Normanville Energy Park - Wind (KCI)

Wind · Westwind Development Pty Ltd · Wind Turbine - Onshore

Development AEMO: Publicly Announced Wind - Wind NEM data · 30 days
Registered nameplate capacity — refresh AI for MW/MWh
Est. SRMC
$0.53/MWh
Key information

Capacity not yet researched — use Refresh equipment & project status (AI).

AEMO status Publicly Announced
Project status Development (AI)

Coordinates

DUID
Owner Westwind Development Pty Ltd
Commissioned
Expected closure
Closure date
Technology Wind Turbine - Onshore
Fuel Wind - Wind
Turbine OEM
Turbine model
Stats window
16 May 2026 06:20 → 15 Jun 2026 06:20 AEST

Dispatch & revenue

16 May 2026 06:20 → 15 Jun 2026 06:20 AEST

No DUID specified. Open this page from the stats list or a generator profile.

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Wind (onshore)
Capacity
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$0.53/MWh
Capex total (greenfield)

How this was derived
No capital cost figure is stated on the project page.

Reference
Normanville Energy Park - WestWind Energy (medium confidence)
Source recorded 05 Jun 2026

Capex refurbishment
Capex / MW
$2,320,675

Shown in table
$2.32M (2026 real AUD)

Reported / source value
$2.20M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fixed OPEX (annual)
Fixed OPEX / MW-yr
$58,017

Shown in table
$58.0k (2026 real AUD)

Reported / source value
$55.0k (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
No project-specific O&M quote was found; fallback default retained.

Reference
Normanville Energy Park - WestWind Energy (low confidence)
Source recorded 05 Jun 2026

Variable OPEX / MWh
$0.53

Shown in table
$0.53 (2026 real AUD)

Reported / source value
$0.50 (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
No project-specific variable O&M quote was found; fallback default retained.

Reference
Normanville Energy Park - WestWind Energy (low confidence)
Source recorded 05 Jun 2026

Fuel cost / GJ
Heat rate GJ/MWh

Confidence: medium · Status: ai estimated · Capex basis: default · AI checked 05 Jun 2026

Notes
WestWind states Normanville Energy Park is a proposed 122 MW onshore wind project with up to 17 turbines, operational by 2028 and with a 40-year project life in the EPBC referral. No project-specific greenfield capital cost announcement was found in the searched owner/government sources, so capex is left unset rather than inferred from benchmarks. AEMO/Aurecon 2024 onshore wind technical assumptions support the fallback O&M defaults and a 25-year design life; however, no specific onshore wind capex line item was extracted here for Normanville.