Kingfisher Solar Storage - Solar

Solar · Lyon Solar · Solar PV - Single axis tracking

Development AEMO: Publicly Announced Solar - Solar NEM data · 24 hours
Registered nameplate capacity — refresh AI for MW/MWh
Est. SRMC
$0.34/MWh
Key information

Capacity not yet researched — use Refresh equipment & project status (AI).

AEMO status Publicly Announced
Project status Development (AI)

Coordinates

DUID
Owner Lyon Solar
Commissioned
Expected closure
Closure date
Technology Solar PV - Single axis tracking
Fuel Solar - Solar
Module OEM
Module / inverter supplier
Inverter OEM
Inverter model
Stats window
14 Jun 2026 08:25 → 15 Jun 2026 08:25 AEST

Dispatch & revenue

14 Jun 2026 08:25 → 15 Jun 2026 08:25 AEST

No DUID specified. Open this page from the stats list or a generator profile.

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Solar (tracking)
Capacity
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$0.34/MWh
Capex total (greenfield)
$1,351.35M

Shown in table
$1,351.35M (2026 real AUD)

Reported / source value
$1,000.00M (2017 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Publicly announced project cost for the wider Kingfisher solar+battery development.

Reference
Lyon Group to develop $1bn solar and battery storage project in Australia (medium confidence)
Source recorded 09 Jun 2026

Capex refurbishment
Capex / MW
$11,261,261

Shown in table
$11.26M (2026 real AUD)

Reported / source value
$8.33M (2017 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fixed OPEX (annual)
Fixed OPEX / MW-yr
$27,027

Shown in table
$27.0k (2026 real AUD)

Reported / source value
$20.0k (2017 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Variable OPEX / MWh
$0.34

Shown in table
$0.34 (2026 real AUD)

Reported / source value
$0.25 (2017 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fuel cost / GJ
$0.00

Shown in table
$0.00 (2026 real AUD)

Reported / source value
$0.00 (2017 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Heat rate GJ/MWh

Confidence: medium · Status: ai estimated · Capex basis: reported · AI checked 09 Jun 2026

Notes
No owner/developer or government source with a plant-specific capex figure for this exact DUID was found in the searches. The $1bn figure is a widely cited public project announcement for the Kingfisher solar and battery project, which appears to cover the broader precinct rather than the solar-only unit; therefore capex should be treated as approximate and may not map exactly to this DUID. AEMO materials indicate Kingfisher Solar Storage as a 100 MW solar / 400 MWh battery project in South Australia, while older references also show a 17 MW solar proposal and earlier 120 MW solar / 100 MW battery concept. The solar-only registered capacity for this unit was not located in authoritative sources, so capex_per_mw is calculated using the 120 MW solar concept from legacy project references as a rough proxy, not as a verified unit-specific capacity.

Sources