Northern Midlands Solar Farm - KCI

Solar · Northern Midlands Solar Farm Tas Pty Ltd (ACN 684 471 627) as trustee for the Northern Midlands Solar Farm Unit Trust (ABN 26 279 618 811) · Solar PV - Single axis tracking

Development AEMO: Anticipated Solar - Solar NEM data · 24 hours
Registered nameplate capacity — refresh AI for MW/MWh
Est. SRMC
$0.26/MWh
Key information

Capacity not yet researched — use Refresh equipment & project status (AI).

AEMO status Anticipated
Project status Development (AI)

Coordinates

DUID
Owner Northern Midlands Solar Farm Tas Pty Ltd (ACN 684 471 627) as trustee for the Northern Midlands Solar Farm Unit Trust (ABN 26 279 618 811)
Commissioned Oct 2027
Expected closure 2057
Closure date
Technology Solar PV - Single axis tracking
Fuel Solar - Solar
Module OEM
Module / inverter supplier
Inverter OEM
Inverter model
Stats window
21 Jun 2026 08:55 → 22 Jun 2026 08:55 AEST

Dispatch & revenue

21 Jun 2026 08:55 → 22 Jun 2026 08:55 AEST

No DUID specified. Open this page from the stats list or a generator profile.

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Solar (tracking)
Capacity
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$0.26/MWh
Capex total (greenfield)

How this was derived
No verified project-specific total investment or construction cost was found in official owner, government, or reliable project sources.

Capex refurbishment
Capex / MW
$1,371,308

Shown in table
$1.37M (2026 real AUD)

Reported / source value
$1.30M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fixed OPEX (annual)
Fixed OPEX / MW-yr
$21,097

Shown in table
$21.1k (2026 real AUD)

Reported / source value
$20.0k (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Used the provided internal technology default because no plant-specific O&M benchmark was required for the requested fallback.

Variable OPEX / MWh
$0.26

Shown in table
$0.26 (2026 real AUD)

Reported / source value
$0.25 (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Used the provided internal technology default because no plant-specific variable O&M value was required for the requested fallback.

Fuel cost / GJ
Heat rate GJ/MWh

Confidence: low · Status: ai estimated · Capex basis: default · AI checked 06 Jun 2026

Notes
No project-specific greenfield construction cost was found in official owner/developer, government, or other reliable sources. Planning documents and government releases confirm the project is a 288 MW solar farm with commissioning expected in 2027, but they do not disclose total project CAPEX. Used server-side fallback O&M assumptions only. The project appears to include a BESS and transmission line in the broader proposal, but the capacity registered for the solar farm itself is 288 MW; no plant-specific CAPEX figure could be verified for this DUID.