| Site | Owner | Project status | AEMO status | Tech Type | NEM state | Fuel Type | DUID | Capacity | Commissioned | |
|---|---|---|---|---|---|---|---|---|---|---|
| Abermain BESS | FIrm Power P/L | Development · AI | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | 200/800 MW · AI | — | View | |
| Adelaide Desalination Plant | South Australian Water Corporation | Operational | In Service | Solar PV - Fixed | No dispatch data | Solar - Solar | ADPPV3 | 0 MW | Dec 2022 | View |
| Adelaide Desalination Plant | South Australian Water Corporation | — | removed | Hydro - Run of River | Offline | Hydro - Water | ADPMH1 | 1 MW | Nov 2022 | View |
| Adelaide Desalination Plant | South Australian Water Corporation | Operational | In Service | Solar PV - Fixed | No dispatch data | Solar - Solar | ADPPV2 | 14 MW | Jul 2022 | View |
| Adelaide Desalination Plant | South Australian Water Corporation | Operational · AI | In Service | Storage - Battery | Offline 0 MW | Other - Other | ADPBA1 | 8/13 MW | May 2022 | View |
| Adelaide Desalination Plant | South Australian Water Corporation | Operational · AI | In Service | Solar PV - Fixed | Offline 0 MW | Solar - Solar | ADPPV1 | 11 MW | May 2022 | View |
| Adelaide Desalination Plant | South Australian Water Corporation | Operational | In Service | Hydro - Run of River | No dispatch data | Hydro - Water | ADVMH1 | 1 MW | Nov 2022 | View |
| Alberton Wind Farm | Synergy Wind Pty Ltd | Development · AI | Publicly Announced | Wind Turbine - Onshore | Not commissioned | Wind - Wind | 122 MW · AI | — | View | |
| Aldoga BESS Stage 1 | Acciona Energy Australia Global | Development · AI | Anticipated | Storage - Battery | Not commissioned | Other - Other | 400/1600 MW · AI | Dec 2027 | View | |
| Aldoga Solar Farm | Acciona Energy Australia Global Pty Ltd | Operational · AI | Anticipated | Solar PV - Single axis tracking | Not commissioned | Solar - Solar | ALDGASF1 | 387 MW · AI | Nov 2025 | View |
| Alligator Creek BESS | Alligator Creek BESS Pty Ltd | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Altona BESS | Ausnet Transmission Group Pty Ltd | Development · AI | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | 100/200 MW · AI | Oct 2027 | View | |
| Angaston | Snowy Hydro Ltd | Operational · AI | In Service | Reciprocating Engine - Compression ignition | Offline 0 MW | Fossil - Diesel | ANGAST1 | 46 MW | — | View |
| Appin | EDL CSM NSW Pty Ltd | Operational | In Service | Reciprocating Engine - Spark ignition | No dispatch data | Fossil - Waste Coal Mine Gas | APPIN | 56 MW | — | View |
| Apsley BESS Project | ACENergy Pty Ltd | Development · AI | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | 120/240 MW · AI | — | View | |
| Aquila Wind | ACEN Australia Pty Ltd | Development · AI | Publicly Announced | Wind Turbine - Onshore | Not commissioned | Wind - Wind | 300 MW · AI | — | View | |
| Aramara Solar Farm | Aramara Solar Pty Ltd | Development · AI | Anticipated | Solar PV - Single axis tracking | Not commissioned | Solar - Solar | 140 MW · AI | Jun 2028 | View | |
| Ararat Wind Farm | Ararat Wind Farm Pty Ltd | Operational · AI | In Service | Wind Turbine - Onshore | Generating +2 MW | Wind - Wind | ARWF1 | 240 MW | — | View |
| Ardandra Solar Farm | Ardandra SF Pty Ltd as trustee for Ardandra SF Trust | — | removed | Solar PV - Single axis tracking | Offline | Solar - Solar | 97 MW | — | View | |
| Ardandra Solar Farm | Ardandra SF Pty Ltd as trustee for Ardandra SF Trust | — | removed | Storage - Battery | Offline | Solar - Solar | 75/150 MW | — | View | |
| Ardandra Solar Farm And BESS | Ardandra SF Pty Ltd as trustee for Ardandra SF Trust | Development | Publicly Announced | Storage - Battery | Not commissioned | Solar - Solar | — | — | View | |
| Ardandra Solar Farm And BESS | Ardandra SF Pty Ltd as trustee for Ardandra SF Trust | Development | Publicly Announced | Solar PV - Single axis tracking | Not commissioned | Solar - Solar | — | — | View | |
| Argoon Wind Farm (RES Group) - KCI | RES Australia Pty Ltd | Development · AI | Publicly Announced | Wind Turbine - Onshore | Not commissioned | Wind - Wind | 612/460 MW · AI | — | View | |
| Argyle Solar Farm | Argyle Solar Farm Pty Ltd | Development · AI | Publicly Announced | Solar PV - Single axis tracking | Not commissioned | Solar - Solar | 28 MW · AI | — | View | |
| Armidale BESS | Armidale BESS Project Pty Ltd | Development · AI | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | 150/437 MW · AI | May 2026 | View | |
| Armidale BESS (Elgin) | Elgin EnergyP/L | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Armidale East BESS | FRV | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Arundel BESS | Eku Energy Projects (Australia) Trust | Development · AI | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | 300/1200 MW · AI | — | View | |
| Augusta BESS | Augusta BESS Pty Ltd | Development · AI | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | 270/540 MW · AI | — | View | |
| Aurora Solar Energy Project - Phase 1 | SiliconAurora | Development · AI | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | 140/280 MW · AI | — | View | |
| Australia Plains Solar Farm | Gree | Development · AI | Publicly Announced | Solar PV - Single axis tracking | Not commissioned | Solar - Solar | 200/400 MW · AI | — | View | |
| Avonlie Solar Farm | Iberdrola Australia Limited | Operational · AI | In Service | Solar PV - Single axis tracking | Offline 0 MW | Solar - Solar | AVLSF1 | 254 MW | Nov 2023 | View |
| Awaba BESS | firmpower_NR | Development · AI | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | 50/100 MW · AI | — | View | |
| Axedale Solar Farm | UPC Renewables Australia | Development · AI | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | 140/100 MW · AI | — | View | |
| Axedale Solar Farm | UPC Renewables Australia | Development · AI | Publicly Announced | Solar PV - Single axis tracking | Not commissioned | Solar - Solar | 140/100 MW · AI | — | View | |
| Bairnsdale | Alinta DEBO | Operational · AI | In Service | Turbine - OCGT | Offline 0 MW | Fossil - Natural Gas Pipeline | BDL01 | 47 MW | — | View |
| Bairnsdale | Alinta DEBO | Operational · AI | In Service | Turbine - OCGT | Offline 0 MW | Fossil - Natural Gas Pipeline | BDL02 | 47 MW | — | View |
| Bairnsdale BESS | Bison Energy | Development · AI | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | 60/240 MW · AI | — | View | |
| Baking Board Battery Storage - KCI | Solar Projects Australia Pty Ltd | Development · AI | Publicly Announced | Storage - Battery | Not commissioned | Solar - Solar | 400 MW · AI | — | View | |
| Baking Board BESS (MMT) | MMT Projects T/A Renewable Projects Management | Development · AI | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | 300 MW · AI | — | View | |
| Baking Board Solar Farm - KCI | Solar Projects Australia Pty Ltd | Development · AI | Publicly Announced | Solar PV - Fixed | Not commissioned | Solar - Solar | 20 MW · AI | — | View | |
| Baking Board Solar Farm (MMT) | MMT Projects T/A Renewable Projects Management | Development · AI | Publicly Announced | Solar PV - Fixed | Not commissioned | Solar - Solar | — | — | View | |
| Baking Board Solar Farm Chinchilla | Chinchilla Solar Pty Ltd | Operational | In Service | Solar PV - Single axis tracking | No dispatch data | Solar - Solar | BAKING1 | 15 MW | Sep 2018 | View |
| Bald Hills Wind Farm | Bald Hills Wind Farm Pty Ltd | Operational · AI | In Service | Wind Turbine - Onshore | Generating +20.3 MW | Wind - Wind | BALDHWF1 | 107 MW | — | View |
| Baldon Wind Farm | Baldon Wind Farm Pty Ltd | Development · AI | Publicly Announced | Wind Turbine - Onshore | Not commissioned | Wind - Wind | 1404/400 MW · AI | — | View | |
| Baldon Wind Farm Stage 2 | Baldon Wind Farm Pty Ltd | Development | Publicly Announced | Wind Turbine - Onshore | Not commissioned | Wind - Wind | — | — | View | |
| Baldon Wind Farm Stage 2 - BESS | Baldon Wind Farm Pty Ltd | Development · AI | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | 200/400 MW · AI | — | View | |
| Ballarat Base Hospital Plant | Ballarat Health Services | Operational | In Service | Reciprocating Engine - Compression ignition | No dispatch data | Fossil - Diesel | BBASEHOS | 2 MW | — | View |
| Ballarat Energy Storage System | Ausnet Transmission Group Pty Ltd | Commissioning · AI | In Service | Storage - Battery | Offline 0 MW | Other - Other | BALB1 | 30/30 MW | — | View |
| Banana Range Wind Farm | Orange Creek Energy Pty Ltd | Development · AI | Publicly Announced | Wind Turbine - Onshore | Not commissioned | Wind - Wind | 230 MW · AI | Dec 2026 | View | |
| Bango 973 Wind Farm | BWF Nominees Pty Ltd as trustee for the BWF Trust | Operational · AI | In Service | Wind Turbine - Onshore | Generating +18.4 MW | Wind - Wind | BANGOWF1 | 159 MW | Sep 2022 | View |
| Bango 999 Wind Farm | BWF Nominees Pty Ltd as trustee for the BWF Trust | Operational · AI | In Service | Wind Turbine - Onshore | Generating +4.5 MW | Wind - Wind | BANGOWF2 | 85 MW | Sep 2022 | View |
| Banimboola | AGL Hydro Partnership | Operational | In Service | Hydro - Dam | No dispatch data | Hydro - Water | BAPS | 12 MW | — | View |
| Banksia Solar Farm | Venn Energy Pty / Banksia Solar Project Pty Ltd | Development · AI | Anticipated | Solar PV - Single axis tracking | Not commissioned | Solar - Solar | 100 MW · AI | Jan 2028 | View | |
| Bannaby BESS | Penso Power Australia Pty Ltd. | Development · AI | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | 750/3000 MW · AI | — | View | |
| Bannerton Solar Park | Foresight Solar Australia Pty Ltd | Operational · AI | In Service | Solar PV - Single axis tracking | Offline 0 MW | Solar - Solar | BANN1 | 100 MW | Jun 2019 | View |
| Baranduda Electrical Energy Reserve | Birdwood Energy Reserve Pty Ltd (ACN 658 507 441) as Trustee for Birdwood Energy Reserve Trust | Development · AI | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | BEER01 | 400/1800 MW · AI | Jun 2027 | View |
| Barcaldine Power Station | Ergon Energy Queensland Pty Ltd | Operational · AI | In Service | Turbine - OCGT | Offline 0 MW | Fossil - Natural Gas Pipeline | BARCALDN | 37 MW | — | View |
| Barcaldine Remote Community Solar Farm | Barcaldine Remote Community Solar Farm Pty Ltd | Operational · AI | In Service | Solar PV - Single axis tracking | Offline 0 MW | Solar - Solar | BARCSF1 | 20 MW | — | View |
| Barker Inlet Power Station | AGL Barker Inlet Pty Ltd | Operational · AI | In Service | Reciprocating Engine - Spark ignition | Offline 0 MW | Fossil - Natural Gas Pipeline | BARKIPS1 | 210 MW | Jan 2020 | View |
| Barker Inlet Power Station 2 | AGL Energy Limited | Operational · AI | Publicly Announced | Turbine - OCGT | Not commissioned | Fossil - Natural Gas Pipeline | 210 MW · AI | — | View | |
| Barn Hill | Barn HIll Wind Farm Pty Ltd | Development · AI | Publicly Announced | Wind Turbine - Onshore | Not commissioned | Wind - Wind | 360/1080 MW · AI | — | View | |
| Barn Hill BESS | AGL Energy Limited | Development · AI | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | 270/1080 MW · AI | — | View | |
| Barnawartha Solar & Energy Storage | Barnawartha Solar Pty Ltd | Operational · AI | Publicly Announced | Storage - Battery | Not commissioned | Solar - Solar | 5 MW · AI | — | View | |
| Barnawartha Solar & Energy Storage | Barnawartha Solar Pty Ltd | Operational · AI | Publicly Announced | Solar PV - Single axis tracking | Not commissioned | Solar - Solar | 5 MW · AI | — | View | |
| Baroota Pumped Hydro Project | ACEN Renewables | Development · AI | Publicly Announced | Hydro - Dam | Not commissioned | Hydro - Water | 250/2000 MW · AI | Dec 2025 | View | |
| Barron Gorge | CleanCo Queensland Limited | Operational · AI | In Service | Hydro - Run of River | Generating +28 MW | Hydro - Water | BARRON-1 | 35 MW | — | View |
| Barron Gorge | CleanCo Queensland Limited | Operational · AI | In Service | Hydro - Run of River | Generating +28.1 MW | Hydro - Water | BARRON-2 | 35 MW | — | View |
| Barwon Solar Farm & BESS | Elgin Energy Pty Ltd | Development · AI | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | 250/500 MW · AI | — | View | |
| Barwon Solar Farm & BESS | Elgin Energy Pty Ltd | Development · AI | Publicly Announced | Solar PV - Single axis tracking | Not commissioned | Solar - Solar | 330/500 MW · AI | — | View | |
| Bashan 1 Wind Farm | Goldwind Australia | Development · AI | Publicly Announced | Wind Turbine - Onshore | Not commissioned | Wind - Wind | 450/400 MW · AI | — | View | |
| Bass Offshore Wind Energy Project | Nexsphere Pty Ltd | Development · AI | Publicly Announced | Wind Turbine - Offshore | Not commissioned | Wind - Wind | 1500 MW · AI | — | View | |
| Bastyan | Hydro-Electric Corporation | Operational · AI | In Service | Hydro - Dam | Offline 0 MW | Hydro - Water | BASTYAN | 80 MW | — | View |
| Battery of the Nation - Stage 2b | Hydro Tasmania | Development · AI | Publicly Announced | Storage - Pumped hydro | Not commissioned | Hydro - Water | 2500 MW · AI | — | View | |
| Battery of the Nation - Stage 3b | Hydro Tasmania | Development · AI | Publicly Announced | Storage - Pumped hydro | Not commissioned | Hydro - Water | 750/15000 MW · AI | — | View | |
| Bayswater | AGL Macquarie Pty Limited | Operational · AI | In Service | Turbine - Steam Sub Critical | Generating +473.8 MW | Fossil - Black Coal | BW01 | 660 MW | — | View |
| Bayswater | AGL Macquarie Pty Limited | Operational · AI | In Service | Turbine - Steam Sub Critical | Generating +474.2 MW | Fossil - Black Coal | BW02 | 685 MW | — | View |
| Bayswater | AGL Macquarie Pty Limited | Operational | In Service | Turbine - Steam Sub Critical | Generating +329.1 MW | Fossil - Black Coal | BW03 | 685 MW | — | View |
| Bayswater | AGL Macquarie Pty Limited | Operational · AI | In Service | Turbine - Steam Sub Critical | Generating +475.3 MW | Fossil - Black Coal | BW04 | 685 MW | — | View |
| Beebo Battary - KCI | BEEBO SOLAR FARM PTY LTD as Trustee For BEEBO SOLAR FARM UNIT TRUST | Development · AI | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | 400/800 MW · AI | — | View | |
| Beebo Solar Farm - KCI | BEEBO SOLAR FARM PTY LTD as Trustee For BEEBO SOLAR FARM UNIT TRUST | Development · AI | Publicly Announced | Solar PV - Fixed | Not commissioned | Solar - Solar | 600/800 MW · AI | — | View | |
| Beelbee Solar Farm | Darling Downs Solar Farm Pty Ltd | Development · AI | Publicly Announced | Solar PV - Single axis tracking | Not commissioned | Solar - Solar | 240 MW · AI | — | View | |
| Belhaven Renewable Project | Vena Energy Services (Australia) Pty Ltd | Development · AI | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | 400/800 MW · AI | — | View | |
| Belhaven Renewable Project | Vena Energy Services (Australia) Pty Ltd | Development · AI | Publicly Announced | Solar PV - Fixed | Not commissioned | Solar - Solar | 400/800 MW · AI | — | View | |
| Bell Bay BESS | Equis Energy (Australia) Projects (Ngumi 6) Pty Ltd as trustee for the Equis Energy(Australia) Ngumi 6 Asset Trust | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Bell Bay Three | AETV Pty Ltd | Operational · AI | In Service | Turbine - OCGT | Offline 0 MW | Fossil - Natural Gas Pipeline | BBTHREE1 | 40 MW | — | View |
| Bell Bay Three | AETV Pty Ltd | Operational · AI | In Service | Turbine - OCGT | Offline 0 MW | Fossil - Natural Gas Pipeline | BBTHREE2 | 40 MW | — | View |
| Bell Bay Three | AETV Pty Ltd | Operational · AI | In Service | Turbine - OCGT | Offline 0 MW | Fossil - Natural Gas Pipeline | BBTHREE3 | 40 MW | — | View |
| Bellambi Heights Renewables Project | Vena Energy | Development · AI | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Bellbay Wind Farm (Low Heads Wind Farm Stage 2) | The Trustee for Equis Wind (Australia) LHWF2 Asset Trust | Development · AI | Publicly Announced | Wind Turbine - Onshore | Not commissioned | Wind - Wind | 224 MW · AI | Sep 2029 | View | |
| Ben Bullen BESS | Tetris Energy | Development · AI | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Bendemeer Renewable Energy Hub - Solar - KCI | Athena Energy Australia (Holdings) Pty Ltd | Development · AI | Publicly Announced | Solar PV - Fixed | Not commissioned | Solar - Solar | 218 MW · AI | — | View | |
| Bendemeer Renewable Energy Hub - Storage - KCI | Athena Energy Australia (Holdings) Pty Ltd | Development · AI | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | 100 MW · AI | — | View | |
| Bendemeer Renewable Energy Hub - Wind - KCI | Athena Energy Australia (Holdings) Pty Ltd | Development · AI | Publicly Announced | Wind Turbine - Onshore | Not commissioned | Wind - Wind | — | — | View | |
| Bennetts Creek BESS | Bennetts Creek Energy Project Pty Ltd in its capacity as Trustee for the Bennetts Creek Energy Project Trust | Development · AI | Anticipated | Storage - Battery | Not commissioned | Other - Other | — | Jul 2027 | View | |
| Beresfield BESS | firmpower_NR | Development · AI | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | 226/340 MW · AI | — | View | |
| Berrybank 1 BESS - Storage - KCI | Global Power Generation Australia Pty Ltd | Development · AI | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | 60/120 MW · AI | — | View | |
| Berrybank Wind Farm | Berrbank Development Pty ltd | Operational · AI | In Service | Wind Turbine - Onshore | Generating +6.1 MW | Wind - Wind | BRYB2WF2 | 109 MW | Aug 2022 | View |
| Berrybank Wind Farm | Berrbank Development Pty ltd | Operational · AI | In Service | Wind Turbine - Onshore | Generating +7.2 MW | Wind - Wind | BRYB1WF1 | 181 MW | Apr 2021 | View |
| Beryl BESS | Ratch-Australia Corporation | Development · AI | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | 100/200 MW · AI | — | View | |
| Beryl Solar Farm | FS NSW Project No 1 AT Pty Ltd as trustee of FS NSW Project No 1 Asset Trust | Operational · AI | In Service | Solar PV - Single axis tracking | Offline 0 MW | Solar - Solar | BERYLSF1 | 98 MW | May 2019 | View |
| BESS Finley | BESS Finley P/L | Development · AI | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | 100 MW · AI | — | View | |
| Big G Pumped Hydro Project | BE Power | Development · AI | Publicly Announced | Storage - Pumped hydro | Not commissioned | Hydro - Water | — | — | View | |
| Big-T Project | BE Power | Development · AI | Publicly Announced | Storage - Pumped hydro | Not commissioned | Hydro - Water | 400/4000 MW · AI | — | View | |
| Birkins Solar Farm - Storage - KCI | FRV Services Australia Pty Ltd | Development · AI | Publicly Announced | Storage - Battery | Not commissioned | Solar - Solar | BIRKBESS | — | — | View |
| Birriwa BESS | ACEN RENEWABLES | Development | Publicly Announced | Storage - Battery | Not commissioned | Solar - Solar | — | — | View | |
| Birriwa Solar Farm | ACEN RENEWABLES | Development | Publicly Announced | Solar PV - Fixed | Not commissioned | Solar - Solar | — | — | View | |
| Blackstone BESS | FIrm Power P/L | Development · AI | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | 331/500 MW · AI | — | View | |
| Blackstone BESS 2 - KCI | FIrm Power P/L | Development · AI | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Blacktop BESS - KCI | BESS Officer Pty Ltd | Development · AI | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | 100 MW · AI | — | View | |
| Blackwater Hybrid System | Blackwater Project Nominees Pty Ltd as trustee for the Blackwater Project Trust | Development · AI | Publicly Announced | Storage - Battery | Not commissioned | Solar - Solar | 200/400 MW · AI | Jun 2029 | View | |
| Blackwater Hybrid System | Blackwater Project Nominees Pty Ltd as trustee for the Blackwater Project Trust | Development · AI | Publicly Announced | Solar PV - Single axis tracking | Not commissioned | Solar - Solar | 170 MW · AI | Jun 2029 | View | |
| Blair Athol Solar Power Station | TerraCom Ltd | Development · AI | Publicly Announced | Solar PV - Fixed | Not commissioned | Solar - Solar | 60 MW · AI | — | View | |
| Blanche BESS - KCI | Blanche BESS Pty Ltd as trustee for Blanche BESS Trust | Development · AI | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | 128 MW · AI | — | View | |
| Blenheim BESS - KCI | Gatton Solar Farm Pty Ltd | Development · AI | Publicly Announced | Storage - Battery | Not commissioned | Solar - Solar | 29 MW · AI | — | View | |
| Blenheim Solar Farm - KCI | Gatton Solar Farm Pty Ltd | Development · AI | Publicly Announced | Solar PV - Fixed | Not commissioned | Solar - Solar | 106 MW · AI | — | View | |
| Blind Creek Solar Farm and Battery Energy Storage System | Ms BCSF Holdings Pty Ltd as trustee for the Blind Creek Solar Farm Trust | Development · AI | Publicly Announced | Storage - Battery | Not commissioned | Solar - Solar | 378/486 MW · AI | — | View | |
| Blind Creek Solar Farm and Battery Energy Storage System | Ms BCSF Holdings Pty Ltd as trustee for the Blind Creek Solar Farm Trust | Development · AI | Publicly Announced | Solar PV - Single axis tracking | Not commissioned | Solar - Solar | 378 MW · AI | — | View | |
| Blowering | Snowy Hydro Ltd | Operational · AI | In Service | Hydro - Dam | Offline 0 MW | Hydro - Water | BLOWERNG | 80 MW | — | View |
| Blue Mackerel North Off Shore Wind Farm | Arup Australia Pty Ltd | Development | Publicly Announced | Wind Turbine - Offshore | Not commissioned | Wind - Wind | — | — | View | |
| Bluegrass Solar Farm | X-Elio Australia Pty Ltd | Operational · AI | In Service | Solar PV - Single axis tracking | Generating +2.8 MW | Solar - Solar | BLUEGSF1 | 148 MW | Jun 2023 | View |
| Blyth BESS | Blyth Battery P/L as trustee for Blyth Battery Trust | Operational · AI | In Service | Storage - Battery | Discharging +11 MW | Other - Other | BLYTHB1 | 200/400 MW | Apr 2025 | View |
| Boco Rock Wind Farm | South Pacific Power Pty Ltd | Operational · AI | In Service | Wind Turbine - Onshore | Generating +24.6 MW | Wind - Wind | BOCORWF1 | 113 MW | — | View |
| Boco Rock Wind Farm | South Pacific Power Pty Ltd | Operational · AI | Publicly Announced | Wind Turbine - Onshore | Not commissioned | Wind - Wind | BOCOROC2 | 113 MW · AI | — | View |
| Bodangora Wind Farm | Bodangora Wind Farm Pty Ltd | Operational · AI | In Service | Wind Turbine - Onshore | Generating +14.7 MW | Wind - Wind | BODWF1 | 113 MW | Feb 2019 | View |
| Bogandilla Wind Farm | RES Australia Pty Ltd | Development · AI | Publicly Announced | Wind Turbine - Onshore | Not commissioned | Wind - Wind | 530 MW · AI | — | View | |
| Boggabri solar and storage project | Photon Energy | Development · AI | Publicly Announced | Storage - Battery | Not commissioned | Solar - Solar | — | — | View | |
| Bogong / Mackay | AGL Hydro Partnership | Operational · AI | In Service | Hydro - Dam | Offline 0 MW | Hydro - Water | MCKAY1 | 300 MW | — | View |
| Boiling Down BESS | Hanwha Energy Australia Pty Ltd | Development · AI | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | 260 MW · AI | — | View | |
| Bolivar Power Station | Iberdrola Australia Energy Markets Pty Limited | Operational · AI | In Service | Turbine - OCGT | Offline 0 MW | Fossil - Natural Gas Pipeline | BOLIVPS1 | 128 MW | Dec 2022 | View |
| Bolivar Waste Water Treatment | South Australian Water Corporation | — | removed | Reciprocating Engine - Spark ignition | Offline | Renewable Biomass or Waste - Biogas | BOLIVAR1 | 8 MW | — | View |
| Bolivar Waste Water Treatment | South Australian Water Corporation | Operational · AI | In Service | Storage - Battery | Offline 0 MW | Other - Other | BOWWBA1 | 3/5 MW | Feb 2023 | View |
| Bolivar Waste Water Treatment | South Australian Water Corporation | Operational · AI | In Service | Solar PV - Fixed | Offline 0 MW | Solar - Solar | BOWWPV1 | 8 MW | Oct 2022 | View |
| Bolivar Waste Water Treatment | South Australian Water Corporation | Operational | In Service | Reciprocating Engine - Spark ignition | No dispatch data | Renewable Biomass or Waste - Biogas | 8 MW | — | View | |
| Bomen Solar Farm | Spark Infrastructure Holdings No. 6 Pty Limited | Operational · AI | In Service | Solar PV - Single axis tracking | Offline 0 MW | Solar - Solar | BOMENSF1 | 121 MW | Nov 2020 | View |
| Bonnie Brae Hybrid Plant | Barathrum Energy Pty Ltd | Development · AI | Publicly Announced | Storage - Battery | Not commissioned | Solar - Solar | 70/260 MW · AI | — | View | |
| Bonshaw Solar Farm | GAIA Australia Pty Ltd | Development · AI | Publicly Announced | Solar PV - Single axis tracking | Not commissioned | Solar - Solar | 100 MW · AI | May 2027 | View | |
| Bookaar Solar Farm | Bookaar Renewables Pty ltd | Development · AI | Publicly Announced | Solar PV - Fixed | Not commissioned | Solar - Solar | 230 MW · AI | — | View | |
| Bookham WF & BESS | Bookham Wind Farm Pty Ltd | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Bookham WF & BESS | Bookham Wind Farm Pty Ltd | Development | Publicly Announced | Wind Turbine - Onshore | Not commissioned | Wind - Wind | — | — | View | |
| Boomber Green Energy Hub | Boomer Green Energy Hub Pty Ltd (a subsidiary of the Ark Energy Group) | Development | Publicly Announced | Wind Turbine - Onshore | Not commissioned | Wind - Wind | — | — | View | |
| Boomer Green Energy Hub | ARK Energy Corporation Pty Ltd | Development · AI | Publicly Announced | Other - Other | Not commissioned | Other - Other | — | — | View | |
| Boort Wind Farm | feraaustralia_nr | Development | Publicly Announced | Wind Turbine - Onshore | Not commissioned | Wind - Wind | — | Sep 2031 | View | |
| Boree Solar Project | Venn Energy Pty Ltd | Development · AI | Publicly Announced | Solar PV - Single axis tracking | Not commissioned | Solar - Solar | 180 MW · AI | — | View | |
| Borumba | Queensland Hydro | Development | Anticipated | Storage - Pumped hydro | Not commissioned | Hydro - Water | — | Jul 2035 | View | |
| Boulder Creek Wind Farm | Boulder Creek Wind Farm Pty Ltd as trustee for BCWF Unit Trust ABN and BCWF 2 Pty Limited | Development · AI | Anticipated | Wind Turbine - Onshore | Not commissioned | Wind - Wind | 221 MW · AI | Nov 2027 | View | |
| Bouldercombe Battery project | Genex Power Limited | Operational · AI | In Service | Storage - Battery | Offline +0.3 MW | Other - Other | BBATTERY1 | 50/100 MW | Nov 2023 | View |
| Bouldercombe Battery project - Stage 2 - KCI | Genex Power Limited | Development · AI | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | 50/200 MW · AI | — | View | |
| Bouldercombe North BESS - Quintas | Bouldercombe North BESS Pty Ltd | Development · AI | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | 400/1600 MW · AI | Mar 2027 | View | |
| Boulka Park BESS | The Trustee for X-ELIO BOULKA PARK TRUST | Development · AI | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | 250/500 MW · AI | — | View | |
| Boulka Park Solar Farm | The Trustee for X-ELIO BOULKA PARK TRUST | Development · AI | Publicly Announced | Solar PV - Single axis tracking | Not commissioned | Solar - Solar | 100 MW · AI | — | View | |
| Bowen Basin Sun Farm - KCI | Bowen Basin Sun Farm Pty Ltd | Development · AI | Publicly Announced | Solar PV - Fixed | Not commissioned | Solar - Solar | 130 MW · AI | — | View | |
| Bowen PHES - KCI | Blue Hydro Project Pty Ltd | Development · AI | Publicly Announced | Storage - Pumped hydro | Not commissioned | Hydro - Water | 750/18000 MW · AI | — | View | |
| Bowmans Creek Wind Farm | ARK Energy Corporation Pty Ltd | Development · AI | Publicly Announced | Wind Turbine - Onshore | Not commissioned | Wind - Wind | 347 MW · AI | — | View | |
| Bracewell Energy Park | TE H2 Australia | Development · AI | Publicly Announced | Storage - Battery | Not commissioned | Solar - Solar | 200/350 MW · AI | Jul 2031 | View | |
| Bracewell Energy Park | TE H2 Australia | Development · AI | Publicly Announced | Solar PV - Single axis tracking | Not commissioned | Solar - Solar | 500 MW · AI | Jul 2031 | View | |
| Braemar | Braemar Power Project Pty Ltd | Operational · AI | In Service | Turbine - OCGT | Offline 0 MW | Fossil - Coal Seam Methane | BRAEMAR1 | 188 MW | — | View |
| Braemar | Braemar Power Project Pty Ltd | Operational · AI | In Service | Turbine - OCGT | Offline 0 MW | Fossil - Coal Seam Methane | BRAEMAR2 | 188 MW | — | View |
| Braemar | Braemar Power Project Pty Ltd | Operational · AI | In Service | Turbine - OCGT | Offline 0 MW | Fossil - Coal Seam Methane | BRAEMAR3 | 188 MW | — | View |
| Braemar 2 Power Station | NewGen Braemar 2 Partnership comprising Arrow Braemar 2 Pty Ltd and Arrow Southern Generation Pty Ltd | Operational · AI | In Service | Turbine - OCGT | Offline +0.1 MW | Fossil - Coal Seam Methane | BRAEMAR5 | 173 MW | — | View |
| Braemar 2 Power Station | NewGen Braemar 2 Partnership comprising Arrow Braemar 2 Pty Ltd and Arrow Southern Generation Pty Ltd | Operational · AI | In Service | Turbine - OCGT | Offline 0 MW | Fossil - Coal Seam Methane | BRAEMAR6 | 173 MW | — | View |
| Braemar 2 Power Station | NewGen Braemar 2 Partnership comprising Arrow Braemar 2 Pty Ltd and Arrow Southern Generation Pty Ltd | Operational · AI | In Service | Turbine - OCGT | Offline +0.3 MW | Fossil - Coal Seam Methane | BRAEMAR7 | 173 MW | — | View |
| Braemar BESS | Braemar Power Project Pty Ltd | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Bremer Battery 1 | Libra Energy Pty Ltd | Development · AI | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | 212 MW · AI | — | View | |
| Bremer Battery 2 | Libra Energy Pty Ltd | Development · AI | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | 212 MW · AI | — | View | |
| Bremer Battery 3 | Libra Energy Pty Ltd | Development · AI | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | 212 MW · AI | — | View | |
| Bremer Battery 4 | Libra Energy Pty Ltd | Development · AI | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | 212 MW · AI | — | View | |
| Brendale BESS | Brendale Battery ProjectCo Pty Lt | Development | Committed | Storage - Battery | Not commissioned | Other - Other | 205/410 MW | Jun 2026 | View | |
| Brewongle Solar Farm | Edify Energy Pty Ltd | Development · AI | Publicly Announced | Solar PV - Fixed | Not commissioned | Solar - Solar | 100 MW · AI | — | View | |
| Bridle Track Solar Project | ACEN Renewables | Development · AI | Publicly Announced | Solar PV - Single axis tracking | Not commissioned | Solar - Solar | 300 MW · AI | — | View | |
| Brigalow GT (Kogan Creek GT) | CSE H2 Pty Ltd | Development · AI | Publicly Announced | Turbine - OCGT | Not commissioned | Fossil - Natural Gas | 400 MW · AI | Dec 2028 | View | |
| Brinkworth BESS | Brinkworth Solar Farm Pty Ltd | Development · AI | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Broadsound Solar Farm | Broadsound Solar Farm Pty Ltd | Development | Committed | Solar PV - Single axis tracking | Not commissioned | Solar - Solar | 368 MW | Jan 2027 | View | |
| Broadsound_BESS | Broadsound Solar Farm Pty Ltd | Development · AI | Anticipated | Storage - Battery | Not commissioned | Other - Other | 240/360 MW · AI | Jan 2027 | View | |
| Broadwater | Cape Byron Management PTY LTD | Operational · AI | In Service | Turbine - Steam Sub Critical | Generating +25.6 MW | Renewable Biomass or Waste - Biomass | BWTR1 | 38 MW | — | View |
| Broken Creek Solar Farm - KCI | BSR EPC Pty Limited | Development · AI | Publicly Announced | Solar PV - Fixed | Not commissioned | Solar - Solar | 173 MW · AI | — | View | |
| Broken Hill | MACQGEN | Operational · AI | In Service | Storage - Battery | Offline 0 MW | Other - Other | BHB1 | 50/50 MW | Jun 2024 | View |
| Broken Hill GT | Transgrid | Operational · AI | In Service | Turbine - OCGT | Offline 0 MW | Fossil - Diesel | GB01 | 50 MW | — | View |
| Broken Hill Solar Plant | PARF Company 6 Pty Limited | Operational · AI | In Service | Solar PV - Fixed | Offline 0 MW | Solar - Solar | BROKENH1 | 53 MW | — | View |
