Yanco Delta Wind Farm

Wind · Yanco Delta Wind Farm Pty Ltd · Wind Turbine - Onshore

Development AEMO: Publicly Announced Wind - Wind NEM data · 24 hours
Registered nameplate capacity — refresh AI for MW/MWh
Est. SRMC
$0.53/MWh
Key information

Capacity not yet researched — use Refresh equipment & project status (AI).

AEMO status Publicly Announced
Project status Development (AI)

Coordinates

DUID
Owner Yanco Delta Wind Farm Pty Ltd
Commissioned
Expected closure
Closure date
Technology Wind Turbine - Onshore
Fuel Wind - Wind
Turbine OEM
Turbine model
Stats window
13 Jun 2026 22:05 → 14 Jun 2026 22:05 AEST

Dispatch & revenue

13 Jun 2026 22:05 → 14 Jun 2026 22:05 AEST

No DUID specified. Open this page from the stats list or a generator profile.

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Wind (onshore)
Capacity
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$0.53/MWh
Capex total (greenfield)
$3,639.24M

Shown in table
$3,639.24M (2026 real AUD)

Reported / source value
$3,450.00M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Project-specific greenfield construction cost estimate used as reported capex.

Reference
Yanco Delta Wind Farm EIS (high confidence)
Source recorded 06 Jun 2026

Capex refurbishment
Capex / MW
$2,426,160

Shown in table
$2.43M (2026 real AUD)

Reported / source value
$2.30M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Derived capex per MW from reported total project investment and stated 1,500 MW project size.

Reference
Yanco Delta Wind Farm EIS (high confidence)
Source recorded 06 Jun 2026

Fixed OPEX (annual)
Fixed OPEX / MW-yr
$58,017

Shown in table
$58.0k (2026 real AUD)

Reported / source value
$55.0k (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
No plant-specific fixed O&M disclosure found; server-side fallback default retained.

Variable OPEX / MWh
$0.53

Shown in table
$0.53 (2026 real AUD)

Reported / source value
$0.50 (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Wind variable O&M is typically low; no plant-specific disclosure found, so fallback retained.

Fuel cost / GJ
Heat rate GJ/MWh

Confidence: high · Status: ai estimated · Capex basis: reported · AI checked 06 Jun 2026

Notes
Reported greenfield construction cost from the project EIS is approximately A$3.45 billion for a 1,500 MW wind farm. No separate plant-specific fixed O&M disclosure was found, so server-side fallback default was used for fixed OPEX per MW-year. Project website indicates target commissioning in November 2028 and early works planned in early 2027; capex year set to the 2024 EIS/reporting year of the source estimate.

Sources