BESS · Lyon Solar · Storage - Battery
14 Jun 2026 00:15 → 15 Jun 2026 00:15 AEST
| Capex total (greenfield) |
—
|
|---|---|
| Capex refurbishment |
—
|
| Capex / MWh storage |
$369,198
Shown in table Reported / source value |
| Fixed OPEX (annual) |
—
|
| Fixed OPEX / MW-yr |
$5,696
Shown in table Reported / source value |
| Variable OPEX / MWh |
$0.00
Shown in table Reported / source value |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: medium · Status: ai estimated · Capex basis: default · AI checked 09 Jun 2026
Notes
No plant-specific greenfield capex announcement for Kingfisher Solar Storage - Storage was found in searched official/developer sources. The best available project-specific source indicates Lyon proposed Kingfisher as a 100 MW/200 MWh battery paired with solar, but no construction cost was located. Therefore capex remains unfilled and should be sourced from a more specific owner/developer announcement if available. O&M fallback uses Aurecon/AEMO 2024 large-scale BESS fixed O&M of AUD 5,400/MW-year for 1-hour systems; for this record only the base per-MW-year value is retained. Battery storage does not use heat rate or fuel cost.