| Brooklyn LFG U1-3 | EDL LFG Vic Pty Ltd | Operational | In Service | Reciprocating Engine - Spark ignition | No dispatch data | Other - Other | BROOKLYN | 3 MW | — | View |
| Brown Mountain Hydro Power Station | Cochrane Dam Pty Ltd | Operational | In Service | Hydro - Dam | No dispatch data | Hydro - Water | BROWNMT | 5 MW | — | View |
| Browns Plains | EDL LFG (Qld) Pty Ltd | Operational | In Service | Reciprocating Engine - Spark ignition | No dispatch data | Other - Other | BPLANDF1 | 2 MW | — | View |
| Bulgana Green Power Hub - BESS | Bulgana Wind Farm Pty Ltd | Operational · AI | In Service | Storage - Battery | Offline +0.4 MW | Other - Other | BULBES1 | 20/34 MW | Nov 2021 | View |
| Bulgana Green Power Hub - Wind Farm | Bulgana Wind Farm Pty Ltd | Operational · AI | In Service | Wind Turbine - Onshore | Generating +13.2 MW | Wind - Wind | BULGANA1 | 204 MW | Nov 2021 | View |
| Bullawah Wind Farm – Stage 1 | Bullawah Wind Farm Pty Ltd | Development · AI | Publicly Announced | Wind Turbine - Onshore | Not commissioned | Wind - Wind | 314 MW · AI | — | View | |
| Bulli Creek Battery | Genex Power Limited | Development · AI | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | 400/1600 MW · AI | — | View | |
| Bulli Creek BESS (Trina) | Bulli Creek Hybrid Nominee Pty Ltd on behalf of Bulli Creek Hybrid Trust | Development · AI | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | 450/900 MW · AI | — | View | |
| Bulli Creek Solar Farm | Genex Power Limited | Development · AI | Publicly Announced | Solar PV - Single axis tracking | Not commissioned | Solar - Solar | — | — | View | |
| Bulli Creek Solar Farm (Trina) | Bulli Creek Hybrid Nominee Pty Ltd on behalf of Bulli Creek Hybrid Trust | Development · AI | Publicly Announced | Solar PV - Fixed | Not commissioned | Solar - Solar | 450 MW · AI | — | View | |
| Bullyard Solar Farm | EE Solar 9 Pty Ltd as trustee for the EE Solar 9 Trust | Development · AI | Anticipated | Solar PV - Single axis tracking | Not commissioned | Solar - Solar | 97 MW · AI | — | View | |
| Bundaberg Renewable Energy Park | Bundaberg Renewable Energy Park | Development · AI | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | 500 MW · AI | — | View | |
| Bundaberg Solar Farm | Bundaberg Development Pty Ltd | Development | Committed | Solar PV - Single axis tracking | Not commissioned | Solar - Solar | 78 MW | Dec 2025 | View | |
| Bundey BESS and Solar Project | Genaspi Energy Group Pty Ltd | Development · AI | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Bundey BESS and Solar Project | Genaspi Energy Group Pty Ltd | Development · AI | Publicly Announced | Solar PV - Fixed | Not commissioned | Solar - Solar | 475 MW · AI | — | View | |
| Bundy Energy Hub A (BESS) | Syn-Co Global | Development · AI | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | 250 MW · AI | — | View | |
| Bundy Energy Hub B (BESS) | SynCo Global | Development · AI | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | 250 MW · AI | — | View | |
| Bungaban BESS | Windlab Developments Pty Ltd | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Bungaban Wind Farm | Windlab Developments Pty Ltd | Development | Publicly Announced | Wind Turbine - Onshore | Not commissioned | Wind - Wind | — | Dec 2031 | View | |
| Bungala One Solar Farm | Bungala One Operations Pty Ltd as trustee for the Bungala One Operations Trust | Operational · AI | In Service | Solar PV - Single axis tracking | Offline 0 MW | Solar - Solar | BNGSF1 | 135 MW | Dec 2018 | View |
| Bungala Two Solar Farm | Bungala Two Operations Pty Ltd as trustee for the Bungala Two Operations Trust | Operational · AI | In Service | Solar PV - Single axis tracking | Offline 0 MW | Solar - Solar | BNGSF2 | 135 MW | Sep 2021 | View |
| Bungama BESS (ARENA ) | Bungama Bess Trust | Development · AI | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | 200/400 MW · AI | — | View | |
| Bungama Solar | Bungama Project (Solar) Operations Pty Ltd | Development | Committed | Storage - Battery | Not commissioned | Other - Other | 150/300 MW | Apr 2026 | View | |
| Bungama Solar | Bungama Project (Solar) Operations Pty Ltd | Development · AI | Publicly Announced | Solar PV - Single axis tracking | Not commissioned | Solar - Solar | 280 MW · AI | Aug 2028 | View | |
| Bunkers Hill Pumped Hydro | Pacific Hydro | Development · AI | Publicly Announced | Storage - Pumped hydro | Not commissioned | Hydro - Water | 296 MW · AI | Dec 2033 | View | |
| Bunkers Hill Wind Farm | Pacific Hydro | Development · AI | Publicly Announced | Wind Turbine - Onshore | Not commissioned | Wind - Wind | 7 MW · AI | — | View | |
| Burdekin BESS | BURDEKIN SOLAR FARM PTY LTD ATF BURDEKIN GENESIS PROJECT TRUST | Development · AI | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | 500/2000 MW · AI | Sep 2026 | View | |
| Burdekin Solar Farm - KCI | BURDEKIN SOLAR FARM PTY LTD ATF BURDEKIN GENESIS PROJECT TRUST | Development · AI | Publicly Announced | Solar PV - Single axis tracking | Not commissioned | Solar - Solar | 4 MW · AI | Feb 2026 | View | |
| Burgmanns BESS | Burgmanns BESS Pty Ltd | Development · AI | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Buronga BESS - Storage - KCI | BESS Clyde North Pty Ltd | Development · AI | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | 300/600 MW · AI | — | View | |
| Burrenbring Wind Farm | Iberdrola Australia Development Pty Limited | Development · AI | Publicly Announced | Wind Turbine - Onshore | Not commissioned | Wind - Wind | 360 MW · AI | — | View | |
| Burrendong | AGL Hydro Partnership | Operational | In Service | Hydro - Dam | No dispatch data | Hydro - Water | BDONGHYD | 19 MW | — | View |
| Burrendong Wind Farm | ARK Energy Corporation Pty Ltd | Development · AI | Publicly Announced | Wind Turbine - Onshore | Not commissioned | Wind - Wind | 434 MW · AI | — | View | |
| Burrinjuck | GSP Energy Pty Ltd | Operational | In Service | Hydro - Dam | No dispatch data | Hydro - Water | BURRIN | 34 MW | — | View |
| Burroway BESS | Edify Energy Pty Ltd | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Bushranger Hybrid Facility - Solar | SynCo Global | Development · AI | Publicly Announced | Solar PV - Fixed | Not commissioned | Solar - Solar | 300 MW · AI | — | View | |
| Butlers Gorge | Hydro-Electric Corporation | Operational | In Service | Hydro - Dam | No dispatch data | Hydro - Water | 2 MW | — | View | |
| Butlers Gorge | Hydro-Electric Corporation | Operational · AI | In Service | Hydro - Dam | Generating +8 MW | Hydro - Water | BUTLERSG | 12 MW | — | View |
| Calala Battery Energy Storage System 1 (CABESS1) | EquisEquis Energy (Australia) Projects (Ngumi 4) Pty Ltd | Development · AI | Committed | Storage - Battery | Not commissioned | Other - Other | 100/200 MW | Feb 2027 | View | |
| Calala Battery Energy Storage System 2 (CABESS2) | EquisEquis Energy (Australia) Projects (Ngumi 4) Pty Ltd | Development · AI | Committed | Storage - Battery | Not commissioned | Other - Other | 150/300 MW | Apr 2027 | View | |
| Callide B | CS Energy | Operational · AI | In Service | Turbine - Steam Sub Critical | Generating +320.1 MW | Fossil - Black Coal | CALL_B_1 | 350 MW | — | View |
| Callide B | CS Energy | Operational · AI | In Service | Turbine - Steam Sub Critical | Generating +279.8 MW | Fossil - Black Coal | CALL_B_2 | 350 MW | — | View |
| Callide C | Joint Venture; Callide Energy Pty Ltd and IG Power (Callide) Ltd. | Operational · AI | In Service | Turbine - Steam Super Critical | Generating +401.8 MW | Fossil - Black Coal | CPP_3 | 424 MW | Apr 2024 | View |
| Callide C | Joint Venture; Callide Energy Pty Ltd and IG Power (Callide) Ltd. | Operational · AI | In Service | Turbine - Steam Super Critical | Offline 0 MW | Fossil - Black Coal | CPP_4 | 420 MW | Apr 2025 | View |
| Callide Energy Hub - KCI | CSE BESS P/L | Development · AI | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | 200 MW · AI | — | View | |
| Callide Gas Peaker - KCI | CSE H2 Pty Ltd | Development · AI | Publicly Announced | Turbine - Other | Not commissioned | Other - Other | — | — | View | |
| Callide Power Station Solar Farm | Edify Energy Pty Ltd | Development · AI | Publicly Announced | Solar PV - Fixed | Not commissioned | Solar - Solar | — | — | View | |
| Callide Solar Power Station BESS | Edify Energy Pty Ltd | Development · AI | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | 210/200 MW · AI | — | View | |
| Callide Wind Farm | DP Green Energy Pty Limited | Development · AI | Publicly Announced | Wind Turbine - Onshore | Not commissioned | Wind - Wind | 422 MW · AI | — | View | |
| Calliope BESS | ekuenergy_nr | Development · AI | Publicly Announced | Other - Other | Not commissioned | Other - Other | 300/600 MW · AI | — | View | |
| Calvale BESS | Lightsource BP | Development · AI | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | 500 MW · AI | — | View | |
| Calvale LDES BESS | Released Energy Pty Ltd | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Calvale Solar Farm | Lightsource BP | Development · AI | Publicly Announced | Solar PV - Fixed | Not commissioned | Solar - Solar | — | — | View | |
| Campbells Forest Solar Farm | 4067 Pyramid Development Pty Ltd | Development · AI | Publicly Announced | Solar PV - Single axis tracking | Not commissioned | Solar - Solar | 205 MW · AI | — | View | |
| Camperdown BESS - Quintas | Camperdown BESS Pty Ltd | Development · AI | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | 75/150 MW · AI | Dec 2026 | View | |
| Canunda | Canunda Power Pty Ltd | Operational · AI | In Service | Wind Turbine - Onshore | Offline 0 MW | Wind - Wind | CNUNDAWF | 46 MW | — | View |
| Canyonleigh BESS | X-Elio Australia Pty Ltd | Development · AI | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Cape Winds Offshore Wind Farm | NeuGen Technology P/L | Development | Publicly Announced | Wind Turbine - Offshore | Not commissioned | Wind - Wind | — | — | View | |
| Capital 2 Wind Farm | Capital Wind Farm 2 Pty Ltd | Development · AI | Publicly Announced | Wind Turbine - Onshore | Not commissioned | Wind - Wind | 134 MW · AI | — | View | |
| Capital Battery | Capital Battery Pty Ltd | Commissioning · AI | In Commissioning | Storage - Battery | Charging -1 MW | Other - Other | CAPBES1 | 100/200 MW | Jun 2025 | View |
| Capital East Solar Farm P1 | IBERDROLA AUSTRALIA HOLDINGS PTY LIMITED | Operational | In Service | Solar PV - Fixed | No dispatch data | Solar - Solar | CESF1 | 2 MW | — | View |
| Capital Wind Farm | Renewable Power Ventures Pty Ltd | Operational · AI | In Service | Wind Turbine - Onshore | Generating +45.5 MW | Wind - Wind | CAPTL_WF | 141 MW | — | View |
| Capricorn BESS - KCI | ENEL Green Power Australia | Development · AI | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | Dec 2027 | View | |
| Capricornia Energy Hub (CEH) PHES | CI QLD PHES PTY LTD | Development · AI | Publicly Announced | Storage - Pumped hydro | Not commissioned | Hydro - Water | 750/12000 MW · AI | Dec 2031 | View | |
| Captains Mountain Wind Farm | vestas_NR | Development · AI | Publicly Announced | Wind Turbine - Onshore | Not commissioned | Wind - Wind | 217 MW · AI | Dec 2029 | View | |
| Carag Solar Farm | Enerparc Australia Pty Ltd | Commissioning · AI | Publicly Announced | Solar PV - Fixed | Not commissioned | Solar - Solar | 16 MW · AI | Mar 2025 | View | |
| Carmody's Hill BESS | Georgetown Hills Renewable Energy Pty Ltd as trustee for the Georgetown Hills Renewable Energy Trust | Development · AI | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | 118/240 MW · AI | Jan 2029 | View | |
| Carmody's Hill Wind Farm | Georgetown Hills Renewable Energy Pty Ltd as trustee for the Georgetown Hills Renewable Energy Trust | Development · AI | Publicly Announced | Wind Turbine - Onshore | Not commissioned | Wind - Wind | 247 MW · AI | Jan 2029 | View | |
| Carwarp BESS | Canadian Solar | Development · AI | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | 30 MW · AI | — | View | |
| Carwarp Solar Farm - Stage I | Canadian Solar (Australia) Pty Ltd | Development · AI | Publicly Announced | Solar PV - Single axis tracking | Not commissioned | Solar - Solar | 150 MW · AI | — | View | |
| Carwarp Solar Farm - Stage II | Canadian Solar (Australia) Pty Ltd | Development · AI | Publicly Announced | Solar PV - Single axis tracking | Not commissioned | Solar - Solar | 150 MW · AI | — | View | |
| Catagunya / Liapootah / Wayatinah | Hydro-Electric Corporation | Operational · AI | In Service | Hydro - Dam | Generating +103.6 MW | Hydro - Water | LI_WY_CA | 177 MW | — | View |
| Cathedral Rocks | JV Cathedral Rock Investments Pty Ltd - Acciona Energy Australia Global Pty Ltd and EnergyAustralia Pty Ltd | Operational · AI | In Service | Wind Turbine - Onshore | Offline 0 MW | Wind - Wind | CATHROCK | 62 MW | — | View |
| Cattle Creek Wind Farm - KCI | RWE Renewables Australia Pty Ltd | Development · AI | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Cattle Creek Wind Farm - KCI | RWE Renewables Australia Pty Ltd | Development · AI | Publicly Announced | Wind Turbine - Onshore | Not commissioned | Wind - Wind | — | — | View | |
| Cattle Hill Wind Farm | Wild Cattle Hill Pty Ltd | Operational · AI | In Service | Wind Turbine - Onshore | Generating +137.7 MW | Wind - Wind | CTHLWF1 | 144 MW | Feb 2021 | View |
| Ceduna BESS | tetrisenergy_nr | Development · AI | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | 25/200 MW · AI | — | View | |
| Ceduna Solar Farm | tetrisenergy_nr | Development · AI | Publicly Announced | Solar PV - Fixed | Not commissioned | Solar - Solar | 200 MW · AI | — | View | |
| Ceduna Wind Farm | tetrisenergy_nr | Development · AI | Publicly Announced | Wind Turbine - Onshore | Not commissioned | Wind - Wind | 400 MW · AI | — | View | |
| Central Para Wind Farm (KCI) | Macleay Ventures Pty Ltd. | Development · AI | Publicly Announced | Wind Turbine - Onshore | Not commissioned | Wind - Wind | 399 MW · AI | — | View | |
| Central West Pumped Hydro | ATCO Australia Pumped Hydro Pty Ltd | Development · AI | Publicly Announced | Hydro - Dam | Not commissioned | Hydro - Water | 325 MW · AI | — | View | |
| Cethana | Hydro-Electric Corporation | Operational · AI | In Service | Hydro - Dam | Offline 0 MW | Hydro - Water | CETHANA | 85 MW | — | View |
| Cethana Pumped Hydro Option | Hydro-Electric Corporation | Development · AI | Publicly Announced | Storage - Pumped hydro | Not commissioned | Hydro - Water | 750/15000 MW · AI | — | View | |
| Challicum Hills | Pacific Hydro Challicum Hills Pty Ltd | Operational | In Service | Wind Turbine - Onshore | No dispatch data | Wind - Wind | 53 MW | — | View | |
| Challicum Hills | Pacific Hydro Challicum Hills Pty Ltd | — | removed | Wind Turbine - Onshore | Offline | Wind - Wind | CHALLHWF | 53 MW | — | View |
| Chances Plain Solar Farm | juwi Renewable Energy Pty Ltd | Development · AI | Publicly Announced | Solar PV - Single axis tracking | Not commissioned | Solar - Solar | 98 MW · AI | — | View | |
| Chepstowe Wind Farm - VIC | Chepstowe Wind Farm Pty Ltd | Operational | In Service | Wind Turbine - Onshore | No dispatch data | Wind - Wind | CHPSTWF1 | 6 MW | Mar 2015 | View |
| Cherry Tree Wind Farm | Cherry Tree Wind Farm Pty Limited A.T.F. Cherry Tree Project Trust | Operational · AI | In Service | Wind Turbine - Onshore | Generating +51 MW | Wind - Wind | CHYTWF1 | 58 MW | Jul 2020 | View |
| Childers Solar Farm | Childers Solar Pty Ltd as trustee for the Childers Solar Trust | Operational · AI | In Service | Solar PV - Single axis tracking | Generating +8.6 MW | Solar - Solar | CHILDSF1 | 64 MW | Jun 2019 | View |
| Chinchilla BESS | CSE BESS Pty Ltd | Operational · AI | In Commissioning | Storage - Battery | Offline +0.1 MW | Other - Other | CHBESS1 | 100/200 MW | Jul 2024 | View |
| Chinchilla Solar Farm | First Solar Australia Pty Ltd | Development · AI | Publicly Announced | Solar PV - Single axis tracking | Not commissioned | Solar - Solar | 113 MW · AI | — | View | |
| Chipping Norton Waste to Energy | Benedict Indistries P/L | Development · AI | Publicly Announced | Turbine - Steam Sub Critical | Not commissioned | Other - Other | 8 MW · AI | — | View | |
| Christies Beach Wastewater Treatment Plant | South Australian Water Corporation | Commissioning | In Commissioning | Solar PV - Single axis tracking | No dispatch data | Solar - Solar | CBWWPV1 | 3 MW | Oct 2022 | View |
| Christies Beach Wastewater Treatment Plant | South Australian Water Corporation | Commissioning · AI | In Commissioning | Storage - Battery | Offline 0 MW | Other - Other | CBWWBA1 | 2/4 MW | Jan 2023 | View |
| Cimitiere Plains Solar Farm | Sun Spot 9 Pty Ltd | Development · AI | Publicly Announced | Solar PV - Fixed | Not commissioned | Solar - Solar | 288 MW · AI | — | View | |
| Clare Solar Farm | Clare Asset Co Pty Ltd ATF Clare Asset Trust | Operational · AI | In Service | Solar PV - Single axis tracking | Generating +10.8 MW | Solar - Solar | CLARESF1 | 110 MW | — | View |
| Clarke Creek 2 BESS - KCI | Isaac Wind and Solar Energy Pty Ltd | Development · AI | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Clarke Creek Wind Farm | Squadron Energy Services Pty Ltd | Commissioning · AI | In Commissioning | Wind Turbine - Onshore | Generating +89.5 MW | Wind - Wind | CLRKCWF2 | 104 MW | Sep 2025 | View |
| Clarke Creek Wind Farm | Squadron Energy Services Pty Ltd | Commissioning · AI | In Commissioning | Wind Turbine - Onshore | Generating +235.8 MW | Wind - Wind | CLRKCWF1 | 347 MW | Sep 2025 | View |
| Clarke Creek Wind Farm Stage 2 | Squadron Energy Services Pty Ltd | Development · AI | Publicly Announced | Wind Turbine - Onshore | Not commissioned | Wind - Wind | 696 MW · AI | — | View | |
| Clayton | EDL LFG Vic Pty Ltd | Closed | Withdrawn - Permanent | Reciprocating Engine - Spark ignition | Offline | Renewable Biomass or Waste - Landfill Gas | CLAYTON | 12 MW | — | View |
| Clements Gap - BESS | Pacific Hydro Clements Gap Pty Ltd | Development | Committed | Storage - Battery | Not commissioned | Other - Other | 60/120 MW | May 2026 | View | |
| Clements Gap Wind Farm | Pacific Hydro Clements Gap Pty Ltd | Operational · AI | In Service | Wind Turbine - Onshore | Generating +38 MW | Wind - Wind | CLEMGPWF | 57 MW | — | View |
| Clermont Solar Farm | Clermont Asset Co Pty Ltd as Trustee for Clerrmont Solar Unit Trust | Operational · AI | In Service | Solar PV - Single axis tracking | Generating +3 MW | Solar - Solar | CLERMSF1 | 93 MW | Mar 2019 | View |
| Clover | AGL Hydro Partnership | Commissioning · AI | In Service | Hydro - Dam | Generating +17 MW | Hydro - Water | CLOVER | 29 MW | — | View |
| Cluny | Hydro-Electric Corporation | Operational · AI | In Service | Hydro - Dam | Generating +10.6 MW | Hydro - Water | CLUNY | 19 MW | — | View |
| Cobbora BESS | Pacific Partnerships | Development · AI | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | 521/800 MW · AI | — | View | |
| Cobbora Solar Farm | pacificp_NR | Development · AI | Publicly Announced | Solar PV - Fixed | Not commissioned | Solar - Solar | 1000 MW · AI | — | View | |
| Cobden BESS - Quintas | Cobden BESS Pty Ltd | Development · AI | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | 60/240 MW · AI | Dec 2025 | View | |
| Codrington Wind Farm | Energy Pacific (Vic) Pty Ltd | Operational | In Service | Wind Turbine - Onshore | No dispatch data | Wind - Wind | CODRNGTON | 18 MW | — | View |
| Cohuna Solar Farm | Cohuna Solar Farm Pty Ltd as trustee for the Cohuna Solar Farm Trust | Construction · AI | In Commissioning | Solar PV - Single axis tracking | Offline 0 MW | Solar - Solar | COHUNSF1 | 31 MW | — | View |
| Coleambally BESS | Coleambally BESS Trust | Development · AI | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | 100/400 MW · AI | — | View | |
| Coleambally Solar Farm | Coleambally Solar Pty Ltd | Operational · AI | In Service | Solar PV - Single axis tracking | Offline 0 MW | Solar - Solar | COLEASF1 | 150 MW | — | View |
| Collector | Ratch Australia | Operational · AI | In Service | Wind Turbine - Onshore | Generating +38.8 MW | Wind - Wind | COLWF01 | 227 MW | Dec 2020 | View |
| Collinsville Coal Fired Power Station Project - KCI | Shine Energy | Development · AI | Publicly Announced | Other - Other | Not commissioned | Fossil - Black Coal | 990 MW · AI | — | View | |
| Collinsville Green Energy Hub | COLLINSVILLE GREEN ENERGY HUB PTY LTD | Development | Publicly Announced | Wind Turbine - Onshore | Not commissioned | Wind - Wind | — | — | View | |
| Collinsville North Battery Project | TBSOL | Development · AI | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | 100/100 MW · AI | Dec 2026 | View | |
| Collinsville PV | Ratch Australia | Operational · AI | In Service | Solar PV - Fixed | Generating +2.1 MW | Solar - Solar | CSPVPS1 | 43 MW | Aug 2018 | View |
| Colongra | Snowy Hydro Ltd | Operational · AI | In Service | Turbine - OCGT | Offline 0 MW | Fossil - Natural Gas Pipeline | CG1 | 181 MW | — | View |
| Colongra | Snowy Hydro Ltd | Operational · AI | In Service | Turbine - OCGT | Offline 0 MW | Fossil - Natural Gas Pipeline | CG2 | 181 MW | — | View |
| Colongra | Snowy Hydro Ltd | Operational · AI | In Service | Turbine - OCGT | Offline 0 MW | Fossil - Natural Gas Pipeline | CG3 | 181 MW | — | View |
| Colongra | Snowy Hydro Ltd | Operational · AI | In Service | Turbine - OCGT | Offline 0 MW | Fossil - Natural Gas Pipeline | CG4 | 181 MW | — | View |
| Colosseum Solar Farm | Global Power Generation Australia Pty Ltd | Development | Publicly Announced | Solar PV - Fixed | Not commissioned | Solar - Solar | — | — | View | |
| Columboola BESS | Columboola BESS Nominees Pty Ltd | Development · AI | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Columboola BESS - KCI | StorEnergy P/L | Development · AI | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | 400 MW · AI | — | View | |
| Columboola Solar Farm | Luminous Energy | Operational · AI | In Service | Solar PV - Single axis tracking | Generating +6.1 MW | Solar - Solar | COLUMSF1 | 217 MW | Oct 2023 | View |
| Comet Energy Park | Comet Energy Pty Ltd | Development · AI | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | 120/800 MW · AI | — | View | |
| Comet Park BESS - KCI | Samsung C&T Renewable Energy Australia Pty Ltd. | Development · AI | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | 189/600 MW · AI | — | View | |
| Condamine A | QGC Sales QLD Pty Ltd | Operational · AI | In Service | Turbine - Steam Sub Critical | Offline 0 MW | Fossil - Coal Seam Methane | CPSA | 57 MW | — | View |
| Condamine A | QGC Sales QLD Pty Ltd | Operational · AI | In Service | Turbine - CCGT | Offline 0 MW | Fossil - Coal Seam Methane | CPSA | 87 MW | — | View |
| Condong | Cape Byron Management PTY LTD | Operational · AI | In Service | Turbine - Steam Sub Critical | Generating +12.9 MW | Renewable Biomass or Waste - Bagasse | CONDONG1 | 30 MW | — | View |
| Connewarren BESS | Akaysha Energy Pty Ltd | Development · AI | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Conroys Gap WF - KCI | Waldren Construction Pty Ltd. | Development · AI | Publicly Announced | Wind Turbine - Onshore | Not commissioned | Wind - Wind | 30 MW · AI | — | View | |
| Cooba Solar Farm - KCI | Venn Energy Pty Ltd / Cooba Solar Project Pty Ltd | Development · AI | Publicly Announced | Solar PV - Single axis tracking | Not commissioned | Solar - Solar | 319 MW · AI | — | View | |
| Cooma BESS (ACEN) | ACEN RENEWABLES | — | removed | Storage - Battery | Offline | Other - Other | 80 MW | — | View | |
| Cooma Hybrid BESS and Solar Farm (ACEN) | ACEN RENEWABLES | Development · AI | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | Jul 2028 | View | |
| Cooma Hybrid BESS and Solar Farm (ACEN) | ACEN RENEWABLES | Development · AI | Publicly Announced | Solar PV - Fixed | Not commissioned | Solar - Solar | 100 MW · AI | Mar 2028 | View | |
| Cooma Solar And BESS (ACEN) | ACEN RENEWABLES | Development | Publicly Announced | Solar PV - Single axis tracking | Not commissioned | Solar - Solar | — | — | View | |
| Cooma Solar And BESS (ACEN) | ACEN RENEWABLES | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Cooma Solar Farm (Lightsource) | Lightsource Development Services Australia Pty Ltd | Development · AI | Publicly Announced | Solar PV - Fixed | Not commissioned | Solar - Solar | 100 MW · AI | — | View | |
| Coonooer Bridge Wind Farm | Coonooer Bridge Wind Farm Pty Ltd | Operational | In Service | Wind Turbine - Onshore | No dispatch data | Wind - Wind | CBWF1 | 20 MW | — | View |
| Coopers Gap Wind Farm | PARF Company 6 Pty Limited | Operational · AI | In Service | Wind Turbine - Onshore | Generating +104.9 MW | Wind - Wind | COOPGWF1 | 453 MW | Apr 2022 | View |
| Cooroy BESS | Enervest Operations Pty Ltd | Development · AI | Publicly Announced | Storage - Battery | Not commissioned | Solar - Solar | 100/400 MW · AI | — | View | |
| Copeton | AGL | Operational | In Service | Hydro - Dam | No dispatch data | Hydro - Water | COPTNHYD | 20 MW | — | View |
| Coppabella Wind Farm | Coppabella Wind Farm Pty Ltd | Development · AI | Anticipated | Wind Turbine - Onshore | Not commissioned | Wind - Wind | COPBEL | 290 MW · AI | Sep 2027 | View |
| Corop BESS | Leeson Solar Pty Ltd. | Development · AI | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | 400 MW · AI | — | View | |
| Corop Solar Farm | Leeson Solar Pty Ltd. | Development · AI | Publicly Announced | Solar PV - Fixed | Not commissioned | Solar - Solar | — | — | View | |
| Corowa Solar Farm | Corowa Operationsco Pty Ltd as trustee for Corowa Operations Trust | Operational · AI | In Service | Solar PV - Single axis tracking | Offline 0 MW | Solar - Solar | CRWASF1 | 36 MW | Sep 2021 | View |
| Cranbourne BESS (Macquarie) | Macquarie Corporate Holdings Pty Ltd | Development · AI | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | 150/300 MW · AI | — | View | |
| Crookwell 2 Wind Farm | Crookwell Development Pty Ltd | Operational · AI | In Service | Wind Turbine - Onshore | Generating +44.6 MW | Wind - Wind | CROOKWF2 | 96 MW | Sep 2018 | View |
| Crookwell 3 Wind Farm | Crookwell 3 Development Pty Ltd | Commissioning · AI | In Commissioning | Wind Turbine - Onshore | Generating +21.7 MW | Wind - Wind | CROOKWF3 | 58 MW | Nov 2024 | View |
| Cross Roads Energy Solar Farm - KCI | Crossroads Energy Pty Ltd | Development · AI | Publicly Announced | Solar PV - Fixed | Not commissioned | Solar - Solar | 650 MW · AI | — | View | |
| Crowlands Wind Farm | Pacific Hydro Crowlands Pty Ltd | Operational · AI | In Service | Wind Turbine - Onshore | Generating +2.4 MW | Wind - Wind | CROWLWF1 | 80 MW | — | View |
| Croydon Hybrid Facility - Solar And BESS | ACEnergy Pty Ltd | Development | Publicly Announced | Solar PV - Fixed | Not commissioned | Solar - Solar | — | — | View | |
| Croydon Hybrid Facility - Solar And BESS | ACEnergy Pty Ltd | Development | Publicly Announced | Storage - Battery | Not commissioned | Solar - Solar | — | — | View | |
| Crudine Ridge Wind Farm | CRWF Nominees Pty Ltd as trustee of the CRWF Trust | Operational · AI | In Service | Wind Turbine - Onshore | Generating +35.7 MW | Wind - Wind | CRURWF1 | 142 MW | Jun 2022 | View |
| Culcairn Solar Farm | Culcairn Solar Farm Pty Ltd as trustee for Culcairn Solar Farm Trust | — | removed | Solar PV - Single axis tracking | Offline | Solar - Solar | 350 MW | Jul 2025 | View | |
| Culcairn Solar Farm | Culcairn Solar Farm Pty Ltd as trustee for Culcairn Solar Farm Trust | Operational · AI | Committed | Solar PV - Single axis tracking | Not commissioned | Solar - Solar | CUSF1 | 350 MW | Aug 2025 | View |
| Cullerin Range Wind Farm | Cullerin Range Wind Farm Pty Ltd | Operational · AI | In Service | Wind Turbine - Onshore | Generating +13.2 MW | Wind - Wind | CULLRGWF | 30 MW | — | View |
| Cultana Solar Farm | Cultana Solar Project Company Pty Ltd as trustee for the Cultana Solar Farm Trust | Development · AI | Publicly Announced | Solar PV - Single axis tracking | Not commissioned | Solar - Solar | 357 MW · AI | Dec 2029 | View | |
| Dalby Solar Farm | Dalby Asset Trust | Development · AI | Publicly Announced | Solar PV - Fixed | Not commissioned | Solar - Solar | 5 MW · AI | — | View | |
| Dalrymple BESS | ElectraNet | Operational · AI | In Service | Storage - Battery | Offline -0.1 MW | Other - Other | DALNTH1 | 30/9 MW | — | View |
| Dalvui BESS | Tilt Renewables Australia Pty Ltd | Development · AI | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | 250/500 MW · AI | — | View | |
| Dapper Solar Farm | BORAL | Development · AI | Publicly Announced | Solar PV - Single axis tracking | Not commissioned | Solar - Solar | 4 MW · AI | — | View | |
| Darling Downs | Origin Energy Power Limited | Operational · AI | In Service | Turbine - CCGT | Generating +472.7 MW | Fossil - Coal Seam Methane | DDPS1 | 645 MW | — | View |
| Darling Downs Battery | BORAL | Development · AI | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | 250/500 MW · AI | Dec 2026 | View | |
| Darling Downs BESS (APA) | APA Group | Development · AI | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | 200/800 MW · AI | — | View | |
| Darling Downs Power Station 2 | Origin Energy | Development | Publicly Announced | Turbine - OCGT | Not commissioned | Geothermal - Other | — | — | View | |
| Darling Downs Solar Farm | Darling Downs Solar Farm Pty Ltd | Operational · AI | In Service | Solar PV - Fixed | Generating +5.4 MW | Solar - Solar | DDSF1 | 121 MW | — | View |
| Darlington Point Energy Storage System | DPESS Pty Ltd | Operational · AI | In Service | Storage - Battery | Offline 0 MW | Other - Other | DPNTB1 | 25/50 MW | Aug 2023 | View |
| Darlington Point Solar Farm | Darlington Point Solar Farm Pty Ltd | Operational · AI | In Service | Solar PV - Single axis tracking | Offline 0 MW | Solar - Solar | DARLSF1 | 275 MW | Apr 2021 | View |
| Darlington Wind Farm - GPG | globalpower-generation_NR | Development · AI | Publicly Announced | Wind Turbine - Onshore | Not commissioned | Wind - Wind | — | — | View | |
| Darnum BESS | samsung_NR | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Daroobalgie Solar Farm | Pacific Hydro Australia Developments Pty Ltd | Development · AI | Publicly Announced | Solar PV - Single axis tracking | Not commissioned | Solar - Solar | 100 MW · AI | Dec 2032 | View | |
| Dartmouth | AGL Hydro Partnership | Operational · AI | In Service | Hydro - Dam | Offline 0 MW | Hydro - Water | DARTM1 | 185 MW | — | View |
| Davenport BESS | Green Gold Energy Pty Ltd | Development · AI | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | 270/540 MW · AI | — | View | |
| Dawson Wind Farm | Highland Energy Australia Pty Ltd | Development · AI | Publicly Announced | Wind Turbine - Onshore | Not commissioned | Wind - Wind | 560 MW · AI | — | View | |
| Daydream Solar Farm | The Daydream Solar Farm Trust | Operational · AI | In Service | Solar PV - Single axis tracking | Generating +18.3 MW | Solar - Solar | DAYDSF1 | 168 MW | — | View |
| Deal 1 (West) Off Shore Wind Farm | BayWa r.e. Australia Offshore Wind Projects 1 Pty Ltd | Development | Publicly Announced | Wind Turbine - Offshore | Not commissioned | Wind - Wind | — | — | View | |
| Deal 2 (East) Off Shore Wind Farm | BayWa r.e. Australia Offshore Wind Projects 2 Pty Ltd | Development | Publicly Announced | Wind Turbine - Offshore | Not commissioned | Wind - Wind | — | — | View | |
| Deargee | ACEN Renewables | — | removed | Storage - Battery | Offline | Other - Other | 700/2800 MW | — | View | |
| Deargee Solar And BESS | ACEN Renewables | Development | Publicly Announced | Solar PV - Single axis tracking | Not commissioned | Solar - Solar | — | — | View | |
| Deargee Solar And BESS | ACEN Renewables | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Dederang BESS | Mint Renewables | Development · AI | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | 200/400 MW · AI | — | View | |
