Wind · Woodside Energy Technologies Pty Ltd · Wind Turbine - Onshore
01 Jun 2026 00:00 → 15 Jun 2026 07:55 AEST
| Capex total (greenfield) |
—
|
|---|---|
| Capex refurbishment |
—
|
| Capex / MW |
$2,320,675
Shown in table Reported / source value |
| Fixed OPEX (annual) |
—
|
| Fixed OPEX / MW-yr default |
$55,000
Shown in table |
| Variable OPEX / MWh default |
$0.50
Shown in table |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: low · Status: ai estimated · Capex basis: default · AI checked 04 Jun 2026
Notes
Searches found AEMO/KCI registry entries confirming the project is publicly announced and sized at 750 MW, but no source-backed plant-specific greenfield investment or construction cost announcement for Mt View Wind Farm (KCI) was found in the available search results. Because no verified project cost was located, no capex estimate was assigned. Site appears to be a proposed/announced wind project rather than an operating asset, so operating assumptions remain unverified and were left blank rather than backfilled from generic benchmarks.