Wind · Westwind Development Pty Ltd · Wind Turbine - Onshore
07 Jun 2026 23:50 → 14 Jun 2026 23:50 AEST
| Capex total (greenfield) |
—
How this was derived Reference |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW |
$2,320,675
Shown in table Reported / source value |
| Fixed OPEX (annual) |
—
|
| Fixed OPEX / MW-yr |
$58,017
Shown in table Reported / source value How this was derived Reference |
| Variable OPEX / MWh |
$0.53
Shown in table Reported / source value How this was derived Reference |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: medium · Status: ai estimated · Capex basis: default · AI checked 05 Jun 2026
Notes
WestWind states Normanville Energy Park is a proposed 122 MW onshore wind project with up to 17 turbines, operational by 2028 and with a 40-year project life in the EPBC referral. No project-specific greenfield capital cost announcement was found in the searched owner/government sources, so capex is left unset rather than inferred from benchmarks. AEMO/Aurecon 2024 onshore wind technical assumptions support the fallback O&M defaults and a 25-year design life; however, no specific onshore wind capex line item was extracted here for Normanville.