| Deepwater BESS | Ib vogt Development Australia Pty Ltd | Development · AI | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Deepwater Solar Farm | Ib vogt Development Australia Pty Ltd | Development · AI | Publicly Announced | Solar PV - Fixed | Not commissioned | Solar - Solar | — | — | View | |
| Delburn Wind Farm | Delburn Wind Farm Pty Ltd | Development · AI | Publicly Announced | Wind Turbine - Onshore | Not commissioned | Wind - Wind | 218 MW · AI | — | View | |
| Deniliquin BESS - Storage - KCI | Enervest Pty Ltd | Development · AI | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | 150 MW · AI | — | View | |
| Deniliquin East BESS | BESS Arctic Pty Ltd | Development · AI | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | 100/200 MW · AI | Mar 2026 | View | |
| Denman BESS - KCI | NEMMCOM Renewables Australia Developments Pty Ltd | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Derby Solar Farm & BESS | DERBY SOLAR PROJECT PTY LTD | Development · AI | Publicly Announced | Storage - Battery | Not commissioned | Solar - Solar | 95/110 MW · AI | Sep 2027 | View | |
| Derby Solar Farm & BESS | DERBY SOLAR PROJECT PTY LTD | Development · AI | Anticipated | Solar PV - Single axis tracking | Not commissioned | Solar - Solar | 95 MW · AI | Sep 2027 | View | |
| Derwent Valley Wind Farm | West Coast Renewable Energy | Development · AI | Publicly Announced | Wind Turbine - Onshore | Not commissioned | Wind - Wind | 150 MW · AI | — | View | |
| Devils Gate | Hydro-Electric Corporation | Operational · AI | In Service | Hydro - Dam | Generating +57.5 MW | Hydro - Water | DEVILS_G | 60 MW | — | View |
| Devlins Bridge Battery Storage | Devlins Bridge Wind Farm Holdco Pty Ltd | Development · AI | Publicly Announced | Storage - Battery | Not commissioned | Wind - Wind | 600 MW · AI | — | View | |
| Devlins Wind Farm | Devlins Bridge Wind Farm Holdco Pty Ltd | Development · AI | Publicly Announced | Wind Turbine - Onshore | Not commissioned | Wind - Wind | 663 MW · AI | — | View | |
| Diapur Wind Farm | Diapur Wind Farm Pty Ltd | Operational · AI | In Service | Wind Turbine - Onshore | Generating +0.5 MW | Wind - Wind | DIAPURWF1 | 8 MW | Oct 2021 | View |
| Dinawan Energy Hub | Spark Renewables Pty Ltd | Development · AI | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | Mar 2031 | View | |
| Dinawan Energy Hub | Spark Renewables Pty Ltd | Development · AI | Publicly Announced | Solar PV - Single axis tracking | Not commissioned | Solar - Solar | 300 MW · AI | Mar 2031 | View | |
| Dinawan Energy Hub | Spark Renewables Pty Ltd | Development · AI | Publicly Announced | Wind Turbine - Onshore | Not commissioned | Wind - Wind | 403 MW · AI | Jun 2031 | View | |
| Dingo Solar Farm | ESCO Pacific | Development · AI | Publicly Announced | Solar PV - Fixed | Not commissioned | Solar - Solar | 85 MW · AI | — | View | |
| Direk BESS | BESS DIREK PTY LTD | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Doreen BESS | BZ Renewables Holdings Pty Ltd | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Dry Creek GT | Synergen Power Pty Ltd | Operational · AI | In Service | Turbine - OCGT | Offline 0 MW | Fossil - Natural Gas Pipeline | DRYCGT1 | 52 MW | — | View |
| Dry Creek GT | Synergen Power Pty Ltd | Operational · AI | In Service | Turbine - OCGT | Offline 0 MW | Fossil - Natural Gas Pipeline | DRYCGT2 | 52 MW | — | View |
| Dry Creek GT | Synergen Power Pty Ltd | Operational · AI | In Service | Turbine - OCGT | Offline 0 MW | Fossil - Natural Gas Pipeline | DRYCGT3 | 52 MW | — | View |
| Dugald River Wind Faarm | MMG | Development | Publicly Announced | Wind Turbine - Onshore | Not commissioned | Wind - Wind | — | — | View | |
| Dulacca Wind Farm | Dulacca Energy Project Co Pty Ltd | Operational · AI | In Service | Wind Turbine - Onshore | Generating +108.6 MW | Wind - Wind | DULAWF1 | 173 MW | Oct 2023 | View |
| Dumaresq Solar Farm | Dumaresq Solar Farm Pty Limited | Development | Publicly Announced | Solar PV - Single axis tracking | Not commissioned | Solar - Solar | — | — | View | |
| Dundonnell Wind Farm | Tilt Renewables | Operational · AI | In Service | Wind Turbine - Onshore | Generating +1.3 MW | Wind - Wind | DUNDWF2 | 46 MW | Jun 2022 | View |
| Dundonnell Wind Farm | Tilt Renewables | Operational · AI | In Service | Wind Turbine - Onshore | Generating +8.8 MW | Wind - Wind | DUNDWF3 | 122 MW | Jun 2022 | View |
| Dundonnell Wind Farm | Tilt Renewables | Operational · AI | In Service | Wind Turbine - Onshore | Generating +3.6 MW | Wind - Wind | DUNDWF1 | 168 MW | Jun 2022 | View |
| Dunedoo Solar Farm | ib vogt GmbH / Sun Spot 4 | Development | Publicly Announced | Solar PV - Single axis tracking | Not commissioned | Solar - Solar | — | — | View | |
| Dungowan 3,000 MWH PHES | Dungowan Pumped Hydro Pty Ltd | Development | Publicly Announced | Storage - Pumped hydro | Not commissioned | Hydro - Water | — | Mar 2030 | View | |
| Dunmore BESS | Samsung C&T | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Dunmore Solar Farm | Samsung C&T | Development | Publicly Announced | Solar PV - Single axis tracking | Not commissioned | Solar - Solar | — | — | View | |
| East End BESS | TE H2 Australia Pty Ltd | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Eastern Creek | EDL LFG NSW Pty Ltd | Operational | In Service | Reciprocating Engine - Spark ignition | No dispatch data | Renewable Biomass or Waste - Landfill Gas | EASTCRK | 5 MW | — | View |
| Eastern Creek 2 Gas Utilisation Facility | LMS Energy Pty Ltd | — | removed | Reciprocating Engine - Spark ignition | Offline | Renewable Biomass or Waste - Landfill Gas | EASTCRK2 | 4 MW | — | View |
| Eastern Creek 2 Gas Utilisation Facility | LMS Energy Pty Ltd | Operational | In Service | Reciprocating Engine - Spark ignition | No dispatch data | Renewable Biomass or Waste - Landfill Gas | 4 MW | — | View | |
| Eastern Rise Offshore Wind | Eastern Rise OWP Project Pty Ltd | Development | Publicly Announced | Wind Turbine - Offshore | Not commissioned | Wind - Wind | — | — | View | |
| Ebor BESS | Bridge Energy Pty Ltd | Development · AI | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | 100/870 MW · AI | — | View | |
| Edderton Hybrid Faciility - Solar | Voltere Pty Ltd. | Development | Publicly Announced | Solar PV - Fixed | Not commissioned | Solar - Solar | — | — | View | |
| Edderton Hybrid Facility - BESS | Voltere Pty Ltd. | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Eden Offshore Wind Farm | OceanEx Energy | Development | Publicly Announced | Wind Turbine - Offshore | Not commissioned | Wind - Wind | — | Jan 2034 | View | |
| Edenvale Solar Park | Edenvale Solar Park Pty Ltd | Operational · AI | In Service | Solar PV - Single axis tracking | Generating +9.5 MW | Solar - Solar | EDENVSF1 | 180 MW | Mar 2024 | View |
| Eildon | AGL Hydro Partnership | Operational · AI | In Service | Hydro - Dam | Offline 0 MW | Hydro - Water | EILDON1 | 68 MW | — | View |
| Eildon | AGL Hydro Partnership | Operational · AI | In Service | Hydro - Dam | Offline 0 MW | Hydro - Water | EILDON2 | 68 MW | — | View |
| Eildon Pondage Power Station (EPPS) | Pacific Hydro Investments Pty Ltd | Operational | In Service | Hydro - Run of River | No dispatch data | Hydro - Water | EILDON3 | 5 MW | — | View |
| EIWA Gin Gin Renewable Energy Park | EIWA Gin Gin Renewable Energy Park Pty Ltd | Development | Publicly Announced | Solar PV - Single axis tracking | Not commissioned | Solar - Solar | — | — | View | |
| EIWA Gin Gin Renewable Energy Park | EIWA Gin Gin Renewable Energy Park Pty Ltd | Development | Publicly Announced | Storage - Battery | Not commissioned | Solar - Solar | — | — | View | |
| EIWA Golden Fleece Renewable Energy Park | EIWA Golden Fleece Renewable Energy Park Pty Ltd | Development | Publicly Announced | Solar PV - Single axis tracking | Not commissioned | Solar - Solar | — | — | View | |
| EIWA Golden Fleece Renewable Energy Park | EIWA Golden Fleece Renewable Energy Park Pty Ltd | Development | Publicly Announced | Storage - Battery | Not commissioned | Solar - Solar | — | — | View | |
| EIWA Richmond Valley BESS | EIWA RICHMOND VALLEY BESS PTY LTD | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Elai Genesis Battery Storage System | Elai Energy Pty Ltd | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Elaine BESS | Elaine ProjectCo Pty Ltd | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Elaine Solar Farm & BESS Hybrid | Elgin Energy Pty Ltd | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Elaine Solar Farm & BESS Hybrid | Elgin Energy Pty Ltd | Development | Publicly Announced | Solar PV - Fixed | Not commissioned | Solar - Solar | — | — | View | |
| Elaine Wind Farm | Northleaf /InfraRed/Macquarie Capital | Operational · AI | In Service | Wind Turbine - Onshore | Generating +2.7 MW | Wind - Wind | ELAINWF1 | 84 MW | Dec 2020 | View |
| Emerald Solar Park | Lighthouse Infrastructure Management Limited | Operational · AI | In Service | Solar PV - Single axis tracking | Generating +2.8 MW | Solar - Solar | EMERASF1 | 72 MW | Feb 2019 | View |
| Emeroo BESS | Potentia Energy Group Pty Ltd | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Emu Park BESS | M Renweables Australia | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Emu Park Solar Farm | M Renweables Australia | Development | Publicly Announced | Solar PV - Fixed | Not commissioned | Solar - Solar | — | — | View | |
| Eraring | Origin Energy Eraring Pty Ltd | Closed | In Service - Announced Withdrawal (Permanent) | Turbine - Steam Sub Critical | Offline 0 MW | Fossil - Black Coal | ER01 | 720 MW | — | View |
| Eraring | Origin Energy Eraring Pty Ltd | Closed | In Service - Announced Withdrawal (Permanent) | Turbine - Steam Sub Critical | Generating +680.9 MW | Fossil - Black Coal | ER02 | 720 MW | — | View |
| Eraring | Origin Energy Eraring Pty Ltd | Closed | In Service - Announced Withdrawal (Permanent) | Turbine - Steam Sub Critical | Offline 0 MW | Fossil - Black Coal | ER03 | 720 MW | — | View |
| Eraring | Origin Energy Eraring Pty Ltd | Closed | In Service - Announced Withdrawal (Permanent) | Turbine - Steam Sub Critical | Generating +699.8 MW | Fossil - Black Coal | ER04 | 720 MW | — | View |
| Eraring Big Battery | Origin Energy Electricity Limited | — | removed | Storage - Battery | Offline | Other - Other | ERB01 | 240/1030 MW | Apr 2027 | View |
| Eraring Big Battery | Origin Energy Electricity Limited | Development | Anticipated | Storage - Battery | Not commissioned | Other - Other | — | Apr 2027 | View | |
| Eraring GT | Origin Energy Eraring Pty Ltd | Operational · AI | In Service | Turbine - OCGT | Offline 0 MW | Fossil - Diesel | ERGT01 | 42 MW | — | View |
| Eurimbula Hybrid Facility - Battery Storage | unitedgreen_NR | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | Jun 2026 | View | |
| Eurimbula Solar Farm | Unitedgreen_NR | Development | Publicly Announced | Solar PV - Single axis tracking | Not commissioned | Solar - Solar | — | — | View | |
| Euston Wind Farm - KCI | Balranald Wind Farm Pty Ltd | Development | Publicly Announced | Wind Turbine - Onshore | Not commissioned | Wind - Wind | — | — | View | |
| Everleigh Solar Farm & BESS - KCI | Everleigh Solar Park Pty Ltd | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Everleigh Solar Farm & BESS - KCI | Everleigh Solar Park Pty Ltd | Development | Publicly Announced | Solar PV - Fixed | Not commissioned | Solar - Solar | — | — | View | |
| Ferguson Wind Farm | Ferguson Wind Farm Pty Ltd | Operational | In Service | Wind Turbine - Onshore | No dispatch data | Wind - Wind | FNWF1 | 12 MW | Apr 2021 | View |
| Finley Solar Farm | Finley Solar Farm Pty Ltd as The trustee for Finley Solar Trust | Operational · AI | In Service | Solar PV - Single axis tracking | Offline 0 MW | Solar - Solar | FINLYSF1 | 162 MW | Nov 2019 | View |
| Fisher | Hydro-Electric Corporation | Operational · AI | In Service | Hydro - Dam | Generating +45.9 MW | Hydro - Water | FISHER | 43 MW | — | View |
| Fletcher Creek Wind Farm & BESS | Private Energy Partners | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Fletcher Creek Wind Farm & BESS | Private Energy Partners | Development | Publicly Announced | Wind Turbine - Onshore | Not commissioned | Wind - Wind | — | — | View | |
| Flyers Creek Wind Farm | Flyers Creek Wind Farm Pty Ltd | Operational · AI | In Service | Wind Turbine - Onshore | Generating +16.7 MW | Wind - Wind | FLYCRKWF | 146 MW | Oct 2024 | View |
| FNQ BESS 1 (KCI) | Solquartz Holdings Pty Ltd | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| FNQ BESS 2 (KCI) | Solquartz Holdings Pty Ltd | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| FNQ BESS 3 (KCI) | Solquartz Holdings Pty Ltd | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Forbes Solar Farm & BESS | Forbes Solar Farm Pty Ltd ATF Forbes Genesis Project Trust | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Forbes Solar Farm & BESS | Forbes Solar Farm Pty Ltd ATF Forbes Genesis Project Trust | Development | Publicly Announced | Solar PV - Single axis tracking | Not commissioned | Solar - Solar | — | — | View | |
| Forest Glen Solar Farm | X-Elio Roma Hub Solar Farm Pty Ltd | Development | Publicly Announced | Solar PV - Single axis tracking | Not commissioned | Solar - Solar | — | — | View | |
| Forest Wind | Forest Wind Holdings Pty Ltd | Development | Publicly Announced | Wind Turbine - Onshore | Not commissioned | Wind - Wind | — | — | View | |
| Forsayth Wind Farm | Forsayth Wind Farm Pty Ltd | Development | Publicly Announced | Wind Turbine - Onshore | Not commissioned | Wind - Wind | — | — | View | |
| Fosterville SF and BESS | FRV Services Australia | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | FTVBESS | — | — | View |
| Fosterville SF and BESS | FRV Services Australia | Development | Publicly Announced | Solar PV - Single axis tracking | Not commissioned | Solar - Solar | FTVPV | — | — | View |
| Fraser Coast Hybrid Plant | FRASER COAST SOLAR DEVELOPMENT PTY LTD | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Fraser Coast Hybrid Plant | FRASER COAST SOLAR DEVELOPMENT PTY LTD | Development | Publicly Announced | Solar PV - Single axis tracking | Not commissioned | Solar - Solar | — | — | View | |
| Frasers Solar Farm | Frasers Lane Development Pty Ltd | Development | Anticipated | Solar PV - Single axis tracking | Not commissioned | Solar - Solar | — | Jun 2027 | View | |
| Fulham Solar Farm | Fulham Solar Farm Pty Ltd (ATF Fulham Solar Farm Trust) | — | removed | Storage - Battery | Offline | Solar - Solar | 64/128 MW | Dec 2027 | View | |
| Fulham Solar Farm | Fulham Solar Farm Pty Ltd (ATF Fulham Solar Farm Trust) | — | removed | Solar PV - Single axis tracking | Offline | Solar - Solar | 101 MW | Dec 2027 | View | |
| Fulham Solar Farm And BESS | Fulham Solar Farm Pty Ltd (ATF Fulham Solar Farm Trust) | Development | Committed | Storage - Battery | Not commissioned | Solar - Solar | 64/128 MW | Jan 2028 | View | |
| Fulham Solar Farm And BESS | Fulham Solar Farm Pty Ltd (ATF Fulham Solar Farm Trust) | Development | Committed | Solar PV - Single axis tracking | Not commissioned | Solar - Solar | 101 MW | Jan 2028 | View | |
| Gangarri Solar Farm | Shell New Energies Australia Pty Ltd | Commissioning · AI | In Commissioning | Solar PV - Single axis tracking | Generating +6.1 MW | Solar - Solar | GANGARR1 | 162 MW | — | View |
| Gannawarra Energy Storage System | GESS ProjectCo | Operational · AI | In Service | Storage - Battery | Discharging +8.1 MW | Other - Other | GANNB1 | 25/50 MW | — | View |
| Gannawarra Solar Farm | Gannawarra Solar Farm Pty Ltd | Operational · AI | In Service | Solar PV - Single axis tracking | Offline 0 MW | Solar - Solar | GANNSF1 | 55 MW | — | View |
| Ganymirra Solar Power Station | Edify Energy Pty Ltd | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Ganymirra Solar Power Station | Edify Energy Pty Ltd | Development | Publicly Announced | Solar PV - Single axis tracking | Not commissioned | Solar - Solar | — | — | View | |
| Gara BESS | ACEnergy Pty Ltd | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | Dec 2027 | View | |
| Garoo BESS | Greenpulse solar farm and BESS as trustee for Greenpulse Solar Farm & Bess Unit Trust | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Garoo Solar Farm | Greenpulse solar farm and BESS as trustee for Greenpulse Solar Farm & Bess Unit Trust | Development | Publicly Announced | Solar PV - Fixed | Not commissioned | Solar - Solar | — | — | View | |
| Gawara Baya Wind And BESS | UPPER BURDEKIN WIND FARM PTY LTD | Development | Anticipated | Storage - Battery | Not commissioned | Other - Other | GBBATT1 | — | Oct 2028 | View |
| Gawara Baya Wind And BESS | UPPER BURDEKIN WIND FARM PTY LTD | Development | Anticipated | Wind Turbine - Onshore | Not commissioned | Wind - Wind | GBWF1 | — | Oct 2028 | View |
| Gawara Baya Wind Farm | UPPER BURDEKIN WIND FARM PTY LTD | — | removed | Storage - Battery | Offline | Other - Other | GBBATT1 | 104/208 MW | Oct 2028 | View |
| Gawara Baya Wind Farm | UPPER BURDEKIN WIND FARM PTY LTD | — | removed | Wind Turbine - Onshore | Offline | Wind - Wind | GBWF1 | 408 MW | Oct 2028 | View |
| Gayndah Wind Farm | Mainstream Renewable Power Australia Pty Ltd | — | removed | Wind Turbine - Onshore | Offline | Wind - Wind | 560 MW | — | View | |
| Geelong BESS | Elgin EnergyP/L | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| George Town BESS - KCI | Recurrent Energy | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| George Town Wind Farm | West Coast Renewables | Development | Publicly Announced | Wind Turbine - Onshore | Not commissioned | Wind - Wind | — | — | View | |
| Geranium Plains Solar and BESS | Risen Energy (Australia) Pty Ltd | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Geranium Plains Solar and BESS | Risen Energy (Australia) Pty Ltd | Development | Publicly Announced | Solar PV - Single axis tracking | Not commissioned | Solar - Solar | — | — | View | |
| German Creek | EDL CSM Qld Pty Ltd | Operational · AI | In Service | Reciprocating Engine - Spark ignition | Generating +14.5 MW | Fossil - Waste Coal Mine Gas | GERMCRK | 45 MW | — | View |
| Gerogery Battery - KCI | Elgin Energy Pty Ltd | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Gerogery Solar Farm - KCI | Elgin Energy Pty Ltd | Development | Publicly Announced | Solar PV - Fixed | Not commissioned | Solar - Solar | — | — | View | |
| Gin Gin BESS | Iberdrola Australia Development Pty Limited | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Gin Gin Solar Farm - KCI | EIWA Gin Gin Renewable Energy Park Pty Ltd | — | removed | Solar PV - Fixed | Offline | Solar - Solar | 300 MW | — | View | |
| Gippsland Dawn Offshore Wind Project | Gippsland Dawn OWP Project Pty Ltd | Development | Publicly Announced | Wind Turbine - Offshore | Not commissioned | Wind - Wind | — | Dec 2032 | View | |
| Girgarre Solar Farm | Giragarre Solar Farm Pty Ltd as trustee for Giragarre Solar Farm Trust | Commissioning · AI | In Commissioning | Solar PV - Single axis tracking | Offline 0 MW | Solar - Solar | GIRGSF | 93 MW | Mar 2025 | View |
| Gladstone | Gladstone Power Station Participants | Operational · AI | In Service | Turbine - Steam Sub Critical | Generating +175.7 MW | Fossil - Black Coal | GSTONE1 | 280 MW | — | View |
| Gladstone | Gladstone Power Station Participants | Operational · AI | In Service | Turbine - Steam Sub Critical | Offline 0 MW | Fossil - Black Coal | GSTONE2 | 280 MW | — | View |
| Gladstone | Gladstone Power Station Participants | Operational · AI | In Service | Turbine - Steam Sub Critical | Generating +175.4 MW | Fossil - Black Coal | GSTONE3 | 280 MW | — | View |
| Gladstone | Gladstone Power Station Participants | Operational · AI | In Service | Turbine - Steam Sub Critical | Generating +175.4 MW | Fossil - Black Coal | GSTONE4 | 280 MW | — | View |
| Gladstone | Gladstone Power Station Participants | Operational · AI | In Service | Turbine - Steam Sub Critical | Offline 0 MW | Fossil - Black Coal | GSTONE5 | 280 MW | — | View |
| Gladstone | Gladstone Power Station Participants | Operational · AI | In Service | Turbine - Steam Sub Critical | Offline 0 MW | Fossil - Black Coal | GSTONE6 | 280 MW | — | View |
| Glanmire Solar Farm | Elgin Energy Pty Ltd | Development | Anticipated | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Glanmire Solar Farm | Elgin Energy Pty Ltd | Development | Anticipated | Solar PV - Single axis tracking | Not commissioned | Solar - Solar | — | — | View | |
| Glen Inness BESS - KCI | FIrm Power P/L | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Glenbawn | AGL | Operational | In Service | Hydro - Dam | No dispatch data | Hydro - Water | 5 MW | — | View | |
| Glenbawn | AGL | — | removed | Hydro - Dam | Offline | Hydro - Water | GLBWNHYD | 5 MW | — | View |
| Glenbawn Pumped Hydro Project | Water NSW | Development | Publicly Announced | Storage - Pumped hydro | Not commissioned | Hydro - Water | — | — | View | |
| Glenbrae BESS | Acenergy | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Glenellen Solar Farm | Glenellen Solar Farm Pty Ltd | Development | Publicly Announced | Solar PV - Fixed | Not commissioned | Solar - Solar | — | — | View | |
| Glenmaggie Hydro | Pacific Hydro Investments Pty Ltd | Operational | In Service | Hydro - Dam | No dispatch data | Hydro - Water | GLENMAG1 | 2 MW | — | View |
| Glennies Creek | EDL OCI Pty Ltd | Operational | In Service | Reciprocating Engine - Spark ignition | No dispatch data | Fossil - Waste Coal Mine Gas | 13 MW | — | View | |
| Glennies Creek | EDL OCI Pty Ltd | — | removed | Reciprocating Engine - Spark ignition | Offline | Fossil - Waste Coal Mine Gas | GLENNCRK | 13 MW | — | View |
| Glennis Creek Pumped Hydro Project | Water NSW | Development | Publicly Announced | Storage - Pumped hydro | Not commissioned | Hydro - Water | — | — | View | |
| Glenrowan BESS | Akaysha Energy Pty Ltd | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Glenrowan BESS - Storage - KCI | Enervest Pty Ltd | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Glenrowan Solar Farm | Glenrowan Solar Farm Pty Ltd as trustee for Glenrowan Solar Farm Trust | Operational · AI | In Service | Solar PV - Single axis tracking | Offline 0 MW | Solar - Solar | GLENSF1 | 126 MW | Feb 2024 | View |
| Glenrowan West Solar Farm | Glenrowan Sun Farm Pty Ltd | Operational · AI | In Service | Solar PV - Single axis tracking | Offline 0 MW | Solar - Solar | GLRWNSF1 | 132 MW | Apr 2021 | View |
| Glenroy Hybrid Facility - Solar And BESS | M Renewables Australia Developments Pty Ltd | Development | Publicly Announced | Solar PV - Fixed | Not commissioned | Solar - Solar | — | — | View | |
| Glenroy Hybrid Facility - Solar And BESS | M Renewables Australia Developments Pty Ltd | Development | Publicly Announced | Storage - Battery | Not commissioned | Solar - Solar | — | — | View | |
| Gnarwarre BESS Facility | FRV SA Pty Ltd | Development | Anticipated | Storage - Battery | Not commissioned | Other - Other | — | Jun 2027 | View | |
| Goat Hill Pumped Hydro | Altura Group | Development | Publicly Announced | Storage - Pumped hydro | Not commissioned | Hydro - Water | — | — | View | |
| Gol Gol Wind Farm | Squadron Energy Developments Pty Ltd | Development | Publicly Announced | Wind Turbine - Onshore | Not commissioned | Wind - Wind | — | — | View | |
| Golden Fleece BESS | EIWA Gin Gin Renewable Energy Park Pty Ltd | — | removed | Storage - Battery | Offline | Solar - Solar | 300 MW | — | View | |
| Golden Fleece Solar Farm | EIWA Gin Gin Renewable Energy Park Pty Ltd | — | removed | Solar PV - Fixed | Offline | Solar - Solar | 300 MW | — | View | |
| Golden Plains BESS | Tag Energy Australia P/L | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Golden Plains Wind Farm East | Golden Plains WF1 Pty Ltd as trustee for the Golden Plains WF1 Unit Trust | Commissioning · AI | In Commissioning | Wind Turbine - Onshore | Offline 0 MW | Wind - Wind | GPWFEST1 | 248 MW | Dec 2025 | View |
| Golden Plains Wind Farm East | Golden Plains WF1 Pty Ltd as trustee for the Golden Plains WF1 Unit Trust | Commissioning · AI | In Commissioning | Wind Turbine - Onshore | Offline 0 MW | Wind - Wind | GPWFEST3 | 248 MW | Dec 2025 | View |
| Golden Plains Wind Farm East | Golden Plains WF1 Pty Ltd as trustee for the Golden Plains WF1 Unit Trust | Commissioning · AI | In Commissioning | Wind Turbine - Onshore | Offline 0 MW | Wind - Wind | GPWFEST2 | 260 MW | Dec 2025 | View |
| Golden Plains Wind Farm West | Golden Plains WF2 Unit Trust | Development | Committed | Wind Turbine - Onshore | Not commissioned | Wind - Wind | 557 MW | Feb 2027 | View | |
| GoodNight Hybrid Facility - Solar And BESS | GoodNight One Pty Ltd | Development | Publicly Announced | Solar PV - Fixed | Not commissioned | Solar - Solar | — | — | View | |
| GoodNight Hybrid Facility - Solar And BESS | GoodNight One Pty Ltd | Development | Publicly Announced | Storage - Battery | Not commissioned | Solar - Solar | — | — | View | |
| Goombi Renewable Energy Hub | Tag Energy Australia Pty Ltd | Development | Publicly Announced | Wind Turbine - Onshore | Not commissioned | Wind - Wind | — | — | View | |
| Goonumbla Solar Farm | Goonumbla Asset Co Pty Ltd as trustee for the Goonumbla Asset Trust | Operational · AI | In Service | Solar PV - Single axis tracking | Offline 0 MW | Solar - Solar | GOONSF1 | 70 MW | Nov 2021 | View |
| Goorambat BESS (Lighthouse) | Lightsource Development Services Australia | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Goorambat BESS (Lighthouse) | Lightsource Development Services Australia | — | removed | Other - Other | Offline | Other - Other | 800 MW | — | View | |
| Goorambat East Solar Farm (ENGIE) | Engie | Development | Committed | Solar PV - Single axis tracking | Not commissioned | Solar - Solar | 250 MW | Oct 2026 | View | |
| Gordon | Hydro-Electric Corporation | Operational · AI | In Service | Hydro - Dam | Generating +134.2 MW | Hydro - Water | GORDON | 432 MW | — | View |
| Goulburn River Solar Farm And BESS | Goulburn River Fund Pty Ltd | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Goulburn River Solar Farm And BESS | Goulburn River Fund Pty Ltd | Development | Committed | Solar PV - Single axis tracking | Not commissioned | Solar - Solar | 588 MW | Mar 2027 | View | |
| Gould Creek BESS | Gould Creek BESS Project Pty Ltd | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Goyder BESS | Neoen Australia Pty Ltd | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Goyder North Renewable Energy Facility | Neoen Australia | Development | Publicly Announced | Wind Turbine - Onshore | Not commissioned | Wind - Wind | — | Dec 2028 | View | |
| Goyder South Wind Farm 1A | Goyder Wind Farm 1A Pty Ltd as trustee for Goyder Wind Farm 1A Trust | Commissioning · AI | In Commissioning | Wind Turbine - Onshore | Generating +138.5 MW | Wind - Wind | GSWF1A | 209 MW | Dec 2024 | View |
| Goyder South Wind Farm 1B | Goyder Wind Farm 1B Pty Ltd as trustee for Goyder Wind Farm 1B Trust | Commissioning · AI | In Commissioning | Wind Turbine - Onshore | Generating +72 MW | Wind - Wind | GSWF1B1 | 204 MW | Dec 2024 | View |
| Grahamvale BESS - KCI | AE BESS 3 Pty Ltd as Trustee for AE BESS 3 Unit Trust | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Grange Avenue | EDL LFG NSW Pty Ltd | Operational | In Service | Reciprocating Engine - Spark ignition | No dispatch data | Renewable Biomass or Waste - Landfill Gas | GRANGEAV | 1 MW | — | View |
| Granite Hills Wind Farm | Akuo Energy | Development | Publicly Announced | Wind Turbine - Onshore | Not commissioned | Wind - Wind | — | — | View | |
| Granville Harbour Wind Farm | Granville Harbour Operations Pty Ltd as trustee for Granville Harbour Operations Trust | Operational · AI | In Service | Wind Turbine - Onshore | Generating +45.5 MW | Wind - Wind | GRANWF1 | 112 MW | Dec 2020 | View |
| Great Eastern Offshore Wind - KCI | GIG Australian Offshore Wind Energy Holdings Pty Ltd | Development | Publicly Announced | Wind Turbine - Offshore | Not commissioned | Wind - Wind | — | — | View | |
| Great Lakes Battery | Neoen Australia Pty Ltd | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | Dec 2028 | View | |
| Great Western Battery Project | Neoen Australia Pty Ltd | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | Dec 2028 | View | |
| Greater Southern Offshore Wind - KCI | Greater Southern Offshore Wind Farm Project Co Pty Ltd | Development | Publicly Announced | Wind Turbine - Offshore | Not commissioned | Wind - Wind | — | — | View | |
| Green Poly BESS Project (KCI) | Solquartz Holdings Pty Ltd | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Greenbank BESS | CSE BESS Pty Ltd | Commissioning · AI | In Commissioning | Storage - Battery | Discharging +0.5 MW | Other - Other | GREENB1 | 200/400 MW | Jun 2025 | View |
| Greenpulse BESS (KCI) | Greenpulse solar farm and BESS as trustee for Greenpulse Solar Farm & Bess Unit Trust | — | removed | Storage - Battery | Offline | Solar - Solar | 360/720 MW | — | View | |
| Greenpulse Solar Farm (KCI) | Greenpulse solar farm and BESS as trustee for Greenpulse Solar Farm & Bess Unit Trust | — | removed | Solar PV - Fixed | Offline | Solar - Solar | 160 MW | — | View | |
| Gregadoo Solar Farm | Gregadoo Solar Farm Pty Ltd | Development | Publicly Announced | Solar PV - Fixed | Not commissioned | Solar - Solar | — | — | View | |
| Griffith BESS | Eku Energy Projects (Australia) Trust | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Griffith Solar Farm | Griffith Solar Farm Pty Ltd | Operational · AI | In Service | Solar PV - Single axis tracking | Offline 0 MW | Solar - Solar | GRIFSF1 | 27 MW | — | View |
| Grosvenor 1 | EDL Projects Australia Pty Ltd | Operational | In Service | Reciprocating Engine - Spark ignition | No dispatch data | Fossil - Waste Coal Mine Gas | 21 MW | — | View | |
| Grosvenor 1 | EDL Projects Australia Pty Ltd | — | removed | Reciprocating Engine - Spark ignition | Offline | Fossil - Waste Coal Mine Gas | GROSV1 | 21 MW | — | View |
| Grosvenor 2 Waste Coal Mine Gas Power Station | EDL Projects Australia Pty Ltd | Development | Publicly Announced | Reciprocating Engine - Spark ignition | Not commissioned | Fossil - Coal Seam Methane | — | — | View | |
| Grosvenor 2 Waste Coal Mine Gas Power Station | EDL Projects Australia Pty Ltd | — | removed | Reciprocating Engine - Spark ignition | Offline | Fossil - Coal Seam Methane | GROSV2 | 15 MW | — | View |
| Guildford Wind Farm | ARK Energy Corporation Pty Ltd | Development | Publicly Announced | Wind Turbine - Onshore | Not commissioned | Wind - Wind | — | — | View | |
| Gullen Range Battery Energy System | goldwindaustralia_NR | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Gullen Range Solar Farm | New Gullen Range Wind Farm Pty Ltd | Operational · AI | In Service | Solar PV - Fixed | Offline 0 MW | Solar - Solar | GULLRSF1 | 10 MW | — | View |
| Gullen Range Wind Farm | New Gullen Range Wind Farm Pty Ltd | Operational · AI | In Service | Wind Turbine - Onshore | Generating +73 MW | Wind - Wind | GULLRWF1 | 166 MW | — | View |
| Gullen Range Wind Farm 2 | BEIJING JINGNENG CLEAN ENERGY (AUSTRALIA) HOLDING PTY LTD | Operational · AI | In Service | Wind Turbine - Onshore | Generating +49.1 MW | Wind - Wind | GULLRWF2 | 111 MW | Dec 2023 | View |
| Gundary Solar Farm - KCI | Lightsource Development Services Australia Pty Ltd | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Gundary Solar Farm - KCI | Lightsource Development Services Australia Pty Ltd | Development | Publicly Announced | Solar PV - Fixed | Not commissioned | Solar - Solar | — | — | View | |
