Wind · CI Proserpine Pty Ltd as trustee for the CI Proserpine Trust · Wind Turbine - Onshore
16 May 2026 07:30 → 15 Jun 2026 07:30 AEST
| Capex total (greenfield) |
—
|
|---|---|
| Capex refurbishment |
—
|
| Capex / MW |
$2,254,098
Shown in table Reported / source value |
| Fixed OPEX (annual) |
—
|
| Fixed OPEX / MW-yr default |
$55,000
Shown in table |
| Variable OPEX / MWh default |
$0.50
Shown in table |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: low · Status: ai estimated · Capex basis: default · AI checked 06 Jun 2026
Notes
No plant-specific greenfield capex or operating cost data was found in the available official and indexed sources. The project website describes Proserpine Wind Farm as a proposed 900 MW wind farm in early-stage development, but no total project investment figure was located. AEMO/CSIRO GenCost and AEMO technical review materials were located for fallback benchmarking if needed, but no site-specific benchmark was applied here because the requested plant-specific capex search returned no verified figure. The project may also be withdrawn or not yet active, based on EPBC status and other sources, so capacity/commissioning details should be verified before any further modelling.