Kings Plain Wind Farm

Wind · Enerfin Energy Services Pty Ltd. · Wind Turbine - Onshore

Development AEMO: Publicly Announced Wind - Wind NEM data · 24 hours
Registered nameplate capacity — refresh AI for MW/MWh
Est. SRMC
$0.53/MWh
Key information

Capacity not yet researched — use Refresh equipment & project status (AI).

AEMO status Publicly Announced
Project status Development (AI)

Coordinates

DUID
Owner Enerfin Energy Services Pty Ltd.
Commissioned
Expected closure
Closure date
Technology Wind Turbine - Onshore
Fuel Wind - Wind
Turbine OEM
Turbine model
Stats window
14 Jun 2026 00:00 → 14 Jun 2026 23:59 AEST

Dispatch & revenue

14 Jun 2026 00:00 → 14 Jun 2026 23:59 AEST

No DUID specified. Open this page from the stats list or a generator profile.

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Wind (onshore)
Capacity
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$0.53/MWh
Capex total (greenfield)
$928.27M

Shown in table
$928.27M (2026 real AUD)

Reported / source value
$880.00M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Used only as fallback because no plant-specific capex announcement was found.

Reference
2024 Energy Technology Cost and Technical Parameter Review (medium confidence)
Source recorded 09 Jun 2026

Capex refurbishment
Capex / MW
$2,320,675

Shown in table
$2.32M (2026 real AUD)

Reported / source value
$2.20M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Server-side fallback used because project-specific capex was not found.

Reference
2024 Energy Technology Cost and Technical Parameter Review (medium confidence)
Source recorded 09 Jun 2026

Fixed OPEX (annual)
$23.21M

Shown in table
$23.21M (2026 real AUD)

Reported / source value
$22.00M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Calculated from fallback fixed O&M per MW-year and assumed capacity.

Reference
2024 Energy Technology Cost and Technical Parameter Review (medium confidence)
Source recorded 09 Jun 2026

Fixed OPEX / MW-yr
$58,017

Shown in table
$58.0k (2026 real AUD)

Reported / source value
$55.0k (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Server-side fallback used because plant-specific fixed O&M was not found.

Reference
2024 Energy Technology Cost and Technical Parameter Review (medium confidence)
Source recorded 09 Jun 2026

Variable OPEX / MWh
$0.53

Shown in table
$0.53 (2026 real AUD)

Reported / source value
$0.50 (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Server default used; no plant-specific source located.

Fuel cost / GJ
Heat rate GJ/MWh

Confidence: low · Status: ai estimated · Capex basis: estimated · AI checked 09 Jun 2026

Notes
No plant-specific greenfield capex announcement was found in the searched sources. The project appears as a publicly announced 400 MW wind project in NSW, but available sources did not provide a project investment figure. AEMO/CSIRO benchmark-based fallback values were therefore used for capex and O&M. The project is not yet shown as built in the searched sources.

Sources