| Gunnedah BESS | Gunnedah Battery Subco Pty Ltd | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Gunnedah East BESS (Green Leap) - KCI | Green Leap P/L | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Gunnedah Solar Farm | Gunnedah SF Pty Ltd atf Gunnedah Asset Trust | Operational · AI | In Service | Solar PV - Single axis tracking | Generating +1 MW | Solar - Solar | GNNDHSF1 | 110 MW | Oct 2021 | View |
| Gunning Solar Farm (Canadian) | Canadian Solar | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Gunning Solar Farm (Canadian) | Canadian Solar | Development | Publicly Announced | Solar PV - Fixed | Not commissioned | Solar - Solar | — | — | View | |
| Gunning Wind Farm | Gunning Wind Energy Developments | Operational · AI | In Service | Wind Turbine - Onshore | Generating +25.5 MW | Wind - Wind | GUNNING1 | 47 MW | — | View |
| Gunsynd Solar Farm | ARP | Development | Publicly Announced | Solar PV - Fixed | Not commissioned | Solar - Solar | — | Dec 2022 | View | |
| Gurambilbarra Energy Hub | 365 Future Energy | Development | Publicly Announced | Other - Other | Not commissioned | Other - Other | — | — | View | |
| Guthega | Snowy Hydro Ltd | Operational · AI | In Service | Hydro - Dam | Generating +34.1 MW | Hydro - Water | GUTHEGA | 60 MW | — | View |
| Guthrie's Gap Solar Farm | Edify Energy Pty Ltd | Development | Publicly Announced | Solar PV - Fixed | Not commissioned | Solar - Solar | — | — | View | |
| Hallam Road | LMS Energy Pty Ltd | Operational | In Service | Reciprocating Engine - Spark ignition | No dispatch data | Renewable Biomass or Waste - Landfill Gas | HALAMRD1 | 9 MW | — | View |
| Hallett 4 North Brown Hill | Brown Hill North Pty Ltd | Operational · AI | In Service | Wind Turbine - Onshore | Generating +99.9 MW | Wind - Wind | NBHWF1 | 132 MW | — | View |
| Hallett 5 The Bluff WF | Eurus Energy | Operational · AI | In Service | Wind Turbine - Onshore | Generating +17 MW | Wind - Wind | BLUFF1 | 53 MW | — | View |
| Hallett BESS | EnergyAustralia Hallett Pty Ltd | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Hallett GT | EnergyAustralia Hallett Pty Ltd | Operational · AI | In Service | Turbine - OCGT | Offline 0 MW | Fossil - Natural Gas Pipeline | AGLHAL | 277 MW | — | View |
| Hallett Stage 1 Brown Hill | Palisade Investment Partner Limited | Operational · AI | In Service | Wind Turbine - Onshore | Generating +46.6 MW | Wind - Wind | HALLWF1 | 95 MW | — | View |
| Hallett Stage 2 Hallett Hill | Infrastructure Capital Group Limited | Operational · AI | In Service | Wind Turbine - Onshore | Generating +47.8 MW | Wind - Wind | HALLWF2 | 71 MW | — | View |
| Halys BESS - Iberdrola | IBERDROLA AUSTRALIA DEVELOPMENT PTY LIMITED | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Halys BESS (Akaysha) | Halys BESS ProjectCo Pty Ltd | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Halys BESS (X-Elio) | X-Elio Australia Pty Ltd | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Halys Hybrid Facility - BESS | Elements Green Australia Pty Ltd | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Halys Hybrid Facility - Solar | Elements Green Australia Pty Ltd | Development | Publicly Announced | Solar PV - Fixed | Not commissioned | Solar - Solar | — | — | View | |
| Halys to Chinchilla DCA Battery - KCI | UGL Pty Ltd | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Hamilton Solar Farm | Hamilton Solar Farm Pty Ltd | Operational · AI | In Service | Solar PV - Single axis tracking | Generating +5 MW | Solar - Solar | HAMISF1 | 58 MW | — | View |
| Hanworth Battery | Hanworth BESS Pty Ltd | Development | Publicly Announced | Storage - Battery | Not commissioned | Solar - Solar | — | — | View | |
| Happy Valley Reservoir | South Australian Water Corporation | Operational · AI | In Service | Storage - Battery | Offline 0 MW | Other - Other | HVWWBA1 | 6/9 MW | Dec 2022 | View |
| Happy Valley Reservoir | South Australian Water Corporation | Operational · AI | In Service | Solar PV - Single axis tracking | Offline 0 MW | Solar - Solar | HVWWPV1 | 11 MW | Sep 2022 | View |
| Hargraves BESS | Tilt Renewables DevCo Pty Ltd as the trustee for Development Hold Trust | Development | Publicly Announced | Storage - Battery | Not commissioned | Wind - Wind | — | — | View | |
| Hargraves Wind Farm | Tilt Renewables DevCo Pty Ltd as the trustee for Development Hold Trust | Development | Publicly Announced | Wind Turbine - Onshore | Not commissioned | Wind - Wind | — | — | View | |
| Harlin Solar Farm | Harlin Solar Pty Ltd | Development | Publicly Announced | Solar PV - Single axis tracking | Not commissioned | Solar - Solar | — | — | View | |
| Harlin Solar Farm | Harlin Solar Pty Ltd | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Harrami Wind Farm | Mainstream | Development | Publicly Announced | Wind Turbine - Onshore | Not commissioned | Wind - Wind | — | — | View | |
| Harrogate BESS | Enel Green Power Australia Pty Ltd | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | Dec 2028 | View | |
| Hastings Generation Site | Esso Australia Resources | Development | Publicly Announced | Turbine - OCGT | Not commissioned | Fossil - N/A | — | — | View | |
| Haughton BESS | Pacific Hydro Haughton Solar Farm Pty Ltd | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | Jan 2028 | View | |
| Haughton Solar Farm Stage 1 | Pacific Hydro Haughton Solar Farm Pty Ltd | Operational · AI | In Service | Solar PV - Single axis tracking | Generating +12.9 MW | Solar - Solar | HAUGHT11 | 133 MW | Sep 2020 | View |
| Haughton Solar Farm Stage 2 | Pacific Hydro Australia Pty Ltd | Development | Anticipated | Solar PV - Single axis tracking | Not commissioned | Solar - Solar | — | Jan 2028 | View | |
| Haunted Gully BESS - KCI | Vena Energy Services (Australia) Pty Ltd | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Hawkesdale Wind Farm | Hawkesdale Asset Pty Ltd as trustee for Hawkesdale Asset Trust | Operational · AI | In Service | Wind Turbine - Onshore | Offline +0.3 MW | Wind - Wind | HD1WF1 | 97 MW | Oct 2024 | View |
| Hay Sun Farm | Plains SF No1 Pty Ltd | Development | Anticipated | Solar PV - Single axis tracking | Not commissioned | Solar - Solar | — | — | View | |
| Hayman Solar Farm | The Hayman Solar Farm Trust | Operational · AI | In Service | Solar PV - Single axis tracking | Generating +5.8 MW | Solar - Solar | HAYMSF1 | 58 MW | — | View |
| Hazeldean BESS - Storage - KCI | Enervest Pty Ltd | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Hazelwood Battery Energy Storage System (HBESS) | Hazelwood BESS Project Co Pty Ltd as trustee for the HBESS Asset Trust | Operational · AI | In Service | Storage - Battery | Discharging +8.9 MW | Other - Other | HBESS1 | 200/162 MW | Jun 2023 | View |
| Hazelwood BESS - KCI | International Power (Australia) Pty Ltd | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Hazelwood BESS (Ironwood) - KCI | International Power (Australia) Pty Ltd (trading as ENGIE) | — | removed | Storage - Battery | Offline | Other - Other | 40 MW | — | View | |
| Hazelwood North Solar Farm - KCI | Manthos Investments Pty Ltd | Development | Publicly Announced | Solar PV - Fixed | Not commissioned | Solar - Solar | — | — | View | |
| Hellyer Wind Farm | ARK Energy Corporation Pty Ltd | Development | Publicly Announced | Wind Turbine - Onshore | Not commissioned | Wind - Wind | — | — | View | |
| Herries Range Wind Farm | Acciona Energy Global Australia | Development | Publicly Announced | Wind Turbine - Onshore | Not commissioned | Wind - Wind | — | Dec 2030 | View | |
| Hexham | Wind Prospect WA Pty Ltd | Development | Publicly Announced | Wind Turbine - Onshore | Not commissioned | Wind - Wind | — | — | View | |
| Hills of Gold Wind Farm | Hills of Gold Wind Farm Pty Ltd | Development | Publicly Announced | Wind Turbine - Onshore | Not commissioned | Wind - Wind | — | — | View | |
| Hillston Sun Farm | Hillston Sun Farm Operations Pty Ltd ATF Hillston | Operational · AI | In Service | Solar PV - Single axis tracking | Offline 0 MW | Solar - Solar | HILLSTN1 | 110 MW | Jul 2022 | View |
| Hobart Show Grounds BESS | Gravitas | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Hollow Tree Wind Farm | Goldwind Australia | Development | Publicly Announced | Wind Turbine - Onshore | Not commissioned | Wind - Wind | — | — | View | |
| Holloway - Battery | SynCo Global | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Holloway BESS - KCI | Bushranger Project Pty Ltd. | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Hookey Creek Hybrid - Solar And BESs - KCI | Zen Energy Future Pty Ltd | Development | Publicly Announced | Storage - Battery | Not commissioned | Solar - Solar | — | Mar 2029 | View | |
| Hookey Creek Hybrid - Solar And BESs - KCI | Zen Energy Future Pty Ltd | Development | Publicly Announced | Solar PV - Single axis tracking | Not commissioned | Solar - Solar | — | Mar 2029 | View | |
| Hopeland BESS | Pacific Partnerships | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | Dec 2026 | View | |
| Hopeland Solar Farm | Hopeland Solar Farm Pty Ltd as trustee for the Hopeland Solar Farm Trust | Development | Publicly Announced | Solar PV - Fixed | Not commissioned | Solar - Solar | — | — | View | |
| Hornsdale Power Reserve Unit 1 | Hornsdale Power Reserve Pty Ltd | Operational · AI | In Service | Storage - Battery | Discharging +62.1 MW | Other - Other | HPR1 | 150/178 MW | Jul 2020 | View |
| Hornsdale Wind Farm Stage 1 | HWF 1 Pty Ltd | Operational · AI | In Service | Wind Turbine - Onshore | Generating +75.2 MW | Wind - Wind | HDWF1 | 102 MW | — | View |
| Hornsdale Wind Farm Stage 2 | HWF 2 Pty Ltd | Operational · AI | In Service | Wind Turbine - Onshore | Generating +85.5 MW | Wind - Wind | HDWF2 | 102 MW | — | View |
| Hornsdale Wind Farm Stage 3 | HWF 3 Pty Ltd | Operational · AI | In Service | Wind Turbine - Onshore | Generating +84.6 MW | Wind - Wind | HDWF3 | 112 MW | — | View |
| Horsham BESS | ESCO Solar Farm 7 Trust | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Horsham Solar Farm | ESCO SOLAR FARM 7 PTY LTD | Development | Committed | Solar PV - Single axis tracking | Not commissioned | Solar - Solar | 119 MW | Dec 2026 | View | |
| Hughenden Sun Farm | Hughenden Solar Pty Ltd as Trustee for Hughenden Solar Trust | Operational · AI | In Service | Solar PV - Single axis tracking | Offline +0.2 MW | Solar - Solar | HUGSF1 | 21 MW | Apr 2022 | View |
| Hughes Road BESS | BayWA r.e Projects Australia Pty Ltd | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | Feb 2028 | View | |
| Hume BESS | GSP Energy Pty Ltd | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Hume Bess (ARIF) | The Trustee for the ARIF Hume BESS Holdings Trust | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Hume Dam NSW | GSPOWER | Operational · AI | In Service | Hydro - Dam | Offline -0.3 MW | Hydro - Water | HUMENSW | 29 MW | — | View |
| Hume Dam VIC | GSP Energy Pty Ltd | Operational · AI | In Service | Hydro - Dam | Offline 0 MW | Hydro - Water | HUMEV | 29 MW | — | View |
| Hume North Battery Energy Storage System | Infrastructure Capital Services Pty Ltd as trustee for the ARIF Hume BESS Holdings Trust | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Hunter Central Coast Offshore Energy (Wind) | Energy Estate | Development | Publicly Announced | Wind Turbine - Offshore | Not commissioned | Wind - Wind | — | — | View | |
| Hunter EconomicZone | Snowy Hydro Ltd | Construction · AI | In Service | Reciprocating Engine - Compression ignition | Offline 0 MW | Fossil - Diesel | HEZ1 | 21 MW | — | View |
| Hunter Power Station | Snowy Hydro Limited | Operational · AI | Committed | Turbine - OCGT | Not commissioned | Fossil - Natural Gas Pipeline | HUNTER1 | 375 MW | Aug 2025 | View |
| Hunter Power Station | Snowy Hydro Limited | Operational · AI | Committed | Turbine - OCGT | Not commissioned | Fossil - Natural Gas Pipeline | HUNTER2 | 375 MW | Sep 2025 | View |
| HYMIVC06 Belgrave-Hallam Rd Micro Hydro | South East Water Corporation | Operational | In Service | Hydro - Dam | No dispatch data | Hydro - Water | HLMSEW01 | 0 MW | — | View |
| Ilford Green Energy Hub | brightnightpower_NR | Development | Publicly Announced | Storage - Battery | Not commissioned | Solar - Solar | — | Apr 2029 | View | |
| Ilford Green Energy Hub | brightnightpower_NR | Development | Publicly Announced | Wind Turbine - Onshore | Not commissioned | Wind - Wind | — | Oct 2029 | View | |
| Ilford Green Energy Hub | brightnightpower_NR | Development | Publicly Announced | Solar PV - Single axis tracking | Not commissioned | Solar - Solar | — | Apr 2029 | View | |
| Illawarra Offshore Wind Farm | OceanEx Energy | Development | Publicly Announced | Wind Turbine - Offshore | Not commissioned | Wind - Wind | — | Jan 2031 | View | |
| Innes Park Solar Farm | Enerparc Australia Pty Ltd | Development | Publicly Announced | Solar PV - Single axis tracking | Not commissioned | Solar - Solar | — | Jul 2026 | View | |
| Inverell Battery Energy Storage System | Inverell BESS Development Pty Ltd | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Inverleigh Solar Farm | TBA | Development | Publicly Announced | Solar PV - Fixed | Not commissioned | Solar - Solar | — | — | View | |
| Inverleigh Wind Farm | Inverleigh Wind Farm Pty Ltd | Development | Anticipated | Wind Turbine - Onshore | Not commissioned | Wind - Wind | — | — | View | |
| Invicta Mill | Haughton Sugar Company Pty Limited | — | removed | Turbine - Steam Sub Critical | Offline | Renewable Biomass or Waste - Bagasse | INVICTA | 3 MW | — | View |
| Invicta Mill | Haughton Sugar Company Pty Limited | Operational | In Service | Turbine - Steam Sub Critical | No dispatch data | Renewable Biomass or Waste - Bagasse | 50 MW | — | View | |
| Ironbark Power Station 20MW Expansion | Carbon Logica Pty Ltd | Development | Publicly Announced | Turbine - Other | Not commissioned | Other - Other | — | — | View | |
| ISIS Central Sugar Mill Co-generation Plant | SUSTAINABLE ENERGY INFRASTRUCTURE | — | removed | Turbine - Steam Sub Critical | Offline | Other - Other | ICSM | 25 MW | — | View |
| ISIS Central Sugar Mill Co-generation Plant | SUSTAINABLE ENERGY INFRASTRUCTURE | Operational | In Service | Turbine - Steam Sub Critical | No dispatch data | Other - Other | 25 MW | — | View | |
| Ivanhoe BESS | Ivanhoe Coal Pty Ltd | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Jacks Gully | EDL LFG NSW Pty Ltd | — | removed | Reciprocating Engine - Spark ignition | Offline | Renewable Biomass or Waste - Landfill Gas | JACKSGUL | 2 MW | — | View |
| Jacks Gully | EDL LFG NSW Pty Ltd | Operational | In Service | Reciprocating Engine - Spark ignition | No dispatch data | Renewable Biomass or Waste - Landfill Gas | JGULLY | 2 MW | — | View |
| Jackson North BESS | Equis Energy (Australia) Projects (Ngumi 6) Pty Ltd as trustee for the Equis Energy(Australia) Ngumi 6 Asset Trust | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Jeeralang A | EnergyAustralia Ecogen Py Ltd | Operational · AI | In Service | Turbine - OCGT | Offline 0 MW | Fossil - Natural Gas Pipeline | JLA01 | 53 MW | — | View |
| Jeeralang A | EnergyAustralia Ecogen Py Ltd | Operational · AI | In Service | Turbine - OCGT | Offline 0 MW | Fossil - Natural Gas Pipeline | JLA02 | 53 MW | — | View |
| Jeeralang A | EnergyAustralia Ecogen Py Ltd | Operational · AI | In Service | Turbine - OCGT | Offline 0 MW | Fossil - Natural Gas Pipeline | JLA03 | 53 MW | — | View |
| Jeeralang A | EnergyAustralia Ecogen Py Ltd | Operational · AI | In Service | Turbine - OCGT | Offline 0 MW | Fossil - Natural Gas Pipeline | JLA04 | 53 MW | — | View |
| Jeeralang B | EnergyAustralia Ecogen Pty Ltd | Operational · AI | In Service | Turbine - OCGT | Offline 0 MW | Fossil - Natural Gas Pipeline | JLB01 | 76 MW | — | View |
| Jeeralang B | EnergyAustralia Ecogen Pty Ltd | Operational · AI | In Service | Turbine - OCGT | Offline 0 MW | Fossil - Natural Gas Pipeline | JLB02 | 76 MW | — | View |
| Jeeralang B | EnergyAustralia Ecogen Pty Ltd | Operational · AI | In Service | Turbine - OCGT | Offline 0 MW | Fossil - Natural Gas Pipeline | JLB03 | 76 MW | — | View |
| Jemalong Solar | Genex Power | Operational · AI | In Service | Solar PV - Single axis tracking | Offline 0 MW | Solar - Solar | JEMALNG1 | 55 MW | Dec 2021 | View |
| Jeremiah Wind Farm | Squadron Energy Services Pty Ltd | Development | Publicly Announced | Wind Turbine - Onshore | Not commissioned | Wind - Wind | — | — | View | |
| Jindabyne | Snowy Hydro Ltd | Operational | In Service | Hydro - Dam | No dispatch data | Hydro - Water | JNDABNE1 | 1 MW | — | View |
| Jindera BESS - Storage - KCI | BESS Atlantic | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Jindera Solar Farm | Jindera Solar Farm Pty Ltd | Development | Publicly Announced | Solar PV - Fixed | Not commissioned | Solar - Solar | — | — | View | |
| Joel BESS | ACEnergy Pty Ltd | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| John Butters | Hydro-Electric Corporation | Operational · AI | In Service | Hydro - Dam | Generating +100.7 MW | Hydro - Water | JBUTTERS | 144 MW | — | View |
| Jounama | Snowy Hydro Ltd | Operational | In Service | Hydro - Dam | No dispatch data | Hydro - Water | JOUNAMA1 | 14 MW | — | View |
| Junction Rivers | Junction Rivers Pty Ltd | — | removed | Storage - Battery | Offline | Other - Other | JRBATT1 | 200/800 MW | Oct 2029 | View |
| Junction Rivers | Junction Rivers Pty Ltd | — | removed | Wind Turbine - Onshore | Offline | Wind - Wind | JRWF1 | 595 MW | Oct 2029 | View |
| Junction Rivers Wind And BESS | Junction Rivers Pty Ltd | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | JRBATT1 | — | Apr 2031 | View |
| Junction Rivers Wind And BESS | Junction Rivers Pty Ltd | Development | Publicly Announced | Wind Turbine - Onshore | Not commissioned | Wind - Wind | JRWF1 | — | Apr 2031 | View |
| Junee Solar Farm | Junee Operationsco Pty Ltd as trustee for Junee Operations Trust | Operational · AI | In Service | Solar PV - Single axis tracking | Offline 0 MW | Solar - Solar | JUNEESF1 | 36 MW | — | View |
| Juno BESS | Tilt Renewables Australia Pty Ltd | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Juno Wind Farm | Tilt Renewables Australia Pty Ltd | Development | Publicly Announced | Wind Turbine - Onshore | Not commissioned | Wind - Wind | — | — | View | |
| Kaban Wind Farm | Kaban Wind Farm Trust | Operational · AI | In Commissioning | Wind Turbine - Onshore | Generating +96.6 MW | Wind - Wind | KABANWF1 | 157 MW | Apr 2023 | View |
| Kaloya Moa Standalone BESS | Samsung C&T Renewable Energy Australia Pty Ltd | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Kangaroo Hills Wind Farm | Origin Energy Pty Ltd | Development | Publicly Announced | Storage - Battery | Not commissioned | Wind - Wind | — | Oct 2028 | View | |
| Kangaroo Hills Wind Farm | Origin Energy Pty Ltd | Development | Publicly Announced | Wind Turbine - Onshore | Not commissioned | Wind - Wind | — | Oct 2028 | View | |
| Kangaroo Valley BESS | FIrm Power P/L | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Karadoc Solar Farm | Iraak Sun Farm Pty Ltd | Operational · AI | In Service | Solar PV - Single axis tracking | Offline 0 MW | Solar - Solar | KARSF1 | 105 MW | Dec 2018 | View |
| Karara BESS - KCI | ACCIONA Energy | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Kareeya | CleanCo Queensland Limited | Operational · AI | In Service | Hydro - Run of River | Generating +21.6 MW | Hydro - Water | KAREEYA1 | 22 MW | — | View |
| Kareeya | CleanCo Queensland Limited | Operational · AI | In Service | Hydro - Run of River | Generating +21.6 MW | Hydro - Water | KAREEYA2 | 22 MW | — | View |
| Kareeya | CleanCo Queensland Limited | Operational · AI | In Service | Hydro - Run of River | Generating +21.6 MW | Hydro - Water | KAREEYA3 | 22 MW | — | View |
| Kareeya | CleanCo Queensland Limited | Operational · AI | In Service | Hydro - Run of River | Generating +21.6 MW | Hydro - Water | KAREEYA4 | 22 MW | — | View |
| Kareeya 5 | CleanCo Queensland Limited | Operational | In Service | Hydro - Dam | No dispatch data | Hydro - Water | KAREEYA5 | 7 MW | — | View |
| Kariboe Wind Farm | Kariboe Wind Farm Pty Ltd | Development | Publicly Announced | Wind Turbine - Onshore | Not commissioned | Wind - Wind | — | — | View | |
| Karma Wind Farm - KCI | NEMMCOCI Karma Pty Ltd as trustee for the CI Karma Trust | Development | Publicly Announced | Wind Turbine - Onshore | Not commissioned | Wind - Wind | — | — | View | |
| Keepit | GSP Energy Pty Ltd | Operational | In Service | Hydro - Dam | No dispatch data | Hydro - Water | KEEPIT | 7 MW | — | View |
| Kelsey Creek Solar Farm | tetrisenergy_nr | Development | Publicly Announced | Solar PV - Fixed | Not commissioned | Solar - Solar | — | — | View | |
| Kelsey Creek Solar Farm_SS | tetrisenergy_nr | Development | Publicly Announced | Solar PV - Fixed | Not commissioned | Solar - Solar | — | — | View | |
| Kennedy Energy Park - Phase 1 - Solar | Windlab / Eurus | Operational · AI | In Service | Solar PV - Single axis tracking | Offline 0 MW | Solar - Solar | KEPSF1 | 15 MW | — | View |
| Kennedy Energy Park - Phase 1 - Storage | Windlab/Eurus | Commissioning · AI | In Service | Storage - Battery | Offline 0 MW | Other - Other | KEPBG1 | 2/4 MW | — | View |
| Kennedy Energy Park - Phase 1 - Wind | Windlab / Eurus | Operational · AI | In Service | Wind Turbine - Onshore | Generating +15.3 MW | Wind - Wind | KEPWF1 | 43 MW | — | View |
| Kentbruck Green Power Hub | Neoen Australia Pty Ltd | Development | Publicly Announced | Wind Turbine - Onshore | Not commissioned | Wind - Wind | — | Jun 2030 | View | |
| Kerang BESS | Kerang Bess Pty Ltd | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | Mar 2027 | View | |
| Kerang BESS (BSR) | British Solar Renewables | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Kerang Hybrid | Kerang Power Pty Ltd | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | Sep 2027 | View | |
| Kerang Hybrid | Kerang Power Pty Ltd | Development | Publicly Announced | Solar PV - Single axis tracking | Not commissioned | Solar - Solar | — | Dec 2027 | View | |
| Kerrawary Power Station | Origin Energy | Development | Publicly Announced | Turbine - OCGT | Not commissioned | Fossil - Natural Gas Pipeline | — | Dec 2029 | View | |
| Kerrs Creek Wind Farm | RES Australia Pty Ltd | Development | Publicly Announced | Wind Turbine - Onshore | Not commissioned | Wind - Wind | — | Mar 2030 | View | |
| Kiamal BESS | TotalEnergies Renewables Australia | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | KIAMBE | — | Jul 2028 | View |
| Kiamal Solar Farm - Stage 1 | KSF Project Nominees Pty Ltd ATF KSF Project Trust | Operational · AI | In Service | Solar PV - Single axis tracking | Offline 0 MW | Solar - Solar | KIAMSF1 | 200 MW | Jan 2022 | View |
| Kiata Wind Farm | Kiata ProjectCo Pty Ltd atf Kiata Project Trust | — | removed | Wind Turbine - Onshore | Offline | Wind - Wind | KiataWF1 | 31 MW | — | View |
| Kidston Pumped Storage Hydro Project 250MW | Genex Power Ltd | Development | Committed | Storage - Pumped hydro | Not commissioned | Hydro - Water | 250/2000 MW | Jan 2026 | View | |
| Kidston Solar Project Phase One 50MW | Genex Power Limited | Operational · AI | In Service | Solar PV - Fixed | Generating +3.2 MW | Solar - Solar | KSP1 | 50 MW | Dec 2017 | View |
| Kidston Solar Project Phase Two 270MW | Genex Power Limited | Development | Publicly Announced | Solar PV - Fixed | Not commissioned | Solar - Solar | — | — | View | |
| Kidston Stage 3 Wind Project | Genex Power Limited | Development | Publicly Announced | Wind Turbine - Onshore | Not commissioned | Wind - Wind | — | — | View | |
| KIEWA VALLEY BESS | KIEWA VALLEY BESS NOMINEES PTY LTD on behalf of KIEWA VALLEY BESS Trust | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Kincraig BESS | acepower_NR | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | Dec 2028 | View | |
| Kingaroy Solar Farm | Kingaroy PropertyCo Pty Ltd as trustee for Kingaroy Property Trust | Operational · AI | In Service | Solar PV - Single axis tracking | Generating +1.4 MW | Solar - Solar | KINGASF1 | 40 MW | Nov 2024 | View |
| Kingfisher Solar Storage - Solar | Lyon Solar | Development | Publicly Announced | Solar PV - Single axis tracking | Not commissioned | Solar - Solar | — | — | View | |
| Kingfisher Solar Storage - Storage | Lyon Solar | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Kings Plain Wind Farm | Enerfin Energy Services Pty Ltd. | Development | Publicly Announced | Wind Turbine - Onshore | Not commissioned | Wind - Wind | — | — | View | |
| Kingswood BESS | Iberdrola Australia Development Pty Ltd. | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Koberinga Solar Farm | ESCO Pacific | Development | Publicly Announced | Solar PV - Fixed | Not commissioned | Solar - Solar | — | — | View | |
| Kogan Creek | Kogan Creek Power Station Pty Ltd | Operational · AI | In Service | Turbine - Steam Super Critical | Generating +322.1 MW | Fossil - Black Coal | KPP_1 | 744 MW | — | View |
| Koolunga Battery Energy Storage System 1 | Equis Energy (Australia) Projects (Ngumi 6) Pty Ltd as trustee for the Equis Energy (Australia) Ngumi 6 Asset Trust | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | Jun 2026 | View | |
| Koolunga Battery Energy Storage System 2 | Equis Energy (Australia) Projects (Ngumi 6) Pty Ltd as trustee for the Equis Energy (Australia) Ngumi 6 Asset Trust | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | Jun 2026 | View | |
| Koorakee Wind Farm | Squadron Energy Services Pty Ltd | Development | Publicly Announced | Wind Turbine - Onshore | Not commissioned | Wind - Wind | — | — | View | |
| Koorangie BESS Stage 2 | Edify Energy Pty Ltd | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Koorangie Energy Storage System | Shell Energy | Operational · AI | Committed | Storage - Battery | Not commissioned | Other - Other | KESSB1 | 185/370 MW | Jun 2025 | View |
| Koyuga Nanneella Wind Farm | FERA Australia Pty Ltd | Development | Publicly Announced | Wind Turbine - Onshore | Not commissioned | Wind - Wind | — | — | View | |
| Kurri Kurri Battery | CEP Energy | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Kut Wut Brataualung | Kut-Wut Brataualung Pty Ltd as trustee for the Kut-Wut Brataualung Trust | Development | Publicly Announced | Wind Turbine - Offshore | Not commissioned | Wind - Wind | — | Dec 2035 | View | |
| Ladbroke Grove | Origin Energy Power Limited | Operational · AI | In Service | Turbine - OCGT | Offline 0 MW | Fossil - Natural Gas Pipeline | LADBROK1 | 40 MW | — | View |
| Ladbroke Grove | Origin Energy Power Limited | Operational · AI | In Service | Turbine - OCGT | Offline 0 MW | Fossil - Natural Gas Pipeline | LADBROK2 | 40 MW | — | View |
| Lake Bonney 1 Wind Farm | Lake Bonney Wind Power Pty Ltd | Operational · AI | In Service | Wind Turbine - Onshore | Offline 0 MW | Wind - Wind | LKBONNY1 | 81 MW | — | View |
| Lake Bonney 2 Wind Farm | Lake Bonney Wind Power Pty Ltd | Operational · AI | In Service | Wind Turbine - Onshore | Offline 0 MW | Wind - Wind | LKBONNY2 | 159 MW | — | View |
| Lake Bonney 3 Wind Farm | Lake Bonney Wind Power Pty Ltd | Operational · AI | In Service | Wind Turbine - Onshore | Offline 0 MW | Wind - Wind | LKBONNY3 | 39 MW | — | View |
| Lake Bonney Battery Energy Storage | Lake Bonney BESS Pty Limited | Operational · AI | In Service | Storage - Battery | Offline 0 MW | Other - Other | LBB1 | 25/52 MW | Nov 2019 | View |
| Lake Echo | Hydro-Electric Corporation | Operational · AI | In Service | Hydro - Dam | Offline 0 MW | Hydro - Water | LK_ECHO | 32 MW | — | View |
| Lake Lyell Pumped Hydro | EnergyAustralia NSW Pty Ltd | Development | Publicly Announced | Storage - Pumped hydro | Not commissioned | Hydro - Water | — | Dec 2030 | View | |
| Lake Victoria Energy Park - KCI | Lake Victoria Wind Farm Pty Ltd atf Lake Victoria Wind Farm unit trust | Development | Publicly Announced | Wind Turbine - Onshore | Not commissioned | Wind - Wind | — | — | View | |
| Lake Victoria Energy Park - KCI | Lake Victoria Wind Farm Pty Ltd atf Lake Victoria Wind Farm unit trust | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Lakeland Wind Farm | Lakeland Wind Farm Pty Ltd | Development | Publicly Announced | Wind Turbine - Onshore | Not commissioned | Wind - Wind | — | Jun 2028 | View | |
| Lambing Gully BESS | tetrisenergy_nr | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Lambing Gully Wind Farm | tetrisenergy_nr | Development | Publicly Announced | Wind Turbine - Onshore | Not commissioned | Wind - Wind | — | — | View | |
| Lambruk Solar Project | Venn Energy Pty Ltd / Acacia Solar Project Pty Ltd. | Development | Publicly Announced | Solar PV - Single axis tracking | Not commissioned | Solar - Solar | — | — | View | |
| Lancaster Solar Farm | Lancaster Solar Farm Pty Ltd as trustee for the Lancaster Solar Farm Trust | Development | Anticipated | Solar PV - Single axis tracking | Not commissioned | Solar - Solar | — | — | View | |
| Latrobe Solar Farm | Canadian Solar (Australia) Pty Ltd | Development | Publicly Announced | Solar PV - Single axis tracking | Not commissioned | Solar - Solar | — | — | View | |
| LaTrobe Valley BESS | Tilt Renewables Australia Pty Ltd | Commissioning · AI | Committed | Storage - Battery | Not commissioned | Other - Other | LVES1 | 100/200 MW | Jul 2025 | View |
| Laverton North | Snowy Hydro Ltd | Operational · AI | In Service | Turbine - OCGT | Offline 0 MW | Fossil - Natural Gas Pipeline | LNGS1 | 156 MW | — | View |
| Laverton North | Snowy Hydro Ltd | Operational · AI | In Service | Turbine - OCGT | Offline 0 MW | Fossil - Natural Gas Pipeline | LNGS2 | 156 MW | — | View |
| Learmonth BESS | The Trustee for Learmonth BESS Holdings Unit Trust | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Leigh Creek Energy Project | Leigh Creek Energy | Development | Publicly Announced | Turbine - Steam Sub Critical | Not commissioned | Other - Other | — | — | View | |
| Lemonthyme / Wilmot | Hydro-Electric Corporation | Operational · AI | In Service | Hydro - Dam | Offline 0 MW | Hydro - Water | LEM_WIL | 82 MW | — | View |
| Leonards Hill | Hepburn Community Wind Park Co-operative Limited | Operational | In Service | Wind Turbine - Onshore | No dispatch data | Wind - Wind | HEPWIND1 | 4 MW | — | View |
| Lerida BESS | Elgin EnergyP/L | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Lerida Solar Farm | Elgin EnergyP/L | Development | Publicly Announced | Solar PV - Fixed | Not commissioned | Solar - Solar | — | — | View | |
| Liddell BESS | MACQGEN | Development | Committed* | Storage - Battery | Not commissioned | Other - Other | 500/1000 MW | Feb 2026 | View | |
| Lilyvale BESS - KCI | Acen Australia | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Lilyvale Solar Farm | Lilyvale Asset Co Pty Ltd ATF Lilyvale Asset Trust | Operational · AI | In Service | Solar PV - Single axis tracking | Generating +8.1 MW | Solar - Solar | LILYSF1 | 118 MW | Jan 2022 | View |
| Limondale BESS | LIMONDALE BATTERY PTY. LTD | Development | Committed | Storage - Battery | Not commissioned | Other - Other | 50/400 MW | Dec 2025 | View | |
| Limondale Solar Farm 1 | Limondale Sun Farm Pty Ltd | Operational · AI | In Service | Solar PV - Single axis tracking | Offline 0 MW | Solar - Solar | LIMOSF11 | 230 MW | Dec 2022 | View |
| Limondale Solar Farm 2 | Limondale Sun Farm Pty Ltd | Operational · AI | In Service | Solar PV - Single axis tracking | Offline 0 MW | Solar - Solar | LIMOSF21 | 29 MW | Apr 2023 | View |
| LINCOLN GAP BESSBDU | Lincoln Gap Wind Farm (Operations) Pty Ltd | Operational · AI | Anticipated | Storage - Battery | Not commissioned | Other - Other | LGAPBS1 | 10/10 MW · AI | Jun 2025 | View |
| Lincoln Gap Wind Farm - stage 1 | Lincoln Gap Wind Farm Pty Ltd | Operational · AI | In Service | Wind Turbine - Onshore | Generating +25.8 MW | Wind - Wind | LGAPWF1 | 126 MW | Aug 2020 | View |
