Wind · Squadron Energy Developments Pty Ltd · Wind Turbine - Onshore
14 Jun 2026 05:15 → 15 Jun 2026 05:15 AEST
| Capex total (greenfield) |
—
|
|---|---|
| Capex refurbishment |
—
|
| Capex / MW |
$2,320,675
Shown in table Reported / source value |
| Fixed OPEX (annual) |
—
|
| Fixed OPEX / MW-yr default |
$55,000
Shown in table |
| Variable OPEX / MWh default |
$0.50
Shown in table |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
0.00
Shown in table |
Confidence: low · Status: ai estimated · Capex basis: default · AI checked 06 Jun 2026
Notes
No plant-specific greenfield capex figure was found in the searched owner/developer materials. The Squadron Energy Pikedale Wind Farm project page confirms the project exists but does not disclose a total investment amount. As a result, no capex or O&M values were populated from project-specific sources.