Nonowie Wind Farm

Wind · Tilt Renewables Australia Pty Ltd · Wind Turbine - Onshore

Development AEMO: Publicly Announced Wind - Wind NEM data · 24 hours
Registered nameplate capacity — refresh AI for MW/MWh
Est. SRMC
$0.53/MWh
Key information

Capacity not yet researched — use Refresh equipment & project status (AI).

AEMO status Publicly Announced
Project status Development (AI)

Coordinates

DUID
Owner Tilt Renewables Australia Pty Ltd
Commissioned
Expected closure
Closure date
Technology Wind Turbine - Onshore
Fuel Wind - Wind
Turbine OEM
Turbine model
Stats window
14 Jun 2026 13:05 → 15 Jun 2026 13:05 AEST

Dispatch & revenue

14 Jun 2026 13:05 → 15 Jun 2026 13:05 AEST

No DUID specified. Open this page from the stats list or a generator profile.

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Wind (onshore)
Capacity
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$0.53/MWh
Capex total (greenfield)

How this was derived
No project-specific greenfield investment or construction cost announcement located in the searched official owner/government sources.

Capex refurbishment
Capex / MW
$2,320,675

Shown in table
$2.32M (2026 real AUD)

Reported / source value
$2.20M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fixed OPEX (annual)
Fixed OPEX / MW-yr
$58,017

Shown in table
$58.0k (2026 real AUD)

Reported / source value
$55.0k (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Used fallback technology default as no plant-specific O&M source was supplied.

Variable OPEX / MWh
$0.53

Shown in table
$0.53 (2026 real AUD)

Reported / source value
$0.50 (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Used fallback technology default as no plant-specific O&M source was supplied.

Fuel cost / GJ
Heat rate GJ/MWh

Confidence: medium · Status: ai estimated · Capex basis: default · AI checked 06 Jun 2026

Notes
Nonowie Wind Farm is currently a proposed 1,200 MW onshore wind project in development, located about 10 km west of Whyalla, South Australia. No plant-specific greenfield capex figure was found in official owner or government sources, so capex remains unfilled rather than using a benchmark. Fixed and variable O&M, emissions intensity, and asset life are based on internal defaults / technology assumptions for onshore wind. No refurbishment cost identified.