Solar · Northern Midlands Solar Farm Tas Pty Ltd (ACN 684 471 627) as trustee for the Northern Midlands Solar Farm Unit Trust (ABN 26 279 618 811) · Solar PV - Single axis tracking
21 Jun 2026 05:50 → 22 Jun 2026 05:50 AEST
| Capex total (greenfield) |
—
How this was derived |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW |
$1,371,308
Shown in table Reported / source value |
| Fixed OPEX (annual) |
—
|
| Fixed OPEX / MW-yr |
$21,097
Shown in table Reported / source value How this was derived |
| Variable OPEX / MWh |
$0.26
Shown in table Reported / source value How this was derived |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: low · Status: ai estimated · Capex basis: default · AI checked 06 Jun 2026
Notes
No project-specific greenfield construction cost was found in official owner/developer, government, or other reliable sources. Planning documents and government releases confirm the project is a 288 MW solar farm with commissioning expected in 2027, but they do not disclose total project CAPEX. Used server-side fallback O&M assumptions only. The project appears to include a BESS and transmission line in the broader proposal, but the capacity registered for the solar farm itself is 288 MW; no plant-specific CAPEX figure could be verified for this DUID.