Solar · Genex Power Limited · Solar PV - Fixed
01 Jun 2026 00:00 → 15 Jun 2026 00:45 AEST
| Capex total (greenfield) |
—
|
|---|---|
| Capex refurbishment |
—
|
| Capex / MW |
$1,160,338
Shown in table Reported / source value |
| Fixed OPEX (annual) |
—
|
| Fixed OPEX / MW-yr default |
$18,000
Shown in table |
| Variable OPEX / MWh |
$0.00
Shown in table Reported / source value |
| Fuel cost / GJ |
$0.00
Shown in table Reported / source value |
| Heat rate GJ/MWh |
—
|
Confidence: low · Status: ai estimated · Capex basis: default · AI checked 09 Jun 2026
Notes
No reliable plant-specific greenfield capex announcement for Kidston Solar Project Phase Two 270MW was found in the available search results. The only clearly quantified Genex Kidston cost found related to the separate 250MW pumped hydro project (total development cost $775M), which must not be used for this solar project. AEMO/CSIRO solar PV references were identified for technology characteristics only; capex was not inferred from benchmarks because the prompt prioritises project-specific cost announcements and no such value was located.