Solar · The Trustee for X-ELIO BOULKA PARK TRUST · Solar PV - Single axis tracking
16 May 2026 07:55 → 15 Jun 2026 07:55 AEST
| Capex total (greenfield) |
$137.13M
Shown in table Reported / source value |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW derived |
$1,371,308
Shown in table Reported / source value |
| Fixed OPEX (annual) |
$1.27M
Shown in table Reported / source value |
| Fixed OPEX / MW-yr |
$12,658
Shown in table Reported / source value How this was derived Reference |
| Variable OPEX / MWh |
$0.00
Shown in table Reported / source value How this was derived Reference |
| Fuel cost / GJ |
$0.00
Shown in table Reported / source value |
| Heat rate GJ/MWh |
—
|
Confidence: low · Status: ai estimated · Capex basis: default · AI checked 05 Jun 2026
Notes
No project-specific greenfield capex figure was located in the searched owner/developer or public sources. AEMO/Aurecon 2024 solar PV benchmark data indicates single-axis tracking utility-scale PV with fixed O&M of $12,000/MW-year and variable O&M included in fixed costs; applied here as fallback. Boulka Park Solar Farm appears in public references as an X-ELIO pipeline project, but no construction cost or commissioning date was found.