Pre-operating NEM Generators

Browse proposed, committed, and other pre-operating generation projects across the NEM.

975 pre-operating projects across the NEM

Browse by type
Project status
AEMO status
Technology
NEM operating state (latest 5-min dispatch)
Site Owner Project status AEMO status Tech Type NEM state Fuel Type DUID Capacity Commissioned
Abermain BESS FIrm Power P/L Development · AI Publicly Announced Storage - Battery Not commissioned Other - Other 200/800 MW · AI View
Alberton Wind Farm Synergy Wind Pty Ltd Development · AI Publicly Announced Wind Turbine - Onshore Not commissioned Wind - Wind 122 MW · AI View
Aldoga BESS Stage 1 Acciona Energy Australia Global Development · AI Anticipated Storage - Battery Not commissioned Other - Other 400/1600 MW · AI Dec 2027 View
Aldoga Solar Farm Acciona Energy Australia Global Pty Ltd Operational · AI Anticipated Solar PV - Single axis tracking Not commissioned Solar - Solar ALDGASF1 387 MW · AI Nov 2025 View
Alligator Creek BESS Alligator Creek BESS Pty Ltd Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Altona BESS Ausnet Transmission Group Pty Ltd Development · AI Publicly Announced Storage - Battery Not commissioned Other - Other 100/200 MW · AI Oct 2027 View
Apsley BESS Project ACENergy Pty Ltd Development · AI Publicly Announced Storage - Battery Not commissioned Other - Other 120/240 MW · AI View
Aquila Wind ACEN Australia Pty Ltd Development · AI Publicly Announced Wind Turbine - Onshore Not commissioned Wind - Wind 300 MW · AI View
Aramara Solar Farm Aramara Solar Pty Ltd Development · AI Anticipated Solar PV - Single axis tracking Not commissioned Solar - Solar 140 MW · AI Jun 2028 View
Ardandra Solar Farm And BESS Ardandra SF Pty Ltd as trustee for Ardandra SF Trust Development Publicly Announced Storage - Battery Not commissioned Solar - Solar View
Ardandra Solar Farm And BESS Ardandra SF Pty Ltd as trustee for Ardandra SF Trust Development Publicly Announced Solar PV - Single axis tracking Not commissioned Solar - Solar View
Argoon Wind Farm (RES Group) - KCI RES Australia Pty Ltd Development · AI Publicly Announced Wind Turbine - Onshore Not commissioned Wind - Wind 612/460 MW · AI View
Argyle Solar Farm Argyle Solar Farm Pty Ltd Development · AI Publicly Announced Solar PV - Single axis tracking Not commissioned Solar - Solar 28 MW · AI View
Armidale BESS Armidale BESS Project Pty Ltd Development · AI Publicly Announced Storage - Battery Not commissioned Other - Other 150/437 MW · AI May 2026 View
Armidale BESS (Elgin) Elgin EnergyP/L Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Armidale East BESS FRV Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Arundel BESS Eku Energy Projects (Australia) Trust Development · AI Publicly Announced Storage - Battery Not commissioned Other - Other 300/1200 MW · AI View
Augusta BESS Augusta BESS Pty Ltd Development · AI Publicly Announced Storage - Battery Not commissioned Other - Other 270/540 MW · AI View
Aurora Solar Energy Project - Phase 1 SiliconAurora Development · AI Publicly Announced Storage - Battery Not commissioned Other - Other 140/280 MW · AI View
Australia Plains Solar Farm Gree Development · AI Publicly Announced Solar PV - Single axis tracking Not commissioned Solar - Solar 200/400 MW · AI View
Awaba BESS firmpower_NR Development · AI Publicly Announced Storage - Battery Not commissioned Other - Other 50/100 MW · AI View
Axedale Solar Farm UPC Renewables Australia Development · AI Publicly Announced Storage - Battery Not commissioned Other - Other 140/100 MW · AI View
Axedale Solar Farm UPC Renewables Australia Development · AI Publicly Announced Solar PV - Single axis tracking Not commissioned Solar - Solar 140/100 MW · AI View
Bairnsdale BESS Bison Energy Development · AI Publicly Announced Storage - Battery Not commissioned Other - Other 60/240 MW · AI View
Baking Board Battery Storage - KCI Solar Projects Australia Pty Ltd Development · AI Publicly Announced Storage - Battery Not commissioned Solar - Solar 400 MW · AI View
Baking Board BESS (MMT) MMT Projects T/A Renewable Projects Management Development · AI Publicly Announced Storage - Battery Not commissioned Other - Other 300 MW · AI View
Baking Board Solar Farm - KCI Solar Projects Australia Pty Ltd Development · AI Publicly Announced Solar PV - Fixed Not commissioned Solar - Solar 20 MW · AI View
Baking Board Solar Farm (MMT) MMT Projects T/A Renewable Projects Management Development · AI Publicly Announced Solar PV - Fixed Not commissioned Solar - Solar View
Baldon Wind Farm Baldon Wind Farm Pty Ltd Development · AI Publicly Announced Wind Turbine - Onshore Not commissioned Wind - Wind 1404/400 MW · AI View
Baldon Wind Farm Stage 2 Baldon Wind Farm Pty Ltd Development Publicly Announced Wind Turbine - Onshore Not commissioned Wind - Wind View
Baldon Wind Farm Stage 2 - BESS Baldon Wind Farm Pty Ltd Development · AI Publicly Announced Storage - Battery Not commissioned Other - Other 200/400 MW · AI View
Banana Range Wind Farm Orange Creek Energy Pty Ltd Development · AI Publicly Announced Wind Turbine - Onshore Not commissioned Wind - Wind 230 MW · AI Dec 2026 View
Banksia Solar Farm Venn Energy Pty / Banksia Solar Project Pty Ltd Development · AI Anticipated Solar PV - Single axis tracking Not commissioned Solar - Solar 100 MW · AI Jan 2028 View
Bannaby BESS Penso Power Australia Pty Ltd. Development · AI Publicly Announced Storage - Battery Not commissioned Other - Other 750/3000 MW · AI View
Baranduda Electrical Energy Reserve Birdwood Energy Reserve Pty Ltd (ACN 658 507 441) as Trustee for Birdwood Energy Reserve Trust Development · AI Publicly Announced Storage - Battery Not commissioned Other - Other BEER01 400/1800 MW · AI Jun 2027 View
Barker Inlet Power Station 2 AGL Energy Limited Operational · AI Publicly Announced Turbine - OCGT Not commissioned Fossil - Natural Gas Pipeline 210 MW · AI View
Barn Hill Barn HIll Wind Farm Pty Ltd Development · AI Publicly Announced Wind Turbine - Onshore Not commissioned Wind - Wind 360/1080 MW · AI View
Barn Hill BESS AGL Energy Limited Development · AI Publicly Announced Storage - Battery Not commissioned Other - Other 270/1080 MW · AI View
Barnawartha Solar & Energy Storage Barnawartha Solar Pty Ltd Operational · AI Publicly Announced Storage - Battery Not commissioned Solar - Solar 5 MW · AI View
Barnawartha Solar & Energy Storage Barnawartha Solar Pty Ltd Operational · AI Publicly Announced Solar PV - Single axis tracking Not commissioned Solar - Solar 5 MW · AI View
Baroota Pumped Hydro Project ACEN Renewables Development · AI Publicly Announced Hydro - Dam Not commissioned Hydro - Water 250/2000 MW · AI Dec 2025 View
Barwon Solar Farm & BESS Elgin Energy Pty Ltd Development · AI Publicly Announced Storage - Battery Not commissioned Other - Other 250/500 MW · AI View
Barwon Solar Farm & BESS Elgin Energy Pty Ltd Development · AI Publicly Announced Solar PV - Single axis tracking Not commissioned Solar - Solar 330/500 MW · AI View
Bashan 1 Wind Farm Goldwind Australia Development · AI Publicly Announced Wind Turbine - Onshore Not commissioned Wind - Wind 450/400 MW · AI View
Bass Offshore Wind Energy Project Nexsphere Pty Ltd Development · AI Publicly Announced Wind Turbine - Offshore Not commissioned Wind - Wind 1500 MW · AI View
Battery of the Nation - Stage 2b Hydro Tasmania Development · AI Publicly Announced Storage - Pumped hydro Not commissioned Hydro - Water 2500 MW · AI View
Battery of the Nation - Stage 3b Hydro Tasmania Development · AI Publicly Announced Storage - Pumped hydro Not commissioned Hydro - Water 750/15000 MW · AI View
Beebo Battary - KCI BEEBO SOLAR FARM PTY LTD as Trustee For BEEBO SOLAR FARM UNIT TRUST Development · AI Publicly Announced Storage - Battery Not commissioned Other - Other 400/800 MW · AI View
Beebo Solar Farm - KCI BEEBO SOLAR FARM PTY LTD as Trustee For BEEBO SOLAR FARM UNIT TRUST Development · AI Publicly Announced Solar PV - Fixed Not commissioned Solar - Solar 600/800 MW · AI View
Beelbee Solar Farm Darling Downs Solar Farm Pty Ltd Development · AI Publicly Announced Solar PV - Single axis tracking Not commissioned Solar - Solar 240 MW · AI View
Belhaven Renewable Project Vena Energy Services (Australia) Pty Ltd Development · AI Publicly Announced Storage - Battery Not commissioned Other - Other 400/800 MW · AI View
Belhaven Renewable Project Vena Energy Services (Australia) Pty Ltd Development · AI Publicly Announced Solar PV - Fixed Not commissioned Solar - Solar 400/800 MW · AI View
Bell Bay BESS Equis Energy (Australia) Projects (Ngumi 6) Pty Ltd as trustee for the Equis Energy(Australia) Ngumi 6 Asset Trust Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Bellambi Heights Renewables Project Vena Energy Development · AI Publicly Announced Storage - Battery Not commissioned Other - Other View
Bellbay Wind Farm (Low Heads Wind Farm Stage 2) The Trustee for Equis Wind (Australia) LHWF2 Asset Trust Development · AI Publicly Announced Wind Turbine - Onshore Not commissioned Wind - Wind 224 MW · AI Sep 2029 View
Ben Bullen BESS Tetris Energy Development · AI Publicly Announced Storage - Battery Not commissioned Other - Other View
Bendemeer Renewable Energy Hub - Solar - KCI Athena Energy Australia (Holdings) Pty Ltd Development · AI Publicly Announced Solar PV - Fixed Not commissioned Solar - Solar 218 MW · AI View
Bendemeer Renewable Energy Hub - Storage - KCI Athena Energy Australia (Holdings) Pty Ltd Development · AI Publicly Announced Storage - Battery Not commissioned Other - Other 100 MW · AI View
Bendemeer Renewable Energy Hub - Wind - KCI Athena Energy Australia (Holdings) Pty Ltd Development · AI Publicly Announced Wind Turbine - Onshore Not commissioned Wind - Wind View
Bennetts Creek BESS Bennetts Creek Energy Project Pty Ltd in its capacity as Trustee for the Bennetts Creek Energy Project Trust Development · AI Anticipated Storage - Battery Not commissioned Other - Other Jul 2027 View
Beresfield BESS firmpower_NR Development · AI Publicly Announced Storage - Battery Not commissioned Other - Other 226/340 MW · AI View
Berrybank 1 BESS - Storage - KCI Global Power Generation Australia Pty Ltd Development · AI Publicly Announced Storage - Battery Not commissioned Other - Other 60/120 MW · AI View
Beryl BESS Ratch-Australia Corporation Development · AI Publicly Announced Storage - Battery Not commissioned Other - Other 100/200 MW · AI View
BESS Finley BESS Finley P/L Development · AI Publicly Announced Storage - Battery Not commissioned Other - Other 100 MW · AI View
Big G Pumped Hydro Project BE Power Development · AI Publicly Announced Storage - Pumped hydro Not commissioned Hydro - Water View
Big-T Project BE Power Development · AI Publicly Announced Storage - Pumped hydro Not commissioned Hydro - Water 400/4000 MW · AI View
Birkins Solar Farm - Storage - KCI FRV Services Australia Pty Ltd Development · AI Publicly Announced Storage - Battery Not commissioned Solar - Solar BIRKBESS View
Birriwa BESS ACEN RENEWABLES Development Publicly Announced Storage - Battery Not commissioned Solar - Solar View
Birriwa Solar Farm ACEN RENEWABLES Development Publicly Announced Solar PV - Fixed Not commissioned Solar - Solar View
Blackstone BESS FIrm Power P/L Development · AI Publicly Announced Storage - Battery Not commissioned Other - Other 331/500 MW · AI View
Blackstone BESS 2 - KCI FIrm Power P/L Development · AI Publicly Announced Storage - Battery Not commissioned Other - Other View
Blacktop BESS - KCI BESS Officer Pty Ltd Development · AI Publicly Announced Storage - Battery Not commissioned Other - Other 100 MW · AI View
Blackwater Hybrid System Blackwater Project Nominees Pty Ltd as trustee for the Blackwater Project Trust Development · AI Publicly Announced Storage - Battery Not commissioned Solar - Solar 200/400 MW · AI Jun 2029 View
Blackwater Hybrid System Blackwater Project Nominees Pty Ltd as trustee for the Blackwater Project Trust Development · AI Publicly Announced Solar PV - Single axis tracking Not commissioned Solar - Solar 170 MW · AI Jun 2029 View
Blair Athol Solar Power Station TerraCom Ltd Development · AI Publicly Announced Solar PV - Fixed Not commissioned Solar - Solar 60 MW · AI View
Blanche BESS - KCI Blanche BESS Pty Ltd as trustee for Blanche BESS Trust Development · AI Publicly Announced Storage - Battery Not commissioned Other - Other 128 MW · AI View
Blenheim BESS - KCI Gatton Solar Farm Pty Ltd Development · AI Publicly Announced Storage - Battery Not commissioned Solar - Solar 29 MW · AI View
Blenheim Solar Farm - KCI Gatton Solar Farm Pty Ltd Development · AI Publicly Announced Solar PV - Fixed Not commissioned Solar - Solar 106 MW · AI View
Blind Creek Solar Farm and Battery Energy Storage System Ms BCSF Holdings Pty Ltd as trustee for the Blind Creek Solar Farm Trust Development · AI Publicly Announced Storage - Battery Not commissioned Solar - Solar 378/486 MW · AI View
Blind Creek Solar Farm and Battery Energy Storage System Ms BCSF Holdings Pty Ltd as trustee for the Blind Creek Solar Farm Trust Development · AI Publicly Announced Solar PV - Single axis tracking Not commissioned Solar - Solar 378 MW · AI View
Blue Mackerel North Off Shore Wind Farm Arup Australia Pty Ltd Development Publicly Announced Wind Turbine - Offshore Not commissioned Wind - Wind View
Boco Rock Wind Farm South Pacific Power Pty Ltd Operational · AI Publicly Announced Wind Turbine - Onshore Not commissioned Wind - Wind BOCOROC2 113 MW · AI View
Bogandilla Wind Farm RES Australia Pty Ltd Development · AI Publicly Announced Wind Turbine - Onshore Not commissioned Wind - Wind 530 MW · AI View
Boggabri solar and storage project Photon Energy Development · AI Publicly Announced Storage - Battery Not commissioned Solar - Solar View
Boiling Down BESS Hanwha Energy Australia Pty Ltd Development · AI Publicly Announced Storage - Battery Not commissioned Other - Other 260 MW · AI View
Bonnie Brae Hybrid Plant Barathrum Energy Pty Ltd Development · AI Publicly Announced Storage - Battery Not commissioned Solar - Solar 70/260 MW · AI View
Bonshaw Solar Farm GAIA Australia Pty Ltd Development · AI Publicly Announced Solar PV - Single axis tracking Not commissioned Solar - Solar 100 MW · AI May 2027 View
Bookaar Solar Farm Bookaar Renewables Pty ltd  Development · AI Publicly Announced Solar PV - Fixed Not commissioned Solar - Solar 230 MW · AI View
Bookham WF & BESS Bookham Wind Farm Pty Ltd Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Bookham WF & BESS Bookham Wind Farm Pty Ltd Development Publicly Announced Wind Turbine - Onshore Not commissioned Wind - Wind View
Boomber Green Energy Hub Boomer Green Energy Hub Pty Ltd (a subsidiary of the Ark Energy Group) Development Publicly Announced Wind Turbine - Onshore Not commissioned Wind - Wind View
Boomer Green Energy Hub ARK Energy Corporation Pty Ltd Development · AI Publicly Announced Other - Other Not commissioned Other - Other View
Boort Wind Farm feraaustralia_nr Development Publicly Announced Wind Turbine - Onshore Not commissioned Wind - Wind Sep 2031 View
Boree Solar Project Venn Energy Pty Ltd Development · AI Publicly Announced Solar PV - Single axis tracking Not commissioned Solar - Solar 180 MW · AI View
Borumba Queensland Hydro Development Anticipated Storage - Pumped hydro Not commissioned Hydro - Water Jul 2035 View
Boulder Creek Wind Farm Boulder Creek Wind Farm Pty Ltd as trustee for BCWF Unit Trust ABN and BCWF 2 Pty Limited Development · AI Anticipated Wind Turbine - Onshore Not commissioned Wind - Wind 221 MW · AI Nov 2027 View
Bouldercombe Battery project - Stage 2 - KCI Genex Power Limited Development · AI Publicly Announced Storage - Battery Not commissioned Other - Other 50/200 MW · AI View
Bouldercombe North BESS - Quintas Bouldercombe North BESS Pty Ltd Development · AI Publicly Announced Storage - Battery Not commissioned Other - Other 400/1600 MW · AI Mar 2027 View
Boulka Park BESS The Trustee for X-ELIO BOULKA PARK TRUST Development · AI Publicly Announced Storage - Battery Not commissioned Other - Other 250/500 MW · AI View
Boulka Park Solar Farm The Trustee for X-ELIO BOULKA PARK TRUST Development · AI Publicly Announced Solar PV - Single axis tracking Not commissioned Solar - Solar 100 MW · AI View
Bowen Basin Sun Farm - KCI Bowen Basin Sun Farm Pty Ltd Development · AI Publicly Announced Solar PV - Fixed Not commissioned Solar - Solar 130 MW · AI View
Bowen PHES - KCI Blue Hydro Project Pty Ltd Development · AI Publicly Announced Storage - Pumped hydro Not commissioned Hydro - Water 750/18000 MW · AI View
Bowmans Creek Wind Farm ARK Energy Corporation Pty Ltd Development · AI Publicly Announced Wind Turbine - Onshore Not commissioned Wind - Wind 347 MW · AI View
Bracewell Energy Park TE H2 Australia Development · AI Publicly Announced Storage - Battery Not commissioned Solar - Solar 200/350 MW · AI Jul 2031 View
