | $0 | 26.5 | — | — | — | — | View | ||
| DRVIOT06 | DRVIOT06 |
$0 | $0 | — | — | — | — | — | View | ||
| DRVIOT07 | DRVIOT07 |
$0 | $0 | — | — | — | — | — | View | ||
| DRXNAD01 | DRXNAD01 |
$0 | $0 | — | — | — | — | — | View | ||
| DRXNAE01 | DRXNAE01 |
$0 | $0 | — | — | — | — | — | View | ||
| DRXNDA01 | DRXNDA01 |
$0 | $0 | — | — | — | — | — | View | ||
| DRSHVS01 | DRSHVS01 |
$0 | $0 | 25.0 | — | — | — | — | View | ||
| DRSHVN02 | DRSHVN02 |
$0 | $0 | 518.7 | — | — | — | — | View | ||
| Snapper Point Power Station | SNAPPER1 |
SA1 | Turbine - OCGT | $0 | $0 | — | — | 1,812.5 | 0.0% | $128.50 | View |
| DRHTVP01 | DRHTVP01 |
$0 | $0 | — | — | — | — | — | View | ||
| DRHTVP03 | DRHTVP03 |
$0 | $0 | — | — | — | — | — | View | ||
| Stanwell | STAN-3 |
QLD1 | Turbine - Steam Sub Critical | $0 | $0 | — | — | — | 0.0% | $52.60 | View |
| DROZVP01 | DROZVP01 |
$0 | $0 | — | — | — | — | — | View | ||
| DROZVP02 | DROZVP02 |
$0 | $0 | — | — | — | — | — | View | ||
| STABESS1 | STABESS1 |
$0 | $0 | — | -1.5 | — | — | — | View | ||
| DROZVP03 | DROZVP03 |
$0 | $0 | — | — | — | — | — | View | ||
| Snuggery | SNUG1 |
SA1 | Turbine - OCGT | $0 | $0 | — | — | — | 0.0% | $2.00 | View |
| SNOWYP | SNOWYP |
$0 | $0 | — | 652.3 | — | — | — | View | ||
| SNOWYGJP | SNOWYGJP |
$0 | $0 | 392.0 | — | — | — | — | View | ||
| DRPSTQ01 | DRPSTQ01 |
$0 | $0 | — | — | — | — | — | View | ||
| DRPSTV01 | DRPSTV01 |
$0 | $0 | 33.3 | — | — | — | — | View | ||
| DRSHVN01 | DRSHVN01 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_VIC9 | RT_VIC9 |
$0 | $0 | — | — | — | — | — | View | ||
| Uranquinty | URANQ11 |
NSW1 | Turbine - OCGT | $0 | $0 | — | — | 1,893.2 | 0.0% | $128.50 | View |
| RT_TAS1 | RT_TAS1 |
$0 | $0 | — | — | — | — | — | View | ||
| ASPSTV01 | ASPSTV01 |
$0 | $0 | 3.7 | — | — | — | — | View | ||
| ASQEEV1 | ASQEEV1 |
$0 | $0 | 49.3 | — | — | — | — | View | ||
| ASQENC1 | ASQENC1 |
$0 | $0 | 8.4 | — | — | — | — | View | ||
| WOOLES1 | WOOLES1 |
$0 | $0 | — | -2.4 | — | — | — | View | ||
| ASRMGE01 | ASRMGE01 |
$0 | $0 | 39.5 | — | — | — | — | View | ||
| ASRMGE02 | ASRMGE02 |
$0 | $0 | 37.4 | — | — | — | — | View | ||
| WNSF1 | WNSF1 |
$0 | $0 | — | 40.5 | — | — | — | View | ||
| ASRMGE03 | ASRMGE03 |
$0 | $0 | 36.3 | — | — | — | — | View | ||
| ASRMGE04 | ASRMGE04 |
$0 | $0 | 150.3 | — | — | — | — | View | ||
| ASRMGE05 | ASRMGE05 |
$0 | $0 | 241.5 | — | — | — | — | View | ||
| ASSDE1 | ASSDE1 |
$0 | $0 | — | — | — | — | — | View | ||
| ASSENC1 | ASSENC1 |
$0 | $0 | 4.1 | — | — | — | — | View | ||
| ASSERDV1 | ASSERDV1 |
$0 | $0 | — | — | — | — | — | View | ||
| ASPBSC01 | ASPBSC01 |
$0 | $0 | 6.5 | — | — | — | — | View | ||
| ASPAPM01 | ASPAPM01 |
$0 | $0 | — | — | — | — | — | View | ||