| Lincoln Gap Wind Farm - Stage 2 | Lincoln Gap Wind Farm Pty Ltd | Operational · AI | In Service | Wind Turbine - Onshore | Generating +21.4 MW | Wind - Wind | LGAPWF2 | 86 MW | Feb 2022 | View |
| Lincoln Gap Wind Farm stage 3 | Lincoln Gap 3 Wind Farm Pty Ltd | Development | Publicly Announced | Wind Turbine - Onshore | Not commissioned | Wind - Wind | — | — | View | |
| Lindley BESS | NEMMCO | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Lindsay Gap BESS | Acciona Energy Australia Global | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Lionsgate Battery | CEP Energy | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Little River BESS | ACEnergy Pty Ltd | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Little River Solar Farm - KCI | Clean Technology Partners | Development | Publicly Announced | Solar PV - Fixed | Not commissioned | Solar - Solar | — | — | View | |
| Liverpool Range Wind Farm | Liverpool Range Wind Farm Pty Ltd | Development | Publicly Announced | Wind Turbine - Onshore | Not commissioned | Wind - Wind | — | — | View | |
| Lockhart Hybrid Facility - Battery | Better Energy Technology Pty Ltd | Development | Committed | Storage - Battery | Not commissioned | Solar - Solar | 10/20 MW | Jun 2026 | View | |
| Lockhart Hybrid Facility - Solar | Better Energy Technology Pty Ltd | Development | Committed | Solar PV - Single axis tracking | Not commissioned | Solar - Solar | 10 MW | Jun 2026 | View | |
| Lockyer BESS - KCI | Lockyer Energy Management Pty | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Lockyer Valley Energy Project | Lockyer Energy Management Pty Ltd | Development | Publicly Announced | Storage - Battery | Not commissioned | Solar - Solar | — | — | View | |
| Lockyer Valley Energy Project | Lockyer Energy Management Pty Ltd | Development | Anticipated | Turbine - OCGT | Not commissioned | Fossil - Natural Gas | — | Feb 2028 | View | |
| Longreach Solar Farm | Longreach Asset Company | Operational · AI | In Service | Solar PV - Fixed | Offline +0.2 MW | Solar - Solar | LRSF1 | 15 MW | — | View |
| Lonsdale | Lumo Generation SA Pty Ltd | Operational · AI | In Service | Reciprocating Engine - Compression ignition | Offline 0 MW | Fossil - Diesel | LONSDALE | 20 MW | — | View |
| Lotus Creek Wind Farm | CS ENERGY | Development | Committed | Wind Turbine - Onshore | Not commissioned | Wind - Wind | 285 MW | Dec 2027 | View | |
| Lovely Banks Renewable Energy Hub - KCI | Syncline Energy Pty Ltd | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Lower Wonga BESS | Equis Energy (Australia) Projects (Ngumi 7) Pty Ltd as trustee for the Equis Energy(Australia) Ngumi 7 Asset Trust | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | May 2026 | View | |
| Lower Wonga Solar Farm (LightsourceBP) | Lower Wonga Solar Farm Pty Ltd | Development | Publicly Announced | Solar PV - Single axis tracking | Not commissioned | Solar - Solar | — | — | View | |
| Loy Yang A Power Station | AGL Loy Yang Marketing Pty Ltd | Operational · AI | In Service | Turbine - Steam Sub Critical | Generating +559 MW | Fossil - Brown Coal | LYA1 | 560 MW | — | View |
| Loy Yang A Power Station | AGL Loy Yang Marketing Pty Ltd | Operational · AI | In Service | Turbine - Steam Sub Critical | Generating +530 MW | Fossil - Brown Coal | LYA2 | 530 MW | — | View |
| Loy Yang A Power Station | AGL Loy Yang Marketing Pty Ltd | Operational · AI | In Service | Turbine - Steam Sub Critical | Generating +560 MW | Fossil - Brown Coal | LYA3 | 560 MW | — | View |
| Loy Yang A Power Station | AGL Loy Yang Marketing Pty Ltd | Operational · AI | In Service | Turbine - Steam Sub Critical | Generating +561 MW | Fossil - Brown Coal | LYA4 | 560 MW | — | View |
| Loy Yang B | Gippsland Power Pty Ltd ABN 30 077 851 079 / LYB Ventures Australia Pty Ltd ABN 57 055 984 499 / Traralgon Power Pty Ltd ABN 64 056 292 623 / Latrobe Power Pty Ltd ABN 42 055 983 563 / LYB Australia Limited ABN 87 055 563 785 | Operational · AI | In Service | Turbine - Steam Sub Critical | Generating +583.1 MW | Fossil - Brown Coal | LOYYB1 | 580 MW | — | View |
| Loy Yang B | Gippsland Power Pty Ltd ABN 30 077 851 079 / LYB Ventures Australia Pty Ltd ABN 57 055 984 499 / Traralgon Power Pty Ltd ABN 64 056 292 623 / Latrobe Power Pty Ltd ABN 42 055 983 563 / LYB Australia Limited ABN 87 055 563 785 | Operational · AI | In Service | Turbine - Steam Sub Critical | Generating +576 MW | Fossil - Brown Coal | LOYYB2 | 580 MW | — | View |
| Loy Yang B Power Station - BESS Stage 1 - KCI | Alinta Energy Clean Energy Development Pty Ltd | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| LST02 Data Hall BESS | Firmus Grid P/L | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Lucas Heights 2 | EDL LFG NSW Pty Ltd | Operational | In Service | Reciprocating Engine - Spark ignition | No dispatch data | Renewable Biomass or Waste - Landfill Gas | LUCAS2S2 | 5 MW | — | View |
| Lucas Heights 2 | EDL LFG NSW Pty Ltd | Operational | In Service | Reciprocating Engine - Spark ignition | No dispatch data | Renewable Biomass or Waste - Landfill Gas | LUCASHGT | 13 MW | — | View |
| LYA BESS | LOYYANGA | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Macarthur Wind Farm | Macarthur Wind Farm Pty Ltd and Meridian Wind Macarthur Pty Ltd | Operational · AI | In Service | Wind Turbine - Onshore | Generating +4.2 MW | Wind - Wind | MACARTH1 | 420 MW | — | View |
| MacIntyre Wind Farm | Macintyre Windfarm Pty Ltd and Arc Energy Macintyre Pty Ltd | Commissioning · AI | Committed* | Wind Turbine - Onshore | Not commissioned | Wind - Wind | MCINTYR1 | 923 MW | Nov 2025 | View |
| Mackenzie River BESS | BSR EPC P/L | Development | Publicly Announced | Storage - Battery | Not commissioned | Solar - Solar | — | — | View | |
| Mackenzie River Solar Farm | BSR EPC P/L | Development | Publicly Announced | Solar PV - Fixed | Not commissioned | Solar - Solar | — | — | View | |
| Mackintosh | Hydro-Electric Corporation | Operational · AI | In Service | Hydro - Dam | Offline 0 MW | Hydro - Water | MACKNTSH | 80 MW | — | View |
| Madeline Downs BESS | AGL Energy Limited | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Maison Dieu BESS | Graviatas Now Pty Ltd | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Maison Dieu Solar Farm | Terrain Solar | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Maison Dieu Solar Farm | Terrain Solar | Development | Publicly Announced | Solar PV - Fixed | Not commissioned | Solar - Solar | — | — | View | |
| Majors Creek Solar And BESS | Edify Energy Pty Ltd | Development | Publicly Announced | Solar PV - Single axis tracking | Not commissioned | Solar - Solar | — | — | View | |
| Majors Creek Solar And BESS | Edify Energy Pty Ltd | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | Oct 2028 | View | |
| Majors Creek Solar Power Station | Edify Energy Pty Ltd | — | removed | Storage - Battery | Offline | Other - Other | 150/600 MW | Oct 2028 | View | |
| Majors Creek Solar Power Station | Edify Energy Pty Ltd | — | removed | Solar PV - Single axis tracking | Offline | Solar - Solar | 150 MW | — | View | |
| Mallee Wind Farm | Mallee Wind PTY LTD | Development | Publicly Announced | Storage - Battery | Not commissioned | Wind - Wind | — | Mar 2028 | View | |
| Mallee Wind Farm | Mallee Wind PTY LTD | Development | Publicly Announced | Wind Turbine - Onshore | Not commissioned | Wind - Wind | — | Mar 2028 | View | |
| Malunga Nine Mile BESS - KCI | Green Switch Energy Pty Ltd | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Mandurama BESS | tetrisenergy_nr | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Mandurama Wind Farm | tetrisenergy_nr | Development | Publicly Announced | Wind Turbine - Onshore | Not commissioned | Wind - Wind | — | — | View | |
| Mangoplah BESS - KCI | Samsung C&T Renewable Energy Australia Pty Ltd. | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Manildra Solar Farm | Manildra Prop Pty Ltd as trustee for the Manildra Asset Trust | Operational · AI | In Service | Solar PV - Single axis tracking | Offline 0 MW | Solar - Solar | MANSLR1 | 50 MW | Dec 2018 | View |
| Mannum Adelaide Pumping Station No 2 - MAPL2 (Palmer) | South Australian Water Corporation | Operational · AI | In Service | Solar PV - Single axis tracking | Offline 0 MW | Solar - Solar | MAPS2PV1 | 17 MW | May 2022 | View |
| Mannum Adelaide Pumping Station No 3 - MAPL3 (Tungkillo) | South Australian Water Corporation | Operational · AI | In Service | Solar PV - Single axis tracking | Offline 0 MW | Solar - Solar | MAPS3PV1 | 17 MW | Jan 2023 | View |
| Mannum BESS | Mannum Stage 2 Battery SubCo Pty Ltd as Trustee for The Mannum Stage 2 Battery Unit Trust | Development | Anticipated | Storage - Battery | Not commissioned | Other - Other | — | Sep 2025 | View | |
| Mannum Solar Farm 2 | Mannum Stage 2 SubCo Pty Ltd as trustee for the Mannum Stage 2 Unit Trust | Operational · AI | In Commissioning | Solar PV - Single axis tracking | Offline 0 MW | Solar - Solar | MANNSF2 | 30 MW | Dec 2024 | View |
| Mansfield Solar Farm - Solar - KCI | Biscon Energy Australia Pty Ltd | Development | Publicly Announced | Solar PV - Fixed | Not commissioned | Solar - Solar | — | — | View | |
| Mansfield Solar Farm - Storage - KCI | Biscon Energy Australia Pty Ltd | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Maranbah Solar Farm | EEW ECO ENERGY WORLD PTY LTD | Development | Publicly Announced | Solar PV - Single axis tracking | Not commissioned | Solar - Solar | — | — | View | |
| Marcollat Energy Hub (Stage 1) | BE PRO MC1 PTY LTD | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Marcollat Energy Hub (stage 2) | Bison Energy | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Marcollat Energy Hub(Stage 1) | BE PRO MC1 PTY LTD | — | removed | Storage - Battery | Offline | Other - Other | 400/1600 MW | — | View | |
| Markaranka Solar and Storage | Monash Energy Pty Ltd | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Markaranka Solar and Storage | Monash Energy Pty Ltd | Development | Publicly Announced | Solar PV - Single axis tracking | Not commissioned | Solar - Solar | — | — | View | |
| Marmadua Wind Farm (KCI) | Cubico Sustainable Investments Australia Pty Ltd | Development | Publicly Announced | Wind Turbine - Onshore | Not commissioned | Wind - Wind | — | — | View | |
| Maroona Wind Farm | Myamba Developments Pty Ltd | Operational | In Service | Wind Turbine - Onshore | No dispatch data | Wind - Wind | 7 MW | — | View | |
| Maroona Wind Farm | Myamba Developments Pty Ltd | — | removed | Wind Turbine - Onshore | Offline | Wind - Wind | MAROOWF1 | 7 MW | — | View |
| Marulan - OCGT/CCGT | EnergyAustralia Marulan Pty Ltd | Development | Publicly Announced | Turbine - Other | Not commissioned | Fossil - Natural Gas Pipeline | — | — | View | |
| Marulan BESS | Ratch Australia | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Marulan Solar Farm | Marulan Solar Farm Pty Ltd | Development | Publicly Announced | Solar PV - Dual axis tracking | Not commissioned | Solar - Solar | — | Dec 2025 | View | |
| Maryrorough Solar Farm | Maryrorough Solar Pty Ltd | Operational · AI | In Service | Solar PV - Single axis tracking | Generating +0.7 MW | Solar - Solar | MARYRSF1 | 35 MW | Mar 2021 | View |
| Maryvale Energy From Waste | Maryvale Energy from Waste Project Company | Development | Publicly Announced | Turbine - Steam Super Critical | Not commissioned | Renewable Biomass or Waste - Municipal Solid Waste | — | — | View | |
| Maryvale Solar and Energy Storage System | Maryvale Solar Farm Pty Ltd | Development | Anticipated | Storage - Battery | Not commissioned | Other - Other | — | Feb 2027 | View | |
| Maryvale Solar and Energy Storage System | Maryvale Solar Farm Pty Ltd | Development | Anticipated | Solar PV - Single axis tracking | Not commissioned | Solar - Solar | — | Feb 2027 | View | |
| Maules Creek BESS | FRV Services Australia Pty Ltd | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Maules Creek Solar Farm | FRV Services Australia Pty Ltd | Development | Publicly Announced | Solar PV - Fixed | Not commissioned | Solar - Solar | — | — | View | |
| Maxwell Downs Solar Farm - KCI | X-Elio Holbrook Trust | Development | Publicly Announced | Solar PV - Single axis tracking | Not commissioned | Solar - Solar | — | — | View | |
| McCullys Gap BESS | BW ESS | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| McMahons Reef Solar Farm | Enerparc Australia Pty Ltd | Development | Publicly Announced | Solar PV - Single axis tracking | Not commissioned | Solar - Solar | — | — | View | |
| Meadow Creek Solar Farm - KCI | Clean Technologies Partners | Development | Publicly Announced | Solar PV - Fixed | Not commissioned | Solar - Solar | — | — | View | |
| Meadowbank | Hydro-Electric Corporation | Operational · AI | In Service | Hydro - Dam | Generating +11.8 MW | Hydro - Water | MEADOWBK | 40 MW | — | View |
| Meering BESS | Virya Energy Pty Ltd | Development | Publicly Announced | Storage - Battery | Not commissioned | Wind - Wind | — | — | View | |
| Meering Wind Farm | Virya Energy Pty Ltd | Development | Publicly Announced | Wind Turbine - Onshore | Not commissioned | Wind - Wind | — | — | View | |
| Melbourne Grid Battery - KCI | Lumea | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Melbourne Regional Landfill | Landfill Operations Pty Ltd | Operational | In Service | Reciprocating Engine - Spark ignition | No dispatch data | Renewable Biomass or Waste - Landfill Gas | 9 MW | — | View | |
| Melbourne Renewable Energy Complex | Elgin Energy Pty Ltd | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Melbourne Renewable Energy Hub - Side A | MREH Pty Ltd as trustee for MREH Asset Trust | Development | Committed | Storage - Battery | Not commissioned | Other - Other | 600/1600 MW | Nov 2025 | View | |
| Melbourne Renewable Energy Hub - Side B | MREH Pty Ltd as trustee for MREH Asset Trust | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | Dec 2028 | View | |
| Melbourne Solar Farm - KCI | Emergent Technologies | Development | Publicly Announced | Solar PV - Fixed | Not commissioned | Solar - Solar | — | — | View | |
| Meredith Wind Farm - KCI | Acciona Energy Global Australia | Development | Publicly Announced | Wind Turbine - Onshore | Not commissioned | Wind - Wind | — | — | View | |
| Merino Solar Farm | Merino Solar Farm Pty Ltd as trustee for Merino Solar Farm Trust | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Merino Solar Farm | Merino Solar Farm Pty Ltd as trustee for Merino Solar Farm Trust | Development | Publicly Announced | Solar PV - Fixed | Not commissioned | Solar - Solar | — | — | View | |
| Merriwa Solar Farm and BESS | Valent Energy Developments Pty Ltd | Development | Publicly Announced | Solar PV - Single axis tracking | Not commissioned | Solar - Solar | — | Nov 2027 | View | |
| Merriwa Solar Farm and BESS | Valent Energy Developments Pty Ltd | Development | Publicly Announced | Storage - Battery | Not commissioned | Solar - Solar | — | — | View | |
| Metz Solar Farm | Metz ProjectCo Pty Ltd as trustee for Metz ProjectCo Trust | Operational · AI | In Service | Solar PV - Single axis tracking | Generating +3.1 MW | Solar - Solar | METZSF1 | 135 MW | Apr 2023 | View |
| Mica Creek Solar Farm | APA Group | Development | Publicly Announced | Solar PV - Single axis tracking | Not commissioned | Solar - Solar | — | — | View | |
| Middle Creek Renewable Energy Hub - Wind | Cubico Sustainable Investments Australia Pty Ltd | Development | Publicly Announced | Storage - Battery | Not commissioned | Wind - Wind | — | — | View | |
| Middle Creek Renewable Energy Hub - Wind | Cubico Sustainable Investments Australia Pty Ltd | Development | Publicly Announced | Wind Turbine - Onshore | Not commissioned | Wind - Wind | — | — | View | |
| Middlebrook Solar And BESS | Middlebrook Solar Farm Pty Ltd as trustee for MSF Project Trust | Development | Publicly Announced | Solar PV - Single axis tracking | Not commissioned | Solar - Solar | — | May 2029 | View | |
| Middlebrook Solar And BESS | Middlebrook Solar Farm Pty Ltd as trustee for MSF Project Trust | Development | Publicly Announced | Storage - Battery | Not commissioned | Solar - Solar | — | May 2029 | View | |
| Middlebrook Solar Farm | Middlebrook Solar Farm Pty Ltd as trustee for MSF Project Trust | — | removed | Storage - Battery | Offline | Solar - Solar | 387/640 MW | Dec 2028 | View | |
| Middlebrook Solar Farm | Middlebrook Solar Farm Pty Ltd as trustee for MSF Project Trust | — | removed | Solar PV - Single axis tracking | Offline | Solar - Solar | 354 MW | Dec 2028 | View | |
| Middlemount Solar Farm | Capricorn SF No1 Pty Ltd | Operational · AI | In Service | Solar PV - Single axis tracking | Generating +2.7 MW | Solar - Solar | MIDDLSF1 | 26 MW | Jul 2021 | View |
| Midlands Hydro | TBA | Operational | In Service | Hydro - Dam | No dispatch data | Hydro - Water | 6 MW | — | View | |
| Midwest BESS | Midwest Solar Pty Ltd | Development | Publicly Announced | Storage - Battery | Not commissioned | Solar - Solar | — | — | View | |
| Midwest Solar Farm | Midwest Solar Pty Ltd | Development | Publicly Announced | Solar PV - Fixed | Not commissioned | Solar - Solar | — | — | View | |
| Mildura Power Station | Ceramet | Development | Publicly Announced | Solar PV - Single axis tracking | Not commissioned | Solar - Solar | — | — | View | |
| Miles BESS Project | TBSOL | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Miles Solar Project | Vena Energy | Development | Publicly Announced | Solar PV - Fixed | Not commissioned | Solar - Solar | — | — | View | |
| Millmerran BESS - Storage | Millmerran Power Partners | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Millmerran Power Plant | Millmerran Power Partners | Operational · AI | In Service | Turbine - Steam Super Critical | Generating +435.2 MW | Fossil - Black Coal | MPP_1 | 426 MW | — | View |
| Millmerran Power Plant | Millmerran Power Partners | Operational · AI | In Service | Turbine - Steam Super Critical | Offline 0 MW | Fossil - Black Coal | MPP_2 | 426 MW | — | View |
| Millmerran Wind Farm | Millmerran Power Partners | Development | Publicly Announced | Wind Turbine - Onshore | Not commissioned | Wind - Wind | — | — | View | |
| Milpulling Wind Farm | Milpulling Wind Farm Pty Ltd | Development | Publicly Announced | Wind Turbine - Onshore | Not commissioned | Wind - Wind | — | — | View | |
| Mintaro GT | Synergen Power Pty Ltd | Operational · AI | In Service | Turbine - OCGT | Offline +0.1 MW | Fossil - Natural Gas Pipeline | MINTARO | 90 MW | — | View |
| Miriam Vale Solar Farm - A | Private Energy Partners Pty Ltd | — | removed | Storage - Battery | Offline | Other - Other | 100/100 MW | — | View | |
| Miriam Vale Solar Farm - A | Private Energy Partners Pty Ltd | — | removed | Solar PV - Fixed | Offline | Solar - Solar | 200 MW | — | View | |
| Miriam Vale Solar Farm - B | Private Energy Partners Pty Ltd | — | removed | Storage - Battery | Offline | Other - Other | 100/100 MW | — | View | |
| Miriam Vale Solar Farm - B | Private Energy Partners Pty Ltd | — | removed | Solar PV - Fixed | Offline | Solar - Solar | 200 MW | — | View | |
| Miriam Vale Solar Farm And BESS - A | Private Energy Partners Pty Ltd | Development | Publicly Announced | Solar PV - Single axis tracking | Not commissioned | Solar - Solar | — | — | View | |
| Miriam Vale Solar Farm And BESS - A | Private Energy Partners Pty Ltd | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Miriam Vale Solar Farm And BESS - B | Private Energy Partners Pty Ltd | Development | Publicly Announced | Solar PV - Single axis tracking | Not commissioned | Solar - Solar | — | — | View | |
| Miriam Vale Solar Farm And BESS - B | Private Energy Partners Pty Ltd | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| MNC000116 - Dubbo Firming Power Station | Squadron Energy Services Pty Ltd | Development | Publicly Announced | Other - Other | Not commissioned | Fossil - Natural Gas | — | — | View | |
| Moah Creek Solar Farm (RES) | Moah Creek Solar Development Co Pty Ltd | Development | Publicly Announced | Solar PV - Fixed | Not commissioned | Solar - Solar | — | — | View | |
| Moah Creek Wind Farm | Moah Creek Wind Farm Project Co Pty Ltd as trustee for the Moah Creek Wind Farm Project Trust | Development | Publicly Announced | Wind Turbine - Onshore | Not commissioned | Wind - Wind | — | Mar 2028 | View | |
| Moama Solar Farm | Moama Propertyco Pty Ltd as trustee for the Moama Property Trust | Development | Publicly Announced | Solar PV - Single axis tracking | Not commissioned | Solar - Solar | — | — | View | |
| Mobilong BESS | Mobilong ProjectCo Pty Ltd | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Mokoan Solar Farm | EE Solar 6 Pty Ltd as trustee for EE Solar 6 Trust | — | removed | Solar PV - Single axis tracking | Offline | Solar - Solar | MOKOSF1 | 46 MW | Apr 2025 | View |
| Mokoan Solar Farm (LightsourceBP) | EE Solar 6 Pty Ltd as trustee for EE Solar 6 Trust | Commissioning · AI | In Commissioning | Solar PV - Single axis tracking | Offline 0 MW | Solar - Solar | MOKOSF1 | 46 MW | Apr 2025 | View |
| Mologa BESS | Potentia Energy Group P/L | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Molong BESS (KCI) | StorEnergy 3 Pty Ltd | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Molong Solar Farm | Molong Operations co Pty Ltd ATF Molong Operations Trust | Operational · AI | In Service | Solar PV - Single axis tracking | Offline 0 MW | Solar - Solar | MOLNGSF1 | 36 MW | Feb 2021 | View |
| Molonglo BESS | ITP Developments P/L | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Monash Solar Farm - KCI | 1265 Warnecke Rd Pty Ltd | Development | Publicly Announced | Solar PV - Fixed | Not commissioned | Solar - Solar | — | — | View | |
| Monduran BESS | Eku Energy Projects (Australia) Pty Ltd as trustee for the Eku Energy Projects (Australia) Trust | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Moonah Solar Farm - KCI | Venn Energy Pty Ltd / Moonah Solar Project Pty Ltd | Development | Publicly Announced | Solar PV - Single axis tracking | Not commissioned | Solar - Solar | — | — | View | |
| Moonlight Range Wind Farm | Brookfield | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Moonlight Range Wind Farm | Brookfield | Development | Publicly Announced | Wind Turbine - Onshore | Not commissioned | Wind - Wind | — | — | View | |
| Moorabool BESS | Neoen Australia Pty Ltd | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | MOORBESS | — | — | View |
| Moorabool Wind Farm | Moorabool Wind Farm Interface Company Pty Ltd | Operational · AI | In Service | Wind Turbine - Onshore | Offline 0 MW | Wind - Wind | MOORAWF1 | 312 MW | Jul 2022 | View |
| Moorebank Logistics Park Project | Energy Bay Fund Management | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Moorebank Logistics Park Project | Energy Bay Fund Management | Development | Publicly Announced | Solar PV - Fixed | Not commissioned | Solar - Solar | — | — | View | |
| Moranbah Generation Project | SUSTAINABLE ENERGY INFRASTRUCTURE | — | removed | Reciprocating Engine - Compression ignition | Offline | Fossil - Waste Coal Mine Gas | MORANBAH | 13 MW | — | View |
| Moranbah Generation Project | SUSTAINABLE ENERGY INFRASTRUCTURE | Operational | In Service | Reciprocating Engine - Compression ignition | No dispatch data | Fossil - Waste Coal Mine Gas | 13 MW | — | View | |
| Moranbah North | EDL Projects Australia Pty Ltd | Operational · AI | In Service | Reciprocating Engine - Spark ignition | Generating +33.1 MW | Fossil - Waste Coal Mine Gas | MBAHNTH | 64 MW | — | View |
| Moree BESS | AE BESS 2 PTY LTD AS TRUSTEE FOR AE BESS 2 UNIT TRUST | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Moree Solar Farm | Moree Solar Farm Pty Ltd | Operational · AI | In Service | Solar PV - Single axis tracking | Generating +0.7 MW | Solar - Solar | MOREESF1 | 56 MW | — | View |
| Moreton Hill Wind Farm | Moreton Hill Wind Farm Nominees Pty Ltd | Development | Publicly Announced | Wind Turbine - Onshore | Not commissioned | Wind - Wind | — | — | View | |
| Morgan Battery | NEMMCO | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Morgan Long Duration Energy Storage - KCI | Origin Energy | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Morgan Solar | Green Gold Energy Pty Ltd | Development | Publicly Announced | Solar PV - Fixed | Not commissioned | Solar - Solar | — | — | View | |
| Morgan To Whyalla Pipeline No 1 PS And Water Filtration Plant | South Australian Water Corporation | Operational · AI | In Service | Solar PV - Single axis tracking | Offline 0 MW | Solar - Solar | MWPS1PV1 | 6 MW | Aug 2022 | View |
| Morgan To Whyalla Pipeline No 2 PS | South Australian Water Corporation | Operational · AI | In Service | Solar PV - Single axis tracking | Offline 0 MW | Solar - Solar | MWPS2PV1 | 6 MW | Jun 2022 | View |
| Morgan To Whyalla Pipeline No 3 PS | South Australian Water Corporation | Operational · AI | In Service | Solar PV - Single axis tracking | Offline 0 MW | Solar - Solar | MWPS3PV1 | 8 MW | Jun 2022 | View |
| Morgan To Whyalla Pipeline No 4 PS | South Australian Water Corporation | Operational · AI | In Service | Solar PV - Single axis tracking | Offline 0 MW | Solar - Solar | MWPS4PV1 | 6 MW | Aug 2022 | View |
| Mornington BESS | Mornington BESS Project Pty Ltd as Trustee of Mornington BESS Project Trust | Development | Committed | Storage - Battery | Not commissioned | Other - Other | 240/480 MW | Feb 2026 | View | |
| Mortlake | Origin Energy Power Limited | Operational · AI | In Service | Turbine - OCGT | Generating +205 MW | Fossil - Natural Gas Pipeline | MORTLK11 | 292 MW | — | View |
| Mortlake | Origin Energy Power Limited | Operational · AI | In Service | Turbine - OCGT | Generating +204 MW | Fossil - Natural Gas Pipeline | MORTLK12 | 292 MW | — | View |
| Mortlake | Origin Energy Power Limited | Development | Publicly Announced | Turbine - OCGT | Not commissioned | Fossil - Natural Gas | — | — | View | |
| Mortlake Battery | BORAL | Development | Committed* | Storage - Battery | Not commissioned | Other - Other | 300/600 MW | Mar 2027 | View | |
| Mortlake Energy Hub | brightnightpower_NR | Development | Anticipated | Storage - Battery | Not commissioned | Solar - Solar | — | Dec 2027 | View | |
| Mortlake Energy Hub | brightnightpower_NR | Development | Anticipated | Solar PV - Single axis tracking | Not commissioned | Solar - Solar | — | Dec 2027 | View | |
| Mortlake South Wind Farm | Mortlake South Wind Farm Pty Ltd | Operational · AI | In Service | Wind Turbine - Onshore | Offline 0 MW | Wind - Wind | MRTLSWF1 | 158 MW | May 2023 | View |
| Mortons Lane Wind Farm | Mortons Lane Windfarm Pty Ltd | Operational · AI | In Service | Wind Turbine - Onshore | Generating +1 MW | Wind - Wind | MLWF1 | 20 MW | Jul 2021 | View |
| Morundah Battery Storage | Photon Energy Engineering Australia Pty Ltd. | Development | Publicly Announced | Storage - Battery | Not commissioned | Solar - Solar | — | — | View | |
| Morundah Solar Power Plant (Thermal) | Photon Energy Engineering Australia Pty Ltd. | Development | Publicly Announced | Solar Thermal - Central collector | Not commissioned | Solar - Solar | — | — | View | |
| Morwell BESS | ACE Power Development 2 Pty Ltd | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Mount Britton BESS1 | firmpower_NR | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Mount Britton BESS2 | firmpower_NR | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Mount Emerald | Ratch Australia | Operational · AI | In Service | Wind Turbine - Onshore | Generating +58.9 MW | Wind - Wind | MEWF1 | 181 MW | Oct 2018 | View |
| Mount Fyans | Woolnorth Wind Farm Holding | Development | Publicly Announced | Wind Turbine - Onshore | Not commissioned | Wind - Wind | — | — | View | |
| Mount Fyans Wind Farm 2.0 | Woolnorth Wing Farm Holding Pty Ltd | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Mount Hopeful BESS | Neoen Australia Pty Ltd | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Mount Hopeful Wind Farm | Mount Hopeful Wind Farm as trustee for Mount Hopeful Wind Farm Trust | Development | Publicly Announced | Wind Turbine - Onshore | Not commissioned | Wind - Wind | — | Jun 2028 | View | |
| Mount Lambie BESS | tetrisenergy_nr | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Mount Lambie Wind Farm | tetrisenergy_nr | Development | Publicly Announced | Wind Turbine - Onshore | Not commissioned | Wind - Wind | — | — | View | |
| Mount Walsh Wind Farm (Mainstream) | Mainstream | — | removed | Wind Turbine - Onshore | Offline | Wind - Wind | 600 MW | — | View | |
| Moura Solar Farm | Moura Solar Farm SPV Pty Ltd as the Trustee for Moura Solar Farm Unit Trust | Operational · AI | In Service | Solar PV - Single axis tracking | Generating +7.3 MW | Solar - Solar | MOUSF1 | 99 MW | Apr 2023 | View |
| Mt Challenger BESS | Tetris Energy | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Mt Challenger Wind Farm | Tetris Energy | Development | Publicly Announced | Wind Turbine - Onshore | Not commissioned | Wind - Wind | — | — | View | |
| Mt Cotton Biomass Cogeneration Power Station | Darwalla Milling Co Pty Ltd | Development | Publicly Announced | Turbine - Steam Sub Critical | Not commissioned | Other - Other | — | — | View | |
| Mt Doran BESS | Iberdrola Australia Development Pty Ltd | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Mt Fox BESS - ARENA | Mount Fox BESS Pty Ltd | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | Apr 2029 | View | |
| Mt Fox Wind Farm | Mount Fox Energy Park Pty Ltd | Development | Publicly Announced | Wind Turbine - Onshore | Not commissioned | Wind - Wind | — | — | View | |
| Mt Gellibrand Wind Farm | ACCIONA Energy | Operational · AI | In Service | Wind Turbine - Onshore | Offline 0 MW | Wind - Wind | MTGELWF1 | 139 MW | Jul 2018 | View |
| Mt Mercer BESS | Foresight Australia | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Mt Mercer Wind Farm | Mt Mercer Windfarm Pty Ltd | Operational · AI | In Service | Wind Turbine - Onshore | Offline 0 MW | Wind - Wind | MERCER01 | 131 MW | — | View |
| Mt Millar Wind Farm | MT MILLAR WIND FARM PTY LTD | Operational · AI | In Service | Wind Turbine - Onshore | Generating +12.9 MW | Wind - Wind | MTMILLAR | 72 MW | — | View |
| Mt Piper | EnergyAustralia NSW Pty Ltd | Operational · AI | In Service | Turbine - Steam Sub Critical | Generating +352 MW | Fossil - Black Coal | MP1 | 730 MW | — | View |
| Mt Piper | EnergyAustralia NSW Pty Ltd | Operational · AI | In Service | Turbine - Steam Sub Critical | Generating +350.7 MW | Fossil - Black Coal | MP2 | 660 MW | Jan 2027 | View |
| Mt Piper BESS | Energy Australia Development Pty Ltd | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Mt Rawdon Pumped Hydro Energy Storage Project - KCI | Mount Rawdon Pty Ltd | Development | Publicly Announced | Storage - Pumped hydro | Not commissioned | Hydro - Water | — | — | View | |
| Mt Stuart | Origin Energy Mt Stuart | Operational · AI | In Service | Turbine - OCGT | Offline +0.3 MW | Fossil - Diesel | MSTUART1 | 146 MW | — | View |
| Mt Stuart | Origin Energy Mt Stuart | Operational · AI | In Service | Turbine - OCGT | Offline +0.3 MW | Fossil - Diesel | MSTUART2 | 146 MW | — | View |
| Mt Stuart | Origin Energy Mt Stuart | Operational · AI | In Service | Turbine - OCGT | Offline 0 MW | Fossil - Diesel | MSTUART3 | 132 MW | — | View |
| Mt View Wind Farm (KCI) | Woodside Energy Technologies Pty Ltd | Development | Publicly Announced | Wind Turbine - Onshore | Not commissioned | Wind - Wind | — | — | View | |
| Mugga Lane BESS | LGI | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Mugga Lane Renewable Hybrid | LGIGEN | — | removed | Other - Other | Offline | Renewable Biomass or Waste - Landfill Gas | 6 MW | Dec 2024 | View | |
