Western Sydney Energy & Resource Recovery Centre

Other Generators · Western Sydney Energy & Resource Recovery Centre · Other - Other

Development AEMO: Publicly Announced Other - Other NEM data · 7 days
Registered nameplate capacity — refresh AI for MW/MWh
Est. SRMC
$2.00/MWh
Key information

Capacity not yet researched — use Refresh equipment & project status (AI).

AEMO status Publicly Announced
Project status Development (AI)

Coordinates

DUID
Owner Western Sydney Energy & Resource Recovery Centre
Commissioned
Expected closure
Closure date
Technology Other - Other
Fuel Other - Other
Equipment OEM
Equipment type / model
Stats window
08 Jun 2026 03:10 → 15 Jun 2026 03:10 AEST

Dispatch & revenue

08 Jun 2026 03:10 → 15 Jun 2026 03:10 AEST

No DUID specified. Open this page from the stats list or a generator profile.

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Other
Capacity
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$2.00/MWh
Capex total (greenfield)
$826.59M

Shown in table
$826.59M (2026 real AUD)

Reported / source value
$644.74M (2020 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
A project-specific capital investment value estimate gives the total greenfield construction cost for WSERRC.

Reference
WESTERN SYDNEY ENERGY AND RESOURCE RECOVERY CENTRE CAPITAL INVESTMENT VALUE ESTIMATE (high confidence)
Source recorded 05 Jun 2026

Capex refurbishment
Capex / MW
$14,251,466

Shown in table
$14.25M (2026 real AUD)

Reported / source value
$11.12M (2020 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Per-MW capex is calculated from the reported total cost and stated 58 MW capacity.

Reference
WESTERN SYDNEY ENERGY AND RESOURCE RECOVERY CENTRE CAPITAL INVESTMENT VALUE ESTIMATE (medium confidence)
Source recorded 05 Jun 2026

Fixed OPEX (annual)
Fixed OPEX / MW-yr default
$40,000

Shown in table
$40.0k (2026 real AUD)

Variable OPEX / MWh default
$2.00

Shown in table
$2.00 (2026 real AUD)

Fuel cost / GJ
Heat rate GJ/MWh

Confidence: high · Status: ai estimated · Capex basis: reported · AI checked 05 Jun 2026

Notes
Project appears to be a proposed Western Sydney waste-to-energy facility (WSERRC/Project Green Waratah). The retrieved capital investment value estimate is nominal June/July 2020 AUD and includes all project establishment and construction costs, not just equipment. No separate DUID or commissioned date was found in the retrieved sources. Facility status in planning records was withdrawn, so this may not have entered operation.

Sources