| ASNENC1 | ASNENC1 |
$0 | $0 | 4.2 | — | — | — | — | View | ||
| Adelaide Desalination Plant | ADPPV1 |
SA1 | Solar PV - Fixed | $0 | $0 | — | — | — | 0.0% | $0.00 | View |
| Somerton | AGLSOM |
VIC1 | Turbine - OCGT | $0 | $0 | — | — | 1,522.5 | 0.0% | $128.50 | View |
| APD01 | APD01 |
$0 | $0 | 1,224.8 | — | — | — | — | View | ||
| ASACLE01 | ASACLE01 |
$0 | $0 | 13.5 | — | — | — | — | View | ||
| ASDEVI01 | ASDEVI01 |
$0 | $0 | 144.0 | — | — | — | — | View | ||
| ASDLBY01 | ASDLBY01 |
$0 | $0 | — | — | — | — | — | View | ||
| ASENGV01 | ASENGV01 |
$0 | $0 | — | — | — | — | — | View | ||
| ASENGY01 | ASENGY01 |
$0 | $0 | — | — | — | — | — | View | ||
| Townsville Power Station | YABULU2 |
QLD1 | Turbine - CCGT | $0 | $0 | — | — | — | 0.0% | $84.30 | View |
| Townsville Power Station | YABULU |
QLD1 | Turbine - CCGT | $0 | $0 | — | — | — | 0.0% | $84.30 | View |
| ASGENE01 | ASGENE01 |
$0 | $0 | — | — | — | — | — | View | ||
| ASNAES1 | ASNAES1 |
$0 | $0 | — | — | — | — | — | View | ||
| ASNBRL1 | ASNBRL1 |
$0 | $0 | 382.5 | — | — | — | — | View | ||
| ASTHYD1 | ASTHYD1 |
$0 | $0 | 0.9 | — | — | — | — | View | ||
| Barcaldine Power Station | BARCALDN |
QLD1 | Turbine - OCGT | $0 | $0 | — | — | — | 0.0% | $141.78 | View |
| VSNEL2S1 | VSNEL2S1 |
$0 | $0 | — | — | — | — | — | View | ||
| Valley Power | VPGS6 |
VIC1 | Turbine - OCGT | $0 | $0 | — | — | 668.0 | 0.0% | $128.50 | View |
| Valley Power | VPGS5 |
VIC1 | Turbine - OCGT | $0 | $0 | — | — | 668.0 | 0.0% | $128.50 | View |
| Valley Power | VPGS4 |
VIC1 | Turbine - OCGT | $0 | $0 | — | — | 668.0 | 0.0% | $128.50 | View |
| Valley Power | VPGS3 |
VIC1 | Turbine - OCGT | $0 | $0 | — | — | 694.2 | 0.0% | $128.50 | View |
| Valley Power | VPGS2 |
VIC1 | Turbine - OCGT | $0 | $0 | — | — | 694.2 | 0.0% | $128.50 | View |
| Valley Power | VPGS1 |
VIC1 | Turbine - OCGT | $0 | $0 | — | — | 694.2 | 0.0% | $128.50 | View |
| Braemar | BRAEMAR3 |
QLD1 | Turbine - OCGT | $0 | $0 | — | — | 2,192.5 | 0.0% | $128.50 | View |
| Braemar 2 Power Station | BRAEMAR6 |
QLD1 | Turbine - OCGT | $0 | $0 | — | — | 2,041.8 | 0.0% | $133.36 | View |
| VENUS1 | VENUS1 |
$0 | $0 | 3.3 | — | — | — | — | View | ||
| BRDDSF01 | BRDDSF01 |
QLD1 | $0 | $0 | — | — | — | 0.0% | $0.27 | View | |
| Uranquinty | URANQ14 |
NSW1 | Turbine - OCGT | $0 | $0 | — | — | 1,900.9 | 0.0% | $128.50 | View |
| Uranquinty | URANQ13 |
NSW1 | Turbine - OCGT | $0 | $0 | — | — | 1,904.4 | 0.0% | $128.50 | View |
| VSQHT1V1 | VSQHT1V1 |
$0 | $0 | — | — | — | — | — | View | ||
| VSSAE1V1 | VSSAE1V1 |
$0 | $0 | — | — | — | — | — | View | ||
| VSSSE1V1 | VSSSE1V1 |
$0 | $0 | — | — | — | — | — | View | ||
| Bell Bay Three | BBTHREE1 |
TAS1 | Turbine - OCGT | $0 | $0 | — | — | 302.1 | 0.0% | $182.63 | View |
