Wind · Prairie Wind Farm Pty Ltd · Wind Turbine - Onshore
21 Jun 2026 14:55 → 22 Jun 2026 14:55 AEST
| Capex total (greenfield) |
—
How this was derived Reference |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW |
$2,254,098
Shown in table Reported / source value |
| Fixed OPEX (annual) |
—
|
| Fixed OPEX / MW-yr |
$29,713
Shown in table Reported / source value How this was derived Reference |
| Variable OPEX / MWh |
$0.00
Shown in table Reported / source value How this was derived Reference |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: medium · Status: ai estimated · Capex basis: default · AI checked 05 Jun 2026
Notes
No plant-specific greenfield capex figure was found in the owner/developer, government, or project pages searched. The project pages confirm Prairie is fully permitted and Wongalee remains in development, but they do not disclose total construction cost. For onshore wind, AEMO/GHD 2025 benchmark fixed O&M is $29,000/MW-yr and variable O&M is included in fixed O&M. Asset life assumed at 30 years as a standard planning assumption. Discount rate set to 7% consistent with GenCost/AEMO planning context.