Port Kembla Power Station

Other Generators · Australian Industrial Power · Other - Other

Publicly Announced Other - Other NEM data · 24 hours
660 MW
Registered nameplate capacity
Est. SRMC
$2.00/MWh

Stats window 29 May 2026 04:00 → 30 May 2026 04:00 AEST

Key information
Capacity
660 MW
Status Publicly Announced
Lifecycle Pre-operating
DUID
Owner Australian Industrial Power
Commissioned
Expected closure
Closure date
Technology Other - Other
Fuel Other - Other

Dispatch & revenue

29 May 2026 04:00 → 30 May 2026 04:00 AEST

No DUID specified. Open this page from the stats list or a generator profile.

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Other
Capacity
660 MW
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$2.00/MWh
Capex total (greenfield)
Capex refurbishment
Capex / MW default $2,000,000
Capex / MWh storage
Fixed OPEX (annual)
Fixed OPEX / MW-yr default $40,000
Variable OPEX / MWh default $2.00
Fuel cost / GJ
Heat rate GJ/MWh

Confidence: unknown · Status: needs review · Capex basis: unknown

Check “Lock” to prevent AI refresh from overwriting a field.

Lock
Lock
Lock
Lock
Lock
Lock
Lock
Lock
Lock
Lock
Lock
Lock
Lock