| Bell Bay Three | BBTHREE2 |
TAS1 | Turbine - OCGT | $0 | $0 | — | — | — | 0.0% | $137.22 | View |
| Bell Bay Three | BBTHREE3 |
TAS1 | Turbine - OCGT | $0 | $0 | — | — | 277.9 | 0.0% | $141.97 | View |
| Bairnsdale | BDL02 |
VIC1 | Turbine - OCGT | $0 | $0 | — | — | — | 0.0% | $158.38 | View |
| Blowering | BLOWERNG |
NSW1 | Hydro - Dam | $0 | $0 | — | — | — | 0.0% | $0.00 | View |
| WAMBOWF2 | WAMBOWF2 |
$0 | $0 | — | 63.5 | 38.8 | — | — | View | ||
| Wambo Wind Farm | WAMBOWF1 |
QLD1 | Wind Turbine - Onshore | $0 | $0 | — | — | — | 0.0% | $0.50 | View |
| Braemar | BRAEMAR1 |
QLD1 | Turbine - OCGT | $0 | $0 | — | — | 2,246.8 | 0.0% | $133.75 | View |
| Braemar | BRAEMAR2 |
QLD1 | Turbine - OCGT | $0 | $0 | — | — | 2,246.8 | 0.0% | $130.94 | View |
| Wivenhoe | W/HOE#2 |
Storage - Pumped hydro | $0 | $0 | 0.9 | 713.7 | 3,130.9 | — | — | View | |
| Wivenhoe | W/HOE#1 |
Storage - Pumped hydro | $0 | $0 | — | — | — | — | — | View | |
| VSVEL2S1 | VSVEL2S1 |
$0 | $0 | — | — | — | — | — | View | ||
| VSSSH1S1 | VSSSH1S1 |
$0 | $0 | — | — | — | — | — | View | ||
| Uranquinty | URANQ12 |
NSW1 | Turbine - OCGT | $0 | $0 | — | — | 1,906.4 | 0.0% | $128.50 | View |
| RT_VIC8 | RT_VIC8 |
$0 | $0 | — | — | — | — | — | View | ||
| PIONEER | PIONEER |
$0 | $0 | — | 706.1 | — | — | — | View | ||
| Dry Creek GT | DRYCGT3 |
SA1 | Turbine - OCGT | $0 | $0 | — | — | 591.5 | 0.0% | $210.15 | View |
| Eraring GT | ERGT01 |
NSW1 | Turbine - OCGT | $0 | $0 | — | — | — | 0.0% | $96.96 | View |
| NESBESS2 | NESBESS2 |
$0 | $0 | — | -0.8 | 275.0 | — | — | View | ||
| NESBESS1 | NESBESS1 |
$0 | $0 | — | -10.3 | 275.0 | — | — | View | ||
| Broken Hill GT | GB01 |
NSW1 | Turbine - OCGT | $0 | $0 | — | — | — | 0.0% | $2.11 | View |
| GPWFWST1 | GPWFWST1 |
$0 | $0 | — | 566.9 | 369.6 | — | — | View | ||
| Morgan To Whyalla Pipeline No 3 PS | MWPS3PV1 |
SA1 | Solar PV - Single axis tracking | $0 | $0 | — | — | — | 0.0% | $0.25 | View |
| GPWFWST2 | GPWFWST2 |
$0 | $0 | — | 752.9 | 605.1 | — | — | View | ||
| Gladstone | GSTONE2 |
QLD1 | Turbine - Steam Sub Critical | $0 | $0 | — | — | — | 0.0% | $49.17 | View |
| Gladstone | GSTONE5 |
QLD1 | Turbine - Steam Sub Critical | $0 | $0 | — | — | — | 0.0% | $58.48 | View |
| Murra Warra Wind Farm - stage 1 | MUWAWF1 |
VIC1 | Wind Turbine - Onshore | $0 | $0 | — | — | — | 0.0% | $0.50 | View |
| Hunter EconomicZone | HEZ1 |
NSW1 | Reciprocating Engine - Compression ignition | $0 | $0 | — | — | 241.7 | 0.0% | $308.00 | View |
| Newport | NPS |
VIC1 | Turbine - Steam Sub Critical | $0 | $0 | — | — | — | 0.0% | $2.00 | View |
| Dry Creek GT | DRYCGT2 |
SA1 | Turbine - OCGT | $0 | $0 | — | — | 422.9 | 0.0% | $135.55 | View |
| Dry Creek GT | DRYCGT1 |
