Warracknabeal Wind Farm

Wind · WestWind Energy Pty Ltd · Wind Turbine - Onshore

Development AEMO: Publicly Announced Wind - Wind NEM data · 30 days
Registered nameplate capacity — refresh AI for MW/MWh
Est. SRMC
$0.55/MWh
Key information

Capacity not yet researched — use Refresh equipment & project status (AI).

AEMO status Publicly Announced
Project status Development (AI)

Coordinates

DUID
Owner WestWind Energy Pty Ltd
Commissioned
Expected closure 2058
Closure date
Technology Wind Turbine - Onshore
Fuel Wind - Wind
Turbine OEM
Turbine model
Stats window
15 May 2026 22:05 → 14 Jun 2026 22:05 AEST

Dispatch & revenue

15 May 2026 22:05 → 14 Jun 2026 22:05 AEST

No DUID specified. Open this page from the stats list or a generator profile.

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Wind (onshore)
Capacity
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$0.55/MWh
Capex total (greenfield)
$3,275.11M

Shown in table
$3,275.11M (2026 real AUD)

Reported / source value
$3,000.00M (2023 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Project-specific construction cost estimate provided by the proponent in a Victorian planning document.

Reference
Warracknabeal Energy Park Social and Economic Assessment (high confidence)
Source recorded 06 Jun 2026

Capex refurbishment
Capex / MW
$10,917,031

Shown in table
$10.92M (2026 real AUD)

Reported / source value
$10.00M (2023 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Installed capacity used to derive capex per MW from the project estimate.

Reference
Warracknabeal Energy Park referral (medium confidence)
Source recorded 06 Jun 2026

Fixed OPEX (annual)
Fixed OPEX / MW-yr
$60,044

Shown in table
$60.0k (2026 real AUD)

Reported / source value
$55.0k (2023 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
No project-specific fixed O&M found; used provided internal fallback default.

Variable OPEX / MWh
$0.55

Shown in table
$0.55 (2026 real AUD)

Reported / source value
$0.50 (2023 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
No project-specific variable O&M found; used provided internal fallback default.

Fuel cost / GJ
Heat rate GJ/MWh

Confidence: medium · Status: ai estimated · Capex basis: reported · AI checked 06 Jun 2026

Notes
Capex is taken from the Warracknabeal Energy Park project estimate of approximately A$2.5–3.0 billion; A$3.0 billion used as the upper-end reported estimate because no separate plant-only greenfield cost for the legacy Warracknabeal Wind Farm was found. The project appears to have evolved into the Warracknabeal Energy Park (up to 1,575 MW), so this may not precisely match a single NEM DUID/site capacity. Fixed OPEX per MW-year is an internal fallback default, not project-specific.