Wind · FERA Australia Pty Ltd · Wind Turbine - Onshore
14 Jun 2026 04:00 → 15 Jun 2026 04:00 AEST
| Capex total (greenfield) |
—
|
|---|---|
| Capex refurbishment |
—
|
| Capex / MW |
$2,320,675
Shown in table Reported / source value |
| Fixed OPEX (annual) |
—
|
| Fixed OPEX / MW-yr |
$58,017
Shown in table Reported / source value |
| Variable OPEX / MWh |
$0.53
Shown in table Reported / source value |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: low · Status: ai estimated · Capex basis: default · AI checked 09 Jun 2026
Notes
No plant-specific capital cost found in the provided search results. FERA Australia’s project page describes Koyuga Nanneella as a potential project with 20-25 turbines across two sites, and media reports describe FERA planning a wind project in the Nanneella-Koyuga district with up to 25 turbines. A separate article mentions a 600 MW project in Strathbogie Shire expected in 2026, but this appears to be a different project and was not used for capex. Default wind-onshore benchmark assumptions used.