Wind · Squadron Energy Services Pty Ltd · Wind Turbine - Onshore
14 Jun 2026 03:35 → 15 Jun 2026 03:35 AEST
| Capex total (greenfield) |
—
|
|---|---|
| Capex refurbishment |
—
|
| Capex / MW |
$2,320,675
Shown in table Reported / source value |
| Fixed OPEX (annual) |
$29.54M
Shown in table Reported / source value |
| Fixed OPEX / MW-yr |
$29,536
Shown in table Reported / source value |
| Variable OPEX / MWh |
$0.00
Shown in table Reported / source value |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: medium · Status: ai estimated · Capex basis: default · AI checked 09 Jun 2026
Notes
No plant-specific greenfield capex figure was found for Koorakee Wind Farm / Koorakee Energy Park in the owner or government sources searched. The NSW planning documents identify Koorakee Energy Park as a proposed 2 GW precinct including up to 1 GW of wind, 1 GW of solar, and a 1 GW/12 GWh BESS, but do not publish a project capital cost. Given the user-supplied DUID/site is for the wind component and no standalone investment announcement was located, capex is left null rather than inferred from the mixed-technology precinct. OPEX and asset-life assumptions are benchmarked from the 2024 AEMO/Aurecon onshore wind review.