| Capex total (greenfield) |
$1,351.35M
Shown in table Reported / source value How this was derived Reference |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW |
$11,261,261
Shown in table Reported / source value |
| Fixed OPEX (annual) |
—
|
| Fixed OPEX / MW-yr |
$27,027
Shown in table Reported / source value |
| Variable OPEX / MWh |
$0.34
Shown in table Reported / source value |
| Fuel cost / GJ |
$0.00
Shown in table Reported / source value |
| Heat rate GJ/MWh |
—
|
Confidence: medium · Status: ai estimated · Capex basis: reported · AI checked 09 Jun 2026
Notes
No owner/developer or government source with a plant-specific capex figure for this exact DUID was found in the searches. The $1bn figure is a widely cited public project announcement for the Kingfisher solar and battery project, which appears to cover the broader precinct rather than the solar-only unit; therefore capex should be treated as approximate and may not map exactly to this DUID. AEMO materials indicate Kingfisher Solar Storage as a 100 MW solar / 400 MWh battery project in South Australia, while older references also show a 17 MW solar proposal and earlier 120 MW solar / 100 MW battery concept. The solar-only registered capacity for this unit was not located in authoritative sources, so capex_per_mw is calculated using the 120 MW solar concept from legacy project references as a rough proxy, not as a verified unit-specific capacity.