Bracewell Energy Park TE H2 Australia Development · AI Publicly Announced Solar PV - Single axis tracking Not commissioned Solar - Solar 500 MW · AI Jul 2031 View
Braemar BESS Braemar Power Project Pty Ltd Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Bremer Battery 1 Libra Energy Pty Ltd Development · AI Publicly Announced Storage - Battery Not commissioned Other - Other 212 MW · AI View
Bremer Battery 2 Libra Energy Pty Ltd Development · AI Publicly Announced Storage - Battery Not commissioned Other - Other 212 MW · AI View
Bremer Battery 3 Libra Energy Pty Ltd Development · AI Publicly Announced Storage - Battery Not commissioned Other - Other 212 MW · AI View
Bremer Battery 4 Libra Energy Pty Ltd Development · AI Publicly Announced Storage - Battery Not commissioned Other - Other 212 MW · AI View
Brendale BESS Brendale Battery ProjectCo Pty Lt Development Committed Storage - Battery Not commissioned Other - Other 205/410 MW Jun 2026 View
Brewongle Solar Farm Edify Energy Pty Ltd Development · AI Publicly Announced Solar PV - Fixed Not commissioned Solar - Solar 100 MW · AI View
Bridle Track Solar Project ACEN Renewables Development · AI Publicly Announced Solar PV - Single axis tracking Not commissioned Solar - Solar 300 MW · AI View
Brigalow GT (Kogan Creek GT) CSE H2 Pty Ltd Development · AI Publicly Announced Turbine - OCGT Not commissioned Fossil - Natural Gas 400 MW · AI Dec 2028 View
Brinkworth BESS Brinkworth Solar Farm Pty Ltd Development · AI Publicly Announced Storage - Battery Not commissioned Other - Other View
Broadsound Solar Farm Broadsound Solar Farm Pty Ltd Development Committed Solar PV - Single axis tracking Not commissioned Solar - Solar 368 MW Jan 2027 View
Broadsound_BESS Broadsound Solar Farm Pty Ltd Development · AI Anticipated Storage - Battery Not commissioned Other - Other 240/360 MW · AI Jan 2027 View
Broken Creek Solar Farm - KCI BSR EPC Pty Limited Development · AI Publicly Announced Solar PV - Fixed Not commissioned Solar - Solar 173 MW · AI View
Bullawah Wind Farm – Stage 1 Bullawah Wind Farm Pty Ltd Development · AI Publicly Announced Wind Turbine - Onshore Not commissioned Wind - Wind 314 MW · AI View
Bulli Creek Battery Genex Power Limited Development · AI Publicly Announced Storage - Battery Not commissioned Other - Other 400/1600 MW · AI View
Bulli Creek BESS (Trina) Bulli Creek Hybrid Nominee Pty Ltd on behalf of Bulli Creek Hybrid Trust Development · AI Publicly Announced Storage - Battery Not commissioned Other - Other 450/900 MW · AI View
Bulli Creek Solar Farm Genex Power Limited Development · AI Publicly Announced Solar PV - Single axis tracking Not commissioned Solar - Solar View
Bulli Creek Solar Farm (Trina) Bulli Creek Hybrid Nominee Pty Ltd on behalf of Bulli Creek Hybrid Trust Development · AI Publicly Announced Solar PV - Fixed Not commissioned Solar - Solar 450 MW · AI View
Bullyard Solar Farm EE Solar 9 Pty Ltd as trustee for the EE Solar 9 Trust Development · AI Anticipated Solar PV - Single axis tracking Not commissioned Solar - Solar 97 MW · AI View
Bundaberg Renewable Energy Park Bundaberg Renewable Energy Park Development · AI Publicly Announced Storage - Battery Not commissioned Other - Other 500 MW · AI View
Bundaberg Solar Farm Bundaberg Development Pty Ltd Development Committed Solar PV - Single axis tracking Not commissioned Solar - Solar 78 MW Dec 2025 View
Bundey BESS and Solar Project Genaspi Energy Group Pty Ltd Development · AI Publicly Announced Storage - Battery Not commissioned Other - Other View
Bundey BESS and Solar Project Genaspi Energy Group Pty Ltd Development · AI Publicly Announced Solar PV - Fixed Not commissioned Solar - Solar 475 MW · AI View
Bundy Energy Hub A (BESS) Syn-Co Global Development · AI Publicly Announced Storage - Battery Not commissioned Other - Other 250 MW · AI View
Bundy Energy Hub B (BESS) SynCo Global Development · AI Publicly Announced Storage - Battery Not commissioned Other - Other 250 MW · AI View
Bungaban BESS Windlab Developments Pty Ltd Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Bungaban Wind Farm Windlab Developments Pty Ltd Development Publicly Announced Wind Turbine - Onshore Not commissioned Wind - Wind Dec 2031 View
Bungama BESS (ARENA ) Bungama Bess Trust Development · AI Publicly Announced Storage - Battery Not commissioned Other - Other 200/400 MW · AI View
Bungama Solar Bungama Project (Solar) Operations Pty Ltd Development Committed Storage - Battery Not commissioned Other - Other 150/300 MW Apr 2026 View
Bungama Solar Bungama Project (Solar) Operations Pty Ltd Development · AI Publicly Announced Solar PV - Single axis tracking Not commissioned Solar - Solar 280 MW · AI Aug 2028 View
Bunkers Hill Pumped Hydro Pacific Hydro Development · AI Publicly Announced Storage - Pumped hydro Not commissioned Hydro - Water 296 MW · AI Dec 2033 View
Bunkers Hill Wind Farm Pacific Hydro Development · AI Publicly Announced Wind Turbine - Onshore Not commissioned Wind - Wind 7 MW · AI View
Burdekin BESS BURDEKIN SOLAR FARM PTY LTD ATF BURDEKIN GENESIS PROJECT TRUST Development · AI Publicly Announced Storage - Battery Not commissioned Other - Other 500/2000 MW · AI Sep 2026 View
Burdekin Solar Farm - KCI BURDEKIN SOLAR FARM PTY LTD ATF BURDEKIN GENESIS PROJECT TRUST Development · AI Publicly Announced Solar PV - Single axis tracking Not commissioned Solar - Solar 4 MW · AI Feb 2026 View
Burgmanns BESS Burgmanns BESS Pty Ltd Development · AI Publicly Announced Storage - Battery Not commissioned Other - Other View
Buronga BESS - Storage - KCI BESS Clyde North Pty Ltd Development · AI Publicly Announced Storage - Battery Not commissioned Other - Other 300/600 MW · AI View
Burrenbring Wind Farm Iberdrola Australia Development Pty Limited Development · AI Publicly Announced Wind Turbine - Onshore Not commissioned Wind - Wind 360 MW · AI View
Burrendong Wind Farm ARK Energy Corporation Pty Ltd Development · AI Publicly Announced Wind Turbine - Onshore Not commissioned Wind - Wind 434 MW · AI View
Burroway BESS Edify Energy Pty Ltd Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Bushranger Hybrid Facility - Solar SynCo Global Development · AI Publicly Announced Solar PV - Fixed Not commissioned Solar - Solar 300 MW · AI View
Calala Battery Energy Storage System 1 (CABESS1) EquisEquis Energy (Australia) Projects (Ngumi 4) Pty Ltd Development · AI Committed Storage - Battery Not commissioned Other - Other 100/200 MW Feb 2027 View
Calala Battery Energy Storage System 2 (CABESS2) EquisEquis Energy (Australia) Projects (Ngumi 4) Pty Ltd Development · AI Committed Storage - Battery Not commissioned Other - Other 150/300 MW Apr 2027 View
Callide Energy Hub - KCI CSE BESS P/L Development · AI Publicly Announced Storage - Battery Not commissioned Other - Other 200 MW · AI View
Callide Gas Peaker - KCI CSE H2 Pty Ltd Development · AI Publicly Announced Turbine - Other Not commissioned Other - Other View
Callide Power Station Solar Farm Edify Energy Pty Ltd Development · AI Publicly Announced Solar PV - Fixed Not commissioned Solar - Solar View
Callide Solar Power Station BESS Edify Energy Pty Ltd Development · AI Publicly Announced Storage - Battery Not commissioned Other - Other 210/200 MW · AI View
Callide Wind Farm DP Green Energy Pty Limited Development · AI Publicly Announced Wind Turbine - Onshore Not commissioned Wind - Wind 422 MW · AI View
Calliope BESS ekuenergy_nr Development · AI Publicly Announced Other - Other Not commissioned Other - Other 300/600 MW · AI View
Calvale BESS Lightsource BP Development · AI Publicly Announced Storage - Battery Not commissioned Other - Other 500 MW · AI View
Calvale LDES BESS Released Energy Pty Ltd Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Calvale Solar Farm Lightsource BP Development · AI Publicly Announced Solar PV - Fixed Not commissioned Solar - Solar View
Campbells Forest Solar Farm 4067 Pyramid Development Pty Ltd Development · AI Publicly Announced Solar PV - Single axis tracking Not commissioned Solar - Solar 205 MW · AI View
Camperdown BESS - Quintas Camperdown BESS Pty Ltd Development · AI Publicly Announced Storage - Battery Not commissioned Other - Other 75/150 MW · AI Dec 2026 View
Canyonleigh BESS X-Elio Australia Pty Ltd Development · AI Publicly Announced Storage - Battery Not commissioned Other - Other View
Cape Winds Offshore Wind Farm NeuGen Technology P/L Development Publicly Announced Wind Turbine - Offshore Not commissioned Wind - Wind View
Capital 2 Wind Farm Capital Wind Farm 2 Pty Ltd Development · AI Publicly Announced Wind Turbine - Onshore Not commissioned Wind - Wind 134 MW · AI View
Capricorn BESS - KCI ENEL Green Power Australia Development · AI Publicly Announced Storage - Battery Not commissioned Other - Other Dec 2027 View
Capricornia Energy Hub (CEH) PHES CI QLD PHES PTY LTD Development · AI Publicly Announced Storage - Pumped hydro Not commissioned Hydro - Water 750/12000 MW · AI Dec 2031 View
Captains Mountain Wind Farm vestas_NR Development · AI Publicly Announced Wind Turbine - Onshore Not commissioned Wind - Wind 217 MW · AI Dec 2029 View
Carag Solar Farm Enerparc Australia Pty Ltd Commissioning · AI Publicly Announced Solar PV - Fixed Not commissioned Solar - Solar 16 MW · AI Mar 2025 View
Carmody's Hill BESS Georgetown Hills Renewable Energy Pty Ltd as trustee for the Georgetown Hills Renewable Energy Trust Development · AI Publicly Announced Storage - Battery Not commissioned Other - Other 118/240 MW · AI Jan 2029 View
Carmody's Hill Wind Farm Georgetown Hills Renewable Energy Pty Ltd as trustee for the Georgetown Hills Renewable Energy Trust Development · AI Publicly Announced Wind Turbine - Onshore Not commissioned Wind - Wind 247 MW · AI Jan 2029 View
Carwarp BESS Canadian Solar Development · AI Publicly Announced Storage - Battery Not commissioned Other - Other 30 MW · AI View
Carwarp Solar Farm - Stage I Canadian Solar (Australia) Pty Ltd Development · AI Publicly Announced Solar PV - Single axis tracking Not commissioned Solar - Solar 150 MW · AI View
Carwarp Solar Farm - Stage II Canadian Solar (Australia) Pty Ltd Development · AI Publicly Announced Solar PV - Single axis tracking Not commissioned Solar - Solar 150 MW · AI View
Cattle Creek Wind Farm - KCI RWE Renewables Australia Pty Ltd Development · AI Publicly Announced Storage - Battery Not commissioned Other - Other View
Cattle Creek Wind Farm - KCI RWE Renewables Australia Pty Ltd Development · AI Publicly Announced Wind Turbine - Onshore Not commissioned Wind - Wind View
Ceduna BESS tetrisenergy_nr Development · AI Publicly Announced Storage - Battery Not commissioned Other - Other 25/200 MW · AI View
Ceduna Solar Farm tetrisenergy_nr Development · AI Publicly Announced Solar PV - Fixed Not commissioned Solar - Solar 200 MW · AI View
Ceduna Wind Farm tetrisenergy_nr Development · AI Publicly Announced Wind Turbine - Onshore Not commissioned Wind - Wind 400 MW · AI View
Central Para Wind Farm (KCI) Macleay Ventures Pty Ltd. Development · AI Publicly Announced Wind Turbine - Onshore Not commissioned Wind - Wind 399 MW · AI View
Central West Pumped Hydro ATCO Australia Pumped Hydro Pty Ltd Development · AI Publicly Announced Hydro - Dam Not commissioned Hydro - Water 325 MW · AI View
Cethana Pumped Hydro Option Hydro-Electric Corporation Development · AI Publicly Announced Storage - Pumped hydro Not commissioned Hydro - Water 750/15000 MW · AI View
Chances Plain Solar Farm juwi Renewable Energy Pty Ltd Development · AI Publicly Announced Solar PV - Single axis tracking Not commissioned Solar - Solar 98 MW · AI View
Chinchilla Solar Farm First Solar Australia Pty Ltd Development · AI Publicly Announced Solar PV - Single axis tracking Not commissioned Solar - Solar 113 MW · AI View
Chipping Norton Waste to Energy Benedict Indistries P/L Development · AI Publicly Announced Turbine - Steam Sub Critical Not commissioned Other - Other 8 MW · AI View
Cimitiere Plains Solar Farm Sun Spot 9 Pty Ltd Development · AI Publicly Announced Solar PV - Fixed Not commissioned Solar - Solar 288 MW · AI View
Clarke Creek 2 BESS - KCI Isaac Wind and Solar Energy Pty Ltd Development · AI Publicly Announced Storage - Battery Not commissioned Other - Other View
Clarke Creek Wind Farm Stage 2 Squadron Energy Services Pty Ltd Development · AI Publicly Announced Wind Turbine - Onshore Not commissioned Wind - Wind 696 MW · AI View
Clements Gap - BESS Pacific Hydro Clements Gap Pty Ltd Development Committed Storage - Battery Not commissioned Other - Other 60/120 MW May 2026 View
Cobbora BESS Pacific Partnerships Development · AI Publicly Announced Storage - Battery Not commissioned Other - Other 521/800 MW · AI View
Cobbora Solar Farm pacificp_NR Development · AI Publicly Announced Solar PV - Fixed Not commissioned Solar - Solar 1000 MW · AI View
Cobden BESS - Quintas Cobden BESS Pty Ltd Development · AI Publicly Announced Storage - Battery Not commissioned Other - Other 60/240 MW · AI Dec 2025 View
Coleambally BESS Coleambally BESS Trust Development · AI Publicly Announced Storage - Battery Not commissioned Other - Other 100/400 MW · AI View
Collinsville Coal Fired Power Station Project - KCI Shine Energy Development · AI Publicly Announced Other - Other Not commissioned Fossil - Black Coal 990 MW · AI View
Collinsville Green Energy Hub COLLINSVILLE GREEN ENERGY HUB PTY LTD Development Publicly Announced Wind Turbine - Onshore Not commissioned Wind - Wind View
Collinsville North Battery Project TBSOL Development · AI Publicly Announced Storage - Battery Not commissioned Other - Other 100/100 MW · AI Dec 2026 View
Colosseum Solar Farm Global Power Generation Australia Pty Ltd Development Publicly Announced Solar PV - Fixed Not commissioned Solar - Solar View
Columboola BESS Columboola BESS Nominees Pty Ltd Development · AI Publicly Announced Storage - Battery Not commissioned Other - Other View
Columboola BESS - KCI StorEnergy P/L Development · AI Publicly Announced Storage - Battery Not commissioned Other - Other 400 MW · AI View
Comet Energy Park Comet Energy Pty Ltd Development · AI Publicly Announced Storage - Battery Not commissioned Other - Other 120/800 MW · AI View
Comet Park BESS - KCI Samsung C&T Renewable Energy Australia Pty Ltd. Development · AI Publicly Announced Storage - Battery Not commissioned Other - Other 189/600 MW · AI View
Connewarren BESS Akaysha Energy Pty Ltd Development · AI Publicly Announced Storage - Battery Not commissioned Other - Other View
Conroys Gap WF - KCI Waldren Construction Pty Ltd. Development · AI Publicly Announced Wind Turbine - Onshore Not commissioned Wind - Wind 30 MW · AI View
Cooba Solar Farm - KCI Venn Energy Pty Ltd / Cooba Solar Project Pty Ltd Development · AI Publicly Announced Solar PV - Single axis tracking Not commissioned Solar - Solar 319 MW · AI View
Cooma Hybrid BESS and Solar Farm (ACEN) ACEN RENEWABLES Development · AI Publicly Announced Storage - Battery Not commissioned Other - Other Jul 2028 View
Cooma Hybrid BESS and Solar Farm (ACEN) ACEN RENEWABLES Development · AI Publicly Announced Solar PV - Fixed Not commissioned Solar - Solar 100 MW · AI Mar 2028 View
Cooma Solar And BESS (ACEN) ACEN RENEWABLES Development Publicly Announced Solar PV - Single axis tracking Not commissioned Solar - Solar View
Cooma Solar And BESS (ACEN) ACEN RENEWABLES Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Cooma Solar Farm (Lightsource) Lightsource Development Services Australia Pty Ltd Development · AI Publicly Announced Solar PV - Fixed Not commissioned Solar - Solar 100 MW · AI View
Cooroy BESS Enervest Operations Pty Ltd Development · AI Publicly Announced Storage - Battery Not commissioned Solar - Solar 100/400 MW · AI View
Coppabella Wind Farm Coppabella Wind Farm Pty Ltd Development · AI Anticipated Wind Turbine - Onshore Not commissioned Wind - Wind COPBEL 290 MW · AI Sep 2027 View
Corop BESS Leeson Solar Pty Ltd. Development · AI Publicly Announced Storage - Battery Not commissioned Other - Other 400 MW · AI View
Corop Solar Farm Leeson Solar Pty Ltd. Development · AI Publicly Announced Solar PV - Fixed Not commissioned Solar - Solar View
Cranbourne BESS (Macquarie) Macquarie Corporate Holdings Pty Ltd Development · AI Publicly Announced Storage - Battery Not commissioned Other - Other 150/300 MW · AI View
Cross Roads Energy Solar Farm - KCI Crossroads Energy Pty Ltd Development · AI Publicly Announced Solar PV - Fixed Not commissioned Solar - Solar 650 MW · AI View
Croydon Hybrid Facility - Solar And BESS ACEnergy Pty Ltd Development Publicly Announced Solar PV - Fixed Not commissioned Solar - Solar View
Croydon Hybrid Facility - Solar And BESS ACEnergy Pty Ltd Development Publicly Announced Storage - Battery Not commissioned Solar - Solar View
Culcairn Solar Farm Culcairn Solar Farm Pty Ltd as trustee for Culcairn Solar Farm Trust Operational · AI Committed Solar PV - Single axis tracking Not commissioned Solar - Solar CUSF1 350 MW Aug 2025 View
