14 Jun 2026 05:30 → 15 Jun 2026 05:30 AEST
| Capex total (greenfield) |
—
|
|---|---|
| Capex refurbishment |
—
|
| Capex / MW |
$2,320,675
Shown in table Reported / source value |
| Fixed OPEX (annual) |
—
|
| Fixed OPEX / MW-yr |
$216,068
Shown in table Reported / source value |
| Variable OPEX / MWh |
$13.86
Shown in table Reported / source value |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: medium · Status: ai estimated · Capex basis: default · AI checked 06 Jun 2026
Notes
No plant-specific greenfield capital cost was found in official owner, government, or major project sources during search. The project appears to be a planned Meering West Wind Farm development by Virya Energy, with around 1.5 GW capacity and 1,000 MWh storage, but the searched materials did not disclose a total project investment figure. O&M and technical life defaults were therefore taken from AEMO/Aurecon wind benchmark parameters for onshore wind; the AEMO cost review indicates 30–35 year technical life and 20–25 year economic design life for onshore wind, and the fixed/variable O&M values cited are from the 2023 Cost and Technical Parameters Review (used as the best available benchmark).