Kerang Hybrid

Solar · Kerang Power Pty Ltd · Solar PV - Single axis tracking

Development AEMO: Publicly Announced Solar - Solar NEM data · 24 hours
Registered nameplate capacity — refresh AI for MW/MWh
Est. SRMC
$0.26/MWh
Key information

Capacity not yet researched — use Refresh equipment & project status (AI).

AEMO status Publicly Announced
Project status Development (AI)

Coordinates

DUID
Owner Kerang Power Pty Ltd
Commissioned Dec 2027
Expected closure 2056
Closure date
Technology Solar PV - Single axis tracking
Fuel Solar - Solar
Module OEM
Module / inverter supplier
Inverter OEM
Inverter model
Stats window
13 Jun 2026 22:50 → 14 Jun 2026 22:50 AEST

Dispatch & revenue

13 Jun 2026 22:50 → 14 Jun 2026 22:50 AEST

No DUID specified. Open this page from the stats list or a generator profile.

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Solar (tracking)
Capacity
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$0.26/MWh
Capex total (greenfield)
$239.19M

Shown in table
$239.19M (2026 real AUD)

Reported / source value
$233.45M (2025 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Calculated benchmark capex total for the solar component only.

Reference
2024 Energy Technology Cost and Technical Parameter Review Report - Solar (medium confidence)
Source recorded 09 Jun 2026

Capex refurbishment
Capex / MW
$1,485,656

Shown in table
$1.49M (2026 real AUD)

Reported / source value
$1.45M (2025 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Benchmark capex used because no plant-specific investment figure was found.

Reference
2024 Energy Technology Cost and Technical Parameter Review Report - Solar (high confidence)
Source recorded 09 Jun 2026

Fixed OPEX (annual)
$1.98M

Shown in table
$1.98M (2026 real AUD)

Reported / source value
$1.93M (2025 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fixed OPEX / MW-yr
$12,295

Shown in table
$12.3k (2026 real AUD)

Reported / source value
$12.0k (2025 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Benchmark fixed O&M per MW-year used for the solar component.

Reference
2024 Energy Technology Cost and Technical Parameter Review Report - Solar (high confidence)
Source recorded 09 Jun 2026

Variable OPEX / MWh
$0.26

Shown in table
$0.26 (2026 real AUD)

Reported / source value
$0.25 (2025 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
No plant-specific variable O&M source was found; retained internal fallback.

Fuel cost / GJ
Heat rate GJ/MWh

Confidence: medium · Status: ai estimated · Capex basis: estimated · AI checked 09 Jun 2026

Notes
No plant-specific greenfield investment announcement for Kerang Hybrid was found in the searched owner/government sources. Capex and O&M therefore use AEMO/Aurecon benchmark assumptions for a utility-scale solar PV ground-mount project, applied to the 161 MW DC solar component. The project page states Kerang Hybrid is a proposed 161 MW DC solar farm with a 55 MW/110 MWh battery and construction targeted to commence in late 2025; the benchmark source indicates single-axis tracking systems have higher capital and maintenance requirements than fixed-tilt systems. The calculated capex_per_mw_aud is based on the benchmark relative cost of $1.45/W DC for the 20 MW ground-mount solar PV case, and fixed OPEX is set at $12,000/MW-yr from the same benchmark table.