Kut Wut Brataualung

Wind · Kut-Wut Brataualung Pty Ltd as trustee for the Kut-Wut Brataualung Trust · Wind Turbine - Offshore

Development AEMO: Publicly Announced Wind - Wind NEM data · 24 hours
Registered nameplate capacity — refresh AI for MW/MWh
Est. SRMC
$0.80/MWh
Key information

Capacity not yet researched — use Refresh equipment & project status (AI).

AEMO status Publicly Announced
Project status Development (AI)

Coordinates

DUID
Owner Kut-Wut Brataualung Pty Ltd as trustee for the Kut-Wut Brataualung Trust
Commissioned Dec 2035
Expected closure
Closure date
Technology Wind Turbine - Offshore
Fuel Wind - Wind
Turbine OEM
Turbine model
Stats window
15 Jun 2026 23:35 → 16 Jun 2026 23:35 AEST

Dispatch & revenue

15 Jun 2026 23:35 → 16 Jun 2026 23:35 AEST

No DUID specified. Open this page from the stats list or a generator profile.

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Wind (offshore)
Capacity
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$0.80/MWh
Capex total (greenfield)

How this was derived
ICN project profile does not state capex.

Reference
Gateway by ICN - Project details (high confidence)
Source recorded 06 Jun 2026

Capex refurbishment
Capex / MW
$4,746,835

Shown in table
$4.75M (2026 real AUD)

Reported / source value
$4.50M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fixed OPEX (annual)
Fixed OPEX / MW-yr
$184,149

Shown in table
$184.1k (2026 real AUD)

Reported / source value
$174.6k (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Used as fallback O&M benchmark because project-specific O&M not found.

Reference
2024 Energy Technology Cost and Technical Parameter Review (high confidence)
Source recorded 06 Jun 2026

Variable OPEX / MWh default
$0.80

Shown in table
$0.80 (2026 real AUD)

Fuel cost / GJ
Heat rate GJ/MWh

Confidence: medium · Status: ai estimated · Capex basis: default · AI checked 06 Jun 2026

Notes
No plant-specific greenfield capex announcement was found for Kut-Wut Brataualung. AEMO/Aurecon 2024 offshore wind benchmark for a hypothetical fixed-foundation project was used for O&M only as fallback; capex was not applied because the project is floating/offshore early-stage and no owner-reported total investment figure was located. Offshore wind O&M benchmark is site-specific and highly variable; fixed O&M shown is the AEMO/Aurecon fixed-foundation reference value, not a project-reported figure.