Cultana Solar Farm Cultana Solar Project Company Pty Ltd as trustee for the Cultana Solar Farm Trust Development · AI Publicly Announced Solar PV - Single axis tracking Not commissioned Solar - Solar 357 MW · AI Dec 2029 View
Dalby Solar Farm Dalby Asset Trust Development · AI Publicly Announced Solar PV - Fixed Not commissioned Solar - Solar 5 MW · AI View
Dalvui BESS Tilt Renewables Australia Pty Ltd Development · AI Publicly Announced Storage - Battery Not commissioned Other - Other 250/500 MW · AI View
Dapper Solar Farm BORAL Development · AI Publicly Announced Solar PV - Single axis tracking Not commissioned Solar - Solar 4 MW · AI View
Darling Downs Battery BORAL Development · AI Publicly Announced Storage - Battery Not commissioned Other - Other 250/500 MW · AI Dec 2026 View
Darling Downs BESS (APA) APA Group Development · AI Publicly Announced Storage - Battery Not commissioned Other - Other 200/800 MW · AI View
Darling Downs Power Station 2 Origin Energy Development Publicly Announced Turbine - OCGT Not commissioned Geothermal - Other View
Darlington Wind Farm - GPG globalpower-generation_NR Development · AI Publicly Announced Wind Turbine - Onshore Not commissioned Wind - Wind View
Darnum BESS samsung_NR Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Daroobalgie Solar Farm Pacific Hydro Australia Developments Pty Ltd Development · AI Publicly Announced Solar PV - Single axis tracking Not commissioned Solar - Solar 100 MW · AI Dec 2032 View
Davenport BESS Green Gold Energy Pty Ltd Development · AI Publicly Announced Storage - Battery Not commissioned Other - Other 270/540 MW · AI View
Dawson Wind Farm Highland Energy Australia Pty Ltd Development · AI Publicly Announced Wind Turbine - Onshore Not commissioned Wind - Wind 560 MW · AI View
Deal 1 (West) Off Shore Wind Farm BayWa r.e. Australia Offshore Wind Projects 1 Pty Ltd Development Publicly Announced Wind Turbine - Offshore Not commissioned Wind - Wind View
Deal 2 (East) Off Shore Wind Farm BayWa r.e. Australia Offshore Wind Projects 2 Pty Ltd Development Publicly Announced Wind Turbine - Offshore Not commissioned Wind - Wind View
Deargee Solar And BESS ACEN Renewables Development Publicly Announced Solar PV - Single axis tracking Not commissioned Solar - Solar View
Deargee Solar And BESS ACEN Renewables Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Dederang BESS Mint Renewables Development · AI Publicly Announced Storage - Battery Not commissioned Other - Other 200/400 MW · AI View
Deepwater BESS Ib vogt Development Australia Pty Ltd Development · AI Publicly Announced Storage - Battery Not commissioned Other - Other View
Deepwater Solar Farm Ib vogt Development Australia Pty Ltd Development · AI Publicly Announced Solar PV - Fixed Not commissioned Solar - Solar View
Delburn Wind Farm Delburn Wind Farm Pty Ltd Development · AI Publicly Announced Wind Turbine - Onshore Not commissioned Wind - Wind 218 MW · AI View
Deniliquin BESS - Storage - KCI Enervest Pty Ltd Development · AI Publicly Announced Storage - Battery Not commissioned Other - Other 150 MW · AI View
Deniliquin East BESS BESS Arctic Pty Ltd Development · AI Publicly Announced Storage - Battery Not commissioned Other - Other 100/200 MW · AI Mar 2026 View
Denman BESS - KCI NEMMCOM Renewables Australia Developments Pty Ltd Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Derby Solar Farm & BESS DERBY SOLAR PROJECT PTY LTD Development · AI Publicly Announced Storage - Battery Not commissioned Solar - Solar 95/110 MW · AI Sep 2027 View
Derby Solar Farm & BESS DERBY SOLAR PROJECT PTY LTD Development · AI Anticipated Solar PV - Single axis tracking Not commissioned Solar - Solar 95 MW · AI Sep 2027 View
Derwent Valley Wind Farm West Coast Renewable Energy Development · AI Publicly Announced Wind Turbine - Onshore Not commissioned Wind - Wind 150 MW · AI View
Devlins Bridge Battery Storage Devlins Bridge Wind Farm Holdco Pty Ltd Development · AI Publicly Announced Storage - Battery Not commissioned Wind - Wind 600 MW · AI View
Devlins Wind Farm Devlins Bridge Wind Farm Holdco Pty Ltd Development · AI Publicly Announced Wind Turbine - Onshore Not commissioned Wind - Wind 663 MW · AI View
Dinawan Energy Hub Spark Renewables Pty Ltd Development · AI Publicly Announced Storage - Battery Not commissioned Other - Other Mar 2031 View
Dinawan Energy Hub Spark Renewables Pty Ltd Development · AI Publicly Announced Solar PV - Single axis tracking Not commissioned Solar - Solar 300 MW · AI Mar 2031 View
Dinawan Energy Hub Spark Renewables Pty Ltd Development · AI Publicly Announced Wind Turbine - Onshore Not commissioned Wind - Wind 403 MW · AI Jun 2031 View
Dingo Solar Farm ESCO Pacific Development · AI Publicly Announced Solar PV - Fixed Not commissioned Solar - Solar 85 MW · AI View
Direk BESS BESS DIREK PTY LTD Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Doreen BESS BZ Renewables Holdings Pty Ltd Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Dugald River Wind Faarm MMG Development Publicly Announced Wind Turbine - Onshore Not commissioned Wind - Wind View
Dumaresq Solar Farm Dumaresq Solar Farm Pty Limited Development Publicly Announced Solar PV - Single axis tracking Not commissioned Solar - Solar View
Dunedoo Solar Farm ib vogt GmbH / Sun Spot 4 Development Publicly Announced Solar PV - Single axis tracking Not commissioned Solar - Solar View
Dungowan 3,000 MWH PHES Dungowan Pumped Hydro Pty Ltd Development Publicly Announced Storage - Pumped hydro Not commissioned Hydro - Water Mar 2030 View
Dunmore BESS Samsung C&T Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Dunmore Solar Farm Samsung C&T Development Publicly Announced Solar PV - Single axis tracking Not commissioned Solar - Solar View
East End BESS TE H2 Australia Pty Ltd Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Eastern Rise Offshore Wind Eastern Rise OWP Project Pty Ltd Development Publicly Announced Wind Turbine - Offshore Not commissioned Wind - Wind View
Ebor BESS Bridge Energy Pty Ltd Development · AI Publicly Announced Storage - Battery Not commissioned Other - Other 100/870 MW · AI View
Edderton Hybrid Faciility - Solar Voltere Pty Ltd. Development Publicly Announced Solar PV - Fixed Not commissioned Solar - Solar View
Edderton Hybrid Facility - BESS Voltere Pty Ltd. Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Eden Offshore Wind Farm OceanEx Energy Development Publicly Announced Wind Turbine - Offshore Not commissioned Wind - Wind Jan 2034 View
EIWA Gin Gin Renewable Energy Park EIWA Gin Gin Renewable Energy Park Pty Ltd Development Publicly Announced Solar PV - Single axis tracking Not commissioned Solar - Solar View
EIWA Gin Gin Renewable Energy Park EIWA Gin Gin Renewable Energy Park Pty Ltd Development Publicly Announced Storage - Battery Not commissioned Solar - Solar View
EIWA Golden Fleece Renewable Energy Park EIWA Golden Fleece Renewable Energy Park Pty Ltd Development Publicly Announced Solar PV - Single axis tracking Not commissioned Solar - Solar View
EIWA Golden Fleece Renewable Energy Park EIWA Golden Fleece Renewable Energy Park Pty Ltd Development Publicly Announced Storage - Battery Not commissioned Solar - Solar View
EIWA Richmond Valley BESS EIWA RICHMOND VALLEY BESS PTY LTD Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Elai Genesis Battery Storage System Elai Energy Pty Ltd Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Elaine BESS Elaine ProjectCo Pty Ltd Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Elaine Solar Farm & BESS Hybrid Elgin Energy Pty Ltd Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Elaine Solar Farm & BESS Hybrid Elgin Energy Pty Ltd Development Publicly Announced Solar PV - Fixed Not commissioned Solar - Solar View
Emeroo BESS Potentia Energy Group Pty Ltd Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Emu Park BESS M Renweables Australia Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Emu Park Solar Farm M Renweables Australia Development Publicly Announced Solar PV - Fixed Not commissioned Solar - Solar View
Eraring Big Battery Origin Energy Electricity Limited Development Anticipated Storage - Battery Not commissioned Other - Other Apr 2027 View
Eurimbula Hybrid Facility - Battery Storage unitedgreen_NR Development Publicly Announced Storage - Battery Not commissioned Other - Other Jun 2026 View
Eurimbula Solar Farm Unitedgreen_NR Development Publicly Announced Solar PV - Single axis tracking Not commissioned Solar - Solar View
Euston Wind Farm - KCI Balranald Wind Farm Pty Ltd Development Publicly Announced Wind Turbine - Onshore Not commissioned Wind - Wind View
Everleigh Solar Farm & BESS - KCI Everleigh Solar Park Pty Ltd Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Everleigh Solar Farm & BESS - KCI Everleigh Solar Park Pty Ltd Development Publicly Announced Solar PV - Fixed Not commissioned Solar - Solar View
Fletcher Creek Wind Farm & BESS Private Energy Partners Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Fletcher Creek Wind Farm & BESS Private Energy Partners Development Publicly Announced Wind Turbine - Onshore Not commissioned Wind - Wind View
FNQ BESS 1 (KCI) Solquartz Holdings Pty Ltd Development Publicly Announced Storage - Battery Not commissioned Other - Other View
FNQ BESS 2 (KCI) Solquartz Holdings Pty Ltd Development Publicly Announced Storage - Battery Not commissioned Other - Other View
FNQ BESS 3 (KCI) Solquartz Holdings Pty Ltd Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Forbes Solar Farm & BESS Forbes Solar Farm Pty Ltd ATF Forbes Genesis Project Trust Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Forbes Solar Farm & BESS Forbes Solar Farm Pty Ltd ATF Forbes Genesis Project Trust Development Publicly Announced Solar PV - Single axis tracking Not commissioned Solar - Solar View
Forest Glen Solar Farm X-Elio Roma Hub Solar Farm Pty Ltd Development Publicly Announced Solar PV - Single axis tracking Not commissioned Solar - Solar View
Forest Wind Forest Wind Holdings Pty Ltd Development Publicly Announced Wind Turbine - Onshore Not commissioned Wind - Wind View
Forsayth Wind Farm Forsayth Wind Farm Pty Ltd Development Publicly Announced Wind Turbine - Onshore Not commissioned Wind - Wind View
Fosterville SF and BESS FRV Services Australia Development Publicly Announced Storage - Battery Not commissioned Other - Other FTVBESS View
Fosterville SF and BESS FRV Services Australia Development Publicly Announced Solar PV - Single axis tracking Not commissioned Solar - Solar FTVPV View
Fraser Coast Hybrid Plant FRASER COAST SOLAR DEVELOPMENT PTY LTD Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Fraser Coast Hybrid Plant FRASER COAST SOLAR DEVELOPMENT PTY LTD Development Publicly Announced Solar PV - Single axis tracking Not commissioned Solar - Solar View
Frasers Solar Farm Frasers Lane Development Pty Ltd Development Anticipated Solar PV - Single axis tracking Not commissioned Solar - Solar Jun 2027 View
Fulham Solar Farm And BESS Fulham Solar Farm Pty Ltd (ATF Fulham Solar Farm Trust) Development Committed Storage - Battery Not commissioned Solar - Solar 64/128 MW Jan 2028 View
Fulham Solar Farm And BESS Fulham Solar Farm Pty Ltd (ATF Fulham Solar Farm Trust) Development Committed Solar PV - Single axis tracking Not commissioned Solar - Solar 101 MW Jan 2028 View
Ganymirra Solar Power Station Edify Energy Pty Ltd Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Ganymirra Solar Power Station Edify Energy Pty Ltd Development Publicly Announced Solar PV - Single axis tracking Not commissioned Solar - Solar View
Gara BESS ACEnergy Pty Ltd Development Publicly Announced Storage - Battery Not commissioned Other - Other Dec 2027 View
Garoo BESS Greenpulse solar farm and BESS as trustee for Greenpulse Solar Farm & Bess Unit Trust Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Garoo Solar Farm Greenpulse solar farm and BESS as trustee for Greenpulse Solar Farm & Bess Unit Trust Development Publicly Announced Solar PV - Fixed Not commissioned Solar - Solar View
Gawara Baya Wind And BESS UPPER BURDEKIN WIND FARM PTY LTD Development Anticipated Storage - Battery Not commissioned Other - Other GBBATT1 Oct 2028 View
Gawara Baya Wind And BESS UPPER BURDEKIN WIND FARM PTY LTD Development Anticipated Wind Turbine - Onshore Not commissioned Wind - Wind GBWF1 Oct 2028 View
Geelong BESS Elgin EnergyP/L Development Publicly Announced Storage - Battery Not commissioned Other - Other View
George Town BESS - KCI Recurrent Energy Development Publicly Announced Storage - Battery Not commissioned Other - Other View
George Town Wind Farm West Coast Renewables Development Publicly Announced Wind Turbine - Onshore Not commissioned Wind - Wind View
Geranium Plains Solar and BESS Risen Energy (Australia) Pty Ltd Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Geranium Plains Solar and BESS Risen Energy (Australia) Pty Ltd Development Publicly Announced Solar PV - Single axis tracking Not commissioned Solar - Solar View
Gerogery Battery - KCI Elgin Energy Pty Ltd Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Gerogery Solar Farm - KCI Elgin Energy Pty Ltd Development Publicly Announced Solar PV - Fixed Not commissioned Solar - Solar View
Gin Gin BESS Iberdrola Australia Development Pty Limited Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Gippsland Dawn Offshore Wind Project Gippsland Dawn OWP Project Pty Ltd Development Publicly Announced Wind Turbine - Offshore Not commissioned Wind - Wind Dec 2032 View
Glanmire Solar Farm Elgin Energy Pty Ltd Development Anticipated Storage - Battery Not commissioned Other - Other View
Glanmire Solar Farm Elgin Energy Pty Ltd Development Anticipated Solar PV - Single axis tracking Not commissioned Solar - Solar View
Glen Inness BESS - KCI FIrm Power P/L Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Glenbawn Pumped Hydro Project Water NSW Development Publicly Announced Storage - Pumped hydro Not commissioned Hydro - Water View
Glenbrae BESS Acenergy Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Glenellen Solar Farm Glenellen Solar Farm Pty Ltd Development Publicly Announced Solar PV - Fixed Not commissioned Solar - Solar View
Glennis Creek Pumped Hydro Project Water NSW Development Publicly Announced Storage - Pumped hydro Not commissioned Hydro - Water View
Glenrowan BESS Akaysha Energy Pty Ltd Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Glenrowan BESS - Storage - KCI Enervest Pty Ltd Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Glenroy Hybrid Facility - Solar And BESS M Renewables Australia Developments Pty Ltd Development Publicly Announced Solar PV - Fixed Not commissioned Solar - Solar View
Glenroy Hybrid Facility - Solar And BESS M Renewables Australia Developments Pty Ltd Development Publicly Announced Storage - Battery Not commissioned Solar - Solar View
Gnarwarre BESS Facility FRV SA Pty Ltd Development Anticipated Storage - Battery Not commissioned Other - Other Jun 2027 View
Goat Hill Pumped Hydro Altura Group Development Publicly Announced Storage - Pumped hydro Not commissioned Hydro - Water View
Gol Gol Wind Farm Squadron Energy Developments Pty Ltd Development Publicly Announced Wind Turbine - Onshore Not commissioned Wind - Wind View
Golden Plains BESS Tag Energy Australia P/L Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Golden Plains Wind Farm West Golden Plains WF2 Unit Trust Development Committed Wind Turbine - Onshore Not commissioned Wind - Wind 557 MW Feb 2027 View
GoodNight Hybrid Facility - Solar And BESS GoodNight One Pty Ltd Development Publicly Announced Solar PV - Fixed Not commissioned Solar - Solar View
GoodNight Hybrid Facility - Solar And BESS GoodNight One Pty Ltd Development Publicly Announced Storage - Battery Not commissioned Solar - Solar View
Goombi Renewable Energy Hub Tag Energy Australia Pty Ltd Development Publicly Announced Wind Turbine - Onshore Not commissioned Wind - Wind View
Goorambat BESS (Lighthouse) Lightsource Development Services Australia Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Goorambat East Solar Farm (ENGIE) Engie Development Committed Solar PV - Single axis tracking Not commissioned Solar - Solar 250 MW Oct 2026 View
Goulburn River Solar Farm And BESS Goulburn River Fund Pty Ltd Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Goulburn River Solar Farm And BESS Goulburn River Fund Pty Ltd Development Committed Solar PV - Single axis tracking Not commissioned Solar - Solar 588 MW Mar 2027 View
Gould Creek BESS Gould Creek BESS Project Pty Ltd Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Goyder BESS Neoen Australia Pty Ltd Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Goyder North Renewable Energy Facility Neoen Australia Development Publicly Announced Wind Turbine - Onshore Not commissioned Wind - Wind Dec 2028 View