SA1 | Turbine - OCGT | $0 | $0 | — | — | 577.3 | 0.0% | $141.50 | View |
| DRXQDA01 | DRXQDA01 |
$0 | $0 | — | — | — | — | — | View | ||
| DRXQQE01 | DRXQQE01 |
$0 | $0 | — | — | — | — | — | View | ||
| DRXSQS01 | DRXSQS01 |
$0 | $0 | — | — | — | — | — | View | ||
| DRXVAE01 | DRXVAE01 |
$0 | $0 | — | — | — | — | — | View | ||
| DRXVDJ01 | DRXVDJ01 |
$0 | $0 | — | — | — | — | — | View | ||
| DRXVDP01 | DRXVDP01 |
$0 | $0 | — | — | — | — | — | View | ||
| DRXVDX01 | DRXVDX01 |
$0 | $0 | — | — | — | — | — | View | ||
| DRXVQP01 | DRXVQP01 |
$0 | $0 | — | — | — | — | — | View | ||
| DRXVQX01 | DRXVQX01 |
$0 | $0 | — | — | — | — | — | View | ||
| Oakey Power Station | OAKEY2 |
QLD1 | Turbine - OCGT | $0 | $0 | — | — | 845.5 | 0.0% | $128.50 | View |
| DRXVQX02 | DRXVQX02 |
$0 | $0 | — | — | — | — | — | View | ||
| Oakey Power Station | OAKEY1 |
QLD1 | Turbine - OCGT | $0 | $0 | — | — | 845.5 | 0.0% | $128.50 | View |
| Hume Dam VIC | HUMEV |
VIC1 | Hydro - Dam | $0 | $0 | — | — | — | 0.0% | $1.54 | View |
| Hunter Power Station | HUNTER1 |
NSW1 | Turbine - OCGT | $0 | $0 | — | — | — | 0.0% | $142.99 | View |
| Hunter Power Station | HUNTER2 |
NSW1 | Turbine - OCGT | $0 | $0 | — | — | — | 0.0% | $152.46 | View |
| KEPBL1 | KEPBL1 |
$0 | $0 | — | — | — | — | — | View | ||
| MLSP1 | MLSP1 |
$0 | $0 | — | 47.3 | — | — | — | View | ||
| MLB01 | MLB01 |
$0 | $0 | — | -7.0 | — | — | — | View | ||
| KERNGSP1 | KERNGSP1 |
$0 | $0 | — | 12.6 | 12.7 | — | — | View | ||
| KIDSPHG1 | KIDSPHG1 |
$0 | $0 | — | — | — | — | — | View | ||
| KIDSPHG2 | KIDSPHG2 |
$0 | $0 | — | — | — | — | — | View | ||
| KIDSPHL1 | KIDSPHL1 |
$0 | $0 | — | — | — | — | — | View | ||
| Kogan Creek | KPP_1 |
QLD1 | Turbine - Steam Super Critical | $0 | $0 | — | — | — | 0.0% | $52.60 | View |
| LINCOLN GAP BESSBDU | LGAPBS1 |
SA1 | Storage - Battery | $0 | $0 | — | — | — | 0.0% | $1.50 | View |
| Lake Echo | LK_ECHO |
TAS1 | Hydro - Dam | $0 | $0 | — | — | — | 0.0% | $1.17 | View |
| Laverton North | LNGS1 |
VIC1 | Turbine - OCGT | $0 | $0 | — | — | 2,063.7 | 0.0% | $128.50 | View |
| Laverton North | LNGS2 |
VIC1 | Turbine - OCGT | $0 | $0 | — | — | 2,063.0 | 0.0% | $128.50 | View |
| Kennedy Energy Park - Phase 1 - Storage | KEPBG1 |
QLD1 | Storage - Battery | $0 | $0 | — | — | — | 0.0% | $2.03 | View |
| Kareeya | KAREEYA2 |
QLD1 | Hydro - Run of River | $0 | $0 | — | — | — | 0.0% | $1.00 | View |
| Mortlake | MORTLK11 |
VIC1 | Turbine - OCGT | $0 | $0 | — | — | 3,293.9 | 0.0% | $128.50 | View |
| Mt Stuart | MSTUART3 |
QLD1 | Turbine - OCGT | $0 | $0 | — | — | 1,420.1 | 0.0% | $2.00 | View |
| Jeeralang A | JLA01 |
VIC1 | Turbine - OCGT | $0 | $0 | — | — | 490.5 | 0.0% | $135.55 | View |
| Jeeralang A | JLA02 |
