Other Generators · Western Sydney Energy & Resource Recovery Centre · Other - Other
13 Jun 2026 16:00 → 14 Jun 2026 16:00 AEST
| Capex total (greenfield) |
$826.59M
Shown in table Reported / source value How this was derived Reference |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW |
$14,251,466
Shown in table Reported / source value How this was derived Reference |
| Fixed OPEX (annual) |
—
|
| Fixed OPEX / MW-yr default |
$40,000
Shown in table |
| Variable OPEX / MWh default |
$2.00
Shown in table |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: high · Status: ai estimated · Capex basis: reported · AI checked 05 Jun 2026
Notes
Project appears to be a proposed Western Sydney waste-to-energy facility (WSERRC/Project Green Waratah). The retrieved capital investment value estimate is nominal June/July 2020 AUD and includes all project establishment and construction costs, not just equipment. No separate DUID or commissioned date was found in the retrieved sources. Facility status in planning records was withdrawn, so this may not have entered operation.