Grahamvale BESS - KCI AE BESS 3 Pty Ltd as Trustee for AE BESS 3 Unit Trust Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Granite Hills Wind Farm Akuo Energy Development Publicly Announced Wind Turbine - Onshore Not commissioned Wind - Wind View
Great Eastern Offshore Wind - KCI GIG Australian Offshore Wind Energy Holdings Pty Ltd Development Publicly Announced Wind Turbine - Offshore Not commissioned Wind - Wind View
Great Lakes Battery Neoen Australia Pty Ltd Development Publicly Announced Storage - Battery Not commissioned Other - Other Dec 2028 View
Great Western Battery Project Neoen Australia Pty Ltd Development Publicly Announced Storage - Battery Not commissioned Other - Other Dec 2028 View
Greater Southern Offshore Wind - KCI Greater Southern Offshore Wind Farm Project Co Pty Ltd Development Publicly Announced Wind Turbine - Offshore Not commissioned Wind - Wind View
Green Poly BESS Project (KCI) Solquartz Holdings Pty Ltd Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Gregadoo Solar Farm Gregadoo Solar Farm Pty Ltd Development Publicly Announced Solar PV - Fixed Not commissioned Solar - Solar View
Griffith BESS Eku Energy Projects (Australia) Trust Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Grosvenor 2 Waste Coal Mine Gas Power Station EDL Projects Australia Pty Ltd Development Publicly Announced Reciprocating Engine - Spark ignition Not commissioned Fossil - Coal Seam Methane View
Guildford Wind Farm ARK Energy Corporation Pty Ltd Development Publicly Announced Wind Turbine - Onshore Not commissioned Wind - Wind View
Gullen Range Battery Energy System goldwindaustralia_NR Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Gundary Solar Farm - KCI Lightsource Development Services Australia Pty Ltd Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Gundary Solar Farm - KCI Lightsource Development Services Australia Pty Ltd Development Publicly Announced Solar PV - Fixed Not commissioned Solar - Solar View
Gunnedah BESS Gunnedah Battery Subco Pty Ltd Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Gunnedah East BESS (Green Leap) - KCI Green Leap P/L Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Gunning Solar Farm (Canadian) Canadian Solar Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Gunning Solar Farm (Canadian) Canadian Solar Development Publicly Announced Solar PV - Fixed Not commissioned Solar - Solar View
Gunsynd Solar Farm ARP Development Publicly Announced Solar PV - Fixed Not commissioned Solar - Solar Dec 2022 View
Gurambilbarra Energy Hub 365 Future Energy Development Publicly Announced Other - Other Not commissioned Other - Other View
Guthrie's Gap Solar Farm Edify Energy Pty Ltd Development Publicly Announced Solar PV - Fixed Not commissioned Solar - Solar View
Hallett BESS EnergyAustralia Hallett Pty Ltd Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Halys BESS - Iberdrola IBERDROLA AUSTRALIA DEVELOPMENT PTY LIMITED Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Halys BESS (Akaysha) Halys BESS ProjectCo Pty Ltd Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Halys BESS (X-Elio) X-Elio Australia Pty Ltd Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Halys Hybrid Facility - BESS Elements Green Australia Pty Ltd Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Halys Hybrid Facility - Solar Elements Green Australia Pty Ltd Development Publicly Announced Solar PV - Fixed Not commissioned Solar - Solar View
Halys to Chinchilla DCA Battery - KCI UGL Pty Ltd Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Hanworth Battery Hanworth BESS Pty Ltd Development Publicly Announced Storage - Battery Not commissioned Solar - Solar View
Hargraves BESS Tilt Renewables DevCo Pty Ltd as the trustee for Development Hold Trust Development Publicly Announced Storage - Battery Not commissioned Wind - Wind View
Hargraves Wind Farm Tilt Renewables DevCo Pty Ltd as the trustee for Development Hold Trust Development Publicly Announced Wind Turbine - Onshore Not commissioned Wind - Wind View
Harlin Solar Farm Harlin Solar Pty Ltd Development Publicly Announced Solar PV - Single axis tracking Not commissioned Solar - Solar View
Harlin Solar Farm Harlin Solar Pty Ltd Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Harrami Wind Farm Mainstream Development Publicly Announced Wind Turbine - Onshore Not commissioned Wind - Wind View
Harrogate BESS Enel Green Power Australia Pty Ltd Development Publicly Announced Storage - Battery Not commissioned Other - Other Dec 2028 View
Hastings Generation Site Esso Australia Resources Development Publicly Announced Turbine - OCGT Not commissioned Fossil - N/A View
Haughton BESS Pacific Hydro Haughton Solar Farm Pty Ltd Development Publicly Announced Storage - Battery Not commissioned Other - Other Jan 2028 View
Haughton Solar Farm Stage 2 Pacific Hydro Australia Pty Ltd Development Anticipated Solar PV - Single axis tracking Not commissioned Solar - Solar Jan 2028 View
Haunted Gully BESS - KCI Vena Energy Services (Australia) Pty Ltd Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Hay Sun Farm Plains SF No1 Pty Ltd Development Anticipated Solar PV - Single axis tracking Not commissioned Solar - Solar View
Hazeldean BESS - Storage - KCI Enervest Pty Ltd Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Hazelwood BESS - KCI International Power (Australia) Pty Ltd Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Hazelwood North Solar Farm - KCI Manthos Investments Pty Ltd Development Publicly Announced Solar PV - Fixed Not commissioned Solar - Solar View
Hellyer Wind Farm ARK Energy Corporation Pty Ltd Development Publicly Announced Wind Turbine - Onshore Not commissioned Wind - Wind View
Herries Range Wind Farm Acciona Energy Global Australia Development Publicly Announced Wind Turbine - Onshore Not commissioned Wind - Wind Dec 2030 View
Hexham Wind Prospect WA Pty Ltd Development Publicly Announced Wind Turbine - Onshore Not commissioned Wind - Wind View
Hills of Gold Wind Farm Hills of Gold Wind Farm Pty Ltd Development Publicly Announced Wind Turbine - Onshore Not commissioned Wind - Wind View
Hobart Show Grounds BESS Gravitas Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Hollow Tree Wind Farm Goldwind Australia Development Publicly Announced Wind Turbine - Onshore Not commissioned Wind - Wind View
Holloway - Battery SynCo Global Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Holloway BESS - KCI Bushranger Project Pty Ltd. Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Hookey Creek Hybrid - Solar And BESs - KCI Zen Energy Future Pty Ltd Development Publicly Announced Storage - Battery Not commissioned Solar - Solar Mar 2029 View
Hookey Creek Hybrid - Solar And BESs - KCI Zen Energy Future Pty Ltd Development Publicly Announced Solar PV - Single axis tracking Not commissioned Solar - Solar Mar 2029 View
Hopeland BESS Pacific Partnerships Development Publicly Announced Storage - Battery Not commissioned Other - Other Dec 2026 View
Hopeland Solar Farm Hopeland Solar Farm Pty Ltd as trustee for the Hopeland Solar Farm Trust Development Publicly Announced Solar PV - Fixed Not commissioned Solar - Solar View
Horsham BESS ESCO Solar Farm 7 Trust Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Horsham Solar Farm ESCO SOLAR FARM 7 PTY LTD Development Committed Solar PV - Single axis tracking Not commissioned Solar - Solar 119 MW Dec 2026 View
Hughes Road BESS BayWA r.e Projects Australia Pty Ltd Development Publicly Announced Storage - Battery Not commissioned Other - Other Feb 2028 View
Hume BESS GSP Energy Pty Ltd Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Hume Bess (ARIF) The Trustee for the ARIF Hume BESS Holdings Trust Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Hume North Battery Energy Storage System Infrastructure Capital Services Pty Ltd as trustee for the ARIF Hume BESS Holdings Trust Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Hunter Central Coast Offshore Energy (Wind) Energy Estate Development Publicly Announced Wind Turbine - Offshore Not commissioned Wind - Wind View
Hunter Power Station Snowy Hydro Limited Operational · AI Committed Turbine - OCGT Not commissioned Fossil - Natural Gas Pipeline HUNTER1 375 MW Aug 2025 View
Hunter Power Station Snowy Hydro Limited Operational · AI Committed Turbine - OCGT Not commissioned Fossil - Natural Gas Pipeline HUNTER2 375 MW Sep 2025 View
Ilford Green Energy Hub brightnightpower_NR Development Publicly Announced Storage - Battery Not commissioned Solar - Solar Apr 2029 View
Ilford Green Energy Hub brightnightpower_NR Development Publicly Announced Wind Turbine - Onshore Not commissioned Wind - Wind Oct 2029 View
Ilford Green Energy Hub brightnightpower_NR Development Publicly Announced Solar PV - Single axis tracking Not commissioned Solar - Solar Apr 2029 View
Illawarra Offshore Wind Farm OceanEx Energy Development Publicly Announced Wind Turbine - Offshore Not commissioned Wind - Wind Jan 2031 View
Innes Park Solar Farm Enerparc Australia Pty Ltd Development Publicly Announced Solar PV - Single axis tracking Not commissioned Solar - Solar Jul 2026 View
Inverell Battery Energy Storage System Inverell BESS Development Pty Ltd Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Inverleigh Solar Farm TBA Development Publicly Announced Solar PV - Fixed Not commissioned Solar - Solar View
Inverleigh Wind Farm Inverleigh Wind Farm Pty Ltd Development Anticipated Wind Turbine - Onshore Not commissioned Wind - Wind View
Ironbark Power Station 20MW Expansion Carbon Logica Pty Ltd Development Publicly Announced Turbine - Other Not commissioned Other - Other View
Ivanhoe BESS Ivanhoe Coal Pty Ltd Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Jackson North BESS Equis Energy (Australia) Projects (Ngumi 6) Pty Ltd as trustee for the Equis Energy(Australia) Ngumi 6 Asset Trust Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Jeremiah Wind Farm Squadron Energy Services Pty Ltd Development Publicly Announced Wind Turbine - Onshore Not commissioned Wind - Wind View
Jindera BESS - Storage - KCI BESS Atlantic Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Jindera Solar Farm Jindera Solar Farm Pty Ltd Development Publicly Announced Solar PV - Fixed Not commissioned Solar - Solar View
Joel BESS ACEnergy Pty Ltd Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Junction Rivers Wind And BESS Junction Rivers Pty Ltd Development Publicly Announced Storage - Battery Not commissioned Other - Other JRBATT1 Apr 2031 View
Junction Rivers Wind And BESS Junction Rivers Pty Ltd Development Publicly Announced Wind Turbine - Onshore Not commissioned Wind - Wind JRWF1 Apr 2031 View
Juno BESS Tilt Renewables Australia Pty Ltd Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Juno Wind Farm Tilt Renewables Australia Pty Ltd Development Publicly Announced Wind Turbine - Onshore Not commissioned Wind - Wind View
Kaloya Moa Standalone BESS Samsung C&T Renewable Energy Australia Pty Ltd Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Kangaroo Hills Wind Farm Origin Energy Pty Ltd Development Publicly Announced Storage - Battery Not commissioned Wind - Wind Oct 2028 View
Kangaroo Hills Wind Farm Origin Energy Pty Ltd Development Publicly Announced Wind Turbine - Onshore Not commissioned Wind - Wind Oct 2028 View
Kangaroo Valley BESS FIrm Power P/L Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Karara BESS - KCI ACCIONA Energy Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Kariboe Wind Farm Kariboe Wind Farm Pty Ltd Development Publicly Announced Wind Turbine - Onshore Not commissioned Wind - Wind View
Karma Wind Farm - KCI NEMMCOCI Karma Pty Ltd as trustee for the CI Karma Trust Development Publicly Announced Wind Turbine - Onshore Not commissioned Wind - Wind View
Kelsey Creek Solar Farm tetrisenergy_nr Development Publicly Announced Solar PV - Fixed Not commissioned Solar - Solar View
Kelsey Creek Solar Farm_SS tetrisenergy_nr Development Publicly Announced Solar PV - Fixed Not commissioned Solar - Solar View
Kentbruck Green Power Hub Neoen Australia Pty Ltd Development Publicly Announced Wind Turbine - Onshore Not commissioned Wind - Wind Jun 2030 View
Kerang BESS Kerang Bess Pty Ltd Development Publicly Announced Storage - Battery Not commissioned Other - Other Mar 2027 View
Kerang BESS (BSR) British Solar Renewables Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Kerang Hybrid Kerang Power Pty Ltd Development Publicly Announced Storage - Battery Not commissioned Other - Other Sep 2027 View
Kerang Hybrid Kerang Power Pty Ltd Development Publicly Announced Solar PV - Single axis tracking Not commissioned Solar - Solar Dec 2027 View
Kerrawary Power Station Origin Energy Development Publicly Announced Turbine - OCGT Not commissioned Fossil - Natural Gas Pipeline Dec 2029 View
Kerrs Creek Wind Farm RES Australia Pty Ltd Development Publicly Announced Wind Turbine - Onshore Not commissioned Wind - Wind Mar 2030 View
Kiamal BESS TotalEnergies Renewables Australia Development Publicly Announced Storage - Battery Not commissioned Other - Other KIAMBE Jul 2028 View
Kidston Pumped Storage Hydro Project 250MW Genex Power Ltd Development Committed Storage - Pumped hydro Not commissioned Hydro - Water 250/2000 MW Jan 2026 View
Kidston Solar Project Phase Two 270MW Genex Power Limited Development Publicly Announced Solar PV - Fixed Not commissioned Solar - Solar View
Kidston Stage 3 Wind Project Genex Power Limited Development Publicly Announced Wind Turbine - Onshore Not commissioned Wind - Wind View
KIEWA VALLEY BESS KIEWA VALLEY BESS NOMINEES PTY LTD on behalf of KIEWA VALLEY BESS Trust Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Kincraig BESS acepower_NR Development Publicly Announced Storage - Battery Not commissioned Other - Other Dec 2028 View
Kingfisher Solar Storage - Solar Lyon Solar Development Publicly Announced Solar PV - Single axis tracking Not commissioned Solar - Solar View
Kingfisher Solar Storage - Storage Lyon Solar Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Kings Plain Wind Farm Enerfin Energy Services Pty Ltd. Development Publicly Announced Wind Turbine - Onshore Not commissioned Wind - Wind View
Kingswood BESS Iberdrola Australia Development Pty Ltd. Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Koberinga Solar Farm ESCO Pacific Development Publicly Announced Solar PV - Fixed Not commissioned Solar - Solar View
Koolunga Battery Energy Storage System 1 Equis Energy (Australia) Projects (Ngumi 6) Pty Ltd as trustee for the Equis Energy (Australia) Ngumi 6 Asset Trust Development Publicly Announced Storage - Battery Not commissioned Other - Other Jun 2026 View
Koolunga Battery Energy Storage System 2 Equis Energy (Australia) Projects (Ngumi 6) Pty Ltd as trustee for the Equis Energy (Australia) Ngumi 6 Asset Trust Development Publicly Announced Storage - Battery Not commissioned Other - Other Jun 2026 View
Koorakee Wind Farm Squadron Energy Services Pty Ltd Development Publicly Announced Wind Turbine - Onshore Not commissioned Wind - Wind View
Koorangie BESS Stage 2 Edify Energy Pty Ltd Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Koorangie Energy Storage System Shell Energy Operational · AI Committed Storage - Battery Not commissioned Other - Other KESSB1 185/370 MW Jun 2025 View
Koyuga Nanneella Wind Farm FERA Australia Pty Ltd Development Publicly Announced Wind Turbine - Onshore Not commissioned Wind - Wind View
Kurri Kurri Battery CEP Energy Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Kut Wut Brataualung Kut-Wut Brataualung Pty Ltd as trustee for the Kut-Wut Brataualung Trust Development Publicly Announced Wind Turbine - Offshore Not commissioned Wind - Wind Dec 2035 View
Lake Lyell Pumped Hydro EnergyAustralia NSW Pty Ltd Development Publicly Announced Storage - Pumped hydro Not commissioned Hydro - Water Dec 2030 View
Lake Victoria Energy Park - KCI Lake Victoria Wind Farm Pty Ltd atf Lake Victoria Wind Farm unit trust Development Publicly Announced Wind Turbine - Onshore Not commissioned Wind - Wind View
Lake Victoria Energy Park - KCI Lake Victoria Wind Farm Pty Ltd atf Lake Victoria Wind Farm unit trust Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Lakeland Wind Farm Lakeland Wind Farm Pty Ltd Development Publicly Announced Wind Turbine - Onshore Not commissioned Wind - Wind Jun 2028 View
Lambing Gully BESS tetrisenergy_nr Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Lambing Gully Wind Farm tetrisenergy_nr Development Publicly Announced Wind Turbine - Onshore Not commissioned Wind - Wind View
Lambruk Solar Project Venn Energy Pty Ltd / Acacia Solar Project Pty Ltd. Development Publicly Announced Solar PV - Single axis tracking Not commissioned Solar - Solar View
Lancaster Solar Farm Lancaster Solar Farm Pty Ltd as trustee for the Lancaster Solar Farm Trust Development Anticipated Solar PV - Single axis tracking Not commissioned Solar - Solar View
Latrobe Solar Farm Canadian Solar (Australia) Pty Ltd Development Publicly Announced Solar PV - Single axis tracking Not commissioned Solar - Solar View