VIC1 | Turbine - OCGT | $0 | $0 | — | — | 652.5 | 0.0% | $128.50 | View |
| Mornington BESS | MRNBESS1 |
VIC1 | Storage - Battery | $0 | $0 | — | — | — | 0.0% | $1.50 | View |
| MREHA3 | MREHA3 |
$0 | $0 | 673.4 | 15.5 | 2,415.0 | — | — | View | ||
| MREHA2 | MREHA2 |
$0 | $0 | 930.5 | 77.7 | 1,224.8 | — | — | View | ||
| MREHA1 | MREHA1 |
$0 | $0 | 886.9 | 66.3 | 1,219.6 | — | — | View | ||
| Jeeralang A | JLA03 |
VIC1 | Turbine - OCGT | $0 | $0 | — | — | 652.5 | 0.0% | $141.46 | View |
| Jeeralang A | JLA04 |
VIC1 | Turbine - OCGT | $0 | $0 | — | — | 652.5 | 0.0% | $177.20 | View |
| Jeeralang B | JLB02 |
VIC1 | Turbine - OCGT | $0 | $0 | — | — | 906.2 | 0.0% | $137.71 | View |
| Jeeralang B | JLB03 |
VIC1 | Turbine - OCGT | $0 | $0 | — | — | 942.5 | 0.0% | $137.85 | View |
| Mortlake | MORTLK12 |
VIC1 | Turbine - OCGT | $0 | $0 | — | — | 3,279.9 | 0.0% | $128.50 | View |
| Lonsdale | LONSDALE |
SA1 | Reciprocating Engine - Compression ignition | $0 | $0 | — | — | 241.7 | 0.0% | $308.00 | View |
| RT_SA4 | RT_SA4 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_NSW2 | RT_NSW2 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_VIC12 | RT_VIC12 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_NSW1 | RT_NSW1 |
$0 | $0 | — | — | — | — | — | View | ||
| DRXNDA03 | DRXNDA03 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_VIC3 | RT_VIC3 |
$0 | $0 | — | — | — | — | — | View | ||
| DRXNDA04 | DRXNDA04 |
$0 | $0 | — | — | — | — | — | View | ||
| DRXNDB04 | DRXNDB04 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_VIC4 | RT_VIC4 |
$0 | $0 | — | — | — | — | — | View | ||
| Roma | ROMA_8 |
QLD1 | Turbine - OCGT | $0 | $0 | — | — | 436.2 | 0.0% | $128.50 | View |
| Roma | ROMA_7 |
QLD1 | Turbine - OCGT | $0 | $0 | — | — | 439.7 | 0.0% | $128.50 | View |
| DRXNDE01 | DRXNDE01 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_NSW3 | RT_NSW3 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_NSW4 | RT_NSW4 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_VIC11 | RT_VIC11 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_SA3 | RT_SA3 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_SA2 | RT_SA2 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_SA1 | RT_SA1 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_QLD1 | RT_QLD1 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_NSW6 | RT_NSW6 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_SA5 | RT_SA5 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_SA6 | RT_SA6 |
$0 | $0 | — | — | — | — | — | View | ||
| DRXNDA02 | DRXNDA02 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_VIC1 | RT_VIC1 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_VIC10 | RT_VIC10 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_NSW5 | RT_NSW5 |
