Solar · Edify Energy Pty Ltd · Solar PV - Single axis tracking
14 Jun 2026 11:45 → 15 Jun 2026 11:45 AEST
| Capex total (greenfield) |
—
|
|---|---|
| Capex refurbishment |
—
|
| Capex / MW |
$1,371,308
Shown in table Reported / source value |
| Fixed OPEX (annual) |
—
|
| Fixed OPEX / MW-yr default |
$20,000
Shown in table |
| Variable OPEX / MWh |
$0.26
Shown in table Reported / source value |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: low · Status: ai estimated · Capex basis: default · AI checked 05 Jun 2026
Notes
No plant-specific greenfield capex announcement was found in the available official Edify or NSW government sources. Edify confirms Peninsula Solar is in development, with 96 MW solar PV + 80 MW energy storage, development consent received in June 2024, and construction anticipated to commence in FY 2025/26. Because no owner/developer project cost figure was located, capex has not been estimated from benchmarks here per instructions. Variable O&M and emissions/default solar assumptions are left as fallback values only where permitted; fixed O&M and other plant-specific operating/fuel inputs were not verified.