Wind · RES Australia Pty Ltd · Wind Turbine - Onshore
08 Jun 2026 09:30 → 15 Jun 2026 09:30 AEST
| Capex total (greenfield) |
—
|
|---|---|
| Capex refurbishment |
—
|
| Capex / MW |
$2,320,675
Shown in table Reported / source value |
| Fixed OPEX (annual) |
—
|
| Fixed OPEX / MW-yr default |
$55,000
Shown in table |
| Variable OPEX / MWh default |
$0.50
Shown in table |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: medium · Status: ai estimated · Capex basis: default · AI checked 06 Jun 2026
Notes
No plant-specific greenfield construction cost was found in the searched owner/developer, government, or other official sources. The project is currently described as a proposed co-located wind farm and BESS with up to 400 MW wind and 1,600 MWh storage, but the public materials located did not disclose total project capex. A public RES page states the project will inject over $600 million into the Victorian economy; this appears to be an economic impact statement, not a greenfield investment cost, so it was not used as capex. Using fallback benchmarks was not necessary because the instruction priority required project-specific capex first, but the project-specific value was not found. Onshore wind asset life set at 25 years as a planning assumption.