$0 | $0 | — | — | — | — | — | View | ||
| DRXNDJ01 | DRXNDJ01 |
$0 | $0 | — | — | — | — | — | View | ||
| DRXNDW01 | DRXNDW01 |
$0 | $0 | — | — | — | — | — | View | ||
| DRXNSS01 | DRXNSS01 |
$0 | $0 | — | — | — | — | — | View | ||
| PUMP2 | PUMP2 |
$0 | $0 | — | 1,373.3 | — | — | — | View | ||
| PUMP1 | PUMP1 |
$0 | $0 | — | — | — | — | — | View | ||
| Port Stanvac 1 | PTSTAN1 |
SA1 | Reciprocating Engine - Compression ignition | $0 | $0 | — | — | 676.7 | 0.0% | $308.00 | View |
| RT_VIC2 | RT_VIC2 |
$0 | $0 | — | — | — | — | — | View | ||
| DRXNVS01 | DRXNVS01 |
$0 | $0 | — | — | — | — | — | View | ||
| Port Lincoln GT | POR03 |
SA1 | Turbine - OCGT | $0 | $0 | — | — | — | 0.0% | $2.00 | View |
| Port Lincoln GT | POR01 |
SA1 | Turbine - OCGT | $0 | $0 | — | — | — | 0.0% | $2.00 | View |
| RT_VIC7 | RT_VIC7 |
$0 | $0 | — | — | — | — | — | View | ||
| Poatina | POAT220 |
TAS1 | Hydro - Dam | $0 | $0 | — | — | — | 0.0% | $1.00 | View |
| Poatina | POAT110 |
TAS1 | Hydro - Dam | $0 | $0 | — | — | — | 0.0% | $1.00 | View |
| PLBESS1 | PLBESS1 |
$0 | $0 | — | — | — | — | — | View | ||
| Quarantine | QPS1 |
SA1 | Turbine - OCGT | $0 | $0 | — | — | 350.4 | 0.0% | $128.50 | View |
| Quarantine | QPS2 |
SA1 | Turbine - OCGT | $0 | $0 | — | — | 298.0 | 0.0% | $128.50 | View |
| DRXNFF01 | DRXNFF01 |
$0 | $0 | — | — | — | — | — | View | ||
| DRXNFS01 | DRXNFS01 |
$0 | $0 | — | — | — | — | — | View | ||
| DRXNQX01 | DRXNQX01 |
$0 | $0 | — | — | — | — | — | View | ||
| QPSFB2 | QPSFB2 |
$0 | $0 | — | 5.6 | 92.1 | — | — | View | ||
| QPSFB1 | QPSFB1 |
$0 | $0 | — | 328.4 | 38.8 | — | — | View | ||
| RT_VIC5 | RT_VIC5 |
$0 | $0 | — | — | — | — | — | View | ||
| DRXNTM02 | DRXNTM02 |
$0 | $0 | — | — | — | — | — | View | ||
| Quarantine | QPS3 |
SA1 | Turbine - OCGT | $0 | $0 | — | — | 350.4 | 0.0% | $128.50 | View |
| RT_VIC6 | RT_VIC6 |
$0 | $0 | — | — | — | — | — | View | ||
| Quarantine | QPS4 |
SA1 | Turbine - OCGT | $0 | $0 | — | — | 275.3 | 0.0% | $128.50 | View |
| Bolivar Power Station | BOLIVPS1 |
SA1 | Turbine - OCGT | $0 | $0 | — | 0.0 | — | 0.0% | $151.37 | View |
| Ladbroke Grove | LADBROK1 |
SA1 | Turbine - OCGT | $-1 | $0 | — | 0.1 | 507.5 | 0.0% | $153.02 | View |
| Torrens Island B | TORRB3 |
SA1 | Turbine - Steam Sub Critical | $-1 | $0 | — | 0.1 | — | 0.0% | $2.00 | View |
| Hume Dam NSW | HUMENSW |
NSW1 | Hydro - Dam | $-7 | $0 | — | -0.1 | — | 0.0% | $1.05 | View |
| Mintaro GT | MINTARO |
SA1 | Turbine - OCGT | $-9 | $0 | — | 0.7 | 1,074.8 | 0.0% | $128.50 | View |
| Tailem Bend Stage 2 Solar Project | TB2SF1 |
SA1 | Solar PV - Single axis tracking | $-22 | $0 | — | 1.3 | — | 0.1% | $0.25 | View |
| Williamsdale BESS | WILLBES1 |