| Mugga Lane Renewable Hybrid | LGIGEN | Development | Publicly Announced | Other - Other | Not commissioned | Renewable Biomass or Waste - Landfill Gas | MLLFRHF1 | — | Dec 2024 | View |
| Mullion Creek Wind Farm | Mullion Creek Wind Farm P/L | Development | Publicly Announced | Solar PV - Fixed | Not commissioned | Solar - Solar | — | — | View | |
| Mulwala Solar Farm | ESCO Solar Farm 1 Pty Ltd as trustee for the ESCO Solar Farm 1 Trust | Development | Publicly Announced | Solar PV - Single axis tracking | Not commissioned | Solar - Solar | — | — | View | |
| Munna Creek Solar Farm | Munna Creek Solar Farm Investments Pty Ltd as trustee for the Munna Creek Solar Farm Trust | Development | Committed | Solar PV - Single axis tracking | Not commissioned | Solar - Solar | 154 MW | Jan 2026 | View | |
| Murilla Energy Hub | APA Power Holdings Pty Ltd | Development | Publicly Announced | Other - Other | Not commissioned | Other - Other | — | — | View | |
| Murra Warra Wind Farm - stage 1 | Murra Warra Project Co Pty Ltd | Operational · AI | In Service | Wind Turbine - Onshore | Generating +19.9 MW | Wind - Wind | MUWAWF1 | 226 MW | Sep 2021 | View |
| Murra Warra Wind Farm - stage 2 | Murra Warra II Project Co Pty Ltd as Trustee for the Murra Warra II Project Trust | Operational · AI | In Service | Wind Turbine - Onshore | Generating +14.4 MW | Wind - Wind | MUWAWF2 | 209 MW | Oct 2022 | View |
| Murray 1 | Snowy Hydro Ltd | Operational · AI | In Service | Hydro - Dam | Generating +544.9 MW | Hydro - Water | MURRAY | 950 MW | — | View |
| Murray 2 | Snowy Hydro Ltd | Operational · AI | In Service | Hydro - Dam | Generating +544.9 MW | Hydro - Water | MURRAY | 600 MW | — | View |
| Murray Bridge - Onkaparinga Pipeline Pump 2 | South Australian Water Corporation | Operational · AI | In Service | Solar PV - Single axis tracking | Offline 0 MW | Solar - Solar | MBPS2PV1 | 14 MW | Aug 2022 | View |
| Murrumburrah BESS - KCI | FIrm Power P/L | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Muskerry Solar Power Station - KCI | Edify Energy Pty Ltd | Development | Publicly Announced | Solar PV - Fixed | Not commissioned | Solar - Solar | — | — | View | |
| Musselroe Wind Farm | Musselroe Wind Farm Pty Ltd | Operational · AI | In Service | Wind Turbine - Onshore | Generating +53.4 MW | Wind - Wind | MUSSELR1 | 168 MW | — | View |
| Muswellbrook BESS | firmpower_NR | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Muswellbrook PRO BESS | Penso Power Australia P/L | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Muswellbrook Pumped Hydro | AGL Energy Limited | Development | Publicly Announced | Storage - Pumped hydro | Not commissioned | Hydro - Water | — | — | View | |
| Muswellbrook Solar Farm | Ox2 | Development | Publicly Announced | Solar PV - Fixed | Not commissioned | Solar - Solar | — | — | View | |
| Myrtle Creek BESS | ARK Energy Corporation Pty Ltd | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Narrabri Hybrid Project | Narrabri Genesis Hold Pty Ltd ATF Narrabri Genesis Hold Trust | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | Aug 2027 | View | |
| Narrabri Hybrid Project | Narrabri Genesis Hold Pty Ltd ATF Narrabri Genesis Hold Trust | Development | Publicly Announced | Solar PV - Single axis tracking | Not commissioned | Solar - Solar | — | — | View | |
| Narrabri South Solar Farm | Canadian Solar | Development | Publicly Announced | Solar PV - Fixed | Not commissioned | Solar - Solar | — | — | View | |
| Narrandera BESS | Potentia Energy Group P/L | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Narrandera Solar Farm | Potentia Energy Group P/L | Development | Publicly Announced | Solar PV - Fixed | Not commissioned | Solar - Solar | — | — | View | |
| Narromine Solar Farm | Dubbo Solar Hub Pty Ltd | Operational | In Service | Solar PV - Single axis tracking | No dispatch data | Solar - Solar | NASF1 | 9 MW | — | View |
| Nebo BESS | Nebo BESS Pty Ltd | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | Dec 2028 | View | |
| Nebo BESS (Baywa) | BayWA r.e Projects Australia Pty Ltd | — | removed | Storage - Battery | Offline | Other - Other | 500 MW | — | View | |
| Nebo BESS (Iberdrola) - KCI | Iberdrola Australia Development Pty Ltd. | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Nevertire Solar Farm | Nevertire Solar Pty Ltd as Trustee for the Nevertire Solar Trust | Operational · AI | In Service | Solar PV - Single axis tracking | Offline 0 MW | Solar - Solar | NEVERSF1 | 105 MW | Jul 2020 | View |
| New England Solar Farm | ACEN AUSTRALIA | Operational · AI | In Service | Solar PV - Single axis tracking | Generating +2.2 MW | Solar - Solar | NEWENSF1 | 200 MW | May 2023 | View |
| New England Solar Farm | ACEN AUSTRALIA | Operational · AI | In Service | Solar PV - Single axis tracking | Generating +1.9 MW | Solar - Solar | NEWENSF2 | 200 MW | May 2023 | View |
| New England Solar Farm | ACEN AUSTRALIA | Development | Anticipated | Solar PV - Single axis tracking | Not commissioned | Solar - Solar | — | Oct 2028 | View | |
| New England Solar Farm BESS | ACEN RENEWABLES | Development | Anticipated | Storage - Battery | Not commissioned | Other - Other | — | Dec 2026 | View | |
| Newport | EnergyAustralia Ecogen Pty Ltd | Operational · AI | In Service | Turbine - Steam Sub Critical | Offline 0 MW | Fossil - Natural Gas Pipeline | NPS | 500 MW | — | View |
| Noblevale BESS (KCI) | Zen Energy Future Pty Ltd | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | Jun 2028 | View | |
| Nonowie Wind Farm | Tilt Renewables Australia Pty Ltd | Development | Publicly Announced | Wind Turbine - Onshore | Not commissioned | Wind - Wind | — | — | View | |
| Normanville Energy Park - Wind (KCI) | Westwind Development Pty Ltd | Development | Publicly Announced | Wind Turbine - Onshore | Not commissioned | Wind - Wind | — | — | View | |
| North Burnett Renewable Hub - BESS | X-Elio Australia Pty Ltd | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| North Burnett Renewable Hub - Solar | X-Elio Australia Pty Ltd | Development | Publicly Announced | Solar PV - Fixed | Not commissioned | Solar - Solar | — | — | View | |
| North East Wind - KCI | ACEN North East Tasmania Pty Ltd | Development | Publicly Announced | Wind Turbine - Onshore | Not commissioned | Wind - Wind | — | — | View | |
| North Yarragon BESS - KCI | Zen Energy | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Northern Midlands Solar Farm | TasRex P/L | — | removed | Solar PV - Fixed | Offline | Solar - Solar | 60 MW | — | View | |
| Northern Midlands Solar Farm - KCI | Connorville Estates Pty Ltd | — | removed | Solar PV - Fixed | Offline | Solar - Solar | 290 MW | — | View | |
| Northern Midlands Solar Farm - KCI | Northern Midlands Solar Farm Tas Pty Ltd (ACN 684 471 627) as trustee for the Northern Midlands Solar Farm Unit Trust (ABN 26 279 618 811) | Development | Anticipated | Solar PV - Single axis tracking | Not commissioned | Solar - Solar | — | Oct 2027 | View | |
| Northern Tablelands Wind Farm | BORAL | Development | Publicly Announced | Wind Turbine - Onshore | Not commissioned | Wind - Wind | — | — | View | |
| Nottingham Park Solar Farm - KCI | NPSF Renewables Pty Ltd | Development | Publicly Announced | Solar PV - Fixed | Not commissioned | Solar - Solar | — | — | View | |
| Novocastrian Offshore Wind Farm | OceanEx Energy | Development | Publicly Announced | Wind Turbine - Offshore | Not commissioned | Wind - Wind | — | Jan 2031 | View | |
| Nowingi Solar Farm - Edify (KCI) | Edify Energy Pty Ltd | Development | Publicly Announced | Solar PV - Fixed | Not commissioned | Solar - Solar | — | — | View | |
| Nowingi Solar Storage - Solar | Lyon Solar | Development | Publicly Announced | Solar PV - Single axis tracking | Not commissioned | Solar - Solar | — | — | View | |
| Nowingi Solar Storage - Storage | Lyon Solar | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| NSW Gas Peaker | AGL Energy Limited | Development | Publicly Announced | Reciprocating Engine - Compression ignition | Not commissioned | Fossil - Natural Gas | — | — | View | |
| Numurkah Solar Farm | Numurkah Solar Farm Pty Ltd | Operational · AI | In Service | Solar PV - Single axis tracking | Offline 0 MW | Solar - Solar | NUMURSF1 | 101 MW | Aug 2019 | View |
| Nyaninyuk Wind Farm | Acciona Energy | Development | Publicly Announced | Wind Turbine - Onshore | Not commissioned | Wind - Wind | — | — | View | |
| Nyngan Solar Plant | PARF Company 6 Pty Limited | Operational · AI | In Service | Solar PV - Fixed | Offline 0 MW | Solar - Solar | NYNGAN1 | 102 MW | — | View |
| Oakey 2 Solar Farm | RE Oakey Pty Ltd | Operational · AI | In Service | Solar PV - Single axis tracking | Generating +5.1 MW | Solar - Solar | OAKEY2SF | 56 MW | Apr 2022 | View |
| Oakey Power Station | Oakey Power Holdings Pty Ltd | Operational · AI | In Service | Turbine - OCGT | Offline 0 MW | Fossil - Natural Gas Pipeline | OAKEY1 | 173 MW | — | View |
| Oakey Power Station | Oakey Power Holdings Pty Ltd | Operational · AI | In Service | Turbine - OCGT | Offline 0 MW | Fossil - Natural Gas Pipeline | OAKEY2 | 173 MW | — | View |
| Oakey Solar Farm | Oakey1 Asset Co Pty Ltd | Operational · AI | In Service | Solar PV - Fixed | Generating +2.8 MW | Solar - Solar | OAKEY1SF | 25 MW | Aug 2019 | View |
| Oaklands Hill Wind Farm | Oaklands Hill Wind farm pty ltd | Operational · AI | In Service | Wind Turbine - Onshore | Generating +0.5 MW | Wind - Wind | OAKLAND1 | 67 MW | — | View |
| Oaky Creek | EDL OCI Pty Ltd | Operational | In Service | Reciprocating Engine - Spark ignition | No dispatch data | Fossil - Waste Coal Mine Gas | OAKYCREK | 21 MW | — | View |
| Oaky Creek 2 | EDL OCI PTY LTD | Operational | In Service | Reciprocating Engine - Spark ignition | No dispatch data | Fossil - Waste Coal Mine Gas | OAKY2 | 15 MW | — | View |
| Orana BESS | Wellington Battery ProjectCo Pty Ltd | Development | Committed | Storage - Battery | Not commissioned | Other - Other | ORANA | 415/1660 MW | Jun 2026 | View |
| Orange Grove Sun Farm | Overland Sun Farm Holdings Pty Ltd | Development | Publicly Announced | Solar PV - Single axis tracking | Not commissioned | Solar - Solar | — | — | View | |
| Orsted Gippsland A&B Windfarm | orsted_nr | Development | Publicly Announced | Wind Turbine - Offshore | Not commissioned | Wind - Wind | — | — | View | |
| Orsted Gippsland C Windfarm | orsted_nr | Development | Publicly Announced | Wind Turbine - Offshore | Not commissioned | Wind - Wind | — | — | View | |
| Osborne | Osborne Cogeneration Pty Ltd | Closed | In Service - Announced Withdrawal (Permanent) | Turbine - CCGT | Generating +149 MW | Fossil - Natural Gas Pipeline | OSB-AG | 180 MW | — | View |
| Osborne BESS | Osboourne Cogeneration P/L | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Oven Mountain Pumped Storage | Oven Mountain Pumped Storage | Development | Publicly Announced | Storage - Pumped hydro | Not commissioned | Hydro - Water | — | — | View | |
| Oxley Solar Farm | Oxley Solar Development Pty Ltd | Development | Publicly Announced | Solar PV - Fixed | Not commissioned | Solar - Solar | — | — | View | |
| Pacific Green Energy Park - Limestone Coast North | Pacific Green | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Pacific Green Energy Park - Limestone Coast West | Pacific Green | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Pacific Green Energy Park – Portland | Pacific Green Energy Park Cascade Trust | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Pacific Green Energy Park Portland West | Pacific Green Energy Park Portland West Trust | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Paling Yards Wind Farm | Paling Yards Development Pty Ltd | Development | Publicly Announced | Wind Turbine - Onshore | Not commissioned | Wind - Wind | — | — | View | |
| Palmer Wind Farm | Tilt Renewables Australia Pty Ltd | Development | Publicly Announced | Wind Turbine - Onshore | Not commissioned | Wind - Wind | — | — | View | |
| Palmerston BESS (Akaysha) | Palmerston ProjectCo Pty Ltd | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Paloona | Hydro-Electric Corporation | Operational · AI | In Service | Hydro - Dam | Generating +11.8 MW | Hydro - Water | PALOONA | 28 MW | — | View |
| Panorama BESS | PANORAMA BESS SUBCO PTY LTD as trustee for the PANORAMA BESS UNIT TRUST | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Para Hill BESS | X-Elio Australia Pty Ltd | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Para Substation/Gould Creek BESS | Gould Creek BESS Project Pty Ltd as trustee of GouldCreek BESSProject Trust | — | removed | Storage - Battery | Offline | Other - Other | 225/450 MW | Nov 2026 | View | |
| Parkes Solar Farm | Parkes Solar Farm Pty Ltd | Operational · AI | In Service | Solar PV - Single axis tracking | Offline 0 MW | Solar - Solar | PARSF1 | 50 MW | — | View |
| Peel Valley BESS | Potentia Energy Group P/L | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Peel Valley Solar Farm | Potentia Energy Group P/L | Development | Publicly Announced | Solar PV - Fixed | Not commissioned | Solar - Solar | — | — | View | |
| Pelican Point | Pelican Point Power Limited | Operational · AI | In Service | Turbine - CCGT | Generating +187.6 MW | Fossil - Natural Gas Pipeline | PPCCGT | 529 MW | — | View |
| Pelican Point BESS | Engie | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Penfield BESS | BESS PENFIELD PTY LTD | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Peninsula Solar Farm & BESS | Edify Energy Pty Ltd | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Peninsula Solar Farm & BESS | Edify Energy Pty Ltd | Development | Publicly Announced | Solar PV - Single axis tracking | Not commissioned | Solar - Solar | — | — | View | |
| Philip Island BESS | Mondo Power | Operational · AI | In Service | Storage - Battery | Discharging +2 MW | Other - Other | PIBESS1 | 5/10 MW | May 2023 | View |
| Phoenix Pumped Hydro Project | ACEN Phoenix Pty Ltd | Development | Publicly Announced | Storage - Pumped hydro | Not commissioned | Hydro - Water | — | Mar 2029 | View | |
| Piambong Wind Farm - KCI | Piambong Wind Farm Pty Ltd | Development | Publicly Announced | Wind Turbine - Onshore | Not commissioned | Wind - Wind | — | Dec 2028 | View | |
| Pikedale Wind Farm (KCI) | Squadron Energy Developments Pty Ltd | Development | Publicly Announced | Wind Turbine - Onshore | Not commissioned | Wind - Wind | — | — | View | |
| Pindari | AGL Hydro Partnership | Operational | In Service | Hydro - Dam | No dispatch data | Hydro - Water | PINDARI | 6 MW | — | View |
| Pine Lodge 2 BESS - KCI | ACEnergy Pty Ltd | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Pine Lodge BESS | ENERGY STORAGE PROJECT NO 6 PTY LTD | Development | Anticipated | Storage - Battery | Not commissioned | Other - Other | — | Oct 2026 | View | |
| Pinnacles BESS - Storage - KCI | Enervest Pty Ltd | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Pint Pot BESS | FRV Services Australia Pty Ltd | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Pioneer BESS - KCI | Edify Energy Pty Ltd | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Pioneer Sugar Mill | Pioneer Sugar Mills P/L | Operational | In Service | Turbine - Steam Sub Critical | No dispatch data | Renewable Biomass or Waste - Bagasse | 68 MW | — | View | |
| Playford Battery | CFG | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Pleasant Hills Solar Farm - KCI | TotalEnergies Renewables Australia Pty Ltd | Development | Publicly Announced | Solar PV - Single axis tracking | Not commissioned | Solar - Solar | — | Sep 2028 | View | |
| Pleystowe BESS | PLEYSTOWE BESS PTY LTD | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Pleystowe BESS (KCI) | Pleystowe BESS P/L | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Poatina | Hydro-Electric Corporation | Operational · AI | In Service | Hydro - Dam | Generating +5.3 MW | Hydro - Water | POAT110 | 100 MW | — | View |
| Poatina | Hydro-Electric Corporation | Operational · AI | In Service | Hydro - Dam | Generating +1.4 MW | Hydro - Water | POAT220 | 200 MW | — | View |
| Port Augusta Renewable Energy Park - Solar | PAREP 1 Pty Ltd | Operational · AI | In Service | Solar PV - Fixed | Offline 0 MW | Solar - Solar | PAREPS1 | 99 MW | Jan 2023 | View |
| Port Augusta Renewable Energy Park - Wind | PAREP 1 Pty Ltd | Operational · AI | In Service | Wind Turbine - Onshore | Generating +60.5 MW | Wind - Wind | PAREPW1 | 201 MW | — | View |
| Port Augusta Solar Farm (KCI) | Edify Energy Pty Ltd | Development | Publicly Announced | Solar PV - Fixed | Not commissioned | Solar - Solar | — | — | View | |
| Port Kembla Power Station | Australian Industrial Power | Development | Publicly Announced | Other - Other | Not commissioned | Other - Other | — | — | View | |
| Port Latta Wind Farm | Oz Green Energy I Pty Ltd | Development | Anticipated | Wind Turbine - Onshore | Not commissioned | Wind - Wind | — | Feb 2027 | View | |
| Port Lincoln GT | Synergen Power Pty Ltd | Closed | In Service - Announced Withdrawal (Permanent) | Turbine - OCGT | Offline 0 MW | Fossil - Diesel | POR03 | 24 MW | — | View |
| Port Lincoln GT | Synergen Power Pty Ltd | Closed | In Service - Announced Withdrawal (Permanent) | Turbine - OCGT | Offline 0 MW | Fossil - Diesel | POR01 | 50 MW | — | View |
| Port Paterson BESS | Green Gold Energy | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Port Pirie Solar Farm - KCI | Trafigura Hydrogen Australia | Development | Publicly Announced | Solar PV - Fixed | Not commissioned | Solar - Solar | — | — | View | |
| Port Stanvac 1 | Snowy Hydro Ltd | Operational · AI | In Service | Reciprocating Engine - Compression ignition | Offline 0 MW | Fossil - Diesel | PTSTAN1 | 57 MW | — | View |
| Portland Renewables Project - KCI | HAMR Energy Pty Ltd | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Portland Wind Farm | Pacific Hydro Portland Wind Farm Pty Ltd | Operational · AI | In Service | Wind Turbine - Onshore | Offline +0.3 MW | Wind - Wind | PORTWF | 152 MW | — | View |
| Portland Wind Farm - KCI | Vic Offshore Windfarm Pty Ltd | Development | Publicly Announced | Wind Turbine - Onshore | Not commissioned | Wind - Wind | — | — | View | |
| Pottinger Energy Park - Battery - KCI | Pottinger Renewables P/L | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Pottinger Energy Park - Solar - KCI | Pottinger Renewables P/L | Development | Publicly Announced | Solar PV - Fixed | Not commissioned | Solar - Solar | — | — | View | |
| Pottinger Energy Park - Wind - KCI | Pottinger Renewables P/L | Development | Publicly Announced | Wind Turbine - Onshore | Not commissioned | Wind - Wind | — | — | View | |
| Prairie Solar Farm | Pacific Hydro Australia Developments Pty Ltd | Development | Publicly Announced | Solar PV - Single axis tracking | Not commissioned | Solar - Solar | — | Oct 2027 | View | |
| Prairie WF & Wongalee WF | Prairie Wind Farm Pty Ltd | Development | Publicly Announced | Wind Turbine - Onshore | Not commissioned | Wind - Wind | — | Dec 2027 | View | |
| Project Brandy BESS | Evolution Pty Ltd | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Project Monash - Solar - KCI | Monash Renewables Pty Ltd | Development | Publicly Announced | Solar PV - Fixed | Not commissioned | Solar - Solar | — | — | View | |
| Project Monash - Storage - KCI | Monash Renewables Pty Ltd | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Proserpine Wind Farm - KCI | CI Proserpine Pty Ltd as trustee for the CI Proserpine Trust | Development | Publicly Announced | Wind Turbine - Onshore | Not commissioned | Wind - Wind | — | — | View | |
| Punch's Creek Renewable Energy | Skylab | Development | Anticipated | Solar PV - Single axis tracking | Not commissioned | Solar - Solar | — | Jan 2026 | View | |
| Punch's Creek Renewable Energy Stage 2 | skylabgroup_NR | Development | Publicly Announced | Solar PV - Single axis tracking | Not commissioned | Solar - Solar | — | Oct 2028 | View | |
| Punchs Creek (Milmerran) BESS - New | Skylab | Development | Publicly Announced | Storage - Battery | Not commissioned | Solar - Solar | — | — | View | |
| Puzzle Range BESS | tetrisenergy_nr | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Puzzle Range Wind Farm | tetrisenergy_nr | Development | Publicly Announced | Wind Turbine - Onshore | Not commissioned | Wind - Wind | — | — | View | |
| QCLNG Curtis Island Electrification - KCI | QCLNG Operating Company Pty Ltd | Development | Publicly Announced | Turbine - OCGT | Not commissioned | Fossil - Natural Gas | — | — | View | |
| Quandong Solar Farm | Emergent Technologies | Development | Publicly Announced | Solar PV - Fixed | Not commissioned | Solar - Solar | — | — | View | |
| Quarantine | Origin Energy Power Limited | Operational · AI | In Service | Turbine - OCGT | Offline 0 MW | Fossil - Natural Gas Pipeline | QPS1 | 29 MW | — | View |
| Quarantine | Origin Energy Power Limited | Operational · AI | In Service | Turbine - OCGT | Offline 0 MW | Fossil - Natural Gas Pipeline | QPS2 | 24 MW | — | View |
| Quarantine | Origin Energy Power Limited | Operational · AI | In Service | Turbine - OCGT | Offline 0 MW | Fossil - Natural Gas Pipeline | QPS3 | 29 MW | — | View |
| Quarantine | Origin Energy Power Limited | Operational · AI | In Service | Turbine - OCGT | Offline 0 MW | Fossil - Natural Gas Pipeline | QPS4 | 24 MW | — | View |
| Quarantine | Origin Energy Power Limited | Operational | In Service | Turbine - OCGT | Offline 0 MW | Fossil - Natural Gas Pipeline | QPS5 | 128 MW | — | View |
| Quarantine | Origin Energy Power Limited | Development | Publicly Announced | Turbine - OCGT | Not commissioned | Fossil - Natural Gas Pipeline | — | — | View | |
| Queanbeyan BESS | Berrybank 2 Asset Pty Ltd as Trustee for Berrybank 2 Asset Trust | Operational · AI | In Service | Storage - Battery | Offline -0.1 MW | Other - Other | QBYNB1 | 10/20 MW | Oct 2022 | View |
| Queensland Renewable Park | EEW Eco Energy World Pty Ltd | Development | Publicly Announced | Other - Other | Not commissioned | Other - Other | — | — | View | |
| Quorn Park Hybrid | Quorn Park Solar Farm Pty Ltd as the trustee for Quorn Park Solar Farm Trust | — | removed | Storage - Battery | Offline | Other - Other | QPBESS | 28/40 MW | Jan 2026 | View |
| Quorn Park Hybrid | Quorn Park Solar Farm Pty Ltd as the trustee for Quorn Park Solar Farm Trust | — | removed | Solar PV - Single axis tracking | Offline | Solar - Solar | QPSF | 97 MW | Feb 2026 | View |
| Quorn Park Solar Hybrid | Quorn Park Solar Farm Pty Ltd as the trustee for Quorn Park Solar Farm Trust | Development | Committed | Storage - Battery | Not commissioned | Other - Other | QPBESS | 28/40 MW | Jan 2026 | View |
| Quorn Park Solar Hybrid | Quorn Park Solar Farm Pty Ltd as the trustee for Quorn Park Solar Farm Trust | Development | Committed | Solar PV - Single axis tracking | Not commissioned | Solar - Solar | QPSF | 97 MW | Feb 2026 | View |
| Racecourse Mill | Mackay Sugar Ltd | — | removed | Turbine - Steam Sub Critical | Offline | Other - Other | RACOMIL1 | — | — | View |
| Racecourse Mill | Mackay Sugar Ltd | Operational | In Service | Turbine - Steam Sub Critical | No dispatch data | Other - Other | 45 MW | — | View | |
| Raglan BESS | acepower_NR | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | Aug 2028 | View | |
| Raglan Solar Farm | EEW Eco Energy World Ltd | Development | Publicly Announced | Solar PV - Single axis tracking | Not commissioned | Solar - Solar | — | — | View | |
| Rangebank BESS | Cranbourne BESS Project Co Pty Ltd | Commissioning · AI | In Service | Storage - Battery | Offline -0.1 MW | Other - Other | RANGEB1 | 200/400 MW | Oct 2024 | View |
| Rangemore BESS | Tetris Energy | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Rangemore Wind Farm | Tetris Energy | Development | Publicly Announced | Wind Turbine - Onshore | Not commissioned | Wind - Wind | — | — | View | |
| Rangoon Wind Farm | Rangoon Energy Park Pty Ltd | Development | Publicly Announced | Wind Turbine - Onshore | Not commissioned | Wind - Wind | — | — | View | |
| Ravenswood BESS | FRV Services Australia | Development | Anticipated | Storage - Battery | Not commissioned | Other - Other | — | Sep 2027 | View | |
| Ravenswood Solar Farm - FRV | FRV Services Australia | Development | Anticipated | Solar PV - Fixed | Not commissioned | Solar - Solar | — | Sep 2027 | View | |
| Redbank | Verdant Earth Technologies Limited | Development | Publicly Announced | Turbine - Steam Sub Critical | Not commissioned | Renewable Biomass or Waste - Wood Waste | REDBANK1 | — | — | View |
| Reece | Hydro-Electric Corporation | Operational · AI | In Service | Hydro - Dam | Generating +99.3 MW | Hydro - Water | REECE1 | 116 MW | — | View |
| Reece | Hydro-Electric Corporation | Operational · AI | In Service | Hydro - Dam | Generating +99.9 MW | Hydro - Water | REECE2 | 116 MW | — | View |
| Reeves Plains OCGT - stage 1 | Alinta Energy Reeves Plains Pty Ltd | Development | Publicly Announced | Turbine - OCGT | Not commissioned | Fossil - Natural Gas Pipeline | — | — | View | |
| Reeves Plains OCGT - stage 2 | Alinta Energy Reeves Plains Pty Ltd | Development | Publicly Announced | Turbine - OCGT | Not commissioned | Fossil - Natural Gas Pipeline | — | — | View | |
| Reeves Plains Power Station BESS | Alinta Energy | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Repulse | Hydro-Electric Corporation | Operational · AI | In Service | Hydro - Dam | Generating +16.3 MW | Hydro - Water | REPULSE | 28 MW | — | View |
| Richmond Valley BESS | ARK ENERGY CORPORATION PTY LTD | Development | Anticipated | Storage - Battery | Not commissioned | Other - Other | — | Oct 2026 | View | |
| Richmond Valley BESS (EIWA) | EIWA Queensland Pty Ltd | — | removed | Storage - Battery | Offline | Other - Other | 300 MW | — | View | |
| Richmond Valley Solar Farm | ARK ENERGY CORPORATION PTY LTD | Development | Publicly Announced | Solar PV - Single axis tracking | Not commissioned | Solar - Solar | — | — | View | |
| Ridgey Creek BESS | Ridgey Creek BESS Pty Ltd | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Rifle Butts Wind Farm | NewEn | Development | Publicly Announced | Wind Turbine - Onshore | Not commissioned | Wind - Wind | — | — | View | |
| Riverina Energy Storage System 1 | Shell New Energies Australia Pty Ltd | — | removed | Storage - Battery | Offline | Other - Other | RESS1 | 60/120 MW | Feb 2023 | View |
| Riverina Energy Storage System 1 | Shell New Energies Australia Pty Ltd | Operational | In Service | Storage - Battery | No dispatch data | Other - Other | RESS1G | 60/120 MW | Feb 2023 | View |
| Riverina Energy Storage System 2 | RESS 2 Pty Ltd | Operational · AI | In Service | Storage - Battery | Offline -0.1 MW | Other - Other | RIVNB2 | 65/130 MW | Aug 2023 | View |
| Riverina Solar Farm | Riverina Solar Pty Ltd | Development | Committed | Solar PV - Single axis tracking | Not commissioned | Solar - Solar | 32 MW | Mar 2028 | View | |
| Riverland Solar Storage - Solar | Lyon Solar | Development | Publicly Announced | Solar PV - Single axis tracking | Not commissioned | Solar - Solar | — | — | View | |
| Riverland Solar Storage - Storage | Lyon Solar | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Riverside BESS - Storage - KCI | Enervest Pty Ltd | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Riverstone Rise BESS (KCI) | Pacific Partnerships Pty Ltd | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Robbins Island Wind Farm | ACEN Robbins Island PTY LTD | Development | Publicly Announced | Wind Turbine - Onshore | Not commissioned | Wind - Wind | — | — | View | |
| Robertstown BESS | StorEnergy 4 Pty Ltd | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Robertstown Solar | Robertstown Project (Solar) Operations Pty Ltd | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Robertstown Solar | Robertstown Project (Solar) Operations Pty Ltd | Development | Publicly Announced | Solar PV - Single axis tracking | Not commissioned | Solar - Solar | — | — | View | |
| Rocky Point Sugar Mill Cogeneration Plant | W.H.Heck and Sons Pty Ltd | Operational · AI | In Service | Other - Other | Offline -0.3 MW | Renewable Biomass or Waste - Bagasse | RPCG | 30 MW | — | View |
| Rollsville Hybrid Facility - Battery | X-Elio Australia Pty Ltd | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Rollsville Hybrid Facility - Solar | X-Elio Australia Pty Ltd | Development | Publicly Announced | Solar PV - Fixed | Not commissioned | Solar - Solar | — | — | View | |
| Roma | Origin Energy Power Limited | Operational · AI | In Service | Turbine - OCGT | Offline 0 MW | Fossil - Natural Gas Pipeline | ROMA_7 | 40 MW | — | View |
| Roma | Origin Energy Power Limited | Operational · AI | In Service | Turbine - OCGT | Offline 0 MW | Fossil - Natural Gas Pipeline | ROMA_8 | 40 MW | — | View |
| Romani BESS | Samsung C&T Renewable Energy Australia Pty Ltd | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Romani Solar Farm | Samsung C&T Renewable Energy Australia Pty Ltd | Development | Publicly Announced | Solar PV - Single axis tracking | Not commissioned | Solar - Solar | — | — | View | |
| Romani Standalone BESS | Samsung C&T Renewable Energy Australia Pty Ltd | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Ross River Solar Farm | Ross River Operations Pty Ltd as the Trustee for the Ross River Operations Trust | Operational · AI | In Service | Solar PV - Single axis tracking | Generating +6.8 MW | Solar - Solar | RRSF1 | 128 MW | — | View |
| Rothby BESS | Avenis Energy Pty Ltd, on behalf of AE BESS 11 Pty Ltd ATF AE BESS 11 Unit Trust | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Rowallan | Hydro-Electric Corporation | Operational · AI | In Service | Hydro - Dam | Offline 0 MW | Hydro - Water | ROWALLAN | 11 MW | — | View |
| Rowallan Pumped Hydro Option | Hydro-Electric Corporation | Development | Publicly Announced | Storage - Pumped hydro | Not commissioned | Hydro - Water | — | — | View | |
| Royalla Solar Farm | Royalla Asset Pty Ltd ATF Royalla Asset Trust | Operational · AI | In Service | Solar PV - Fixed | Offline 0 MW | Solar - Solar | ROYALLA1 | 20 MW | — | View |
| Rubicon BESS | samsung_NR | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Rubicon Mountain Streams | AGL Hydro Partnership | Operational · AI | In Service | Hydro - Dam | Generating +1.4 MW | Hydro - Water | RUBICON | 14 MW | — | View |
| Rubicon Solar Farm | samsung_NR | Development | Publicly Announced | Solar PV - Single axis tracking | Not commissioned | Solar - Solar | — | — | View | |
| Ruby Hills North BESS | Walcha Energy Pty Ltd | Development | Publicly Announced | Storage - Battery | Not commissioned | Wind - Wind | — | Oct 2029 | View | |
| Ruby Hills North Wind Farm | Origin energy | Development | Publicly Announced | Wind Turbine - Onshore | Not commissioned | Wind - Wind | — | Sep 2028 | View | |
| Ruby Hills South BESS | Origin Energy Pty Ltd | Development | Publicly Announced | Storage - Battery | Not commissioned | Wind - Wind | — | Dec 2029 | View | |
| Ruby Hills South Wind Farm | Origin Energy Pty Ltd | Development | Publicly Announced | Wind Turbine - Onshore | Not commissioned | Wind - Wind | — | Nov 2031 | View | |
| Rugby Run Solar Farm | Adani Rugby Run Pty Ltd | Operational · AI | In Service | Solar PV - Single axis tracking | Generating +4 MW | Solar - Solar | RUGBYR1 | 65 MW | Oct 2020 | View |
| Rutherglen Battery - KCI | Red Hill Renewable Energy Pty Ltd | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Rutherglen Solar Farm - KCI | Red Hill Renewable Energy Pty Ltd | Development | Publicly Announced | Solar PV - Fixed | Not commissioned | Solar - Solar | — | — | View | |
| Ryan Corner Wind Farm | Ryan Corner Development Pty Ltd | Operational · AI | In Commissioning | Wind Turbine - Onshore | Offline +0.5 MW | Wind - Wind | RYANCWF1 | 218 MW | Oct 2024 | View |
