Solar · Skylab · Solar PV - Single axis tracking
14 Jun 2026 00:00 → 14 Jun 2026 23:59 AEST
| Capex total (greenfield) |
—
How this was derived Reference |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW |
$1,371,308
Shown in table Reported / source value |
| Fixed OPEX (annual) |
—
|
| Fixed OPEX / MW-yr |
$12,658
Shown in table Reported / source value How this was derived Reference |
| Variable OPEX / MWh |
$0.26
Shown in table Reported / source value How this was derived Reference |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: medium · Status: ai estimated · Capex basis: default · AI checked 05 Jun 2026
Notes
No project-specific greenfield capex figure was found in the owner/developer or government sources searched. Stage 1 is described by Skylab as ~480MWp PV with 400MW/1600MWh BESS, while EDPR's page describes 400MWac solar with 400MWh BESS after acquisition of Stage 1 in August 2025. For operating assumptions, a solar PV tracking system has zero fuel use and zero direct operational emissions; asset life set to 25 years from AEMO technical assumptions. Fixed O&M is an AI-estimated fallback, not a cited plant-specific benchmark, because the requested project-specific capex search did not return a reported total project investment figure.