Meering Wind Farm

Wind · Virya Energy Pty Ltd · Wind Turbine - Onshore

Development AEMO: Publicly Announced Wind - Wind NEM data · 30 days
Registered nameplate capacity — refresh AI for MW/MWh
Est. SRMC
$13.86/MWh
Key information

Capacity not yet researched — use Refresh equipment & project status (AI).

AEMO status Publicly Announced
Project status Development (AI)

Coordinates

DUID
Owner Virya Energy Pty Ltd
Commissioned
Expected closure
Closure date
Technology Wind Turbine - Onshore
Fuel Wind - Wind
Turbine OEM
Turbine model
Stats window
16 May 2026 07:15 → 15 Jun 2026 07:15 AEST

Dispatch & revenue

16 May 2026 07:15 → 15 Jun 2026 07:15 AEST

No DUID specified. Open this page from the stats list or a generator profile.

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Wind (onshore)
Capacity
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$13.86/MWh
Capex total (greenfield)
Capex refurbishment
Capex / MW
$2,320,675

Shown in table
$2.32M (2026 real AUD)

Reported / source value
$2.20M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fixed OPEX (annual)
Fixed OPEX / MW-yr
$216,068

Shown in table
$216.1k (2026 real AUD)

Reported / source value
$204.8k (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Variable OPEX / MWh
$13.86

Shown in table
$13.86 (2026 real AUD)

Reported / source value
$13.14 (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fuel cost / GJ
Heat rate GJ/MWh

Confidence: medium · Status: ai estimated · Capex basis: default · AI checked 06 Jun 2026

Notes
No plant-specific greenfield capital cost was found in official owner, government, or major project sources during search. The project appears to be a planned Meering West Wind Farm development by Virya Energy, with around 1.5 GW capacity and 1,000 MWh storage, but the searched materials did not disclose a total project investment figure. O&M and technical life defaults were therefore taken from AEMO/Aurecon wind benchmark parameters for onshore wind; the AEMO cost review indicates 30–35 year technical life and 20–25 year economic design life for onshore wind, and the fixed/variable O&M values cited are from the 2023 Cost and Technical Parameters Review (used as the best available benchmark).

Sources