Koorakee Wind Farm

Wind · Squadron Energy Services Pty Ltd · Wind Turbine - Onshore

Development AEMO: Publicly Announced Wind - Wind NEM data · 7 days
Registered nameplate capacity — refresh AI for MW/MWh
Est. SRMC
$0.00/MWh
Key information

Capacity not yet researched — use Refresh equipment & project status (AI).

AEMO status Publicly Announced
Project status Development (AI)

Coordinates

DUID
Owner Squadron Energy Services Pty Ltd
Commissioned
Expected closure
Closure date
Technology Wind Turbine - Onshore
Fuel Wind - Wind
Turbine OEM
Turbine model
Stats window
08 Jun 2026 01:55 → 15 Jun 2026 01:55 AEST

Dispatch & revenue

08 Jun 2026 01:55 → 15 Jun 2026 01:55 AEST

No DUID specified. Open this page from the stats list or a generator profile.

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Wind (onshore)
Capacity
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$0.00/MWh
Capex total (greenfield)
Capex refurbishment
Capex / MW
$2,320,675

Shown in table
$2.32M (2026 real AUD)

Reported / source value
$2.20M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fixed OPEX (annual)
$29.54M

Shown in table
$29.54M (2026 real AUD)

Reported / source value
$28.00M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fixed OPEX / MW-yr
$29,536

Shown in table
$29.5k (2026 real AUD)

Reported / source value
$28.0k (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Variable OPEX / MWh
$0.00

Shown in table
$0.00 (2026 real AUD)

Reported / source value
$0.00 (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fuel cost / GJ
Heat rate GJ/MWh

Confidence: medium · Status: ai estimated · Capex basis: default · AI checked 09 Jun 2026

Notes
No plant-specific greenfield capex figure was found for Koorakee Wind Farm / Koorakee Energy Park in the owner or government sources searched. The NSW planning documents identify Koorakee Energy Park as a proposed 2 GW precinct including up to 1 GW of wind, 1 GW of solar, and a 1 GW/12 GWh BESS, but do not publish a project capital cost. Given the user-supplied DUID/site is for the wind component and no standalone investment announcement was located, capex is left null rather than inferred from the mixed-technology precinct. OPEX and asset-life assumptions are benchmarked from the 2024 AEMO/Aurecon onshore wind review.

Sources