Wind · Kut-Wut Brataualung Pty Ltd as trustee for the Kut-Wut Brataualung Trust · Wind Turbine - Offshore
17 May 2026 23:35 → 16 Jun 2026 23:35 AEST
| Capex total (greenfield) |
—
How this was derived Reference |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW |
$4,746,835
Shown in table Reported / source value |
| Fixed OPEX (annual) |
—
|
| Fixed OPEX / MW-yr |
$184,149
Shown in table Reported / source value How this was derived Reference |
| Variable OPEX / MWh default |
$0.80
Shown in table |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: medium · Status: ai estimated · Capex basis: default · AI checked 06 Jun 2026
Notes
No plant-specific greenfield capex announcement was found for Kut-Wut Brataualung. AEMO/Aurecon 2024 offshore wind benchmark for a hypothetical fixed-foundation project was used for O&M only as fallback; capex was not applied because the project is floating/offshore early-stage and no owner-reported total investment figure was located. Offshore wind O&M benchmark is site-specific and highly variable; fixed O&M shown is the AEMO/Aurecon fixed-foundation reference value, not a project-reported figure.