Tummaville Hybrid Facility - Solar (KCI)

Solar · Elements Green Australia Pty Ltd · Solar PV - Fixed

Development AEMO: Publicly Announced Solar - Solar NEM data · 24 hours
Registered nameplate capacity — refresh AI for MW/MWh
Est. SRMC
$0.00/MWh
Key information

Capacity not yet researched — use Refresh equipment & project status (AI).

AEMO status Publicly Announced
Project status Development (AI)

Coordinates

DUID
Owner Elements Green Australia Pty Ltd
Commissioned
Expected closure
Closure date
Technology Solar PV - Fixed
Fuel Solar - Solar
Module OEM
Module / inverter supplier
Inverter OEM
Inverter model
Stats window
14 Jun 2026 03:50 → 15 Jun 2026 03:50 AEST

Dispatch & revenue

14 Jun 2026 03:50 → 15 Jun 2026 03:50 AEST

No DUID specified. Open this page from the stats list or a generator profile.

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Solar (fixed)
Capacity
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$0.00/MWh
Capex total (greenfield)
Capex refurbishment
Capex / MW
$1,160,338

Shown in table
$1.16M (2026 real AUD)

Reported / source value
$1.10M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fixed OPEX (annual)
Fixed OPEX / MW-yr
$12,658

Shown in table
$12.7k (2026 real AUD)

Reported / source value
$12.0k (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Used as a proxy benchmark for fixed-axis solar PV O&M where plant-specific O&M was unavailable.

Reference
2024 Energy Technology Cost and Technical Parameter Review / distributed resources tables (medium confidence)
Source recorded 05 Jun 2026

Variable OPEX / MWh
$0.00

Shown in table
$0.00 (2026 real AUD)

Reported / source value
$0.00 (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Solar PV variable O&M is treated as zero in the benchmark table because it is included in fixed O&M.

Reference
2024 Energy Technology Cost and Technical Parameter Review / distributed resources tables (medium confidence)
Source recorded 05 Jun 2026

Fuel cost / GJ
$0.00

Shown in table
$0.00 (2026 real AUD)

Reported / source value
$0.00 (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Heat rate GJ/MWh

Confidence: low · Status: ai estimated · Capex basis: default · AI checked 05 Jun 2026

Notes
No project-specific greenfield capex announcement was found for Tummaville Hybrid Facility - Solar (KCI). The project may be referenced under a different public name or may not yet have a disclosed investment figure. O&M and performance assumptions were inferred from AEMO 2024 solar PV benchmark tables for a mid-size fixed-axis solar PV plant. Capacity, storage, and commissioning date were not verified from the available sources.

Sources