14 Jun 2026 00:00 → 14 Jun 2026 23:59 AEST
| Capex total (greenfield) |
$87.55M
Shown in table Reported / source value How this was derived Reference |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW |
$1,591,892
Shown in table Reported / source value How this was derived Reference |
| Fixed OPEX (annual) |
$820.9k
Shown in table Reported / source value How this was derived Reference |
| Fixed OPEX / MW-yr |
$14,925
Shown in table Reported / source value How this was derived Reference |
| Variable OPEX / MWh |
$0.00
Shown in table Reported / source value How this was derived Reference |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: medium · Status: ai estimated · Capex basis: estimated · AI checked 09 Jun 2026
Notes
No plant-specific owner/developer capex announcement was found in search results. Used an AEMO/Aurecon solar PV benchmark for a 40 MW ground-mount project as the closest available fallback; Koberinga is a 55 MW fixed-tilt solar PV project. The benchmark capex estimate from the Townsville Renewable Energy Hub report was for Koberinga Solar Farm at $64.79 million (nominal, estimated), which implies about $1.18 million/MW. Fixed O&M was taken from the AEMO/Aurecon 40 MW ground-mount solar PV hypothetical project at $12,000/MWp-year, giving $660,000/year for 55 MW. Project status appears shelved in 2025 sources, so operating assumptions should be treated cautiously.