13 Jun 2026 16:45 → 14 Jun 2026 16:45 AEST
| Capex total (greenfield) |
—
How this was derived Reference |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW |
$2,320,675
Shown in table Reported / source value |
| Fixed OPEX (annual) |
—
|
| Fixed OPEX / MW-yr |
$29,536
Shown in table Reported / source value How this was derived Reference |
| Variable OPEX / MWh |
$0.00
Shown in table Reported / source value |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: medium · Status: ai estimated · Capex basis: default · AI checked 06 Jun 2026
Notes
ENGIE describes The Plains Renewable Energy Park as a proposed/in-development integrated wind and solar project south of Hay with up to 1,350 MW proposed wind capacity and up to 1,900 MW total park capacity, but no plant-specific greenfield construction cost was found in sourced materials. Used AEMO/Aurecon 2024 onshore wind benchmark O&M for fallback. Because the site is not yet commissioned and no DUID/capacity was provided, capex and per-MW values are left null rather than inferred from benchmarks.