NSW1 | Storage - Battery | $-42 | $0 | — | -1.4 | — | 0.0% | $1.50 | View |
| Jeeralang B | JLB01 |
VIC1 | Turbine - OCGT | $-45 | $0 | — | 3.4 | 942.5 | 0.2% | $128.50 | View |
| Mannum Adelaide Pumping Station No 2 - MAPL2 (Palmer) | MAPS2PV1 |
SA1 | Solar PV - Single axis tracking | $-79 | $0 | — | 23.4 | 3.6 | 5.9% | $0.26 | View |
| Happy Valley Reservoir | HVWWPV1 |
SA1 | Solar PV - Single axis tracking | $-117 | $0 | — | 16.7 | 2.7 | 6.3% | $0.00 | View |
| Mannum Adelaide Pumping Station No 3 - MAPL3 (Tungkillo) | MAPS3PV1 |
SA1 | Solar PV - Single axis tracking | $-191 | $0 | — | 27.8 | 3.8 | 7.0% | $0.25 | View |
| Capital Battery | CAPBES1 |
NSW1 | Storage - Battery | $-266 | $0 | — | -41.1 | 1,208.3 | -1.7% | $1.50 | View |
| Mortons Lane Wind Farm | MLWF1 |
VIC1 | Wind Turbine - Onshore | $-414 | $0 | — | 150.6 | — | 32.2% | $0.50 | View |
| Yatpool Solar Farm | YATSF1 |
VIC1 | Solar PV - Single axis tracking | $-782 | $0 | — | 210.9 | 38.7 | 9.3% | $0.25 | View |
| Rocky Point Sugar Mill Cogeneration Plant | RPCG |
QLD1 | Other - Other | $-936 | $0 | — | -19.8 | — | -2.8% | $117.00 | View |
| Gannawarra Solar Farm | GANNSF1 |
VIC1 | Solar PV - Single axis tracking | $-2.7k | $0 | — | 217.4 | 24.4 | 16.5% | $0.34 | View |
| Karadoc Solar Farm | KARSF1 |
VIC1 | Solar PV - Single axis tracking | $-3.2k | $0 | — | 382.9 | 52.9 | 15.3% | $0.00 | View |
| Clements Gap Wind Farm | CLEMGPWF |
SA1 | Wind Turbine - Onshore | $-3.4k | $0 | — | 329.8 | 46.7 | 24.2% | $0.80 | View |
| Wemen Solar Farm | WEMENSF1 |
VIC1 | Solar PV - Single axis tracking | $-4.2k | $0 | — | 417.3 | 58.9 | 17.8% | $0.25 | View |
| Bannerton Solar Park | BANN1 |
VIC1 | Solar PV - Single axis tracking | $-4.3k | $0 | — | 341.1 | 38.3 | 14.2% | $0.34 | View |
| Snowtown S2 Wind Farm | SNOWSTH1 |
SA1 | Wind Turbine - Onshore | $-4.4k | $0 | — | 1,350.7 | 346.3 | 44.7% | $0.74 | View |
| Winton Solar Farm | WINTSF1 |
VIC1 | Solar PV - Single axis tracking | $-4.5k | $0 | — | 314.4 | 22.0 | 15.4% | $0.25 | View |
| Waterloo Wind Farm | WATERLWF |
SA1 | Wind Turbine - Onshore | $-5.0k | $0 | — | 1,177.5 | 312.6 | 37.5% | $0.50 | View |
| Quarantine | QPS5 |
SA1 | Turbine - OCGT | $-5.5k | $0 | — | 189.5 | 1,543.0 | 6.2% | $209.05 | View |
| Glenrowan Solar Farm | GLENSF1 |
VIC1 | Solar PV - Single axis tracking | $-6.2k | $0 | — | 460.0 | 40.7 | 15.2% | $0.25 | View |
| Kiamal Solar Farm - Stage 1 | KIAMSF1 |
VIC1 | Solar PV - Single axis tracking | $-7.0k | $0 | — | 900.1 | 127.8 | 18.8% | $0.00 | View |
| Snowtown S2 Wind Farm | SNOWNTH1 |
SA1 | Wind Turbine - Onshore | $-7.2k | $0 | — | 1,314.6 | 302.4 | 38.0% | $0.50 | View |
| Liddell BESS | LDBESS1 |
NSW1 | Storage - Battery | $-71.7k | $0 | — | -446.9 | 5,579.7 | -3.7% | $1.50 | View |