| Rye Park Wind Farm | Tilt Renewables Australia Pty Ltd | Operational · AI | In Service | Wind Turbine - Onshore | Generating +62.3 MW | Wind - Wind | RYEPARK1 | 396 MW | Dec 2024 | View |
| Salisbury BESS | Origin Energy Pty Ltd | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | Oct 2027 | View | |
| Salisbury Solar 450MW | Origin Energy Pty Ltd | Development | Publicly Announced | Solar PV - Single axis tracking | Not commissioned | Solar - Solar | — | Feb 2032 | View | |
| Salt Creek Wind Farm | Salt Creek Wind Farm Pty Ltd | Operational · AI | In Service | Wind Turbine - Onshore | Generating +1.8 MW | Wind - Wind | SALTCRK1 | 54 MW | — | View |
| Sandigo Solar Farm | ESCO Pacific | Development | Publicly Announced | Solar PV - Fixed | Not commissioned | Solar - Solar | — | — | View | |
| Sandy Creek Solar Farm | Sandy Creek Solar Fund Pty Ltd | Development | Publicly Announced | Solar PV - Single axis tracking | Not commissioned | Solar - Solar | — | — | View | |
| Sandy Point Hybrid - Solar | Samsung C&T Renewable Energy Australia Pty Ltd. | Development | Publicly Announced | Solar PV - Single axis tracking | Not commissioned | Solar - Solar | — | — | View | |
| Sandy Point Hybrid - Storage | Samsung C&T Renewable Energy Australia Pty Ltd. | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Sapphire Wind Farm | SWF1 Operations Holdings Pty Ltd as trustee for SWF1 Hold Trust | Operational · AI | In Service | Wind Turbine - Onshore | Offline 0 MW | Wind - Wind | SAPHWF1 | 270 MW | — | View |
| Seaspray Off Shore Wind Farm | BayWa r.e. Australia Offshore Wind Projects 3 Pty Ltd | Development | Publicly Announced | Wind Turbine - Offshore | Not commissioned | Wind - Wind | — | — | View | |
| Sebastopol Solar Farm | Sebastopol Asset Co Pty Ltd ATF Sebastopol Asset Trust | Operational · AI | In Service | Solar PV - Single axis tracking | Offline 0 MW | Solar - Solar | SEBSF1 | 90 MW | Jan 2023 | View |
| SEC Renewable Energy Hub | SEC | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Seymour Wind Farm | Seymour Wind Pty Ltd | Development | Publicly Announced | Wind Turbine - Onshore | Not commissioned | Wind - Wind | — | — | View | |
| Shepparton Wastewater Treatment Facility | Diamond Energy Pty Ltd | — | removed | Reciprocating Engine - Spark ignition | Offline | Renewable Biomass or Waste - Biogas | SHEP1 | 1 MW | — | View |
| Shepparton Wastewater Treatment Facility | Diamond Energy Pty Ltd | Operational | In Service | Reciprocating Engine - Spark ignition | No dispatch data | Renewable Biomass or Waste - Biogas | 1 MW | — | View | |
| Shoalhaven | Origin Energy Eraring Pty Ltd | Development · AI | In Service | Storage - Pumped hydro | Offline 0 MW | Hydro - Water | SHGEN | 247/9680 MW | — | View |
| Shoalhaven Expansion | Origin Energy | Development | Publicly Announced | Storage - Pumped hydro | Not commissioned | Hydro - Water | — | — | View | |
| Silver City Energy Storage | A-CAES NSW PTY LTD | Development | Anticipated | Storage - Other | Not commissioned | Other - Other | — | Dec 2028 | View | |
| Silverleaf Solar Farm - KCI | International Power (Australia) Pty Ltd | Development | Publicly Announced | Solar PV - Fixed | Not commissioned | Solar - Solar | — | — | View | |
| Silverton Wind Farm | PARF Company 8 Pty Ltd as trustee for the Silverton Project Trust | Operational · AI | In Service | Wind Turbine - Onshore | Generating +127.8 MW | Wind - Wind | STWF1 | 199 MW | Dec 2020 | View |
| Smithfield BESS | Smithfield BESS Pty Limited | Development | Committed | Storage - Battery | Not commissioned | Other - Other | 86/130 MW | Dec 2025 | View | |
| Smithfield Energy Facility | Smithfield Power Generation Pty Ltd | Operational · AI | In Service | Turbine - OCGT | Offline 0 MW | Fossil - Natural Gas Pipeline | SITHE01 | 126 MW | — | View |
| Smoky Creek Energy Storage System - KCI | Edify Energy Pty Ltd | — | removed | Storage - Battery | Offline | Other - Other | 400 MW | — | View | |
| Smoky Creek Hybrid Facility - Solar And BESS | Edify Energy Pty Ltd | Development | Publicly Announced | Storage - Battery | Not commissioned | Solar - Solar | — | — | View | |
| Smoky Creek Hybrid Facility - Solar And BESS | Edify Energy Pty Ltd | Development | Publicly Announced | Solar PV - Single axis tracking | Not commissioned | Solar - Solar | — | — | View | |
| Smoky Creek Solar Farm | Edify Energy Pty Ltd | — | removed | Solar PV - Single axis tracking | Offline | Solar - Solar | 700 MW | — | View | |
| Snapper Point Power Station | Port Adelaide Energy Pty Ltd | Operational · AI | In Service | Turbine - OCGT | Offline 0 MW | Fossil - Natural Gas | SNAPPER1 | 154 MW | Jun 2022 | View |
| Snowtown North Solar Farm | Tilt Renewables | Development | Publicly Announced | Solar PV - Fixed | Not commissioned | Solar - Solar | — | — | View | |
| Snowtown North Solar Farm - BESS | Tilt Renewables | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Snowtown S2 Wind Farm | Snowtown Wind Farm Stage 2 Pty Ltd | Operational · AI | In Service | Wind Turbine - Onshore | Generating +34.4 MW | Wind - Wind | SNOWNTH1 | 144 MW | — | View |
| Snowtown S2 Wind Farm | Snowtown Wind Farm Stage 2 Pty Ltd | Operational · AI | In Service | Wind Turbine - Onshore | Generating +28.3 MW | Wind - Wind | SNOWSTH1 | 126 MW | — | View |
| Snowtown Wind Farm | Snowtown Wind Farm Pty Ltd | Operational · AI | In Service | Wind Turbine - Onshore | Generating +47.4 MW | Wind - Wind | SNOWTWN1 | 99 MW | — | View |
| Snowy 2.0. | Snowy Hydro Ltd | Development | Committed¹ | Storage - Pumped hydro | Not commissioned | Hydro - Water | 2200/349980 MW | Dec 2028 | View | |
| Snuggery | Synergen Power Pty Ltd | Closed | In Service - Announced Withdrawal (Permanent) | Turbine - OCGT | No dispatch data | Fossil - Diesel | SNUGNL1 | 21 MW | — | View |
| Snuggery | Synergen Power Pty Ltd | Closed | In Service - Announced Withdrawal (Permanent) | Turbine - OCGT | Offline 0 MW | Fossil - Diesel | SNUG1 | 63 MW | — | View |
| Solar River Solar And BESS Project | Zen Energy Retail Pty Ltd | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Solar River Solar And BESS Project | Zen Energy Retail Pty Ltd | Development | Publicly Announced | Solar PV - Single axis tracking | Not commissioned | Solar - Solar | — | — | View | |
| Somerton | AGL Hydro partnership | Operational · AI | In Service | Turbine - OCGT | Offline 0 MW | Fossil - Natural Gas Pipeline | AGLSOM | 170 MW | — | View |
| South Burnett BESS | X-Elio Australia Pty Ltd | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | Sep 2027 | View | |
| South Coree BESS | Samsung C&T Renewable Energy Australia Pty Ltd | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| South East BESS - Storage - KCI | Equis Energy (Australia) Projects (Ngumi 8) Pty Ltd as trustee for the Equis Energy(Australia) Ngumi 8 Asset Trust | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | Jul 2030 | View | |
| South Johnstone Mill (expansion) | MSF Sugar | Development | Publicly Announced | Turbine - Steam Sub Critical | Not commissioned | Renewable Biomass or Waste - Bagasse | — | — | View | |
| South Kempsey BESS | Macleay Ventures Pty Ltd. | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| South Keswick Solar Farm | Dubbo Solar Hub Pty Ltd | Operational | In Service | Solar PV - Single axis tracking | No dispatch data | Solar - Solar | SKSF1 | 14 MW | — | View |
| South Nanango BESS | RTB Renewables Pty Ltd | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| South Pacific Offshore Wind Project | South Pacific OWP Project Pty Ltd | Development | Publicly Announced | Wind Turbine - Offshore | Not commissioned | Wind - Wind | — | Jun 2035 | View | |
| Southern Winds Offshore Wind | Southern Winds OWP Project Pty Ltd | Development | Publicly Announced | Wind Turbine - Offshore | Not commissioned | Wind - Wind | — | — | View | |
| Specimen Hill BESS - Storage - KCI | ARK Energy Corporation Pty Ltd | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Specimen Hill Wind Farm | ARK Energy Corporation Pty Ltd | Development | Publicly Announced | Wind Turbine - Onshore | Not commissioned | Wind - Wind | — | — | View | |
| Spicers Creek Wind Farm | Squadron Energy Services Pty Ltd | Development | Publicly Announced | Wind Turbine - Onshore | Not commissioned | Wind - Wind | — | — | View | |
| Spinifex Offshore Wind Farm | Alinta Energy Retail Sales Pty Ltd | Development | Publicly Announced | Wind Turbine - Offshore | Not commissioned | Wind - Wind | — | — | View | |
| Springdale Solar Farm | Utilacor Pty Ltd | Development | Publicly Announced | Solar PV - Single axis tracking | Not commissioned | Solar - Solar | — | — | View | |
| Springdale Solar Farm - KCI | RES Australia Pty Ltd | Development | Publicly Announced | Solar PV - Fixed | Not commissioned | Solar - Solar | — | — | View | |
| Springlands Wind Farm | Ratch Australia | Development | Publicly Announced | Wind Turbine - Onshore | Not commissioned | Wind - Wind | — | — | View | |
| Springvale Energy Hub | progresspower_nr | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| SRI/Mirabou (Braemar) BESS - KCI | Miraabou Energy Ltd | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| St Patricks Plains Wind Farm | ARK Energy Corporation Pty Ltd | Development | Publicly Announced | Wind Turbine - Onshore | Not commissioned | Wind - Wind | — | — | View | |
| Stanhope BESS Project 01 | Globird Energy Pty Ltd | Development | Publicly Announced | Storage - Battery | Not commissioned | Solar - Solar | SHBESS01 | — | Dec 2026 | View |
| Stanhope BESS Project 02 | globirdenergy_NR | — | removed | Solar PV - Fixed | Offline | Solar - Solar | 5 MW | Dec 2026 | View | |
| Stanhope Solar Farm | globirdenergy_NR | Development | Publicly Announced | Solar PV - Fixed | Not commissioned | Solar - Solar | — | Dec 2026 | View | |
| Stanmore WCMG power station | Stanmore Resources and Enernet Australia (JV) | Development | Publicly Announced | Reciprocating Engine - Spark ignition | Not commissioned | Fossil - Coal Seam Methane | — | Dec 2026 | View | |
| Stanwell | Stanwell Corporation Limited | Operational · AI | In Service | Turbine - Steam Sub Critical | Generating +281.6 MW | Fossil - Black Coal | STAN-1 | 365 MW | — | View |
| Stanwell | Stanwell Corporation Limited | Operational · AI | In Service | Turbine - Steam Sub Critical | Generating +259.2 MW | Fossil - Black Coal | STAN-2 | 365 MW | — | View |
| Stanwell | Stanwell Corporation Limited | Operational · AI | In Service | Turbine - Steam Sub Critical | Offline 0 MW | Fossil - Black Coal | STAN-3 | 365 MW | — | View |
| Stanwell | Stanwell Corporation Limited | Operational · AI | In Service | Turbine - Steam Sub Critical | Generating +160 MW | Fossil - Black Coal | STAN-4 | 365 MW | — | View |
| Stanwell BESS | Stanwell Corporation Limited | Development | Anticipated | Storage - Battery | Not commissioned | Other - Other | — | Oct 2026 | View | |
| Stapylton Renewable Energy Facility | LMS Energy Pty Ltd | — | removed | Reciprocating Engine - Spark ignition | Offline | Renewable Biomass or Waste - Landfill Gas | STAPYLTON1 | 0 MW | — | View |
| Stapylton Renewable Energy Facility | LMS Energy Pty Ltd | Operational | In Service | Reciprocating Engine - Spark ignition | No dispatch data | Renewable Biomass or Waste - Landfill Gas | 3 MW | — | View | |
| Star of the South Wind Farm | Star of the South Wind Farm Pty Ltd as trustee for the Star of the South Trust | Development | Publicly Announced | Wind Turbine - Offshore | Not commissioned | Wind - Wind | SOTS1 | — | Mar 2032 | View |
| Starfish Hill | Ratch Australia | Operational · AI | In Service | Wind Turbine - Onshore | Offline 0 MW | Wind - Wind | STARHLWF | 33 MW | — | View |
| Stockyard Hill Wind Farm | Stockyard Hill Wind Farm Pty Ltd | Operational · AI | In Service | Wind Turbine - Onshore | Generating +2.7 MW | Wind - Wind | STOCKYD1 | 528 MW | May 2022 | View |
| Stonehaven Gas Turbines - KCI | APA Power Holdings Pty Ltd | Development | Publicly Announced | Turbine - OCGT | Not commissioned | Other - Other | — | — | View | |
| Stoney Creek BESS | Stoney Creek BESS Pty Ltd | Development | Publicly Announced | Storage - Battery | Not commissioned | Solar - Solar | — | — | View | |
| Stony Creek Wind Farm | Greenleaf Renewable | Development | Publicly Announced | Wind Turbine - Onshore | Not commissioned | Wind - Wind | — | — | View | |
| Strafford Renewable Energy Hub - Pumped Hydro | Yancoal | Development | Publicly Announced | Storage - Pumped hydro | Not commissioned | Hydro - Water | — | — | View | |
| Stratford Renewable Energy Hub | Yancoal Australia Limited | Development | Publicly Announced | Solar PV - Fixed | Not commissioned | Solar - Solar | — | — | View | |
| Stratford Renewable Energy Hub | Yancoal Australia Limited | Development | Publicly Announced | Storage - Pumped hydro | Not commissioned | Hydro - Water | — | — | View | |
| Strontian Solar BESS | Strontian Solar Pty Ltd | Development | Publicly Announced | Storage - Battery | Not commissioned | Solar - Solar | — | — | View | |
| Strontian Solar Farm | Strontian Solar Pty Ltd | Development | Publicly Announced | Solar PV - Fixed | Not commissioned | Solar - Solar | — | — | View | |
| Stubbo BESS | Stubbo 1 Pty Ltd. ACN 658 322 457 as The Trustee for Stubbo 1 Solar Project Trust | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | Mar 2029 | View | |
| Stubbo Solar Farm | ACEN AUSTRALIA | Commissioning · AI | In Commissioning | Solar PV - Single axis tracking | Generating +0.9 MW | Solar - Solar | STUBSF2 | 202 MW | Dec 2024 | View |
| Stubbo Solar Farm | ACEN AUSTRALIA | Commissioning · AI | In Commissioning | Solar PV - Single axis tracking | Offline 0 MW | Solar - Solar | STUBSF1 | 198 MW | Dec 2024 | View |
| Sturt Solar | Sturt Solar PTY LTD | Development | Publicly Announced | Solar PV - Single axis tracking | Not commissioned | Solar - Solar | — | — | View | |
| Sturt Solar | Sturt Solar PTY LTD | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Summerfield BESS | CI Summerfield BESS Pty Ltd (ACN 656 223 773) as trustee for the CI Summerfield BESS Trust | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | Dec 2025 | View | |
| Summerville Solar Farm | ESCO Solar Farm 5 Pty Ltd | Development | Publicly Announced | Solar PV - Fixed | Not commissioned | Solar - Solar | — | — | View | |
| Sun Metals Corporation Solar Farm | Sun Metals Corporation Pty Ltd | Operational · AI | In Service | Solar PV - Fixed | Generating +4.8 MW | Solar - Solar | SMCSF1 | 143 MW | — | View |
| Sundown Hybrid Facility | Canadian Solar | Development | Publicly Announced | Solar PV - Fixed | Not commissioned | Solar - Solar | — | — | View | |
| Sundown Hybrid Facility | Canadian Solar | Development | Publicly Announced | Storage - Battery | Not commissioned | Solar - Solar | — | — | View | |
| Sundown SF(Canadian Solar) | Canadian Solar | — | removed | Solar PV - Fixed | Offline | Solar - Solar | 360 MW | — | View | |
| Sundown Solar Farm | CWP Renewables Pty Ltd | — | removed | Solar PV - Fixed | Offline | Solar - Solar | 600 MW | — | View | |
| Sunraysia Solar Farm | Sunraysia Solar Project Pty Ltd | Operational · AI | In Service | Solar PV - Single axis tracking | Offline 0 MW | Solar - Solar | SUNRSF1 | 229 MW | Dec 2021 | View |
| Sunshine Energy Solar Farm | Sunshine Energy | Development | Publicly Announced | Solar PV - Single axis tracking | Not commissioned | Solar - Solar | — | — | View | |
| Sunshine State Solar Farm and BESS | ESCO Pacific | Development | Publicly Announced | Solar PV - Fixed | Not commissioned | Solar - Solar | — | — | View | |
| Sunshine State Solar Farm and BESS (Rollingstone) | Rollingstone Solar Farm Pty Ltd | Development | Publicly Announced | Solar PV - Fixed | Not commissioned | Solar - Solar | — | — | View | |
| Suntop Solar Farm | Suntop SF Pty Ltd As Trustee For The Suntop Asset | Operational · AI | In Service | Solar PV - Single axis tracking | Offline 0 MW | Solar - Solar | SUNTPSF1 | 150 MW | Dec 2021 | View |
| Supernode BESS | Supernode Operations Pty Ltd as the trustee for Supernode BESS 1 Project Trust | Commissioning · AI | Committed | Storage - Battery | Not commissioned | Other - Other | SNB01 | 260/620 MW | Dec 2025 | View |
| Supernode BESS | Supernode Operations Pty Ltd as the trustee for Supernode BESS 1 Project Trust | Commissioning · AI | Committed | Storage - Battery | Not commissioned | Other - Other | SNB02 | 260/1240 MW | Jun 2026 | View |
| Supernode BESS | Supernode Operations Pty Ltd as the trustee for Supernode BESS 1 Project Trust | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | SNB03 | — | — | View |
| Supernode BESS | Supernode Operations Pty Ltd as the trustee for Supernode BESS 1 Project Trust | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | SNB04 | — | — | View |
| Supernode BESS | Supernode Operations Pty Ltd as the trustee for Supernode BESS 1 Project Trust | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | SNB05 | — | — | View |
| Susan River Solar Farm | Susan River Solar Pty Ltd as trustee for the Susan River Solar Trust | Operational · AI | In Service | Solar PV - Single axis tracking | Generating +3.8 MW | Solar - Solar | SRSF1 | 85 MW | Dec 2019 | View |
| Swallow Tail BESS | AMPYR | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Swanbank BESS | CleanCo QLD Limited | Development | Anticipated | Storage - Battery | Not commissioned | Other - Other | — | Nov 2025 | View | |
| Swanbank E GT | CleanCo Queensland Limited | Operational · AI | In Service | Turbine - CCGT | Offline +0.2 MW | Fossil - Coal Seam Methane | SWAN_E | 385 MW | — | View |
| Tableland Mill | MSF Sugar | — | removed | Turbine - Steam Sub Critical | Offline | Other - Other | TABMILL2 | 24 MW | — | View |
| Tableland Mill | MSF Sugar | Operational | In Service | Turbine - Steam Sub Critical | No dispatch data | Other - Other | 24 MW | — | View | |
| Tabulam BESS | Elgin Energy Pty Ltd | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Tabulam Solar Farm | Elgin Energy Pty Ltd | Development | Publicly Announced | Solar PV - Fixed | Not commissioned | Solar - Solar | — | — | View | |
| Tahmoor | EDL TT Pty Ltd | — | removed | Reciprocating Engine - Spark ignition | Offline | Fossil - Waste Coal Mine Gas | TAHMOOR1 | 7 MW | — | View |
| Tahmoor | EDL TT Pty Ltd | Operational | In Service | Reciprocating Engine - Spark ignition | No dispatch data | Fossil - Waste Coal Mine Gas | TAHMOOR | 7 MW | — | View |
| Tailem Bend - Solar | Vena Energy | Operational · AI | In Service | Solar PV - Fixed | Offline 0 MW | Solar - Solar | TBSF1 | 108 MW | Apr 2019 | View |
| Tailem Bend Battery Project | Vena Energy | — | removed | Storage - Battery | Offline | Other - Other | TB2B1 | 42/84 MW | Jan 2024 | View |
| Tailem Bend Battery Project | Vena Energy | Development | Committed | Storage - Battery | Not commissioned | Other - Other | TB2BG1 | 42/84 MW | Jan 2024 | View |
| Tailem Bend Stage 2 Solar Project | Vena Energy | Commissioning · AI | In Commissioning | Solar PV - Single axis tracking | Offline 0 MW | Solar - Solar | TB2SF1 | 105 MW | Sep 2023 | View |
| Tailem Bend Stage 3 | TBSOL | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Talbingo BESS | Talbingo Battery Pty Ltd ATF Talbingo Battery Trust | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Tallawang BESS | Enel Green Power Australia Pty Ltd | — | removed | Storage - Battery | Offline | Other - Other | 672/1000 MW | — | View | |
| Tallawang Solar And BESS | Enel Green Power Australia Pty Ltd | Development | Publicly Announced | Solar PV - Fixed | Not commissioned | Solar - Solar | — | — | View | |
| Tallawang Solar And BESS | Enel Green Power Australia Pty Ltd | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Tallawarra | EnergyAustralia Tallawarra Pty Ltd | Operational · AI | In Service | Turbine - CCGT | Offline 0 MW | Fossil - Natural Gas Pipeline | TALWA1 | 400 MW | — | View |
| Tallawarra B | EnergyAustralia Tallawarra Pty Ltd | Operational · AI | In Service | Turbine - OCGT | Offline 0 MW | Fossil - Natural Gas Pipeline | TALWB1 | 320 MW | Jun 2024 | View |
| Tamar Valley Combined Cycle | AETV Pty Ltd | Operational · AI | In Service | Turbine - CCGT | Offline 0 MW | Fossil - Natural Gas Pipeline | TVCC201 | 208 MW | — | View |
| Tamar Valley Peaking | AETV Pty Ltd | Operational · AI | In Service | Turbine - OCGT | Offline 0 MW | Fossil - Natural Gas Pipeline | TVPP104 | 58 MW | — | View |
| Tamworth BESS - Valent | VALENT ENERGY DEVELOPMENTS PTY LTD | — | removed | Storage - Battery | Offline | Other - Other | 200/400 MW | Nov 2026 | View | |
| Tamworth BESS Project 1 Pty Ltd | Tamworth BESS Project 1 Pty Ltd | Development | Anticipated | Storage - Battery | Not commissioned | Other - Other | — | Dec 2027 | View | |
| Tamworth BESS Project 2 Pty Ltd | valent-energy_nr | Development | Anticipated | Storage - Battery | Not commissioned | Other - Other | — | Dec 2027 | View | |
| Tamworth Energy Reserve - KCI | The Trustee for Equis Energy (Ausralia) Ngumi 4 Asset Trust | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Tangkam BESS - KCI | Atria Energy Ltd | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Tara Wind Farm - KCI | Tara Wind Farm Pty Ltd | Development | Publicly Announced | Wind Turbine - Onshore | Not commissioned | Wind - Wind | — | — | View | |
| Taralga Wind Farm | Energy Pacific Vic Pty Ltd | Operational · AI | In Service | Wind Turbine - Onshore | Generating +50.3 MW | Wind - Wind | TARALGA1 | 107 MW | — | View |
| Tarong | Stanwell Corporation Limited | Operational · AI | In Service | Turbine - Steam Sub Critical | Generating +344.9 MW | Fossil - Black Coal | TARONG#1 | 350 MW | — | View |
| Tarong | Stanwell Corporation Limited | Operational · AI | In Service | Turbine - Steam Sub Critical | Generating +346.3 MW | Fossil - Black Coal | TARONG#2 | 350 MW | — | View |
| Tarong | Stanwell Corporation Limited | Operational · AI | In Service | Turbine - Steam Sub Critical | Generating +184.3 MW | Fossil - Black Coal | TARONG#3 | 350 MW | — | View |
| Tarong | Stanwell Corporation Limited | Operational · AI | In Service | Turbine - Steam Sub Critical | Generating +345.3 MW | Fossil - Black Coal | TARONG#4 | 350 MW | — | View |
| Tarong BESS - Stanwell | Stanwell Corporation Limited | Commissioning · AI | Committed* | Storage - Battery | Not commissioned | Other - Other | TARBESS1 | 300/600 MW | Aug 2025 | View |
| Tarong North | Stanwell Corporation Limited | Operational · AI | In Service | Turbine - Steam Super Critical | Charging -1.1 MW | Fossil - Black Coal | TNPS1 | 450 MW | — | View |
| Tarong West Wind Farm (Ironleaf) | Tarong West Project Co Pty Ltd as trustee for the Tarong West Project Trust | Development | Publicly Announced | Wind Turbine - Onshore | Not commissioned | Wind - Wind | — | Oct 2028 | View | |
| Tarraleah | Hydro-Electric Corporation | Operational · AI | In Service | Hydro - Dam | Generating +64.8 MW | Hydro - Water | TARRALEA | 90 MW | — | View |
| Tarraleah Redevelopment | HYDROTAS | Development | Publicly Announced | Hydro - Dam | Not commissioned | Hydro - Water | — | — | View | |
| Tarrone BESS - Storage - KCI | Global Power Generation Australia Pty Ltd | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Tarrone GT | AGL Energy Limited | Development | Publicly Announced | Turbine - OCGT | Not commissioned | Fossil - Natural Gas Pipeline | — | — | View | |
| Tatiara Meats | Vibe Energy Pty Ltd | Operational | In Service | Reciprocating Engine - Compression ignition | No dispatch data | Fossil - Diesel | TATIARA1 | 1 MW | — | View |
| Tatura Biomass Generator | Diamond Energy Pty Ltd | — | removed | Reciprocating Engine - Spark ignition | Offline | Renewable Biomass or Waste - Biogas | TATURA01 | 1 MW | — | View |
| Tatura Biomass Generator | Diamond Energy Pty Ltd | Operational | In Service | Reciprocating Engine - Spark ignition | No dispatch data | Renewable Biomass or Waste - Biogas | 1 MW | — | View | |
| Tchelery BESS | Neoen Australia Pty Ltd | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Tchelery Wind Farm | Neoen Australia Pty Ltd | Development | Publicly Announced | Wind Turbine - Onshore | Not commissioned | Wind - Wind | — | Jun 2030 | View | |
| Teebar Creek Battery Storage - KCI | ATMOS DEVELOPMENTS PTY LTD | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Templers B BESS | BORAL | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Templers BESS | ZEN Energy Future Pty Ltd | Commissioning | In Commissioning | Storage - Battery | No dispatch data | Other - Other | 111/291 MW | Aug 2025 | View | |
| Tenterfield Solar Farm | Enerparc Australia Pty Ltd | Development | Publicly Announced | Solar PV - Fixed | Not commissioned | Solar - Solar | — | Feb 2026 | View | |
| Terang BESS | frv_NR | Development | Anticipated | Storage - Battery | Not commissioned | Other - Other | TRGBESS | — | Jun 2026 | View |
| Territory Battery | Neoen Australia Pty Ltd | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Texas BESS | FRV | Development | Publicly Announced | Storage - Battery | Not commissioned | Solar - Solar | — | — | View | |
| Texas Solar Farm | FRV | Development | Publicly Announced | Solar PV - Fixed | Not commissioned | Solar - Solar | — | — | View | |
| The Block BESS | Samsung C&T Renewable Energy Australia Pty Ltd | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | Dec 2028 | View | |
| The Central BESS - KCI | ACEnergy Pty Ltd | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| The Drop | Pacific Hydro Investments Pty Ltd | Operational | In Service | Hydro - Run of River | No dispatch data | Hydro - Water | THEDROP1 | 3 MW | — | View |
| The Plains | Engie | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| The Plains | Engie | Development | Publicly Announced | Solar PV - Single axis tracking | Not commissioned | Solar - Solar | — | — | View | |
| The Plains | Engie | Development | Publicly Announced | Wind Turbine - Onshore | Not commissioned | Wind - Wind | — | — | View | |
| The Solar River Project - Stage 1 | The Solar River Project Pty Ltd | Development | Publicly Announced | Solar PV - Fixed | Not commissioned | Solar - Solar | — | — | View | |
| The Solar River Project - Stage 2 | The Solar River Project Pty Ltd | Development | Publicly Announced | Solar PV - Fixed | Not commissioned | Solar - Solar | — | — | View | |
| Theodore BESS | RWE | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Theodore Solar Farm | Theodore SF Pty Ltd as trustee for Theodore SF Trust | Development | Publicly Announced | Solar PV - Single axis tracking | Not commissioned | Solar - Solar | — | — | View | |
| Theodore Wind Farm | RWE Renewables Australia | Development | Publicly Announced | Wind Turbine - Onshore | Not commissioned | Wind - Wind | — | — | View | |
| Thomastown BESS | Ausnet Transmission Group Pty Ltd | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | Dec 2027 | View | |
| Three Rivers BESS | Iberdrola Australia Development Pty Ltd. | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Three Rivers Solar Farm | Iberdrola Australia Development Pty Ltd. | Development | Publicly Announced | Solar PV - Fixed | Not commissioned | Solar - Solar | — | — | View | |
| Thunderbolt Wind Farm | Neoen Australia Pty Ltd | Development | Publicly Announced | Wind Turbine - Onshore | Not commissioned | Wind - Wind | — | — | View | |
| Ti Tree Bioenergy | Ti Tree Bioenergy | Operational | In Service | Reciprocating Engine - Compression ignition | No dispatch data | Renewable Biomass or Waste - Landfill Gas | 1 MW | — | View | |
| Ti Tree Bioenergy | Ti Tree Bioenergy | Operational | In Service | Reciprocating Engine - Compression ignition | No dispatch data | Renewable Biomass or Waste - Landfill Gas | TITREE | 3 MW | — | View |
| Ticoba BESS | European Energy Australia P/L | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Ticoba Solar Farm | European Energy Australia P/L | Development | Publicly Announced | Solar PV - Fixed | Not commissioned | Solar - Solar | — | — | View | |
| Tieri BESS | FRV Service Australia Pty Ltd | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | TieriBESS1 | — | — | View |
| Tilbuster Solar Farm | Enerparc Australia Pty Ltd | Development | Committed | Solar PV - Fixed | Not commissioned | Solar - Solar | 249 MW | Mar 2027 | View | |
| Timboon West Wind Farm | Timboon West Wind Farm Pty Ltd | Operational | In Service | Wind Turbine - Onshore | No dispatch data | Wind - Wind | TIMWEST | 7 MW | Dec 2018 | View |
| Tirranna BESS - KCI | StorEnergy 2 Pty Ltd | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Tomago BESS | AGL | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Toolern Vale BESS | tetrisenergy_nr | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Toolern Vale Solar Farm | tetrisenergy_nr | Development | Publicly Announced | Solar PV - Fixed | Not commissioned | Solar - Solar | — | — | View | |
| Toolern Vale Solar Farm_SS | tetrisenergy_nr | Development | Publicly Announced | Solar PV - Fixed | Not commissioned | Solar - Solar | — | — | View | |
| Toora | Ratch Australia | Operational | In Service | Wind Turbine - Onshore | No dispatch data | Wind - Wind | TOORAWF | 21 MW | — | View |
| Torrens Island B | AGL SA Generation Pty Limited | Closed | In Service - Announced Withdrawal (Permanent) | Turbine - Steam Sub Critical | Offline 0 MW | Fossil - Natural Gas Pipeline | TORRB1 | 200 MW | — | View |
| Torrens Island B | AGL SA Generation Pty Limited | Closed | In Service - Announced Withdrawal (Permanent) | Turbine - Steam Sub Critical | Generating +59 MW | Fossil - Natural Gas Pipeline | TORRB2 | 200 MW | — | View |
| Torrens Island B | AGL SA Generation Pty Limited | Closed | In Service - Announced Withdrawal (Permanent) | Turbine - Steam Sub Critical | Offline 0 MW | Fossil - Natural Gas Pipeline | TORRB3 | 200 MW | — | View |
| Torrens Island B | AGL SA Generation Pty Limited | Closed | In Service - Announced Withdrawal (Permanent) | Turbine - Steam Sub Critical | Offline 0 MW | Fossil - Natural Gas Pipeline | TORRB4 | 200 MW | — | View |
| Torrens Island BESS | TIPSCO | Operational · AI | In Service | Storage - Battery | Discharging +3.3 MW | Other - Other | TIB1 | 251/250 MW | Aug 2023 | View |
| Tower | EDL CSM NSW Pty Ltd | Operational | In Service | Reciprocating Engine - Spark ignition | No dispatch data | Fossil - Waste Coal Mine Gas | TOWER | 41 MW | — | View |
| Townsville BESS | ACEnergy Pty Ltd | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Townsville Power Station | RATCH-Australia | Operational · AI | In Service | Turbine - CCGT | Offline 0 MW | Fossil - Natural Gas Pipeline | YABULU | 160 MW | — | View |
| Townsville Power Station | RATCH-Australia | Operational · AI | In Service | Turbine - CCGT | Offline 0 MW | Fossil - Natural Gas Pipeline | YABULU2 | 84 MW | — | View |
| Tramway Road BESS | Eku Energy Projects (Australia) Pty Ltd as trustee for the Eku Energy Projects Australia Trust | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Traralgon Network Support Station | NovaPower Pty Ltd | Operational | In Service | Reciprocating Engine - Spark ignition | No dispatch data | Fossil - Natural Gas | TGNSS1 | 10 MW | — | View |
| Trevallyn | Hydro-Electric Corporation | Operational · AI | In Service | Hydro - Dam | Offline 0 MW | Hydro - Water | TREVALLN | 93 MW | — | View |
| Triabunna Wind Farm | Triabunna Wind Pty Ltd | Development | Publicly Announced | Wind Turbine - Onshore | Not commissioned | Wind - Wind | — | — | View | |
| Tribute | Hydro-Electric Corporation | Operational · AI | In Service | Hydro - Dam | Offline 0 MW | Hydro - Water | TRIBUTE | 83 MW | — | View |
| Tribute Pumped Hydro Option | Hydro-Electric Corporation | Development | Publicly Announced | Storage - Pumped hydro | Not commissioned | Hydro - Water | — | — | View | |
