14 Jun 2026 03:50 → 15 Jun 2026 03:50 AEST
| Capex total (greenfield) |
$145.97M
Shown in table Reported / source value How this was derived Reference |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW |
$2,919,346
Shown in table Reported / source value How this was derived Reference |
| Fixed OPEX (annual) |
$1.24M
Shown in table Reported / source value How this was derived |
| Fixed OPEX / MW-yr |
$24,862
Shown in table Reported / source value How this was derived |
| Variable OPEX / MWh |
$0.28
Shown in table Reported / source value How this was derived |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: medium · Status: ai estimated · Capex basis: reported · AI checked 09 Jun 2026
Notes
Project-specific capex evidence found in a Queensland parliamentary research brief listing Kelsey Creek Solar Farm at 50 MW and Investment $105,680,317. The owner/developer name in the prompt (tetrisenergy_nr) could not be independently verified from the searched sources, and no higher-confidence owner press release or financial close announcement was located. Capacity used for capex-per-MW calculation assumes 50 MW from the same source. Fixed OPEX uses the provided server-side fallback because no plant-specific O&M source was located.