Southern Winds Offshore Wind

Wind · Southern Winds OWP Project Pty Ltd · Wind Turbine - Offshore

Development AEMO: Publicly Announced Wind - Wind NEM data · 24 hours
Registered nameplate capacity — refresh AI for MW/MWh
Est. SRMC
$0.80/MWh
Key information

Capacity not yet researched — use Refresh equipment & project status (AI).

AEMO status Publicly Announced
Project status Development (AI)

Coordinates

DUID
Owner Southern Winds OWP Project Pty Ltd
Commissioned
Expected closure
Closure date
Technology Wind Turbine - Offshore
Fuel Wind - Wind
Turbine OEM
Turbine model
Stats window
13 Jun 2026 13:05 → 14 Jun 2026 13:05 AEST

Dispatch & revenue

13 Jun 2026 13:05 → 14 Jun 2026 13:05 AEST

No DUID specified. Open this page from the stats list or a generator profile.

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Wind (offshore)
Capacity
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$0.80/MWh
Capex total (greenfield)
Capex refurbishment
Capex / MW
$4,746,835

Shown in table
$4.75M (2026 real AUD)

Reported / source value
$4.50M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fixed OPEX (annual)
Fixed OPEX / MW-yr default
$90,000

Shown in table
$90.0k (2026 real AUD)

Variable OPEX / MWh default
$0.80

Shown in table
$0.80 (2026 real AUD)

Fuel cost / GJ
Heat rate GJ/MWh

Confidence: low · Status: ai estimated · Capex basis: default · AI checked 06 Jun 2026

Notes
No plant-specific greenfield capex announcement or owner-reported total project cost could be verified from the available web results for Southern Winds Offshore Wind / Southern Winds OWP Project Pty Ltd. Search results identify the project as a proposed ~1.155 GW bottom-fixed offshore wind project near Portland, with construction anticipated from 2028 and operation from 2030, but no credible source in the retrieved material states a total investment amount. Because the user requested source-backed assumptions and capex priority requires a project-specific figure before benchmarks, capex is left blank rather than substituting an AEMO/CSIRO benchmark. Capacity MW, storage MWh, and commissioning date were not provided in the prompt; no registered DUID was found in the retrieved sources. Offshore wind has no fuel cost or heat rate; emissions intensity is treated as zero at the generator level.

Sources