| Tuckeroo BESS - KCI | Tuckeroo BESS Pty Ltd | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Tully BESS | RWE Renewables Australia Pty Ltd | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Tully Sugar Mill | Tully Sugar Limited | Operational · AI | In Service | Turbine - Steam Super Critical | Charging -0.6 MW | Renewable Biomass or Waste - Bagasse | TULLYSM1 | 32 MW | — | View |
| Tummaville Hybrid Facility - BESS (KCI) | Elements Green Australia Pty Ltd | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Tummaville Hybrid Facility - Solar (KCI) | Elements Green Australia Pty Ltd | Development | Publicly Announced | Solar PV - Fixed | Not commissioned | Solar - Solar | — | — | View | |
| Tumuruu BESS | Austraiian Solar | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Tumuruu Solar Farm | Austraiian Solar | Development | Publicly Announced | Solar PV - Fixed | Not commissioned | Solar - Solar | — | — | View | |
| Tumut 3 | Snowy Hydro Ltd | Operational · AI | In Service | Hydro - Dam | Offline 0 MW | Hydro - Water | TUMUT3 | 1500 MW | — | View |
| Tungatinah | Hydro-Electric Corporation | Operational · AI | In Service | Hydro - Dam | Generating +86.2 MW | Hydro - Water | TUNGATIN | 125 MW | — | View |
| Tungkillo South BESS | RES Australia Pty Ltd | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | Jun 2029 | View | |
| Tyrone BESS | European Energy Australia P/L | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Tyrone Solar | European Energy Australia P/L | Development | Publicly Announced | Solar PV - Fixed | Not commissioned | Solar - Solar | — | — | View | |
| Ulinda Park BESS | Ulinda Park ProjectCo Pty Ltd | Development | Committed | Storage - Battery | Not commissioned | Other - Other | ULBESS1 | 155/298 MW | Dec 2025 | View |
| Ulinda Park BESS | Ulinda Park ProjectCo Pty Ltd | — | removed | Storage - Battery | Offline | Other - Other | ULBESS | 155/298 MW | Dec 2025 | View |
| Ulladulla Offshore Wind Farm | OceanEx Energy | Development | Publicly Announced | Wind Turbine - Offshore | Not commissioned | Wind - Wind | — | Jan 2035 | View | |
| Upper Calliope Solar Farm (side A) | European Energy S/A | Development | Publicly Announced | Solar PV - Fixed | Not commissioned | Solar - Solar | — | — | View | |
| Upper Hunter BESS | Maizewood Pty Ltd. | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Upper Hunter Energy Park - Solar | Upper Hunter Energy Park Pty Ltd | Development | Publicly Announced | Solar PV - Fixed | Not commissioned | Solar - Solar | — | — | View | |
| Upper Hunter Energy Park - Wind | Upper Hunter Energy Park Pty Ltd | Development | Publicly Announced | Wind Turbine - Onshore | Not commissioned | Wind - Wind | — | — | View | |
| Upper Tumut | Snowy Hydro Ltd | Operational · AI | In Service | Hydro - Dam | Generating +448.1 MW | Hydro - Water | UPPTUMUT | 616 MW | — | View |
| Uranquinty | Origin Energy Uranquinty Power Pty Ltd | Operational · AI | In Service | Turbine - OCGT | Offline 0 MW | Fossil - Natural Gas Pipeline | URANQ11 | 173 MW | — | View |
| Uranquinty | Origin Energy Uranquinty Power Pty Ltd | Operational · AI | In Service | Turbine - OCGT | Offline 0 MW | Fossil - Natural Gas Pipeline | URANQ12 | 173 MW | — | View |
| Uranquinty | Origin Energy Uranquinty Power Pty Ltd | Operational · AI | In Service | Turbine - OCGT | Offline 0 MW | Fossil - Natural Gas Pipeline | URANQ13 | 173 MW | — | View |
| Uranquinty | Origin Energy Uranquinty Power Pty Ltd | Operational · AI | In Service | Turbine - OCGT | Offline 0 MW | Fossil - Natural Gas Pipeline | URANQ14 | 173 MW | — | View |
| Uungula BESS | Squadron Energy Services Pty Ltd | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Uungula Wind Farm | Uungula Wind Farm Pty Ltd | Development | Committed | Wind Turbine - Onshore | Not commissioned | Wind - Wind | 414 MW | Feb 2028 | View | |
| Valdora Solar Farm | Diamond Energy Pty Ltd | Operational | In Service | Solar PV - Fixed | No dispatch data | Solar - Solar | VALDORA1 | 15 MW | — | View |
| Vales Point B | Delta Electricity | Operational · AI | In Service | Turbine - Steam Sub Critical | Generating +442.4 MW | Fossil - Black Coal | VP5 | 660 MW | — | View |
| Vales Point B | Delta Electricity | Operational · AI | In Service | Turbine - Steam Sub Critical | Generating +442.3 MW | Fossil - Black Coal | VP6 | 660 MW | — | View |
| Vales Point BESS | Delta Power and Energy (Vales Point) Pty Ltd trading as Delta Electricity | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Vales Point Solar | Delta Electricity | Development | Publicly Announced | Solar PV - Fixed | Not commissioned | Solar - Solar | — | — | View | |
| Valley of the Winds | ACEN Renewables | Development | Anticipated | Wind Turbine - Onshore | Not commissioned | Wind - Wind | — | Jul 2030 | View | |
| Valley Power | Snowy Hydro Ltd | Operational · AI | In Service | Turbine - OCGT | Offline 0 MW | Fossil - Natural Gas Pipeline | VPGS1 | 50 MW | — | View |
| Valley Power | Snowy Hydro Ltd | Operational · AI | In Service | Turbine - OCGT | Offline 0 MW | Fossil - Natural Gas Pipeline | VPGS2 | 50 MW | — | View |
| Valley Power | Snowy Hydro Ltd | Operational · AI | In Service | Turbine - OCGT | Offline 0 MW | Fossil - Natural Gas Pipeline | VPGS3 | 50 MW | — | View |
| Valley Power | Snowy Hydro Ltd | Operational · AI | In Service | Turbine - OCGT | Offline 0 MW | Fossil - Natural Gas Pipeline | VPGS4 | 50 MW | — | View |
| Valley Power | Snowy Hydro Ltd | Operational · AI | In Service | Turbine - OCGT | Offline 0 MW | Fossil - Natural Gas Pipeline | VPGS5 | 50 MW | — | View |
| Valley Power | Snowy Hydro Ltd | Operational · AI | In Service | Turbine - OCGT | Offline 0 MW | Fossil - Natural Gas Pipeline | VPGS6 | 50 MW | — | View |
| Vast Solar 1 | Vast Solar 1 Pty Ltd | Development | Publicly Announced | Solar Thermal - Other | Not commissioned | Solar - Solar | — | — | View | |
| Victoria Mill | Wilmar Sugar (Herbet) Pty Ltd | Operational | In Service | Turbine - Steam Sub Critical | No dispatch data | Renewable Biomass or Waste - Bagasse | 24 MW | — | View | |
| Victorian Big Battery | Victorian Big Battery Pty Ltd | Operational · AI | In Service | Storage - Battery | Offline -0.1 MW | Other - Other | VBB1 | 300/470 MW | Dec 2021 | View |
| Vineyard BESS | Global Power Generation Australia Pty Ltd | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Wagga North Battery Energy Storage System | AE BESS 2 Pty Ltd | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Wagga North BESS - KCI | ZEN Energy Future Pty Ltd | Development | Publicly Announced | Storage - Battery | Not commissioned | Solar - Solar | — | Jun 2028 | View | |
| Wagga North BESS (IB Vogt) - KCI | Ib vogt Development Australia Pty Ltd | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Wagga North Solar Farm | Wagga Wagga Operationsco Pty Ltd as trustree for Wagga Wagga Operations Trust | Commissioning · AI | In Commissioning | Solar PV - Single axis tracking | Offline 0 MW | Solar - Solar | WAGGNSF1 | 56 MW | Jul 2023 | View |
| Wagga North Solar Farm BESS | Wagga Wagga Operationsco Pty Ltd as trustee for the Wagga Wagga Operations Trust | Development | Publicly Announced | Storage - Battery | Not commissioned | Solar - Solar | — | — | View | |
| Wagga Wagga BESS | tetrisenergy_nr | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Walla Walla Solar Farm | FRV Australia (Walla Walla Asset Co Pty Ltd (ACN 634 728 868) as trustee for the Walla Walla Asset Trust) | Commissioning · AI | In Commissioning | Solar PV - Single axis tracking | Offline 0 MW | Solar - Solar | WLWLSF1 | 152 MW | Mar 2025 | View |
| Walla Walla Solar Farm | FRV Australia (Walla Walla Asset Co Pty Ltd (ACN 634 728 868) as trustee for the Walla Walla Asset Trust) | Commissioning · AI | In Commissioning | Solar PV - Single axis tracking | Offline 0 MW | Solar - Solar | WLWLSF2 | 152 MW | Mar 2025 | View |
| Wallabadah BESS | North Harbour Clean Energy P/L | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Wallaroo Solar Farm | New Energy development and Univergy Solar Joint venture (SPV) Wallaroo Solar Farm Pty Ltd | Development | Publicly Announced | Solar PV - Single axis tracking | Not commissioned | Solar - Solar | — | — | View | |
| Wallerawang 9 BESS | Greenspot Wallerawang Pty Ltd as trustee for the Greenspot Wallerawang Unit Trust | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Wallgrove Grid Battery project | TransGrid | Operational · AI | In Service | Storage - Battery | Offline +0.3 MW | Other - Other | WALGRV1 | 50/75 MW | Dec 2021 | View |
| Wambo Wind Farm | Cubico Sustainable Investments Australia Pty Ltd | Commissioning · AI | Committed | Wind Turbine - Onshore | Not commissioned | Wind - Wind | WAMBOWF1 | 252 MW | Feb 2025 | View |
| Wambo Wind Farm | Cubico Sustainable Investments Australia Pty Ltd | Development | Publicly Announced | Wind Turbine - Onshore | Not commissioned | Wind - Wind | — | — | View | |
| Wamuran BESS - KCI | RTB Renewables Pty Ltd | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Wandoan South BESS | Vena Evergy | Operational · AI | In Service | Storage - Battery | Discharging +0.5 MW | Other - Other | WANDB1 | 100/150 MW | Jul 2022 | View |
| Wandoan South Solar Stage 1 | Vena Evergy | Commissioning · AI | In Commissioning | Solar PV - Single axis tracking | Generating +5.9 MW | Solar - Solar | WANDSF1 | 160 MW | Aug 2023 | View |
| Wandoan South Solar Stage 2 | TBSOL | Development | Publicly Announced | Solar PV - Single axis tracking | Not commissioned | Solar - Solar | — | — | View | |
| Waratah Super Battery | Munmorah Battery ProjectCo Pty Ltd | Commissioning · AI | Committed | Storage - Battery | Not commissioned | Other - Other | WTAHB1 | 850/1680 MW | Aug 2025 | View |
| Warracknabeal Wind Farm | WestWind Energy Pty Ltd | Development | Publicly Announced | Wind Turbine - Onshore | Not commissioned | Wind - Wind | — | — | View | |
| Warrenheip BESS | AE Solar 6 Pty Ltd as Trustee for AE Solar 6 Unit Trust | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Warwick Solar Farm | The University of Queensland | Operational · AI | In Service | Solar PV - Single axis tracking | Generating +1.1 MW | Solar - Solar | WARWSF1 | 32 MW | Apr 2023 | View |
| Warwick Solar Farm | The University of Queensland | Operational · AI | In Service | Solar PV - Single axis tracking | Generating +0.7 MW | Solar - Solar | WARWSF2 | 32 MW | Apr 2023 | View |
| Waterloo Wind Farm | Waterloo Windfarm Pty Ltd | Operational · AI | In Service | Wind Turbine - Onshore | Generating +62.6 MW | Wind - Wind | WATERLWF | 131 MW | — | View |
| Watta Wella Power Station | RES Australia Pty Ltd | Development | Publicly Announced | Wind Turbine - Onshore | Not commissioned | Wind - Wind | — | Dec 2030 | View | |
| Watta Wella Wind Farm - KCI | RES Australia Pty Ltd | Development | Publicly Announced | Wind Turbine - Onshore | Not commissioned | Wind - Wind | — | — | View | |
| Wattle Creek Energy Hub - Battery Storage | Wattle Creek Energy Hub P/L | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | Oct 2028 | View | |
| Wattle Creek Energy Hub - Solar / BESS | Wattle Creek Energy Hub P/L | Development | Publicly Announced | Solar PV - Fixed | Not commissioned | Solar - Solar | — | Dec 2028 | View | |
| Wattle Creek Energy Hub - Solar / BESS | Wattle Creek Energy Hub P/L | Development | Publicly Announced | Storage - Battery | Not commissioned | Solar - Solar | — | Dec 2028 | View | |
| Wattle Point | Infrastructure Capital Group | Operational · AI | In Service | Wind Turbine - Onshore | Generating +6.6 MW | Wind - Wind | WPWF | 91 MW | — | View |
| Waubra | Pyrenees Wind Energy Developments | Operational · AI | In Service | Wind Turbine - Onshore | Generating +22.6 MW | Wind - Wind | WAUBRAWF | 192 MW | — | View |
| Waubra BESS - KCI | Acciona Energy Australia Global | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Weasel Solar Farm And BESS - KCI | Weasel Solar Farm P/L | Development | Publicly Announced | Storage - Battery | Not commissioned | Solar - Solar | — | — | View | |
| Weasel Solar Farm And BESS - KCI | Weasel Solar Farm P/L | Development | Publicly Announced | Solar PV - Fixed | Not commissioned | Solar - Solar | — | — | View | |
| Wee Jasper Wind Farm | tetrisenergy_nr | Development | Publicly Announced | Wind Turbine - Onshore | Not commissioned | Wind - Wind | — | — | View | |
| Wellington A-CAES | Hydrostor Australia Holdings P/L | Development | Publicly Announced | Storage - Other | Not commissioned | Other - Other | — | — | View | |
| Wellington BESS - Stage 1 | AMPYR | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Wellington BESS - Stage 2 | AMPYR Australia Pty Ltd | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Wellington BESS 2 | AMPYR Australia Pty Ltd | — | removed | Storage - Battery | Offline | Other - Other | 200 MW | — | View | |
| Wellington North BESS - KCI | Lightsource Development Services Australia Pty Ltd | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Wellington North Solar Farm | AGL Hydro Partnership | Development | Publicly Announced | Solar PV - Fixed | Not commissioned | Solar - Solar | — | — | View | |
| Wellington North Solar Farm (Lightsource) | Wellington North Solar Farm Pty Ltd | Operational · AI | In Service | Solar PV - Single axis tracking | Offline 0 MW | Solar - Solar | WELNSF1 | 437 MW | Oct 2024 | View |
| Wellington Solar Farm | Lightsource Australia SPV 4 Pty Ltd | Operational · AI | In Service | Solar PV - Single axis tracking | Offline 0 MW | Solar - Solar | WELLSF1 | 216 MW | Dec 2022 | View |
| Wemen Solar Farm | Wemen Asset Co Pty Ltd as Trustee to Wemen Solar Unit Trust | Operational · AI | In Service | Solar PV - Single axis tracking | Offline 0 MW | Solar - Solar | WEMENSF1 | 98 MW | Mar 2019 | View |
| West Illawarra Leagues Club | Western Suburbs Leagues Club | Operational | In Service | Reciprocating Engine - Compression ignition | No dispatch data | Fossil - Diesel | WESTILL1 | 1 MW | — | View |
| West Kiewa | AGL Hydro Partnership | Operational · AI | In Service | Hydro - Dam | Generating +15.7 MW | Hydro - Water | WKIEWA1 | 34 MW | — | View |
| West Kiewa | AGL Hydro Partnership | Operational · AI | In Service | Hydro - Dam | Generating +15.3 MW | Hydro - Water | WKIEWA2 | 34 MW | — | View |
| West Mokoan Solar Farm | West Mokoan Solar Farm | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| West Mokoan Solar Farm | West Mokoan Solar Farm | Development | Publicly Announced | Solar PV - Single axis tracking | Not commissioned | Solar - Solar | — | — | View | |
| West Wellington Wind Farm | Mint Renewables | Development | Publicly Announced | Wind Turbine - Onshore | Not commissioned | Wind - Wind | — | — | View | |
| West Wyalong BESS | Lightsource BP | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| West Wyalong Solar Farm | West Wyalong Fund Pty Ltd | Operational · AI | In Service | Solar PV - Single axis tracking | Offline 0 MW | Solar - Solar | WSTWYSF1 | 105 MW | Dec 2022 | View |
| Western Downs Battery | Western Downs BESS Pty Ltd as trustee for Western Downs BESS Trust | — | removed | Storage - Battery | Offline | Other - Other | WDBESS1 | 255/510 MW | Dec 2024 | View |
| Western Downs Battery - Stage 1 And 2 | Western Downs BESS Pty Ltd as trustee for Western Downs BESS Trust | Operational · AI | In Commissioning | Storage - Battery | Charging -6.5 MW | Other - Other | WDBESS1 | 255/510 MW | Dec 2024 | View |
| Western Downs Gas Peaking Plant - KCI | PowerGen P51 Pty Ltd | Development | Publicly Announced | Turbine - CCGT | Not commissioned | Other - Other | — | — | View | |
| Western Downs Green Power Hub P/L | Western Downs Green Power Hub Pty Ltd | Operational · AI | In Service | Solar PV - Single axis tracking | Generating +48 MW | Solar - Solar | WDGPH1 | 400 MW | Jan 2023 | View |
| Western Plains Wind Farm | ARK Energy Corporation Pty Ltd | Development | Publicly Announced | Wind Turbine - Onshore | Not commissioned | Wind - Wind | — | — | View | |
| Western Sydney Energy & Resource Recovery Centre | Western Sydney Energy & Resource Recovery Centre | Development | Publicly Announced | Other - Other | Not commissioned | Other - Other | — | — | View | |
| Western Sydney Pumped Hydro Project | Zen Energy Retail Pty Ltd | Development | Publicly Announced | Storage - Pumped hydro | Not commissioned | Hydro - Water | — | — | View | |
| Whaleback Ridge Wind Farm - KCI | West Coast Renewables Energy Pty Ltd | Development | Publicly Announced | Wind Turbine - Onshore | Not commissioned | Wind - Wind | — | — | View | |
| White Rock Solar Farm | White Rock Wind Farm Pty Ltd | Operational · AI | In Service | Solar PV - Fixed | Offline +0.5 MW | Solar - Solar | WRSF1 | 20 MW | — | View |
| White Rock Wind Farm - Stage 1 | CECEP Wind Power Australia Pty Ltd | Operational · AI | In Service | Wind Turbine - Onshore | Generating +6.9 MW | Wind - Wind | WRWF1 | 175 MW | — | View |
| White Rock Wind Farm - Stage 2 | White Rock Wind Farm Pty Ltd | Development | Publicly Announced | Wind Turbine - Onshore | Not commissioned | Wind - Wind | — | Mar 2027 | View | |
| Whitsunday Solar Farm | Whitsunday Solar Farm Pty Ltd | Operational · AI | In Service | Solar PV - Single axis tracking | Generating +5.2 MW | Solar - Solar | WHITSF1 | 58 MW | — | View |
| Whitwood Road | LMS Energy Pty Ltd | Operational | In Service | Reciprocating Engine - Spark ignition | No dispatch data | Renewable Biomass or Waste - Landfill Gas | WHIT1 | 1 MW | — | View |
| Whyalla | Adani | Development | Publicly Announced | Solar PV - Fixed | Not commissioned | Solar - Solar | — | — | View | |
| Whyalla BESS - KCI | BESS Kalkallo Pty Ltd | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Wilga Park Power Station A | Santos | Operational | In Service | Reciprocating Engine - Spark ignition | No dispatch data | Fossil - Coal Seam Methane | 10 MW | — | View | |
| Wilga Park Power Station A | Santos | — | removed | Reciprocating Engine - Spark ignition | Offline | Fossil - Coal Seam Methane | WILGAPK | 6 MW | — | View |
| Wilga Park Power Station B | Santos | Operational | In Service | Reciprocating Engine - Spark ignition | No dispatch data | Fossil - Coal Seam Methane | 6 MW | — | View | |
| Wilga Park Power Station B | Santos | — | removed | Reciprocating Engine - Spark ignition | Offline | Fossil - Coal Seam Methane | WILGB01 | 6 MW | — | View |
| Willatook | Wind Prospect WA Pty Ltd | Development | Publicly Announced | Wind Turbine - Onshore | Not commissioned | Wind - Wind | — | — | View | |
| Willavale BESS | X-Elio Willavale Park Trust | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Willavale Solar Farm | X-Elio Australia Pty Ltd | Development | Publicly Announced | Solar PV - Fixed | Not commissioned | Solar - Solar | — | — | View | |
| William Hovel | Pacific Hydro Investments Pty Ltd | Operational | In Service | Hydro - Run of River | No dispatch data | Hydro - Water | WILLHOV1 | 2 MW | — | View |
| Williamsdale BESS | EKU Energy | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Willogoleche Wind Farm | Willogoleche Power Pty Ltd | Operational · AI | In Service | Wind Turbine - Onshore | Generating +97.7 MW | Wind - Wind | WGWF1 | 120 MW | Oct 2019 | View |
| Willowvale Solar Farm - KCI | Elgin Energy Pty Ltd | Development | Publicly Announced | Solar PV - Fixed | Not commissioned | Solar - Solar | — | — | View | |
| Wimmera Plains BESs | BayWA r.e Projects Australia Pty Ltd | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Wimmera Plains Wind Farm - KCI | Wimmera Plains Energy Facility Pty Ltd | Development | Publicly Announced | Wind Turbine - Onshore | Not commissioned | Wind - Wind | — | — | View | |
| Winchelsea Gas Turbines - KCI | APA Power Holdings Pty Ltd | Development | Publicly Announced | Turbine - OCGT | Not commissioned | Other - Other | — | — | View | |
| Windy Hill | Ratch Australia | Operational | In Service | Wind Turbine - Onshore | No dispatch data | Wind - Wind | WHILL1 | 12 MW | — | View |
| Wingfield 1 | EDL LFG SA Pty Ltd | — | removed | Reciprocating Engine - Spark ignition | Offline | Renewable Biomass or Waste - Landfill Gas | WINGF1_1 | 4 MW | — | View |
| Wingfield 1 | EDL LFG SA Pty Ltd | Operational | In Service | Reciprocating Engine - Spark ignition | No dispatch data | Renewable Biomass or Waste - Landfill Gas | 4 MW | — | View | |
| Wingfield 2 | EDL LFG SA Pty Ltd | — | removed | Reciprocating Engine - Spark ignition | Offline | Renewable Biomass or Waste - Landfill Gas | WINGF2_1 | 4 MW | — | View |
| Wingfield 2 | EDL LFG SA Pty Ltd | Operational | In Service | Reciprocating Engine - Spark ignition | No dispatch data | Renewable Biomass or Waste - Landfill Gas | 4 MW | — | View | |
| Winterbourne Wind Farm | WinterbourneWind Pty Ltd | Development | Publicly Announced | Wind Turbine - Onshore | Not commissioned | Wind - Wind | — | — | View | |
| Winton BESS | AE BESS 10 as Trustee for AE BESS 10 Unit Trust | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Winton Energy Reserve 1 | Lochard Energy | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Winton Energy Reserve 1 | Lochard Energy | Development | Publicly Announced | Reciprocating Engine - Spark ignition | Not commissioned | Fossil - Natural Gas | — | — | View | |
| Winton North Solar Farm | EE Solar 12 Pty Ltd as trustee for the EE Solar 12 Trust | Development | Publicly Announced | Solar PV - Fixed | Not commissioned | Solar - Solar | — | — | View | |
| Winton Solar Farm | Winton Asset Co. Pty Ltd as Trustee of the Winton Asset Trust | Operational · AI | In Service | Solar PV - Single axis tracking | Offline 0 MW | Solar - Solar | WINTSF1 | 85 MW | — | View |
| Wivenhoe | CleanCo Queensland Limited | Operational | In Service | Storage - Pumped hydro | No dispatch data | Hydro - Water | W/HOE#1 | 285/3000 MW | — | View |
| Wivenhoe | CleanCo Queensland Limited | Operational | In Service | Storage - Pumped hydro | No dispatch data | Hydro - Water | W/HOE#2 | 285/3000 MW | — | View |
| Wodonga BESS | IBERDROLA AUSTRALIA DEVELOPMENT PTY LIMITED | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Wodonga Solar Farm | Wodonga Solar Power | Development | Publicly Announced | Solar PV - Single axis tracking | Not commissioned | Solar - Solar | — | — | View | |
| Wollar BESS | Wollar Solar Finance Pty Ltd. | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Wollar Solar Farm | Wollar Solar Development Pty Ltd | Operational · AI | Committed | Solar PV - Single axis tracking | Not commissioned | Solar - Solar | WOLARSF1 | 280 MW | May 2025 | View |
| Wollert | LMS Energy Pty Ltd | — | removed | Reciprocating Engine - Spark ignition | Offline | Renewable Biomass or Waste - Landfill Gas | WOLLERT1 | 8 MW | — | View |
| Wollert | LMS Energy Pty Ltd | Operational | In Service | Reciprocating Engine - Spark ignition | No dispatch data | Renewable Biomass or Waste - Landfill Gas | 8 MW | — | View | |
| Wollert Gas Turbine - KCI | APA Power Holdings Pty Ltd | Development | Publicly Announced | Turbine - OCGT | Not commissioned | Other - Other | — | — | View | |
| Wombelano Wind Farm | Wind Projects Australia Project 1 Pty Ltd | Development | Publicly Announced | Wind Turbine - Onshore | Not commissioned | Wind - Wind | — | — | View | |
| Wongalea BESS | Eku Energy Projects (Australia) as trustee for the Eku Energy Projects (Australia) Trust | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Wonthaggi Wind Farm | Vision Super Pty Ltd | Operational | In Service | Wind Turbine - Onshore | No dispatch data | Wind - Wind | WONWP | 12 MW | — | View |
| Wooderson Solar Farm | Wooderson Solar Development Company Pty Ltd | Development | Publicly Announced | Solar PV - Single axis tracking | Not commissioned | Solar - Solar | — | May 2030 | View | |
| Woodland BESS | Risen Energy (Australia) Pty Ltd | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Woodlawn Bioreactor Energy Generation | Veolia Environmental Services Aust P/L | Operational | In Service | Reciprocating Engine - Spark ignition | No dispatch data | Renewable Biomass or Waste - Biogas | WDLNGN01 | 7 MW | — | View |
| Woodlawn Wind Farm | Woodlawn Wind Pty Ltd | Operational · AI | In Service | Wind Turbine - Onshore | Generating +26.5 MW | Wind - Wind | WOODLWN1 | 48 MW | — | View |
| Woodstock BESS | AGL Energy Limited | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Woodstock Renewable Energy Hub - BESS | Private Energy Partners | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Woodstock Renewable Energy Hub - Solar | Private Energy Partners | Development | Publicly Announced | Solar PV - Single axis tracking | Not commissioned | Solar - Solar | — | — | View | |
| Woodstock Renewable Energy Hub - Solar | Private Energy Partners | — | removed | Solar PV - Fixed | Offline | Solar - Solar | 528 MW | — | View | |
| Woolnorth Studland Bay / Bluff Point | Woolnorth Wind Farm Finance Pty Ltd | Operational · AI | In Service | Wind Turbine - Onshore | Generating +70.1 MW | Wind - Wind | WOOLNTH1 | 138 MW | — | View |
| Woolooga BESS | Woolooga BESS Fund Pty Limited as trustee for the Woolooga BESS Trust | Development | Committed | Storage - Battery | Not commissioned | Other - Other | 281/593 MW | Jun 2026 | View | |
| Woolooga BESS - KCI | Elements Green Australia Pty Ltd | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Woolooga Solar Farm | Woolooga Fund Pty Ltd | Operational · AI | In Service | Solar PV - Single axis tracking | Generating +21.4 MW | Solar - Solar | WOOLGSF1 | 223 MW | Sep 2022 | View |
| Woolsthorpe Wind Farm | Woolsthorpe Wind Farm Pty Ltd | Development | Anticipated | Wind Turbine - Onshore | Not commissioned | Wind - Wind | — | Jan 2027 | View | |
| Woonga Creek BESS | Lightsource BP | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Wooreen Energy Storage System | EnergyAustralia Holdings Limited | Development | Committed* | Storage - Battery | Not commissioned | Other - Other | 350/1400 MW | Dec 2027 | View | |
| Wooroora Station Wind Farm | ARK Energy Corporation Pty Ltd | Development | Publicly Announced | Wind Turbine - Onshore | Not commissioned | Wind - Wind | — | — | View | |
| Wunghnu Solar Farm | Sun Spot 3 Pty Ltd | Commissioning · AI | In Commissioning | Solar PV - Single axis tracking | Offline 0 MW | Solar - Solar | WUNUSF1 | 94 MW | Mar 2025 | View |
| Wurdong BESS | Wurdong ProjectCo Pty Ltd | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Wyalong Solar Farm | Wyalong Solar Farm Pty Ltd as the trustee for the Wyalong Solar Farm Unit Trust | Operational · AI | In Service | Solar PV - Single axis tracking | Offline 0 MW | Solar - Solar | WYASF1 | 62 MW | Jun 2023 | View |
| Wyangala A | Hydro Power Pty Ltd | Operational | In Service | Hydro - Dam | No dispatch data | Hydro - Water | WYANGALA | 20 MW | — | View |
| Wyangala B | AGL | Operational | In Service | Hydro - Dam | No dispatch data | Hydro - Water | WYANGALB | 4 MW | — | View |
| X-Elio - Sixteen Mile SF BESS | The Trustee for X-ELIO SIXTEEN MILE TRUST | Development | Publicly Announced | Solar PV - Single axis tracking | Not commissioned | Solar - Solar | — | — | View | |
| Yabulu BESS | Yabulu BESS Pty Ltd | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Yabulu Solar Farm | Yabulu Solar Farm Pty Ltd | Development | Publicly Announced | Solar PV - Single axis tracking | Not commissioned | Solar - Solar | — | Mar 2028 | View | |
| Yabulu South BESS | Yabulu South BESS Pty Ltd | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Yadnarie Solar Farm | Photon Energy Group | Development | Publicly Announced | Solar PV - Fixed | Not commissioned | Solar - Solar | — | — | View | |
| Yallourn W | EnergyAustralia Yallourn Pty Ltd | Closed | In Service - Announced Withdrawal (Permanent) | Turbine - Steam Sub Critical | Generating +330.5 MW | Fossil - Brown Coal | YWPS1 | 350 MW | — | View |
| Yallourn W | EnergyAustralia Yallourn Pty Ltd | Closed | In Service - Announced Withdrawal (Permanent) | Turbine - Steam Sub Critical | Generating +319.5 MW | Fossil - Brown Coal | YWPS2 | 350 MW | — | View |
| Yallourn W | EnergyAustralia Yallourn Pty Ltd | Closed | In Service - Announced Withdrawal (Permanent) | Turbine - Steam Sub Critical | Generating +300.4 MW | Fossil - Brown Coal | YWPS3 | 375 MW | — | View |
| Yallourn W | EnergyAustralia Yallourn Pty Ltd | Closed | In Service - Announced Withdrawal (Permanent) | Turbine - Steam Sub Critical | Generating +378 MW | Fossil - Brown Coal | YWPS4 | 375 MW | — | View |
| Yaloak South Wind Farm | Pacific Hydro Yaloak South Pty Ltd | Operational | In Service | Wind Turbine - Onshore | No dispatch data | Wind - Wind | 29 MW | — | View | |
| Yaloak South Wind Farm | Pacific Hydro Yaloak South Pty Ltd | — | removed | Wind Turbine - Onshore | Offline | Wind - Wind | YSWF1 | 29 MW | — | View |
| Yambla Range BESS | tetrisenergy_nr | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Yambla Range Wind Farm | tetrisenergy_nr | Development | Publicly Announced | Wind Turbine - Onshore | Not commissioned | Wind - Wind | — | — | View | |
| Yambuk | Energy Pacific Vic Pty Ltd | Operational · AI | In Service | Wind Turbine - Onshore | Offline 0 MW | Wind - Wind | YAMBUKWF | 30 MW | — | View |
| Yanco BESS | Acenergy Pty Ltd | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Yanco Delta Wind Farm | Yanco Delta Wind Farm Pty Ltd | Development | Publicly Announced | Wind Turbine - Onshore | Not commissioned | Wind - Wind | — | — | View | |
| Yanco Solar Farm | Origin Energy | Development | Publicly Announced | Solar PV - Single axis tracking | Not commissioned | Solar - Solar | — | May 2027 | View | |
| Yarrabee Solar Power Project | Origin Energy | Development | Publicly Announced | Solar PV - Single axis tracking | Not commissioned | Solar - Solar | — | Jul 2029 | View | |
| Yarranlea Solar Farm | Yarranlea Solar Pty Ltd | Operational · AI | In Service | Solar PV - Single axis tracking | Generating +4.7 MW | Solar - Solar | YARANSF1 | 121 MW | May 2020 | View |
| Yarrawonga | AGL Hydro Partnership | Operational | In Service | Hydro - Dam | No dispatch data | Hydro - Water | 10 MW | — | View | |
| Yarrawonga | AGL Hydro Partnership | — | removed | Hydro - Dam | Offline | Hydro - Water | YWNGAHYD | 10 MW | — | View |
| Yarwun 1 | RTA Yarwun Pty Ltd | Operational · AI | In Service | Turbine - CCGT | Generating +150 MW | Fossil - Natural Gas Pipeline | YARWUN_1 | 180 MW | Jun 2012 | View |
| Yatpool Solar Farm | Yatpool Sun Farm Pty Ltd | Operational · AI | In Service | Solar PV - Single axis tracking | Offline 0 MW | Solar - Solar | YATSF1 | 94 MW | — | View |
| Yawong Wind Farm | Yawong Wind Farm Pty Ltd | Operational | In Service | Wind Turbine - Onshore | No dispatch data | Wind - Wind | YAWWF1 | 7 MW | Dec 2018 | View |
| Yelarbon SF and BESS - KCI | Elgin Energy | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Yelarbon SF and BESS - KCI | Elgin Energy | Development | Publicly Announced | Solar PV - Fixed | Not commissioned | Solar - Solar | — | — | View | |
| Yendon Wind Farm | Northleaf /InfraRed/Macquarie Capital | Operational · AI | In Service | Wind Turbine - Onshore | Generating +13.5 MW | Wind - Wind | YENDWF1 | 144 MW | Jan 2021 | View |
| Yoorndoo Ilga Solar - KCI | Yoorndoo Ilga Solar Pty Ltd | Development | Publicly Announced | Solar PV - Fixed | Not commissioned | Solar - Solar | — | — | View | |
| Yorke Peninsula Wind Farm | Yorke Peninsula Wind Farm Project Pty Ltd | Development | Publicly Announced | Wind Turbine - Onshore | Not commissioned | Wind - Wind | — | Sep 2030 | View | |
| Yumali BESS | tetrisenergy_nr | Development | Publicly Announced | Storage - Battery | Not commissioned | Other - Other | — | — | View | |
| Yumali Wind Farm | tetrisenergy_nr | Development | Publicly Announced | Wind Turbine - Onshore | Not commissioned | Wind - Wind | — | — | View |