LaTrobe Valley BESS Tilt Renewables Australia Pty Ltd Commissioning · AI Committed Storage - Battery Not commissioned Other - Other LVES1 100/200 MW Jul 2025 View
Learmonth BESS The Trustee for Learmonth BESS Holdings Unit Trust Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Leigh Creek Energy Project Leigh Creek Energy Development Publicly Announced Turbine - Steam Sub Critical Not commissioned Other - Other View
Lerida BESS Elgin EnergyP/L Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Lerida Solar Farm Elgin EnergyP/L Development Publicly Announced Solar PV - Fixed Not commissioned Solar - Solar View
Liddell BESS MACQGEN Development Committed* Storage - Battery Not commissioned Other - Other 500/1000 MW Feb 2026 View
Lilyvale BESS - KCI Acen Australia Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Limondale BESS LIMONDALE BATTERY PTY. LTD Development Committed Storage - Battery Not commissioned Other - Other 50/400 MW Dec 2025 View
LINCOLN GAP BESSBDU Lincoln Gap Wind Farm (Operations) Pty Ltd Operational · AI Anticipated Storage - Battery Not commissioned Other - Other LGAPBS1 10/10 MW · AI Jun 2025 View
Lincoln Gap Wind Farm stage 3 Lincoln Gap 3 Wind Farm Pty Ltd Development Publicly Announced Wind Turbine - Onshore Not commissioned Wind - Wind View
Lindley BESS NEMMCO Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Lindsay Gap BESS Acciona Energy Australia Global Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Lionsgate Battery CEP Energy Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Little River BESS ACEnergy Pty Ltd Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Little River Solar Farm - KCI Clean Technology Partners Development Publicly Announced Solar PV - Fixed Not commissioned Solar - Solar View
Liverpool Range Wind Farm Liverpool Range Wind Farm Pty Ltd Development Publicly Announced Wind Turbine - Onshore Not commissioned Wind - Wind View
Lockhart Hybrid Facility - Battery Better Energy Technology Pty Ltd Development Committed Storage - Battery Not commissioned Solar - Solar 10/20 MW Jun 2026 View
Lockhart Hybrid Facility - Solar Better Energy Technology Pty Ltd Development Committed Solar PV - Single axis tracking Not commissioned Solar - Solar 10 MW Jun 2026 View
Lockyer BESS - KCI Lockyer Energy Management Pty Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Lockyer Valley Energy Project Lockyer Energy Management Pty Ltd Development Publicly Announced Storage - Battery Not commissioned Solar - Solar View
Lockyer Valley Energy Project Lockyer Energy Management Pty Ltd Development Anticipated Turbine - OCGT Not commissioned Fossil - Natural Gas Feb 2028 View
Lotus Creek Wind Farm CS ENERGY Development Committed Wind Turbine - Onshore Not commissioned Wind - Wind 285 MW Dec 2027 View
Lovely Banks Renewable Energy Hub - KCI Syncline Energy Pty Ltd Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Lower Wonga BESS Equis Energy (Australia) Projects (Ngumi 7) Pty Ltd as trustee for the Equis Energy(Australia) Ngumi 7 Asset Trust Development Publicly Announced Storage - Battery Not commissioned Other - Other May 2026 View
Lower Wonga Solar Farm (LightsourceBP) Lower Wonga Solar Farm Pty Ltd Development Publicly Announced Solar PV - Single axis tracking Not commissioned Solar - Solar View
Loy Yang B Power Station - BESS Stage 1 - KCI Alinta Energy Clean Energy Development Pty Ltd Development Publicly Announced Storage - Battery Not commissioned Other - Other View
LST02 Data Hall BESS Firmus Grid P/L Development Publicly Announced Storage - Battery Not commissioned Other - Other View
LYA BESS LOYYANGA Development Publicly Announced Storage - Battery Not commissioned Other - Other View
MacIntyre Wind Farm Macintyre Windfarm Pty Ltd and Arc Energy Macintyre Pty Ltd Commissioning · AI Committed* Wind Turbine - Onshore Not commissioned Wind - Wind MCINTYR1 923 MW Nov 2025 View
Mackenzie River BESS BSR EPC P/L Development Publicly Announced Storage - Battery Not commissioned Solar - Solar View
Mackenzie River Solar Farm BSR EPC P/L Development Publicly Announced Solar PV - Fixed Not commissioned Solar - Solar View
Madeline Downs BESS AGL Energy Limited Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Maison Dieu BESS Graviatas Now Pty Ltd Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Maison Dieu Solar Farm Terrain Solar Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Maison Dieu Solar Farm Terrain Solar Development Publicly Announced Solar PV - Fixed Not commissioned Solar - Solar View
Majors Creek Solar And BESS Edify Energy Pty Ltd Development Publicly Announced Solar PV - Single axis tracking Not commissioned Solar - Solar View
Majors Creek Solar And BESS Edify Energy Pty Ltd Development Publicly Announced Storage - Battery Not commissioned Other - Other Oct 2028 View
Mallee Wind Farm Mallee Wind PTY LTD Development Publicly Announced Storage - Battery Not commissioned Wind - Wind Mar 2028 View
Mallee Wind Farm Mallee Wind PTY LTD Development Publicly Announced Wind Turbine - Onshore Not commissioned Wind - Wind Mar 2028 View
Malunga Nine Mile BESS - KCI Green Switch Energy Pty Ltd Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Mandurama BESS tetrisenergy_nr Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Mandurama Wind Farm tetrisenergy_nr Development Publicly Announced Wind Turbine - Onshore Not commissioned Wind - Wind View
Mangoplah BESS - KCI Samsung C&T Renewable Energy Australia Pty Ltd. Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Mannum BESS Mannum Stage 2 Battery SubCo Pty Ltd as Trustee for The Mannum Stage 2 Battery Unit Trust Development Anticipated Storage - Battery Not commissioned Other - Other Sep 2025 View
Mansfield Solar Farm - Solar - KCI Biscon Energy Australia Pty Ltd Development Publicly Announced Solar PV - Fixed Not commissioned Solar - Solar View
Mansfield Solar Farm - Storage - KCI Biscon Energy Australia Pty Ltd Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Maranbah Solar Farm EEW ECO ENERGY WORLD PTY LTD Development Publicly Announced Solar PV - Single axis tracking Not commissioned Solar - Solar View
Marcollat Energy Hub (Stage 1) BE PRO MC1 PTY LTD Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Marcollat Energy Hub (stage 2) Bison Energy Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Markaranka Solar and Storage Monash Energy Pty Ltd Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Markaranka Solar and Storage Monash Energy Pty Ltd Development Publicly Announced Solar PV - Single axis tracking Not commissioned Solar - Solar View
Marmadua Wind Farm (KCI) Cubico Sustainable Investments Australia Pty Ltd Development Publicly Announced Wind Turbine - Onshore Not commissioned Wind - Wind View
Marulan - OCGT/CCGT EnergyAustralia Marulan Pty Ltd Development Publicly Announced Turbine - Other Not commissioned Fossil - Natural Gas Pipeline View
Marulan BESS Ratch Australia Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Marulan Solar Farm Marulan Solar Farm Pty Ltd Development Publicly Announced Solar PV - Dual axis tracking Not commissioned Solar - Solar Dec 2025 View
Maryvale Energy From Waste Maryvale Energy from Waste Project Company Development Publicly Announced Turbine - Steam Super Critical Not commissioned Renewable Biomass or Waste - Municipal Solid Waste View
Maryvale Solar and Energy Storage System Maryvale Solar Farm Pty Ltd Development Anticipated Storage - Battery Not commissioned Other - Other Feb 2027 View
Maryvale Solar and Energy Storage System Maryvale Solar Farm Pty Ltd Development Anticipated Solar PV - Single axis tracking Not commissioned Solar - Solar Feb 2027 View
Maules Creek BESS FRV Services Australia Pty Ltd Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Maules Creek Solar Farm FRV Services Australia Pty Ltd Development Publicly Announced Solar PV - Fixed Not commissioned Solar - Solar View
Maxwell Downs Solar Farm - KCI X-Elio Holbrook Trust Development Publicly Announced Solar PV - Single axis tracking Not commissioned Solar - Solar View
McCullys Gap BESS BW ESS Development Publicly Announced Storage - Battery Not commissioned Other - Other View
McMahons Reef Solar Farm Enerparc Australia Pty Ltd Development Publicly Announced Solar PV - Single axis tracking Not commissioned Solar - Solar View
Meadow Creek Solar Farm - KCI Clean Technologies Partners Development Publicly Announced Solar PV - Fixed Not commissioned Solar - Solar View
Meering BESS Virya Energy Pty Ltd Development Publicly Announced Storage - Battery Not commissioned Wind - Wind View
Meering Wind Farm Virya Energy Pty Ltd Development Publicly Announced Wind Turbine - Onshore Not commissioned Wind - Wind View
Melbourne Grid Battery - KCI Lumea Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Melbourne Renewable Energy Complex Elgin Energy Pty Ltd Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Melbourne Renewable Energy Hub - Side A MREH Pty Ltd as trustee for MREH Asset Trust Development Committed Storage - Battery Not commissioned Other - Other 600/1600 MW Nov 2025 View
Melbourne Renewable Energy Hub - Side B MREH Pty Ltd as trustee for MREH Asset Trust Development Publicly Announced Storage - Battery Not commissioned Other - Other Dec 2028 View
Melbourne Solar Farm - KCI Emergent Technologies Development Publicly Announced Solar PV - Fixed Not commissioned Solar - Solar View
Meredith Wind Farm - KCI Acciona Energy Global Australia Development Publicly Announced Wind Turbine - Onshore Not commissioned Wind - Wind View
Merino Solar Farm Merino Solar Farm Pty Ltd as trustee for Merino Solar Farm Trust Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Merino Solar Farm Merino Solar Farm Pty Ltd as trustee for Merino Solar Farm Trust Development Publicly Announced Solar PV - Fixed Not commissioned Solar - Solar View
Merriwa Solar Farm and BESS Valent Energy Developments Pty Ltd Development Publicly Announced Solar PV - Single axis tracking Not commissioned Solar - Solar Nov 2027 View
Merriwa Solar Farm and BESS Valent Energy Developments Pty Ltd Development Publicly Announced Storage - Battery Not commissioned Solar - Solar View
Mica Creek Solar Farm APA Group Development Publicly Announced Solar PV - Single axis tracking Not commissioned Solar - Solar View
Middle Creek Renewable Energy Hub - Wind Cubico Sustainable Investments Australia Pty Ltd Development Publicly Announced Storage - Battery Not commissioned Wind - Wind View
Middle Creek Renewable Energy Hub - Wind Cubico Sustainable Investments Australia Pty Ltd Development Publicly Announced Wind Turbine - Onshore Not commissioned Wind - Wind View
Middlebrook Solar And BESS Middlebrook Solar Farm Pty Ltd as trustee for MSF Project Trust Development Publicly Announced Solar PV - Single axis tracking Not commissioned Solar - Solar May 2029 View
Middlebrook Solar And BESS Middlebrook Solar Farm Pty Ltd as trustee for MSF Project Trust Development Publicly Announced Storage - Battery Not commissioned Solar - Solar May 2029 View
Midwest BESS Midwest Solar Pty Ltd Development Publicly Announced Storage - Battery Not commissioned Solar - Solar View
Midwest Solar Farm Midwest Solar Pty Ltd Development Publicly Announced Solar PV - Fixed Not commissioned Solar - Solar View
Mildura Power Station Ceramet Development Publicly Announced Solar PV - Single axis tracking Not commissioned Solar - Solar View
Miles BESS Project TBSOL Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Miles Solar Project Vena Energy Development Publicly Announced Solar PV - Fixed Not commissioned Solar - Solar View
Millmerran BESS - Storage Millmerran Power Partners Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Millmerran Wind Farm Millmerran Power Partners Development Publicly Announced Wind Turbine - Onshore Not commissioned Wind - Wind View
Milpulling Wind Farm Milpulling Wind Farm Pty Ltd Development Publicly Announced Wind Turbine - Onshore Not commissioned Wind - Wind View
Miriam Vale Solar Farm And BESS - A Private Energy Partners Pty Ltd Development Publicly Announced Solar PV - Single axis tracking Not commissioned Solar - Solar View
Miriam Vale Solar Farm And BESS - A Private Energy Partners Pty Ltd Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Miriam Vale Solar Farm And BESS - B Private Energy Partners Pty Ltd Development Publicly Announced Solar PV - Single axis tracking Not commissioned Solar - Solar View
Miriam Vale Solar Farm And BESS - B Private Energy Partners Pty Ltd Development Publicly Announced Storage - Battery Not commissioned Other - Other View
MNC000116 - Dubbo Firming Power Station Squadron Energy Services Pty Ltd Development Publicly Announced Other - Other Not commissioned Fossil - Natural Gas View
Moah Creek Solar Farm (RES) Moah Creek Solar Development Co Pty Ltd Development Publicly Announced Solar PV - Fixed Not commissioned Solar - Solar View
Moah Creek Wind Farm Moah Creek Wind Farm Project Co Pty Ltd as trustee for the Moah Creek Wind Farm Project Trust Development Publicly Announced Wind Turbine - Onshore Not commissioned Wind - Wind Mar 2028 View
Moama Solar Farm Moama Propertyco Pty Ltd as trustee for the Moama Property Trust Development Publicly Announced Solar PV - Single axis tracking Not commissioned Solar - Solar View
Mobilong BESS Mobilong ProjectCo Pty Ltd Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Mologa BESS Potentia Energy Group P/L Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Molong BESS (KCI) StorEnergy 3 Pty Ltd Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Molonglo BESS ITP Developments P/L Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Monash Solar Farm - KCI 1265 Warnecke Rd Pty Ltd Development Publicly Announced Solar PV - Fixed Not commissioned Solar - Solar View
Monduran BESS Eku Energy Projects (Australia) Pty Ltd as trustee for the Eku Energy Projects (Australia) Trust Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Moonah Solar Farm - KCI Venn Energy Pty Ltd / Moonah Solar Project Pty Ltd Development Publicly Announced Solar PV - Single axis tracking Not commissioned Solar - Solar View
Moonlight Range Wind Farm Brookfield Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Moonlight Range Wind Farm Brookfield Development Publicly Announced Wind Turbine - Onshore Not commissioned Wind - Wind View
Moorabool BESS Neoen Australia Pty Ltd Development Publicly Announced Storage - Battery Not commissioned Other - Other MOORBESS View
Moorebank Logistics Park Project Energy Bay Fund Management Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Moorebank Logistics Park Project Energy Bay Fund Management Development Publicly Announced Solar PV - Fixed Not commissioned Solar - Solar View
Moree BESS AE BESS 2 PTY LTD AS TRUSTEE FOR AE BESS 2 UNIT TRUST Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Moreton Hill Wind Farm Moreton Hill Wind Farm Nominees Pty Ltd Development Publicly Announced Wind Turbine - Onshore Not commissioned Wind - Wind View
Morgan Battery NEMMCO Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Morgan Long Duration Energy Storage - KCI Origin Energy Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Morgan Solar Green Gold Energy Pty Ltd Development Publicly Announced Solar PV - Fixed Not commissioned Solar - Solar View
Mornington BESS Mornington BESS Project Pty Ltd as Trustee of Mornington BESS Project Trust Development Committed Storage - Battery Not commissioned Other - Other 240/480 MW Feb 2026 View
Mortlake Origin Energy Power Limited Development Publicly Announced Turbine - OCGT Not commissioned Fossil - Natural Gas View
Mortlake Battery BORAL Development Committed* Storage - Battery Not commissioned Other - Other 300/600 MW Mar 2027 View
Mortlake Energy Hub brightnightpower_NR Development Anticipated Storage - Battery Not commissioned Solar - Solar Dec 2027 View
Mortlake Energy Hub brightnightpower_NR Development Anticipated Solar PV - Single axis tracking Not commissioned Solar - Solar Dec 2027 View
Morundah Battery Storage Photon Energy Engineering Australia Pty Ltd. Development Publicly Announced Storage - Battery Not commissioned Solar - Solar View
Morundah Solar Power Plant (Thermal) Photon Energy Engineering Australia Pty Ltd. Development Publicly Announced Solar Thermal - Central collector Not commissioned Solar - Solar View
Morwell BESS ACE Power Development 2 Pty Ltd Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Mount Britton BESS1 firmpower_NR Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Mount Britton BESS2 firmpower_NR Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Mount Fyans Woolnorth Wind Farm Holding Development Publicly Announced Wind Turbine - Onshore Not commissioned Wind - Wind View
