Wind · WestWind Energy Pty Ltd · Wind Turbine - Onshore
14 Jun 2026 00:00 → 14 Jun 2026 23:59 AEST
| Capex total (greenfield) |
$3,275.11M
Shown in table Reported / source value How this was derived Reference |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW |
$10,917,031
Shown in table Reported / source value How this was derived Reference |
| Fixed OPEX (annual) |
—
|
| Fixed OPEX / MW-yr |
$60,044
Shown in table Reported / source value How this was derived |
| Variable OPEX / MWh |
$0.55
Shown in table Reported / source value How this was derived |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: medium · Status: ai estimated · Capex basis: reported · AI checked 06 Jun 2026
Notes
Capex is taken from the Warracknabeal Energy Park project estimate of approximately A$2.5–3.0 billion; A$3.0 billion used as the upper-end reported estimate because no separate plant-only greenfield cost for the legacy Warracknabeal Wind Farm was found. The project appears to have evolved into the Warracknabeal Energy Park (up to 1,575 MW), so this may not precisely match a single NEM DUID/site capacity. Fixed OPEX per MW-year is an internal fallback default, not project-specific.