Mount Fyans Wind Farm 2.0 Woolnorth Wing Farm Holding Pty Ltd Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Mount Hopeful BESS Neoen Australia Pty Ltd Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Mount Hopeful Wind Farm Mount Hopeful Wind Farm as trustee for Mount Hopeful Wind Farm Trust Development Publicly Announced Wind Turbine - Onshore Not commissioned Wind - Wind Jun 2028 View
Mount Lambie BESS tetrisenergy_nr Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Mount Lambie Wind Farm tetrisenergy_nr Development Publicly Announced Wind Turbine - Onshore Not commissioned Wind - Wind View
Mt Challenger BESS Tetris Energy Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Mt Challenger Wind Farm Tetris Energy Development Publicly Announced Wind Turbine - Onshore Not commissioned Wind - Wind View
Mt Cotton Biomass Cogeneration Power Station Darwalla Milling Co Pty Ltd Development Publicly Announced Turbine - Steam Sub Critical Not commissioned Other - Other View
Mt Doran BESS Iberdrola Australia Development Pty Ltd Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Mt Fox BESS - ARENA Mount Fox BESS Pty Ltd Development Publicly Announced Storage - Battery Not commissioned Other - Other Apr 2029 View
Mt Fox Wind Farm Mount Fox Energy Park Pty Ltd Development Publicly Announced Wind Turbine - Onshore Not commissioned Wind - Wind View
Mt Mercer BESS Foresight Australia Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Mt Piper BESS Energy Australia Development Pty Ltd Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Mt Rawdon Pumped Hydro Energy Storage Project - KCI Mount Rawdon Pty Ltd Development Publicly Announced Storage - Pumped hydro Not commissioned Hydro - Water View
Mt View Wind Farm (KCI) Woodside Energy Technologies Pty Ltd Development Publicly Announced Wind Turbine - Onshore Not commissioned Wind - Wind View
Mugga Lane BESS LGI Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Mugga Lane Renewable Hybrid LGIGEN Development Publicly Announced Other - Other Not commissioned Renewable Biomass or Waste - Landfill Gas MLLFRHF1 Dec 2024 View
Mullion Creek Wind Farm Mullion Creek Wind Farm P/L Development Publicly Announced Solar PV - Fixed Not commissioned Solar - Solar View
Mulwala Solar Farm ESCO Solar Farm 1 Pty Ltd as trustee for the ESCO Solar Farm 1 Trust Development Publicly Announced Solar PV - Single axis tracking Not commissioned Solar - Solar View
Munna Creek Solar Farm Munna Creek Solar Farm Investments Pty Ltd as trustee for the Munna Creek Solar Farm Trust Development Committed Solar PV - Single axis tracking Not commissioned Solar - Solar 154 MW Jan 2026 View
Murilla Energy Hub APA Power Holdings Pty Ltd Development Publicly Announced Other - Other Not commissioned Other - Other View
Murrumburrah BESS - KCI FIrm Power P/L Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Muskerry Solar Power Station - KCI Edify Energy Pty Ltd Development Publicly Announced Solar PV - Fixed Not commissioned Solar - Solar View
Muswellbrook BESS firmpower_NR Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Muswellbrook PRO BESS Penso Power Australia P/L Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Muswellbrook Pumped Hydro AGL Energy Limited Development Publicly Announced Storage - Pumped hydro Not commissioned Hydro - Water View
Muswellbrook Solar Farm Ox2 Development Publicly Announced Solar PV - Fixed Not commissioned Solar - Solar View
Myrtle Creek BESS ARK Energy Corporation Pty Ltd Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Narrabri Hybrid Project Narrabri Genesis Hold Pty Ltd ATF Narrabri Genesis Hold Trust Development Publicly Announced Storage - Battery Not commissioned Other - Other Aug 2027 View
Narrabri Hybrid Project Narrabri Genesis Hold Pty Ltd ATF Narrabri Genesis Hold Trust Development Publicly Announced Solar PV - Single axis tracking Not commissioned Solar - Solar View
Narrabri South Solar Farm Canadian Solar Development Publicly Announced Solar PV - Fixed Not commissioned Solar - Solar View
Narrandera BESS Potentia Energy Group P/L Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Narrandera Solar Farm Potentia Energy Group P/L Development Publicly Announced Solar PV - Fixed Not commissioned Solar - Solar View
Nebo BESS Nebo BESS Pty Ltd Development Publicly Announced Storage - Battery Not commissioned Other - Other Dec 2028 View
Nebo BESS (Iberdrola) - KCI Iberdrola Australia Development Pty Ltd. Development Publicly Announced Storage - Battery Not commissioned Other - Other View
New England Solar Farm ACEN AUSTRALIA Development Anticipated Solar PV - Single axis tracking Not commissioned Solar - Solar Oct 2028 View
New England Solar Farm BESS ACEN RENEWABLES Development Anticipated Storage - Battery Not commissioned Other - Other Dec 2026 View
Noblevale BESS (KCI) Zen Energy Future Pty Ltd Development Publicly Announced Storage - Battery Not commissioned Other - Other Jun 2028 View
Nonowie Wind Farm Tilt Renewables Australia Pty Ltd Development Publicly Announced Wind Turbine - Onshore Not commissioned Wind - Wind View
Normanville Energy Park - Wind (KCI) Westwind Development Pty Ltd Development Publicly Announced Wind Turbine - Onshore Not commissioned Wind - Wind View
North Burnett Renewable Hub - BESS X-Elio Australia Pty Ltd Development Publicly Announced Storage - Battery Not commissioned Other - Other View
North Burnett Renewable Hub - Solar X-Elio Australia Pty Ltd Development Publicly Announced Solar PV - Fixed Not commissioned Solar - Solar View
North East Wind - KCI ACEN North East Tasmania Pty Ltd Development Publicly Announced Wind Turbine - Onshore Not commissioned Wind - Wind View
North Yarragon BESS - KCI Zen Energy Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Northern Midlands Solar Farm - KCI Northern Midlands Solar Farm Tas Pty Ltd (ACN 684 471 627) as trustee for the Northern Midlands Solar Farm Unit Trust (ABN 26 279 618 811) Development Anticipated Solar PV - Single axis tracking Not commissioned Solar - Solar Oct 2027 View
Northern Tablelands Wind Farm BORAL Development Publicly Announced Wind Turbine - Onshore Not commissioned Wind - Wind View
Nottingham Park Solar Farm - KCI NPSF Renewables Pty Ltd Development Publicly Announced Solar PV - Fixed Not commissioned Solar - Solar View
Novocastrian Offshore Wind Farm OceanEx Energy Development Publicly Announced Wind Turbine - Offshore Not commissioned Wind - Wind Jan 2031 View
Nowingi Solar Farm - Edify (KCI) Edify Energy Pty Ltd Development Publicly Announced Solar PV - Fixed Not commissioned Solar - Solar View
Nowingi Solar Storage - Solar Lyon Solar Development Publicly Announced Solar PV - Single axis tracking Not commissioned Solar - Solar View
Nowingi Solar Storage - Storage Lyon Solar Development Publicly Announced Storage - Battery Not commissioned Other - Other View
NSW Gas Peaker AGL Energy Limited Development Publicly Announced Reciprocating Engine - Compression ignition Not commissioned Fossil - Natural Gas View
Nyaninyuk Wind Farm Acciona Energy Development Publicly Announced Wind Turbine - Onshore Not commissioned Wind - Wind View
Orana BESS Wellington Battery ProjectCo Pty Ltd Development Committed Storage - Battery Not commissioned Other - Other ORANA 415/1660 MW Jun 2026 View
Orange Grove Sun Farm Overland Sun Farm Holdings Pty Ltd Development Publicly Announced Solar PV - Single axis tracking Not commissioned Solar - Solar View
Orsted Gippsland A&B Windfarm orsted_nr Development Publicly Announced Wind Turbine - Offshore Not commissioned Wind - Wind View
Orsted Gippsland C Windfarm orsted_nr Development Publicly Announced Wind Turbine - Offshore Not commissioned Wind - Wind View
Osborne BESS Osboourne Cogeneration P/L Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Oven Mountain Pumped Storage Oven Mountain Pumped Storage Development Publicly Announced Storage - Pumped hydro Not commissioned Hydro - Water View
Oxley Solar Farm Oxley Solar Development Pty Ltd Development Publicly Announced Solar PV - Fixed Not commissioned Solar - Solar View
Pacific Green Energy Park - Limestone Coast North Pacific Green Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Pacific Green Energy Park - Limestone Coast West Pacific Green Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Pacific Green Energy Park – Portland Pacific Green Energy Park Cascade Trust Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Pacific Green Energy Park Portland West Pacific Green Energy Park Portland West Trust Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Paling Yards Wind Farm Paling Yards Development Pty Ltd Development Publicly Announced Wind Turbine - Onshore Not commissioned Wind - Wind View
Palmer Wind Farm Tilt Renewables Australia Pty Ltd Development Publicly Announced Wind Turbine - Onshore Not commissioned Wind - Wind View
Palmerston BESS (Akaysha) Palmerston ProjectCo Pty Ltd Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Panorama BESS PANORAMA BESS SUBCO PTY LTD as trustee for the PANORAMA BESS UNIT TRUST Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Para Hill BESS X-Elio Australia Pty Ltd Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Peel Valley BESS Potentia Energy Group P/L Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Peel Valley Solar Farm Potentia Energy Group P/L Development Publicly Announced Solar PV - Fixed Not commissioned Solar - Solar View
Pelican Point BESS Engie Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Penfield BESS BESS PENFIELD PTY LTD Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Peninsula Solar Farm & BESS Edify Energy Pty Ltd Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Peninsula Solar Farm & BESS Edify Energy Pty Ltd Development Publicly Announced Solar PV - Single axis tracking Not commissioned Solar - Solar View
Phoenix Pumped Hydro Project ACEN Phoenix Pty Ltd Development Publicly Announced Storage - Pumped hydro Not commissioned Hydro - Water Mar 2029 View
Piambong Wind Farm - KCI Piambong Wind Farm Pty Ltd Development Publicly Announced Wind Turbine - Onshore Not commissioned Wind - Wind Dec 2028 View
Pikedale Wind Farm (KCI) Squadron Energy Developments Pty Ltd Development Publicly Announced Wind Turbine - Onshore Not commissioned Wind - Wind View
Pine Lodge 2 BESS - KCI ACEnergy Pty Ltd Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Pine Lodge BESS ENERGY STORAGE PROJECT NO 6 PTY LTD Development Anticipated Storage - Battery Not commissioned Other - Other Oct 2026 View
Pinnacles BESS - Storage - KCI Enervest Pty Ltd Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Pint Pot BESS FRV Services Australia Pty Ltd Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Pioneer BESS - KCI Edify Energy Pty Ltd Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Playford Battery CFG Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Pleasant Hills Solar Farm - KCI TotalEnergies Renewables Australia Pty Ltd Development Publicly Announced Solar PV - Single axis tracking Not commissioned Solar - Solar Sep 2028 View
Pleystowe BESS PLEYSTOWE BESS PTY LTD Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Pleystowe BESS (KCI) Pleystowe BESS P/L Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Port Augusta Solar Farm (KCI) Edify Energy Pty Ltd Development Publicly Announced Solar PV - Fixed Not commissioned Solar - Solar View
Port Kembla Power Station Australian Industrial Power Development Publicly Announced Other - Other Not commissioned Other - Other View
Port Latta Wind Farm Oz Green Energy I Pty Ltd Development Anticipated Wind Turbine - Onshore Not commissioned Wind - Wind Feb 2027 View
Port Paterson BESS Green Gold Energy Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Port Pirie Solar Farm - KCI Trafigura Hydrogen Australia Development Publicly Announced Solar PV - Fixed Not commissioned Solar - Solar View
Portland Renewables Project - KCI HAMR Energy Pty Ltd Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Portland Wind Farm - KCI Vic Offshore Windfarm Pty Ltd Development Publicly Announced Wind Turbine - Onshore Not commissioned Wind - Wind View
Pottinger Energy Park - Battery - KCI Pottinger Renewables P/L Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Pottinger Energy Park - Solar - KCI Pottinger Renewables P/L Development Publicly Announced Solar PV - Fixed Not commissioned Solar - Solar View
Pottinger Energy Park - Wind - KCI Pottinger Renewables P/L Development Publicly Announced Wind Turbine - Onshore Not commissioned Wind - Wind View
Prairie Solar Farm Pacific Hydro Australia Developments Pty Ltd Development Publicly Announced Solar PV - Single axis tracking Not commissioned Solar - Solar Oct 2027 View
Prairie WF & Wongalee WF Prairie Wind Farm Pty Ltd Development Publicly Announced Wind Turbine - Onshore Not commissioned Wind - Wind Dec 2027 View
Project Brandy BESS Evolution Pty Ltd Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Project Monash - Solar - KCI Monash Renewables Pty Ltd Development Publicly Announced Solar PV - Fixed Not commissioned Solar - Solar View
Project Monash - Storage - KCI Monash Renewables Pty Ltd Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Proserpine Wind Farm - KCI CI Proserpine Pty Ltd as trustee for the CI Proserpine Trust Development Publicly Announced Wind Turbine - Onshore Not commissioned Wind - Wind View
Punch's Creek Renewable Energy Skylab Development Anticipated Solar PV - Single axis tracking Not commissioned Solar - Solar Jan 2026 View
Punch's Creek Renewable Energy Stage 2 skylabgroup_NR Development Publicly Announced Solar PV - Single axis tracking Not commissioned Solar - Solar Oct 2028 View
Punchs Creek (Milmerran) BESS - New Skylab Development Publicly Announced Storage - Battery Not commissioned Solar - Solar View
Puzzle Range BESS tetrisenergy_nr Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Puzzle Range Wind Farm tetrisenergy_nr Development Publicly Announced Wind Turbine - Onshore Not commissioned Wind - Wind View
QCLNG Curtis Island Electrification - KCI QCLNG Operating Company Pty Ltd Development Publicly Announced Turbine - OCGT Not commissioned Fossil - Natural Gas View
Quandong Solar Farm Emergent Technologies Development Publicly Announced Solar PV - Fixed Not commissioned Solar - Solar View
Quarantine Origin Energy Power Limited Development Publicly Announced Turbine - OCGT Not commissioned Fossil - Natural Gas Pipeline View
Queensland Renewable Park EEW Eco Energy World Pty Ltd Development Publicly Announced Other - Other Not commissioned Other - Other View
Quorn Park Solar Hybrid Quorn Park Solar Farm Pty Ltd as the trustee for Quorn Park Solar Farm Trust Development Committed Storage - Battery Not commissioned Other - Other QPBESS 28/40 MW Jan 2026 View
Quorn Park Solar Hybrid Quorn Park Solar Farm Pty Ltd as the trustee for Quorn Park Solar Farm Trust Development Committed Solar PV - Single axis tracking Not commissioned Solar - Solar QPSF 97 MW Feb 2026 View
Raglan BESS acepower_NR Development Publicly Announced Storage - Battery Not commissioned Other - Other Aug 2028 View
Raglan Solar Farm EEW Eco Energy World Ltd Development Publicly Announced Solar PV - Single axis tracking Not commissioned Solar - Solar View
Rangemore BESS Tetris Energy Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Rangemore Wind Farm Tetris Energy Development Publicly Announced Wind Turbine - Onshore Not commissioned Wind - Wind View
Rangoon Wind Farm Rangoon Energy Park Pty Ltd Development Publicly Announced Wind Turbine - Onshore Not commissioned Wind - Wind View
Ravenswood BESS FRV Services Australia Development Anticipated Storage - Battery Not commissioned Other - Other Sep 2027 View
Ravenswood Solar Farm - FRV FRV Services Australia Development Anticipated Solar PV - Fixed Not commissioned Solar - Solar Sep 2027 View
Redbank Verdant Earth Technologies Limited Development Publicly Announced Turbine - Steam Sub Critical Not commissioned Renewable Biomass or Waste - Wood Waste REDBANK1 View
Reeves Plains OCGT - stage 1 Alinta Energy Reeves Plains Pty Ltd Development Publicly Announced Turbine - OCGT Not commissioned Fossil - Natural Gas Pipeline View
Reeves Plains OCGT - stage 2 Alinta Energy Reeves Plains Pty Ltd Development Publicly Announced Turbine - OCGT Not commissioned Fossil - Natural Gas Pipeline View
Reeves Plains Power Station BESS Alinta Energy Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Richmond Valley BESS ARK ENERGY CORPORATION PTY LTD Development Anticipated Storage - Battery Not commissioned Other - Other Oct 2026 View
Richmond Valley Solar Farm ARK ENERGY CORPORATION PTY LTD Development Publicly Announced Solar PV - Single axis tracking Not commissioned Solar - Solar View
Ridgey Creek BESS Ridgey Creek BESS Pty Ltd Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Rifle Butts Wind Farm  NewEn Development Publicly Announced Wind Turbine - Onshore Not commissioned Wind - Wind View
Riverina Solar Farm Riverina Solar Pty Ltd Development Committed Solar PV - Single axis tracking Not commissioned Solar - Solar 32 MW Mar 2028 View
Riverland Solar Storage - Solar Lyon Solar Development Publicly Announced Solar PV - Single axis tracking Not commissioned Solar - Solar View
Riverland Solar Storage - Storage Lyon Solar Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Riverside BESS - Storage - KCI Enervest Pty Ltd Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Riverstone Rise BESS (KCI) Pacific Partnerships Pty Ltd Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Robbins Island Wind Farm ACEN Robbins Island PTY LTD Development Publicly Announced Wind Turbine - Onshore Not commissioned Wind - Wind View
Robertstown BESS StorEnergy 4 Pty Ltd Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Robertstown Solar Robertstown Project (Solar) Operations Pty Ltd Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Robertstown Solar Robertstown Project (Solar) Operations Pty Ltd Development Publicly Announced Solar PV - Single axis tracking Not commissioned Solar - Solar View
Rollsville Hybrid Facility - Battery X-Elio Australia Pty Ltd Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Rollsville Hybrid Facility - Solar X-Elio Australia Pty Ltd Development Publicly Announced Solar PV - Fixed Not commissioned Solar - Solar View
Romani BESS Samsung C&T Renewable Energy Australia Pty Ltd Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Romani Solar Farm Samsung C&T Renewable Energy Australia Pty Ltd Development Publicly Announced Solar PV - Single axis tracking Not commissioned Solar - Solar View
Romani Standalone BESS Samsung C&T Renewable Energy Australia Pty Ltd Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Rothby BESS Avenis Energy Pty Ltd, on behalf of AE BESS 11 Pty Ltd ATF AE BESS 11 Unit Trust Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Rowallan Pumped Hydro Option Hydro-Electric Corporation Development Publicly Announced Storage - Pumped hydro Not commissioned Hydro - Water View
Rubicon BESS samsung_NR Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Rubicon Solar Farm samsung_NR Development Publicly Announced Solar PV - Single axis tracking Not commissioned Solar - Solar View
Ruby Hills North BESS Walcha Energy Pty Ltd Development Publicly Announced Storage - Battery Not commissioned Wind - Wind Oct 2029 View
Ruby Hills North Wind Farm Origin energy Development Publicly Announced Wind Turbine - Onshore Not commissioned Wind - Wind Sep 2028 View
Ruby Hills South BESS Origin Energy Pty Ltd Development Publicly Announced Storage - Battery Not commissioned Wind - Wind Dec 2029 View
Ruby Hills South Wind Farm Origin Energy Pty Ltd Development Publicly Announced Wind Turbine - Onshore Not commissioned Wind - Wind Nov 2031 View
Rutherglen Battery - KCI Red Hill Renewable Energy Pty Ltd Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Rutherglen Solar Farm - KCI Red Hill Renewable Energy Pty Ltd Development Publicly Announced Solar PV - Fixed Not commissioned Solar - Solar View
Salisbury BESS Origin Energy Pty Ltd Development Publicly Announced Storage - Battery Not commissioned Other - Other Oct 2027 View
Salisbury Solar 450MW Origin Energy Pty Ltd Development Publicly Announced Solar PV - Single axis tracking Not commissioned Solar - Solar Feb 2032 View
Sandigo Solar Farm ESCO Pacific Development Publicly Announced Solar PV - Fixed Not commissioned Solar - Solar View
Sandy Creek Solar Farm Sandy Creek Solar Fund Pty Ltd Development Publicly Announced Solar PV - Single axis tracking Not commissioned Solar - Solar View
Sandy Point Hybrid - Solar Samsung C&T Renewable Energy Australia Pty Ltd. Development Publicly Announced Solar PV - Single axis tracking Not commissioned Solar - Solar View
Sandy Point Hybrid - Storage Samsung C&T Renewable Energy Australia Pty Ltd. Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Seaspray Off Shore Wind Farm BayWa r.e. Australia Offshore Wind Projects 3 Pty Ltd Development Publicly Announced Wind Turbine - Offshore Not commissioned Wind - Wind View
SEC Renewable Energy Hub SEC Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Seymour Wind Farm Seymour Wind Pty Ltd Development Publicly Announced Wind Turbine - Onshore Not commissioned Wind - Wind View
Shoalhaven Expansion Origin Energy Development Publicly Announced Storage - Pumped hydro Not commissioned Hydro - Water View
Silver City Energy Storage A-CAES NSW PTY LTD Development Anticipated Storage - Other Not commissioned Other - Other Dec 2028 View
Silverleaf Solar Farm - KCI International Power (Australia) Pty Ltd Development Publicly Announced Solar PV - Fixed Not commissioned Solar - Solar View
Smithfield BESS Smithfield BESS Pty Limited Development Committed Storage - Battery Not commissioned Other - Other 86/130 MW Dec 2025 View
Smoky Creek Hybrid Facility - Solar And BESS Edify Energy Pty Ltd Development Publicly Announced Storage - Battery Not commissioned Solar - Solar View
Smoky Creek Hybrid Facility - Solar And BESS Edify Energy Pty Ltd Development Publicly Announced Solar PV - Single axis tracking Not commissioned Solar - Solar View
Snowtown North Solar Farm Tilt Renewables Development Publicly Announced Solar PV - Fixed Not commissioned Solar - Solar View
Snowtown North Solar Farm - BESS Tilt Renewables Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Snowy 2.0. Snowy Hydro Ltd Development Committed¹ Storage - Pumped hydro Not commissioned Hydro - Water 2200/349980 MW Dec 2028 View
Solar River Solar And BESS Project Zen Energy Retail Pty Ltd Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Solar River Solar And BESS Project Zen Energy Retail Pty Ltd Development Publicly Announced Solar PV - Single axis tracking Not commissioned Solar - Solar View
South Burnett BESS X-Elio Australia Pty Ltd Development Publicly Announced Storage - Battery Not commissioned Other - Other Sep 2027 View
South Coree BESS Samsung C&T Renewable Energy Australia Pty Ltd Development Publicly Announced Storage - Battery Not commissioned Other - Other View
South East BESS - Storage - KCI Equis Energy (Australia) Projects (Ngumi 8) Pty Ltd as trustee for the Equis Energy(Australia) Ngumi 8 Asset Trust Development Publicly Announced Storage - Battery Not commissioned Other - Other Jul 2030 View
South Johnstone Mill (expansion) MSF Sugar Development Publicly Announced Turbine - Steam Sub Critical Not commissioned Renewable Biomass or Waste - Bagasse View
South Kempsey BESS Macleay Ventures Pty Ltd. Development Publicly Announced Storage - Battery Not commissioned Other - Other View
South Nanango BESS RTB Renewables Pty Ltd Development Publicly Announced Storage - Battery Not commissioned Other - Other View
South Pacific Offshore Wind Project South Pacific OWP Project Pty Ltd Development Publicly Announced Wind Turbine - Offshore Not commissioned Wind - Wind Jun 2035 View
Southern Winds Offshore Wind Southern Winds OWP Project Pty Ltd Development Publicly Announced Wind Turbine - Offshore Not commissioned Wind - Wind View
Specimen Hill BESS - Storage - KCI ARK Energy Corporation Pty Ltd Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Specimen Hill Wind Farm ARK Energy Corporation Pty Ltd Development Publicly Announced Wind Turbine - Onshore Not commissioned Wind - Wind View
Spicers Creek Wind Farm Squadron Energy Services Pty Ltd Development Publicly Announced Wind Turbine - Onshore Not commissioned Wind - Wind View
Spinifex Offshore Wind Farm Alinta Energy Retail Sales Pty Ltd Development Publicly Announced Wind Turbine - Offshore Not commissioned Wind - Wind View
Springdale Solar Farm Utilacor Pty Ltd Development Publicly Announced Solar PV - Single axis tracking Not commissioned Solar - Solar View
Springdale Solar Farm - KCI RES Australia Pty Ltd Development Publicly Announced Solar PV - Fixed Not commissioned Solar - Solar View
Springlands Wind Farm Ratch Australia Development Publicly Announced Wind Turbine - Onshore Not commissioned Wind - Wind View
Springvale Energy Hub progresspower_nr Development Publicly Announced Storage - Battery Not commissioned Other - Other View
SRI/Mirabou (Braemar) BESS - KCI Miraabou Energy Ltd Development Publicly Announced Storage - Battery Not commissioned Other - Other View
St Patricks Plains Wind Farm ARK Energy Corporation Pty Ltd Development Publicly Announced Wind Turbine - Onshore Not commissioned Wind - Wind View
Stanhope BESS Project 01 Globird Energy Pty Ltd Development Publicly Announced Storage - Battery Not commissioned Solar - Solar SHBESS01 Dec 2026 View
Stanhope Solar Farm globirdenergy_NR Development Publicly Announced Solar PV - Fixed Not commissioned Solar - Solar Dec 2026 View
Stanmore WCMG power station Stanmore Resources and Enernet Australia (JV) Development Publicly Announced Reciprocating Engine - Spark ignition Not commissioned Fossil - Coal Seam Methane Dec 2026 View
Stanwell BESS Stanwell Corporation Limited Development Anticipated Storage - Battery Not commissioned Other - Other Oct 2026 View
Star of the South Wind Farm Star of the South Wind Farm Pty Ltd as trustee for the Star of the South Trust Development Publicly Announced Wind Turbine - Offshore Not commissioned Wind - Wind SOTS1 Mar 2032 View
Stonehaven Gas Turbines - KCI APA Power Holdings Pty Ltd Development Publicly Announced Turbine - OCGT Not commissioned Other - Other View
Stoney Creek BESS Stoney Creek BESS Pty Ltd Development Publicly Announced Storage - Battery Not commissioned Solar - Solar View
Stony Creek Wind Farm Greenleaf Renewable Development Publicly Announced Wind Turbine - Onshore Not commissioned Wind - Wind View
Strafford Renewable Energy Hub - Pumped Hydro Yancoal Development Publicly Announced Storage - Pumped hydro Not commissioned Hydro - Water View
Stratford Renewable Energy Hub Yancoal Australia Limited Development Publicly Announced Solar PV - Fixed Not commissioned Solar - Solar View
Stratford Renewable Energy Hub Yancoal Australia Limited Development Publicly Announced Storage - Pumped hydro Not commissioned Hydro - Water View
Strontian Solar BESS Strontian Solar Pty Ltd Development Publicly Announced Storage - Battery Not commissioned Solar - Solar View
Strontian Solar Farm Strontian Solar Pty Ltd Development Publicly Announced Solar PV - Fixed Not commissioned Solar - Solar View
Stubbo BESS Stubbo 1 Pty Ltd. ACN 658 322 457 as The Trustee for Stubbo 1 Solar Project Trust Development Publicly Announced Storage - Battery Not commissioned Other - Other Mar 2029 View
Sturt Solar Sturt Solar PTY LTD Development Publicly Announced Solar PV - Single axis tracking Not commissioned Solar - Solar View
Sturt Solar Sturt Solar PTY LTD Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Summerfield BESS CI Summerfield BESS Pty Ltd (ACN 656 223 773) as trustee for the CI Summerfield BESS Trust Development Publicly Announced Storage - Battery Not commissioned Other - Other Dec 2025 View
Summerville Solar Farm ESCO Solar Farm 5 Pty Ltd Development Publicly Announced Solar PV - Fixed Not commissioned Solar - Solar View
Sundown Hybrid Facility Canadian Solar Development Publicly Announced Solar PV - Fixed Not commissioned Solar - Solar View
Sundown Hybrid Facility Canadian Solar Development Publicly Announced Storage - Battery Not commissioned Solar - Solar View
Sunshine Energy Solar Farm Sunshine Energy Development Publicly Announced Solar PV - Single axis tracking Not commissioned Solar - Solar View
Sunshine State Solar Farm and BESS ESCO Pacific Development Publicly Announced Solar PV - Fixed Not commissioned Solar - Solar View
Sunshine State Solar Farm and BESS (Rollingstone) Rollingstone Solar Farm Pty Ltd Development Publicly Announced Solar PV - Fixed Not commissioned Solar - Solar View
Supernode BESS Supernode Operations Pty Ltd as the trustee for Supernode BESS 1 Project Trust Commissioning · AI Committed Storage - Battery Not commissioned Other - Other SNB01 260/620 MW Dec 2025 View
Supernode BESS Supernode Operations Pty Ltd as the trustee for Supernode BESS 1 Project Trust Commissioning · AI Committed Storage - Battery Not commissioned Other - Other SNB02 260/1240 MW Jun 2026 View
Supernode BESS Supernode Operations Pty Ltd as the trustee for Supernode BESS 1 Project Trust Development Publicly Announced Storage - Battery Not commissioned Other - Other SNB03 View
Supernode BESS Supernode Operations Pty Ltd as the trustee for Supernode BESS 1 Project Trust Development Publicly Announced Storage - Battery Not commissioned Other - Other SNB04 View
Supernode BESS Supernode Operations Pty Ltd as the trustee for Supernode BESS 1 Project Trust Development Publicly Announced Storage - Battery Not commissioned Other - Other SNB05 View
Swallow Tail BESS AMPYR Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Swanbank BESS CleanCo QLD Limited Development Anticipated Storage - Battery Not commissioned Other - Other Nov 2025 View
Tabulam BESS Elgin Energy Pty Ltd Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Tabulam Solar Farm Elgin Energy Pty Ltd Development Publicly Announced Solar PV - Fixed Not commissioned Solar - Solar View
Tailem Bend Battery Project Vena Energy Development Committed Storage - Battery Not commissioned Other - Other TB2BG1 42/84 MW Jan 2024 View
Tailem Bend Stage 3 TBSOL Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Talbingo BESS Talbingo Battery Pty Ltd ATF Talbingo Battery Trust Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Tallawang Solar And BESS Enel Green Power Australia Pty Ltd Development Publicly Announced Solar PV - Fixed Not commissioned Solar - Solar View
Tallawang Solar And BESS Enel Green Power Australia Pty Ltd Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Tamworth BESS Project 1 Pty Ltd Tamworth BESS Project 1 Pty Ltd Development Anticipated Storage - Battery Not commissioned Other - Other Dec 2027 View
Tamworth BESS Project 2 Pty Ltd valent-energy_nr Development Anticipated Storage - Battery Not commissioned Other - Other Dec 2027 View
Tamworth Energy Reserve - KCI The Trustee for Equis Energy (Ausralia) Ngumi 4 Asset Trust Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Tangkam BESS - KCI Atria Energy Ltd Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Tara Wind Farm - KCI Tara Wind Farm Pty Ltd Development Publicly Announced Wind Turbine - Onshore Not commissioned Wind - Wind View
Tarong BESS - Stanwell Stanwell Corporation Limited Commissioning · AI Committed* Storage - Battery Not commissioned Other - Other TARBESS1 300/600 MW Aug 2025 View
Tarong West Wind Farm (Ironleaf) Tarong West Project Co Pty Ltd as trustee for the Tarong West Project Trust Development Publicly Announced Wind Turbine - Onshore Not commissioned Wind - Wind Oct 2028 View
Tarraleah Redevelopment HYDROTAS Development Publicly Announced Hydro - Dam Not commissioned Hydro - Water View
Tarrone BESS - Storage - KCI Global Power Generation Australia Pty Ltd Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Tarrone GT AGL Energy Limited Development Publicly Announced Turbine - OCGT Not commissioned Fossil - Natural Gas Pipeline View
Tchelery BESS Neoen Australia Pty Ltd Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Tchelery Wind Farm Neoen Australia Pty Ltd Development Publicly Announced Wind Turbine - Onshore Not commissioned Wind - Wind Jun 2030 View
Teebar Creek Battery Storage - KCI ATMOS DEVELOPMENTS PTY LTD Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Templers B BESS BORAL Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Tenterfield Solar Farm Enerparc Australia Pty Ltd Development Publicly Announced Solar PV - Fixed Not commissioned Solar - Solar Feb 2026 View
Terang BESS frv_NR Development Anticipated Storage - Battery Not commissioned Other - Other TRGBESS Jun 2026 View
Territory Battery Neoen Australia Pty Ltd Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Texas BESS FRV Development Publicly Announced Storage - Battery Not commissioned Solar - Solar View
Texas Solar Farm FRV Development Publicly Announced Solar PV - Fixed Not commissioned Solar - Solar View
The Block BESS Samsung C&T Renewable Energy Australia Pty Ltd Development Publicly Announced Storage - Battery Not commissioned Other - Other Dec 2028 View
The Central BESS - KCI ACEnergy Pty Ltd Development Publicly Announced Storage - Battery Not commissioned Other - Other View
The Plains Engie Development Publicly Announced Storage - Battery Not commissioned Other - Other View
The Plains Engie Development Publicly Announced Solar PV - Single axis tracking Not commissioned Solar - Solar View
The Plains Engie Development Publicly Announced Wind Turbine - Onshore Not commissioned Wind - Wind View
The Solar River Project - Stage 1 The Solar River Project Pty Ltd Development Publicly Announced Solar PV - Fixed Not commissioned Solar - Solar View
The Solar River Project - Stage 2 The Solar River Project Pty Ltd Development Publicly Announced Solar PV - Fixed Not commissioned Solar - Solar View
Theodore BESS RWE Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Theodore Solar Farm Theodore SF Pty Ltd as trustee for Theodore SF Trust Development Publicly Announced Solar PV - Single axis tracking Not commissioned Solar - Solar View
Theodore Wind Farm RWE Renewables Australia Development Publicly Announced Wind Turbine - Onshore Not commissioned Wind - Wind View
Thomastown BESS Ausnet Transmission Group Pty Ltd Development Publicly Announced Storage - Battery Not commissioned Other - Other Dec 2027 View
Three Rivers BESS Iberdrola Australia Development Pty Ltd. Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Three Rivers Solar Farm Iberdrola Australia Development Pty Ltd. Development Publicly Announced Solar PV - Fixed Not commissioned Solar - Solar View
Thunderbolt Wind Farm Neoen Australia Pty Ltd Development Publicly Announced Wind Turbine - Onshore Not commissioned Wind - Wind View
Ticoba BESS European Energy Australia P/L Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Ticoba Solar Farm European Energy Australia P/L Development Publicly Announced Solar PV - Fixed Not commissioned Solar - Solar View
Tieri BESS FRV Service Australia Pty Ltd Development Publicly Announced Storage - Battery Not commissioned Other - Other TieriBESS1 View
Tilbuster Solar Farm Enerparc Australia Pty Ltd Development Committed Solar PV - Fixed Not commissioned Solar - Solar 249 MW Mar 2027 View
Tirranna BESS - KCI StorEnergy 2 Pty Ltd Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Tomago BESS AGL Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Toolern Vale BESS tetrisenergy_nr Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Toolern Vale Solar Farm tetrisenergy_nr Development Publicly Announced Solar PV - Fixed Not commissioned Solar - Solar View
Toolern Vale Solar Farm_SS tetrisenergy_nr Development Publicly Announced Solar PV - Fixed Not commissioned Solar - Solar View
Townsville BESS ACEnergy Pty Ltd Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Tramway Road BESS Eku Energy Projects (Australia) Pty Ltd as trustee for the Eku Energy Projects Australia Trust Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Triabunna Wind Farm Triabunna Wind Pty Ltd Development Publicly Announced Wind Turbine - Onshore Not commissioned Wind - Wind View
Tribute Pumped Hydro Option Hydro-Electric Corporation Development Publicly Announced Storage - Pumped hydro Not commissioned Hydro - Water View
Tuckeroo BESS - KCI Tuckeroo BESS Pty Ltd Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Tully BESS RWE Renewables Australia Pty Ltd Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Tummaville Hybrid Facility - BESS (KCI) Elements Green Australia Pty Ltd Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Tummaville Hybrid Facility - Solar (KCI) Elements Green Australia Pty Ltd Development Publicly Announced Solar PV - Fixed Not commissioned Solar - Solar View
Tumuruu BESS Austraiian Solar Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Tumuruu Solar Farm Austraiian Solar Development Publicly Announced Solar PV - Fixed Not commissioned Solar - Solar View
Tungkillo South BESS RES Australia Pty Ltd Development Publicly Announced Storage - Battery Not commissioned Other - Other Jun 2029 View
Tyrone BESS European Energy Australia P/L Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Tyrone Solar European Energy Australia P/L Development Publicly Announced Solar PV - Fixed Not commissioned Solar - Solar View
Ulinda Park BESS Ulinda Park ProjectCo Pty Ltd Development Committed Storage - Battery Not commissioned Other - Other ULBESS1 155/298 MW Dec 2025 View
Ulladulla Offshore Wind Farm OceanEx Energy Development Publicly Announced Wind Turbine - Offshore Not commissioned Wind - Wind Jan 2035 View
Upper Calliope Solar Farm (side A) European Energy S/A Development Publicly Announced Solar PV - Fixed Not commissioned Solar - Solar View
Upper Hunter BESS Maizewood Pty Ltd. Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Upper Hunter Energy Park - Solar Upper Hunter Energy Park Pty Ltd Development Publicly Announced Solar PV - Fixed Not commissioned Solar - Solar View
Upper Hunter Energy Park - Wind Upper Hunter Energy Park Pty Ltd Development Publicly Announced Wind Turbine - Onshore Not commissioned Wind - Wind View
Uungula BESS Squadron Energy Services Pty Ltd Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Uungula Wind Farm Uungula Wind Farm Pty Ltd Development Committed Wind Turbine - Onshore Not commissioned Wind - Wind 414 MW Feb 2028 View
Vales Point BESS Delta Power and Energy (Vales Point) Pty Ltd trading as Delta Electricity Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Vales Point Solar Delta Electricity Development Publicly Announced Solar PV - Fixed Not commissioned Solar - Solar View
Valley of the Winds ACEN Renewables Development Anticipated Wind Turbine - Onshore Not commissioned Wind - Wind Jul 2030 View
Vast Solar 1 Vast Solar 1 Pty Ltd Development Publicly Announced Solar Thermal - Other Not commissioned Solar - Solar View
Vineyard BESS Global Power Generation Australia Pty Ltd Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Wagga North Battery Energy Storage System AE BESS 2 Pty Ltd Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Wagga North BESS - KCI ZEN Energy Future Pty Ltd Development Publicly Announced Storage - Battery Not commissioned Solar - Solar Jun 2028 View
Wagga North BESS (IB Vogt) - KCI Ib vogt Development Australia Pty Ltd Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Wagga North Solar Farm BESS Wagga Wagga Operationsco Pty Ltd as trustee for the Wagga Wagga Operations Trust Development Publicly Announced Storage - Battery Not commissioned Solar - Solar View
Wagga Wagga BESS tetrisenergy_nr Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Wallabadah BESS North Harbour Clean Energy P/L Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Wallaroo Solar Farm New Energy development and Univergy Solar Joint venture (SPV) Wallaroo Solar Farm Pty Ltd Development Publicly Announced Solar PV - Single axis tracking Not commissioned Solar - Solar View
Wallerawang 9 BESS Greenspot Wallerawang Pty Ltd as trustee for the Greenspot Wallerawang Unit Trust Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Wambo Wind Farm Cubico Sustainable Investments Australia Pty Ltd Commissioning · AI Committed Wind Turbine - Onshore Not commissioned Wind - Wind WAMBOWF1 252 MW Feb 2025 View
Wambo Wind Farm Cubico Sustainable Investments Australia Pty Ltd Development Publicly Announced Wind Turbine - Onshore Not commissioned Wind - Wind View
Wamuran BESS - KCI RTB Renewables Pty Ltd Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Wandoan South Solar Stage 2 TBSOL Development Publicly Announced Solar PV - Single axis tracking Not commissioned Solar - Solar View
Waratah Super Battery Munmorah Battery ProjectCo Pty Ltd Commissioning · AI Committed Storage - Battery Not commissioned Other - Other WTAHB1 850/1680 MW Aug 2025 View
Warracknabeal Wind Farm WestWind Energy Pty Ltd Development Publicly Announced Wind Turbine - Onshore Not commissioned Wind - Wind View
Warrenheip BESS AE Solar 6 Pty Ltd as Trustee for AE Solar 6 Unit Trust Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Watta Wella Power Station RES Australia Pty Ltd Development Publicly Announced Wind Turbine - Onshore Not commissioned Wind - Wind Dec 2030 View
Watta Wella Wind Farm - KCI RES Australia Pty Ltd Development Publicly Announced Wind Turbine - Onshore Not commissioned Wind - Wind View
Wattle Creek Energy Hub - Battery Storage Wattle Creek Energy Hub P/L Development Publicly Announced Storage - Battery Not commissioned Other - Other Oct 2028 View
Wattle Creek Energy Hub - Solar / BESS Wattle Creek Energy Hub P/L Development Publicly Announced Solar PV - Fixed Not commissioned Solar - Solar Dec 2028 View
Wattle Creek Energy Hub - Solar / BESS Wattle Creek Energy Hub P/L Development Publicly Announced Storage - Battery Not commissioned Solar - Solar Dec 2028 View
Waubra BESS - KCI Acciona Energy Australia Global Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Weasel Solar Farm And BESS - KCI Weasel Solar Farm P/L Development Publicly Announced Storage - Battery Not commissioned Solar - Solar View
Weasel Solar Farm And BESS - KCI Weasel Solar Farm P/L Development Publicly Announced Solar PV - Fixed Not commissioned Solar - Solar View
Wee Jasper Wind Farm tetrisenergy_nr Development Publicly Announced Wind Turbine - Onshore Not commissioned Wind - Wind View
Wellington A-CAES Hydrostor Australia Holdings P/L Development Publicly Announced Storage - Other Not commissioned Other - Other View
Wellington BESS - Stage 1 AMPYR Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Wellington BESS - Stage 2 AMPYR Australia Pty Ltd Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Wellington North BESS - KCI Lightsource Development Services Australia Pty Ltd Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Wellington North Solar Farm AGL Hydro Partnership Development Publicly Announced Solar PV - Fixed Not commissioned Solar - Solar View
West Mokoan Solar Farm West Mokoan Solar Farm Development Publicly Announced Storage - Battery Not commissioned Other - Other View
West Mokoan Solar Farm West Mokoan Solar Farm Development Publicly Announced Solar PV - Single axis tracking Not commissioned Solar - Solar View
West Wellington Wind Farm Mint Renewables Development Publicly Announced Wind Turbine - Onshore Not commissioned Wind - Wind View
West Wyalong BESS Lightsource BP Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Western Downs Gas Peaking Plant - KCI PowerGen P51 Pty Ltd Development Publicly Announced Turbine - CCGT Not commissioned Other - Other View
Western Plains Wind Farm ARK Energy Corporation Pty Ltd Development Publicly Announced Wind Turbine - Onshore Not commissioned Wind - Wind View
Western Sydney Energy & Resource Recovery Centre Western Sydney Energy & Resource Recovery Centre Development Publicly Announced Other - Other Not commissioned Other - Other View
Western Sydney Pumped Hydro Project Zen Energy Retail Pty Ltd Development Publicly Announced Storage - Pumped hydro Not commissioned Hydro - Water View
Whaleback Ridge Wind Farm - KCI West Coast Renewables Energy Pty Ltd Development Publicly Announced Wind Turbine - Onshore Not commissioned Wind - Wind View
White Rock Wind Farm - Stage 2 White Rock Wind Farm Pty Ltd Development Publicly Announced Wind Turbine - Onshore Not commissioned Wind - Wind Mar 2027 View
Whyalla Adani Development Publicly Announced Solar PV - Fixed Not commissioned Solar - Solar View
Whyalla BESS - KCI BESS Kalkallo Pty Ltd Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Willatook Wind Prospect WA Pty Ltd Development Publicly Announced Wind Turbine - Onshore Not commissioned Wind - Wind View
Willavale BESS X-Elio Willavale Park Trust Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Willavale Solar Farm X-Elio Australia Pty Ltd Development Publicly Announced Solar PV - Fixed Not commissioned Solar - Solar View
Williamsdale BESS EKU Energy Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Willowvale Solar Farm - KCI Elgin Energy Pty Ltd Development Publicly Announced Solar PV - Fixed Not commissioned Solar - Solar View
Wimmera Plains BESs BayWA r.e Projects Australia Pty Ltd Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Wimmera Plains Wind Farm - KCI Wimmera Plains Energy Facility Pty Ltd Development Publicly Announced Wind Turbine - Onshore Not commissioned Wind - Wind View
Winchelsea Gas Turbines - KCI APA Power Holdings Pty Ltd Development Publicly Announced Turbine - OCGT Not commissioned Other - Other View
Winterbourne Wind Farm WinterbourneWind Pty Ltd Development Publicly Announced Wind Turbine - Onshore Not commissioned Wind - Wind View
Winton BESS AE BESS 10 as Trustee for AE BESS 10 Unit Trust Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Winton Energy Reserve 1 Lochard Energy Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Winton Energy Reserve 1 Lochard Energy Development Publicly Announced Reciprocating Engine - Spark ignition Not commissioned Fossil - Natural Gas View
Winton North Solar Farm EE Solar 12 Pty Ltd as trustee for the EE Solar 12 Trust Development Publicly Announced Solar PV - Fixed Not commissioned Solar - Solar View
Wodonga BESS IBERDROLA AUSTRALIA DEVELOPMENT PTY LIMITED Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Wodonga Solar Farm Wodonga Solar Power Development Publicly Announced Solar PV - Single axis tracking Not commissioned Solar - Solar View
Wollar BESS Wollar Solar Finance Pty Ltd. Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Wollar Solar Farm Wollar Solar Development Pty Ltd Operational · AI Committed Solar PV - Single axis tracking Not commissioned Solar - Solar WOLARSF1 280 MW May 2025 View
Wollert Gas Turbine - KCI APA Power Holdings Pty Ltd Development Publicly Announced Turbine - OCGT Not commissioned Other - Other View
Wombelano Wind Farm Wind Projects Australia Project 1 Pty Ltd Development Publicly Announced Wind Turbine - Onshore Not commissioned Wind - Wind View
Wongalea BESS Eku Energy Projects (Australia) as trustee for the Eku Energy Projects (Australia) Trust Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Wooderson Solar Farm Wooderson Solar Development Company Pty Ltd Development Publicly Announced Solar PV - Single axis tracking Not commissioned Solar - Solar May 2030 View
Woodland BESS Risen Energy (Australia) Pty Ltd Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Woodstock BESS AGL Energy Limited Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Woodstock Renewable Energy Hub - BESS Private Energy Partners Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Woodstock Renewable Energy Hub - Solar Private Energy Partners Development Publicly Announced Solar PV - Single axis tracking Not commissioned Solar - Solar View
Woolooga BESS Woolooga BESS Fund Pty Limited as trustee for the Woolooga BESS Trust Development Committed Storage - Battery Not commissioned Other - Other 281/593 MW Jun 2026 View
Woolooga BESS - KCI Elements Green Australia Pty Ltd Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Woolsthorpe Wind Farm Woolsthorpe Wind Farm Pty Ltd Development Anticipated Wind Turbine - Onshore Not commissioned Wind - Wind Jan 2027 View
Woonga Creek BESS Lightsource BP Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Wooreen Energy Storage System EnergyAustralia Holdings Limited Development Committed* Storage - Battery Not commissioned Other - Other 350/1400 MW Dec 2027 View
Wooroora Station Wind Farm ARK Energy Corporation Pty Ltd Development Publicly Announced Wind Turbine - Onshore Not commissioned Wind - Wind View
Wurdong BESS Wurdong ProjectCo Pty Ltd Development Publicly Announced Storage - Battery Not commissioned Other - Other View
X-Elio - Sixteen Mile SF BESS The Trustee for X-ELIO SIXTEEN MILE TRUST Development Publicly Announced Solar PV - Single axis tracking Not commissioned Solar - Solar View
Yabulu BESS Yabulu BESS Pty Ltd Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Yabulu Solar Farm Yabulu Solar Farm Pty Ltd Development Publicly Announced Solar PV - Single axis tracking Not commissioned Solar - Solar Mar 2028 View
Yabulu South BESS Yabulu South BESS Pty Ltd Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Yadnarie Solar Farm Photon Energy Group Development Publicly Announced Solar PV - Fixed Not commissioned Solar - Solar View
Yambla Range BESS tetrisenergy_nr Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Yambla Range Wind Farm tetrisenergy_nr Development Publicly Announced Wind Turbine - Onshore Not commissioned Wind - Wind View
Yanco BESS Acenergy Pty Ltd Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Yanco Delta Wind Farm Yanco Delta Wind Farm Pty Ltd Development Publicly Announced Wind Turbine - Onshore Not commissioned Wind - Wind View
Yanco Solar Farm Origin Energy Development Publicly Announced Solar PV - Single axis tracking Not commissioned Solar - Solar May 2027 View
Yarrabee Solar Power Project Origin Energy Development Publicly Announced Solar PV - Single axis tracking Not commissioned Solar - Solar Jul 2029 View
Yelarbon SF and BESS - KCI Elgin Energy Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Yelarbon SF and BESS - KCI Elgin Energy Development Publicly Announced Solar PV - Fixed Not commissioned Solar - Solar View
Yoorndoo Ilga Solar - KCI Yoorndoo Ilga Solar Pty Ltd Development Publicly Announced Solar PV - Fixed Not commissioned Solar - Solar View
Yorke Peninsula Wind Farm Yorke Peninsula Wind Farm Project Pty Ltd Development Publicly Announced Wind Turbine - Onshore Not commissioned Wind - Wind Sep 2030 View
Yumali BESS tetrisenergy_nr Development Publicly Announced Storage - Battery Not commissioned Other - Other View
Yumali Wind Farm tetrisenergy_nr Development Publicly Announced Wind Turbine - Onshore Not commissioned Wind - Wind View

No generators match the selected filters.